SlideShare a Scribd company logo
1 of 7
Download to read offline
1 | P a g e
KINGSLY NOVA
AROKIYAM
Curriculum Vitae
PIPING ENGINEER /
PROJECT ENGINEER
(MECHANICAL ENGINEER)
Email:
kingslynova@hotmail.com
Contact Numbers:
+971-52-5080745
Please scan to capture contact details
2 | P a g e
KINGSLY NOVA AROKIYAM
Email: kingslynova@hotmail.com  Mob: +91-8973131259, +971525080745
PIPING ENGINEER | PROJECT ENGINEER
OBJECTIVE
An eagerness to learn and work professionally with a high degree of dedication and involvement in achieving the aims
and goods of the establishment.
EDUCATION
Amity University, Dubai Jan2014
MBA - Working professional (Operations)
Karunya University, Coimbatore -India
May 2011
B.tech in Mechanical engineering
 Project: 60days Project at Ashok Leyland – Hosur (India).
PROFILE SUMMARY
 Mechanical Engineering with nearly 5+ years of experience in:
Piping Engineering Project Management Vendor Development
Piping Materials Liaison & Coordination Process
Improvement
 Presently associated with MKG Contracting LLC, , Abu Dhabi, UAE as Project Engineer - Mechanical
 Skilled in construction of piping and tank
 Deftness in handling overall project including planning, Man power estimation, scheduling, preparation of
blueprints and execution of projects for installation, commissioning & erection assignments
 An effective communicator with good decision making, interpersonal & organizational abilities.
 Good knowledge on pressure vessels and tanks as per the ASME & API standards.
CORE COMPETENCIES
 Interaction with Client and coordination of activities according to client requirement.
 Control and Coordination of Subcontractor and Supplier activities.
 Checking & issuing piping fabrication drawings with support details; checking piping drawings developed by
site drafting personnel for effective operations
 Periodically reviewing & monitoring progress of project for ensuring completion within scheduled time and
cost parameters
 Implementing hand marked-up changes to drawings and maintaining standard drawing templates
 Ensuring comprehensive and cost effective inspection of all static equipment for ensuring plant integrity &
reliability
PROFESSIONAL EXPERIENCE
MKG Contracting LLC, , Abu Dhabi, UAE Sept 2016 – Till Now
Project engineer.
 Responsible in pipeline project planning, screening of pipeline project opportunities, route selection, third party
and environmental impact studies, feasibility assessments and concept selections, and front-end design.
 Review of Project specification and P&ID s.
 Communicating with project manager to report on project status.
 Planning day to day program, manpower, over all time duration to complete job.
 Undertaking technical and constructability studies.
 Submission of Four weak look ahead
 Billing.-Invoice, Abstract, Measurement, Etc… (Departmental/Contractor)
3 | P a g e
 Interacting between client and plant engineering division.
 Internal inspection and arranging walk through to develop Quality & HSE requirements.
 Read and interrupt the details of Drawings & prepare BOQ.
 Focusing on projects plan towards 1 month ahead.
 Preparation of daily and Monthly progress reports.
 Read and interrupt the details of drawing create isometric drawings by Hand sketch or using AUTOCAD
Software.
 Preparing Proposal for Constructability drawings as per to site condition.
 Ensure all the works will be carry out by HSE & quality standards.
 Submission of Method statement, JSA, Material Submittals, Execution plan, HIP & all construction documents.
 Continuous follow up with procurement to get the all materials within the time schedule.
 Continuous Follow up &Monitoring of activities to complete within schedule.
 Managing, supervising and monitoring the subcontractors/subordinates to complete the work within schedule.
 Managing Budget, equipment and Manpower resources.
 Advance planning, scheduling and delivering the project resources by discussing with project team.
 Coordinating with Civil, Electrical and other discipline engineers in order to smooth function and to meet the
technical requirements.
 Ensuring HSE, quality & delivering the structures with in time.
 Planning & preparing necessary arrangements for heavy equipment erections.
 Optimum utilization of Man power & equipment’s.
 Handling all piping technical queries and investigating all field pipe work related problems, including the drawing
of field sketches when necessary.
 Raising MTO(s) for all materials required to additional materials for hydro test etc.
Responsible for Piping erection operations and pipe support installation in accordance with schedule,
Procedures, Specifications, Priorities and Availability of Construction Drawings
 Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings
and standard requirements
 Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location,
orientation, alignment and plumpness.
 Keeping in close contact with key project members and decision makers.
 Technical Bid evaluation and selection of suppliers
 Preparation of “AS BUILT” drawings.
 Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics
Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling
commissioning and Pre-Commissioning requirements for the project.
 Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages
before signing the completion of piping / mechanical.
 Ensure that hydro test reinstatement is to be done as per procedure.
 Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no
prolongation of project.
Employer : MKG Contracting LLC, , Abu Dhabi, UAE .
