This resume is for Rufino B. Cada, who is applying for the position of QA/QC Electrical Engineer/Inspector. He has over 26 years of experience in construction projects, including his current role as QA/QC Electrical Engineer/Inspector for Saudi Oger Ltd in Saudi Arabia for the past 16 years. He holds a Bachelor's degree in Electrical Engineering and is a licensed Electrical Engineer in the Philippines.
1. PROFESSIONAL RESUME
1. Candidate Name : RUFINO B. CADA
2. Proposed Project position : QA/QC Electrical Engineer/ Inspector
3. Written and spoken English : Confirm
4. Current job title : QA/QC Electrical Engineer/ Inspector
5. Number of years in current job title : 16 Years
6. Current work location : Construction of King Abdullah
Center for world Culture (Client-Aramco)
Dhahran – Saudi Arabia
7. Educational Background & Qualification:
Bachelor of Science in Electrical Engineering, in October
1984. Passed the Licensure Board Examination for
Electrical Engineer, September 1985
8. Professional Work Experiences : More than 26 years of actual construction, almost sixteen
years of which as QA/QC Electrical Engineer/Inspector
Company Served:
8.1 Company Name : Saudi Oger Ltd.
Job Title : QA/QC Electrical Engineer/ Inspector
Project : Construction of King Abdullah Center for World Culture
KACWC / Aramco, Dhahran, Saudi Arabia
Period : 5 months (December 2015 to Present)
Project : Construction of Mechanized Brigade (Saudi Arabia
National Guard), Al-Ahsa, Saudi Arabia
Period : 62 months (September 2010 to November 2015)
Project : Construction of Office Park – 8446 Al Khafji Joint Operations
(Kuwait Gulf Oil Co./Aramco Gulf Operations)
Period : 60 months (August 2005 to August 2010)
Pages 1 of 4
2. Responsibilities : Verify methods of testing instrument calibration and
evaluation for performing designated inspection and testing.
Interprets engineering drawings, schematic diagrams, or
formulas to apply quality standards . Ensure that all materials
and equipment installed on site conforms to the contract
documents or MSS. Check material installations as per
specifications and proper tools to be used during installation
process. Records test data, applying statistical quality control
procedures. Evaluate data and writes reports to validate or
indicate deviation from existing standards. Ensure that all
aspect of quality control in relation to contract documents are
identified and observed. Ensure close communication lines
with the SPM, Consultant and Subcontractors. Conduct
commissioning of equipment, systems and completed works
by the subcontractors with direct supervision of the
consultants and in presence of the maintenance.
8.2 Company Name : Malihan Enterprises
Job Title : QA/QC Supervisor
Projects : Various Government Buildings/Electrical Facilities.
(Department of Public Works and Highways – Phil. Gov’t)
Locations : Laguna and Metro Manila, Philippines
Period : 12 months (July 2004 to July 2205)
Responsibilities : Ensure the quality records, acceptance certificates,
electrical completion certificates and the documentation for
specific systems and buildings/areas are prepared and
collated in accordance with project requirements.
Coordinate with the planning and scheduling department to
ensure objective dates are understood for each turn over
area. Monitor and control the status of punch list and
exception lists relevant to quality dossiers. Witnessing and
sentencing of all site inspections within their disciplines.
Coordinate all site inspections with the site subcontractors.
Ensure that all inspection reports are accurate and that all
attached documents are current status. Ensure all work is
correctly prepared prior to any inspection being undertaken.
Liaise with the site construction engineers and provide
assistance when requested. Prepare nonconformance
reports to the QA manager and assist in developing
corrective actions. Assist the QC manager and construction
manager in resolving any discrepancies and ambiguities.
Coordinate with the customers QC inspectors for the
resolution of site problems. Coordinate with the site
subcontractors to ensure that communications exist and are
maintained.
Pages 2 of 4
3. 8.3 Company Name : IMPSA Construction Corporation
Job Title : QA/QC Electrical Inspector/Supervisor
Projects : Refurbishment/Expansion of 650MW KPS Power Station,
11MW Caliraya Hydroelectric Power Plant and 23MW
Botocan Hydroelectric Power Plant
Location : Laguna, Philippines
Period : 31 Months (September2001 to March 2004))
Responsibilities : Review approved drawings and act for any ambiguities,
interferences and errors found on the
drawings/specifications. Conduct field inspections of
electrical installations including electro-mechanical
equipments and instruments upon delivery, prior and after
installation. Investigate and decide if completed work
complies with the approved plans and specifications.
Supervise/witness construction tests and commissioning of
electrical equipments and facilities and assist in
preparation of handing over package documents. Check and
verifiy submitted test results and documents prior to
client’s approval/acceptance. Attend construction meetings
with client and subcontractors and provide
recommendations for problems arising during construction.
Perform other jobs as assigned or as situation requires