Current Project : EPC of Union Chlorine plant, ICAD, Abu Dhabi, UAE
Project at : ICAD Abu Dhabi
Project Value : 10 million AED
Position : Project engineer
Duration : From September, 2016 to Present
Essar Projects Saudi Company, Al Khobar, Dammam, Saudi Arabia Dec 2015 – Sept 2016
Piping engineer.
 Responsible in pipeline project planning, screening of pipeline project opportunities, route selection, third party
and environmental impact studies, feasibility assessments and concept selections, and front-end design.
 Review of Project specification and P&ID s.
 Communicating with project manager to report on project status.
 Planning day to day program, manpower, over all time duration to complete job.
 Undertaking technical and constructability studies.
 Submission of Four weak look ahead
 Billing.-Invoice, Abstract, Measurement, Etc… (Departmental/Contractor)
4 | P a g e
 Interacting between client and plant engineering division.
 Internal inspection and arranging walk through to develop Quality & HSE requirements.
 Read and interrupt the details of Drawings & prepare BOQ.
 Focusing on projects plan towards 1 month ahead.
 Preparation of daily and Monthly progress reports.
 Read and interrupt the details of drawing create isometric drawings by Hand sketch or using AUTOCAD
Software.
 Read and interrupt the details of Drawings, discussion with Engineering, SAPMT, Proponent, LPD and operations.
 Conducting Constructability review with 30%, 60% & 90% drawing.
 Preparing Proposal for Constructability drawings as per to site condition.
 Ensure all the works will be carry out by HSE & quality standards.
 Submission of Method statement, JSA, Material Submittals, Execution plan, HIP & all construction documents.
 Continuous follow up with procurement to get the all materials within the time schedule.
 Continuous Follow up &Monitoring of activities to complete within schedule.
 Managing, supervising and monitoring the subcontractors/subordinates to complete the work within schedule.
 Managing Budget, equipment and Manpower resources.
 Advance planning, scheduling and delivering the project resources by discussing with project team.
 Coordinating with Civil, Electrical and other discipline engineers in order to smooth function and to meet the
technical requirements.
 Ensuring HSE, quality & delivering the structures with in time.
 Planning & preparing necessary arrangements for heavy equipment erections.
 Optimum utilization of Man power & equipment’s.
 Handling all piping technical queries and investigating all field pipe work related problems, including the drawing
of field sketches when necessary.
 Raising MTO(s) for all materials required to additional materials for hydro test etc.
Responsible for Piping erection operations and pipe support installation in accordance with schedule,
Procedures, Specifications, Priorities and Availability of Construction Drawings
 Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings
and standard requirements
 Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location,
orientation, alignment and plumpness.
 Keeping in close contact with key project members and decision makers.
 Technical Bid evaluation and selection of suppliers
 Preparation of “AS BUILT” drawings.
 Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics
Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling
commissioning and Pre-Commissioning requirements for the project.
 Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages
before signing the completion of piping / mechanical.
 Ensure that hydro test reinstatement is to be done as per procedure.
 Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no
prolongation of project.
Employer : ESSAR PROJECTS SAUDI COMPANY.
Current Project : EPC of Shaybah Crude Stabilization Project at Abqaiq Plant (SAUDI ARAMCO PROJECT)
Project at : Saudi Aramco (KSA)
Project Value : 55 million USD
Position : Piping engineer
Duration : From November, 2015 to Present
Project Summary:
 New AXL Storage Tank.
 New AXL 2nd Stage Shipper Pump / Modification in existing shipper pumps discharge lines.
 Modification in 110-C-9 Inlet / Outlet Lines.
 Modification in existing spheroids (T-900/901/902) Lines.
 Installation/ Replacement of existing Bottom Pumps.
 Piping Tie-In. (92No’s)
 Existing Facilities Demolition Works.
5 | P a g e
 New construction of Concrete Dyke Wall
 Access Ramp, Road and Drain works
 Steel Structure works (Access walkway, cross overs, Firefighting &Valve operating platforms).
 Fire proofing works
 Electrical, Instrumentation and Loss preventions work.
Capital engineering consultancy. Sharjah/Dubai- UAE March 2014 – December 2015
Piping engineer / Project engineer.
 Actively involved in contract review with the clients / consultants thereby resolving Technical queries.
 Performed engineering calculations as and where required to verify applicable code requirements. Reviewed
 Communicating with project manager to report on project status.
 Accountable for the interpretation of technical requirements (Design Basis) given by Client / PMC, PFD, material
and energy balance, equipment specifications, standard specifications of the project for further development of
P&IDs and equipment datasheets
 Resolving any financial queries that are raised.
 Leading and organizing a team with a project requirement and fulfilling the client requirement.
 Reviewed engineering drawings, data sheets and welding procedure & specifications
 Expedited procurement and supervised fabrication in line with designs
 Performed modification of tender documents & scope review
 Scheduled all aspects of the project as per MIS and procedures & expectations set for project quality
 Prepared and reviewed manpower forecast, materials, tools, supplies & supported service and initiated action to
insure stocks are maintained at minimum adequate levels in coordination with respective Division Managers
 Ensured that the project achieves its objectives in respect of HSE, quality, cost and schedule
 Established performance & delivery criteria and ensured that client & organizational requirements were met
 Assisted the contractors project team for planning and controlled the execution of technical functions of the
project
 Coordinated with vendors / subcontractors for procurement of engineered items
 Ensured field documents like IFC drawings and shop drawings were updated to reflect client approved drawing
revisions
 Reviewed and ensured compilation of technical documents for bid preparation & submission to client
 Interfaced with internal departments like procurement, production, planning & QC
 Worked with Project Manager for daily administration of the project report, including client coordination,
correspondence and meeting’s minutes, progress & presentation
 Oversaw material engineering which included preparation of purchase specifications, purchase requisitions,
technical bid analysis, vendor document / drawing evaluation after order
List of some of the projects handled by me successfully.
 Al Zahara petrochemical LLC , sharjah, UAE
Coordinated and worked with contractors on construction and design phase for erecting the Storage tanks,
pipelines and distillation plant structure – Diesel and base oil Distillation plant.
 ATS TERMINAL FZE , HFZ - Sharjah, UAE
Storage tanks and pipelines – Oil Storage plant.
 ADGAS , Abu dhabi, UAE
Storage tanks, pipelines and structural – LNG and LPG plant.
 Gulf oil tanking FZE, Dubai, UAE
 Worked with contractors on detailed engineering and construction phase for Addition of pipelines for
the existing base oil storage tanks TK-105 and TK-106 – Oil storage plant
 Emirates steel, Abu dhabi, UAE
 Installation of new PHEs and Modification of Piping Connected to PHEs of Amine Circuits in Emirates
Iron &Steel Co at Phase-2.
 Installation and execution for modification of pumping circuits and piping related to the installation of
new direct and indirect cooling towers in the emirates iron and steel Co at Phase-1.
 ARZOO TERMINAL FZE, HFZ – Sharjah, UAE
Storage tanks and pipeline design – Oil storage plant.
 MAG Lubricants, Techno Park – Jebel Ali, Dubai, UAE
 Proposed Installation and erection of 6 Nos. storage tanks, additive tanks, pipelines and structural –
Base Oil storage plant
 Etihad Petrochemical Industries F.Z.C, HFZ – Sharjah, UAE
Handled the construction activity with contractors and Engineering coordination for proposed Oil Terminal plant
with pack tower, blending and storage tanks on plot no:-HD-18 at Phase-1, HFZA, Sharjah,
6 | P a g e
 Montgomerie golf course, Emirates hills – Dubai, UAE
Handled the construction activity with contractors for proposed pump station with vertical multistage pump,
filters, chemical storage tanks and pipeline design for main irrigation network of 1.2 km.
Equipment Fabricators Pvt. Ltd., Bangalore- India July 2013– February2014
Project engineer / piping engineer
 Interpretation of drawings, checking of fabricated materials, solving site related technical issues.
 Maintain record of DRGS in scope, upcoming & release to contractors & also maintain the DPR, BOM.
Reviewing the Fabrication drawings for food, pharma, dairy and biochemical industry i.e. pressure vessels,
reactors, fermenters& heat exchangers as per the code of international standards and company standards.
 Doing BOM for the pressure vessels and piping.
 Make work distribution for CNC machine for cutting drilling and plate cutting etc.
 Planning & reviewing of drawing, Co-ordination with material department to arrange the required material as
per drawings,
 Co-ordination with sub-contractors, QC, QMD department & end of dispatch with co-ordination of erection
engineers.
 Planning and day to day execution of vessel fabrication and piping fabrication,
 Drawing review, preparing mobilization plan and other related jobs.
 Checking & Issue of Isometrics (P&ID Check, Line Routing, Support Check, Special requirement check etc...)
 Preparation of Material Requisitions & datasheets of all Piping Items, Valves and other piping special items like
Strainer, Steam Traps etc.
 Review of isometrics and support and support detailing for the same.
 Preparation of PMS & stress analysis methodologies
 Performing pipe stress analysis (static) analysis for the process cell piping and outside cell piping including the
waste tank farm and the off gas systems
 Reviewing Equipment Vendor Gad’s and finalizing Nozzle orientations as per L/O feasibility and Design basis.
 Checking of Isometrics along with BOM in correlation with P&ID end connectivity and validity as per PMS and
line list.
 Interference checking of piping with other equipment, structures & piping
 Review of 3D models.
 Site visit to collect existing facilities information for revamping activities, identifying Tie-In Locations as per P&ID,
mark up drawings and preparation of Tie-In packages
list of some of the projects handled by me successfully.
 BIOCON SDN BHD MALAYSIA .
- Cladded pressure vessel and processing tank as per asme s for Package 12,15&16, BIOCON SDN BHD
MALAYSIA – Bioreactors plant.
 Hindustan Unilever.
- Pressure vessel and tank as per asme for Coffee Extracting plant, Mysore.
 Givaudan sapphire, Singapore
- Process tanks and pressure vessel For Perfume processing plant as per asme code.
Ion Exchange India Ltd., Hosur – India September 2011 – July 2013
Senior Officer – piping
 Design and drafting and as-built support for electrical and mechanical controls engineering documents, including
PFD’s, P&ID’s, One Line Diagrams, Motor Schematics, Cable and Conduit Schedules etc. using Autocad 2013 P&ID
SOFTWARE.
 Responsible for producing engineering output like Flow diagram (P&ID), Equipment layout and Foundation
drawings for water (DM) and waste water (ETP) treatment processes.
 Designing, checking and reviewing the Fabrication drawings for water treatment units i.e. pressure vessels,
storage and regeneration tanks as per the code of international standards and company standards.
 Designed various pressure vessels for water treatment plant according to ASME Codes Section VIII Div.1 & 2, and
the production drawings with BOQ for boilers and pressure vessels.
 Design & detailing of Pressure vessels by ASME SEC VIII DIV-1,PV-Elite
 Designing of Storage tanks as per API 650.
 Experience in piping layout, piping design and pipe thickness calculation as per ASME B31.3
 Actively involved in piping design, pipe routing, selection and sizing of pipe in Auto Cad.
 Water and Waste Water Systems, reviewed/developed technical specifications for Waste Water Systems which
include oil water separator, sewage treatment plant, hot blowdown cooling system and various pumping
7 | P a g e
systems. Reviewed offers and documentation from suppliers. Responsible for waste water system PID, system
manual and waste water source list. Coordinated with Electrical, I&C, Civil and Arrangement departments in
aspects relevant to water and waste water treatment. Developed detailed calculations for waste water systems.
 Actively involved in contract review with the clients / consultants thereby resolving Technical queries.
 Verifying the dispatches to avoid short / wrong supplies to ensure smooth erection / commissioning of the
plants and projects.
 Preparation of Project Specification for various static equipments
 Preparation of Mechanical Data Sheet
 Checking & Issue of Isometrics (P&ID Check, Line Routing, Support Check, Special requirement check etc...)
 Preparation of Material Requisitions & datasheets of all Piping Items, Valves and other piping special items like
Strainer, Traps etc.
 Carried out vendor drawing review and providing technical assistance to team members.
 Co-ordination with client, vendors and inter departmental for input data.
 Preparation of piping standard support drawings for the project
 Co-ordinations with other functional departments such as Mechanical, Civil, Electrical, Instrumentation for
successful completion of project.
 Review 3D model by Smart Plant 3D for Clash Check, Piping Routing, Elevations as per Vender Packages, Piping &
Equipment Supporting Details.
 Prepare equipment nozzle, ladder and platform orientation.
List of some of the projects handled by me successfully.
 JSW STEELS, TORANGALU.
- 3X50 m3/Hr – AUTO Demineralization plant.
 NAVA BHARAT ENERGY INDIA LTD.
- 1X150MW CFPP (UNIT #1) POLONCHA, A.P – Demineralization plant.
 DEEPAK FERTILIZER AND PETROCHEMICAL CORPORATION LTD.
- 20 m3/Hr – AUTO Demineralization plant.
 ISPAT DAMODAR LIMITED.
- 18MW –Demineralization plant.
 SWASTIK POWER AND MINERAL RESOURCES PVT LTD.
- 1X25 MW THERMAL PLANT – Filter and Demineralization plant.
EXTRA CURRICULAR:
Global Certifications:
 Karunya university, School of Mechanical Sciences, Coimbatore (Solid works)
 Cadd Centre - Hosur (Catia v5)
 Petrocon Institute of piping engineering, Bangalore (PDMS)
 Petrocon Institute of piping engineering, Bangalore (CEASER)
 Petrocon Institute of piping engineering, Bangalore (Process Piping Engineering as per ASME B31.3)
Computer Software:
 Excellent knowledge of Microsoft Word, Excel and PowerPoint presentations.
 Working Knowledge in Auto cad.
 Working Knowledge in Autodesk inventer.
 Working Knowledge in Pro-E(Wild Fire).
 Working Knowledge in PDMS.
 Basic knowledge on CEASER Pipe stress analysis.
PERSONAL
• Languages:Tamil (native) • English (fluent) • Hindi (basic)
• Interests:Photography • Travel • Painting • Music • Cricket• Kabaddi
• Driving License:• Indian (LMV & TWD), UAE driving license

More Related Content

What's hot

Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarALPESH CONTRACTOR
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorandi dipayadnya
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6Mujahid Ali Akhtar
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1John Raj BE, MBA
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXummar shaik
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarGowrijayashankar S V
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
HARDEO SAFI Resume 1
HARDEO SAFI Resume 1HARDEO SAFI Resume 1
HARDEO SAFI Resume 1hardeo safi
 

What's hot (20)

Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
Resume_SBA_180515
Resume_SBA_180515Resume_SBA_180515
Resume_SBA_180515
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCX
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.
 
SSNair-CV-Latest-2016
SSNair-CV-Latest-2016SSNair-CV-Latest-2016
SSNair-CV-Latest-2016
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
HARDEO SAFI Resume 1
HARDEO SAFI Resume 1HARDEO SAFI Resume 1
HARDEO SAFI Resume 1
 

Similar to KINGSLY M PIPING-PROJECT CV ABD

Similar to KINGSLY M PIPING-PROJECT CV ABD (20)

cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016
 
CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Pugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CVPugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CV
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
J Jagadeesan- CV
J Jagadeesan- CVJ Jagadeesan- CV
J Jagadeesan- CV
 
Senior Project Engineer
Senior Project EngineerSenior Project Engineer
Senior Project Engineer
 
Amulya Gupta CV
Amulya Gupta CVAmulya Gupta CV
Amulya Gupta CV
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 

KINGSLY M PIPING-PROJECT CV ABD

  • 1. 1 | P a g e KINGSLY NOVA AROKIYAM Curriculum Vitae PIPING ENGINEER / PROJECT ENGINEER (MECHANICAL ENGINEER) Email: kingslynova@hotmail.com Contact Numbers: +971-52-5080745 Please scan to capture contact details
  • 2. 2 | P a g e KINGSLY NOVA AROKIYAM Email: kingslynova@hotmail.com  Mob: +91-8973131259, +971525080745 PIPING ENGINEER | PROJECT ENGINEER OBJECTIVE An eagerness to learn and work professionally with a high degree of dedication and involvement in achieving the aims and goods of the establishment. EDUCATION Amity University, Dubai Jan2014 MBA - Working professional (Operations) Karunya University, Coimbatore -India May 2011 B.tech in Mechanical engineering  Project: 60days Project at Ashok Leyland – Hosur (India). PROFILE SUMMARY  Mechanical Engineering with nearly 5+ years of experience in: Piping Engineering Project Management Vendor Development Piping Materials Liaison & Coordination Process Improvement  Presently associated with MKG Contracting LLC, , Abu Dhabi, UAE as Project Engineer - Mechanical  Skilled in construction of piping and tank  Deftness in handling overall project including planning, Man power estimation, scheduling, preparation of blueprints and execution of projects for installation, commissioning & erection assignments  An effective communicator with good decision making, interpersonal & organizational abilities.  Good knowledge on pressure vessels and tanks as per the ASME & API standards. CORE COMPETENCIES  Interaction with Client and coordination of activities according to client requirement.  Control and Coordination of Subcontractor and Supplier activities.  Checking & issuing piping fabrication drawings with support details; checking piping drawings developed by site drafting personnel for effective operations  Periodically reviewing & monitoring progress of project for ensuring completion within scheduled time and cost parameters  Implementing hand marked-up changes to drawings and maintaining standard drawing templates  Ensuring comprehensive and cost effective inspection of all static equipment for ensuring plant integrity & reliability PROFESSIONAL EXPERIENCE MKG Contracting LLC, , Abu Dhabi, UAE Sept 2016 – Till Now Project engineer.  Responsible in pipeline project planning, screening of pipeline project opportunities, route selection, third party and environmental impact studies, feasibility assessments and concept selections, and front-end design.  Review of Project specification and P&ID s.  Communicating with project manager to report on project status.  Planning day to day program, manpower, over all time duration to complete job.  Undertaking technical and constructability studies.  Submission of Four weak look ahead  Billing.-Invoice, Abstract, Measurement, Etc… (Departmental/Contractor)
  • 3. 3 | P a g e  Interacting between client and plant engineering division.  Internal inspection and arranging walk through to develop Quality & HSE requirements.  Read and interrupt the details of Drawings & prepare BOQ.  Focusing on projects plan towards 1 month ahead.  Preparation of daily and Monthly progress reports.  Read and interrupt the details of drawing create isometric drawings by Hand sketch or using AUTOCAD Software.  Preparing Proposal for Constructability drawings as per to site condition.  Ensure all the works will be carry out by HSE & quality standards.  Submission of Method statement, JSA, Material Submittals, Execution plan, HIP & all construction documents.  Continuous follow up with procurement to get the all materials within the time schedule.  Continuous Follow up &Monitoring of activities to complete within schedule.  Managing, supervising and monitoring the subcontractors/subordinates to complete the work within schedule.  Managing Budget, equipment and Manpower resources.  Advance planning, scheduling and delivering the project resources by discussing with project team.  Coordinating with Civil, Electrical and other discipline engineers in order to smooth function and to meet the technical requirements.  Ensuring HSE, quality & delivering the structures with in time.  Planning & preparing necessary arrangements for heavy equipment erections.  Optimum utilization of Man power & equipment’s.  Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.  Raising MTO(s) for all materials required to additional materials for hydro test etc. Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings  Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements  Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness.  Keeping in close contact with key project members and decision makers.  Technical Bid evaluation and selection of suppliers  Preparation of “AS BUILT” drawings.  Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.  Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.  Ensure that hydro test reinstatement is to be done as per procedure.  Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project. Employer : MKG Contracting LLC, , Abu Dhabi, UAE . Current Project : EPC of Union Chlorine plant, ICAD, Abu Dhabi, UAE Project at : ICAD Abu Dhabi Project Value : 10 million AED Position : Project engineer Duration : From September, 2016 to Present Essar Projects Saudi Company, Al Khobar, Dammam, Saudi Arabia Dec 2015 – Sept 2016 Piping engineer.  Responsible in pipeline project planning, screening of pipeline project opportunities, route selection, third party and environmental impact studies, feasibility assessments and concept selections, and front-end design.  Review of Project specification and P&ID s.  Communicating with project manager to report on project status.  Planning day to day program, manpower, over all time duration to complete job.  Undertaking technical and constructability studies.  Submission of Four weak look ahead  Billing.-Invoice, Abstract, Measurement, Etc… (Departmental/Contractor)
  • 4. 4 | P a g e  Interacting between client and plant engineering division.  Internal inspection and arranging walk through to develop Quality & HSE requirements.  Read and interrupt the details of Drawings & prepare BOQ.  Focusing on projects plan towards 1 month ahead.  Preparation of daily and Monthly progress reports.  Read and interrupt the details of drawing create isometric drawings by Hand sketch or using AUTOCAD Software.  Read and interrupt the details of Drawings, discussion with Engineering, SAPMT, Proponent, LPD and operations.  Conducting Constructability review with 30%, 60% & 90% drawing.  Preparing Proposal for Constructability drawings as per to site condition.  Ensure all the works will be carry out by HSE & quality standards.  Submission of Method statement, JSA, Material Submittals, Execution plan, HIP & all construction documents.  Continuous follow up with procurement to get the all materials within the time schedule.  Continuous Follow up &Monitoring of activities to complete within schedule.  Managing, supervising and monitoring the subcontractors/subordinates to complete the work within schedule.  Managing Budget, equipment and Manpower resources.  Advance planning, scheduling and delivering the project resources by discussing with project team.  Coordinating with Civil, Electrical and other discipline engineers in order to smooth function and to meet the technical requirements.  Ensuring HSE, quality & delivering the structures with in time.  Planning & preparing necessary arrangements for heavy equipment erections.  Optimum utilization of Man power & equipment’s.  Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.  Raising MTO(s) for all materials required to additional materials for hydro test etc. Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings  Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements  Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness.  Keeping in close contact with key project members and decision makers.  Technical Bid evaluation and selection of suppliers  Preparation of “AS BUILT” drawings.  Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.  Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.  Ensure that hydro test reinstatement is to be done as per procedure.  Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project. Employer : ESSAR PROJECTS SAUDI COMPANY. Current Project : EPC of Shaybah Crude Stabilization Project at Abqaiq Plant (SAUDI ARAMCO PROJECT) Project at : Saudi Aramco (KSA) Project Value : 55 million USD Position : Piping engineer Duration : From November, 2015 to Present Project Summary:  New AXL Storage Tank.  New AXL 2nd Stage Shipper Pump / Modification in existing shipper pumps discharge lines.  Modification in 110-C-9 Inlet / Outlet Lines.  Modification in existing spheroids (T-900/901/902) Lines.  Installation/ Replacement of existing Bottom Pumps.  Piping Tie-In. (92No’s)  Existing Facilities Demolition Works.
  • 5. 5 | P a g e  New construction of Concrete Dyke Wall  Access Ramp, Road and Drain works  Steel Structure works (Access walkway, cross overs, Firefighting &Valve operating platforms).  Fire proofing works  Electrical, Instrumentation and Loss preventions work. Capital engineering consultancy. Sharjah/Dubai- UAE March 2014 – December 2015 Piping engineer / Project engineer.  Actively involved in contract review with the clients / consultants thereby resolving Technical queries.  Performed engineering calculations as and where required to verify applicable code requirements. Reviewed  Communicating with project manager to report on project status.  Accountable for the interpretation of technical requirements (Design Basis) given by Client / PMC, PFD, material and energy balance, equipment specifications, standard specifications of the project for further development of P&IDs and equipment datasheets  Resolving any financial queries that are raised.  Leading and organizing a team with a project requirement and fulfilling the client requirement.  Reviewed engineering drawings, data sheets and welding procedure & specifications  Expedited procurement and supervised fabrication in line with designs  Performed modification of tender documents & scope review  Scheduled all aspects of the project as per MIS and procedures & expectations set for project quality  Prepared and reviewed manpower forecast, materials, tools, supplies & supported service and initiated action to insure stocks are maintained at minimum adequate levels in coordination with respective Division Managers  Ensured that the project achieves its objectives in respect of HSE, quality, cost and schedule  Established performance & delivery criteria and ensured that client & organizational requirements were met  Assisted the contractors project team for planning and controlled the execution of technical functions of the project  Coordinated with vendors / subcontractors for procurement of engineered items  Ensured field documents like IFC drawings and shop drawings were updated to reflect client approved drawing revisions  Reviewed and ensured compilation of technical documents for bid preparation & submission to client  Interfaced with internal departments like procurement, production, planning & QC  Worked with Project Manager for daily administration of the project report, including client coordination, correspondence and meeting’s minutes, progress & presentation  Oversaw material engineering which included preparation of purchase specifications, purchase requisitions, technical bid analysis, vendor document / drawing evaluation after order List of some of the projects handled by me successfully.  Al Zahara petrochemical LLC , sharjah, UAE Coordinated and worked with contractors on construction and design phase for erecting the Storage tanks, pipelines and distillation plant structure – Diesel and base oil Distillation plant.  ATS TERMINAL FZE , HFZ - Sharjah, UAE Storage tanks and pipelines – Oil Storage plant.  ADGAS , Abu dhabi, UAE Storage tanks, pipelines and structural – LNG and LPG plant.  Gulf oil tanking FZE, Dubai, UAE  Worked with contractors on detailed engineering and construction phase for Addition of pipelines for the existing base oil storage tanks TK-105 and TK-106 – Oil storage plant  Emirates steel, Abu dhabi, UAE  Installation of new PHEs and Modification of Piping Connected to PHEs of Amine Circuits in Emirates Iron &Steel Co at Phase-2.  Installation and execution for modification of pumping circuits and piping related to the installation of new direct and indirect cooling towers in the emirates iron and steel Co at Phase-1.  ARZOO TERMINAL FZE, HFZ – Sharjah, UAE Storage tanks and pipeline design – Oil storage plant.  MAG Lubricants, Techno Park – Jebel Ali, Dubai, UAE  Proposed Installation and erection of 6 Nos. storage tanks, additive tanks, pipelines and structural – Base Oil storage plant  Etihad Petrochemical Industries F.Z.C, HFZ – Sharjah, UAE Handled the construction activity with contractors and Engineering coordination for proposed Oil Terminal plant with pack tower, blending and storage tanks on plot no:-HD-18 at Phase-1, HFZA, Sharjah,
  • 6. 6 | P a g e  Montgomerie golf course, Emirates hills – Dubai, UAE Handled the construction activity with contractors for proposed pump station with vertical multistage pump, filters, chemical storage tanks and pipeline design for main irrigation network of 1.2 km. Equipment Fabricators Pvt. Ltd., Bangalore- India July 2013– February2014 Project engineer / piping engineer  Interpretation of drawings, checking of fabricated materials, solving site related technical issues.  Maintain record of DRGS in scope, upcoming & release to contractors & also maintain the DPR, BOM. Reviewing the Fabrication drawings for food, pharma, dairy and biochemical industry i.e. pressure vessels, reactors, fermenters& heat exchangers as per the code of international standards and company standards.  Doing BOM for the pressure vessels and piping.  Make work distribution for CNC machine for cutting drilling and plate cutting etc.  Planning & reviewing of drawing, Co-ordination with material department to arrange the required material as per drawings,  Co-ordination with sub-contractors, QC, QMD department & end of dispatch with co-ordination of erection engineers.  Planning and day to day execution of vessel fabrication and piping fabrication,  Drawing review, preparing mobilization plan and other related jobs.  Checking & Issue of Isometrics (P&ID Check, Line Routing, Support Check, Special requirement check etc...)  Preparation of Material Requisitions & datasheets of all Piping Items, Valves and other piping special items like Strainer, Steam Traps etc.  Review of isometrics and support and support detailing for the same.  Preparation of PMS & stress analysis methodologies  Performing pipe stress analysis (static) analysis for the process cell piping and outside cell piping including the waste tank farm and the off gas systems  Reviewing Equipment Vendor Gad’s and finalizing Nozzle orientations as per L/O feasibility and Design basis.  Checking of Isometrics along with BOM in correlation with P&ID end connectivity and validity as per PMS and line list.  Interference checking of piping with other equipment, structures & piping  Review of 3D models.  Site visit to collect existing facilities information for revamping activities, identifying Tie-In Locations as per P&ID, mark up drawings and preparation of Tie-In packages list of some of the projects handled by me successfully.  BIOCON SDN BHD MALAYSIA . - Cladded pressure vessel and processing tank as per asme s for Package 12,15&16, BIOCON SDN BHD MALAYSIA – Bioreactors plant.  Hindustan Unilever. - Pressure vessel and tank as per asme for Coffee Extracting plant, Mysore.  Givaudan sapphire, Singapore - Process tanks and pressure vessel For Perfume processing plant as per asme code. Ion Exchange India Ltd., Hosur – India September 2011 – July 2013 Senior Officer – piping  Design and drafting and as-built support for electrical and mechanical controls engineering documents, including PFD’s, P&ID’s, One Line Diagrams, Motor Schematics, Cable and Conduit Schedules etc. using Autocad 2013 P&ID SOFTWARE.  Responsible for producing engineering output like Flow diagram (P&ID), Equipment layout and Foundation drawings for water (DM) and waste water (ETP) treatment processes.  Designing, checking and reviewing the Fabrication drawings for water treatment units i.e. pressure vessels, storage and regeneration tanks as per the code of international standards and company standards.  Designed various pressure vessels for water treatment plant according to ASME Codes Section VIII Div.1 & 2, and the production drawings with BOQ for boilers and pressure vessels.  Design & detailing of Pressure vessels by ASME SEC VIII DIV-1,PV-Elite  Designing of Storage tanks as per API 650.  Experience in piping layout, piping design and pipe thickness calculation as per ASME B31.3  Actively involved in piping design, pipe routing, selection and sizing of pipe in Auto Cad.  Water and Waste Water Systems, reviewed/developed technical specifications for Waste Water Systems which include oil water separator, sewage treatment plant, hot blowdown cooling system and various pumping
  • 7. 7 | P a g e systems. Reviewed offers and documentation from suppliers. Responsible for waste water system PID, system manual and waste water source list. Coordinated with Electrical, I&C, Civil and Arrangement departments in aspects relevant to water and waste water treatment. Developed detailed calculations for waste water systems.  Actively involved in contract review with the clients / consultants thereby resolving Technical queries.  Verifying the dispatches to avoid short / wrong supplies to ensure smooth erection / commissioning of the plants and projects.  Preparation of Project Specification for various static equipments  Preparation of Mechanical Data Sheet  Checking & Issue of Isometrics (P&ID Check, Line Routing, Support Check, Special requirement check etc...)  Preparation of Material Requisitions & datasheets of all Piping Items, Valves and other piping special items like Strainer, Traps etc.  Carried out vendor drawing review and providing technical assistance to team members.  Co-ordination with client, vendors and inter departmental for input data.  Preparation of piping standard support drawings for the project  Co-ordinations with other functional departments such as Mechanical, Civil, Electrical, Instrumentation for successful completion of project.  Review 3D model by Smart Plant 3D for Clash Check, Piping Routing, Elevations as per Vender Packages, Piping & Equipment Supporting Details.  Prepare equipment nozzle, ladder and platform orientation. List of some of the projects handled by me successfully.  JSW STEELS, TORANGALU. - 3X50 m3/Hr – AUTO Demineralization plant.  NAVA BHARAT ENERGY INDIA LTD. - 1X150MW CFPP (UNIT #1) POLONCHA, A.P – Demineralization plant.  DEEPAK FERTILIZER AND PETROCHEMICAL CORPORATION LTD. - 20 m3/Hr – AUTO Demineralization plant.  ISPAT DAMODAR LIMITED. - 18MW –Demineralization plant.  SWASTIK POWER AND MINERAL RESOURCES PVT LTD. - 1X25 MW THERMAL PLANT – Filter and Demineralization plant. EXTRA CURRICULAR: Global Certifications:  Karunya university, School of Mechanical Sciences, Coimbatore (Solid works)  Cadd Centre - Hosur (Catia v5)  Petrocon Institute of piping engineering, Bangalore (PDMS)  Petrocon Institute of piping engineering, Bangalore (CEASER)  Petrocon Institute of piping engineering, Bangalore (Process Piping Engineering as per ASME B31.3) Computer Software:  Excellent knowledge of Microsoft Word, Excel and PowerPoint presentations.  Working Knowledge in Auto cad.  Working Knowledge in Autodesk inventer.  Working Knowledge in Pro-E(Wild Fire).  Working Knowledge in PDMS.  Basic knowledge on CEASER Pipe stress analysis. PERSONAL • Languages:Tamil (native) • English (fluent) • Hindi (basic) • Interests:Photography • Travel • Painting • Music • Cricket• Kabaddi • Driving License:• Indian (LMV & TWD), UAE driving license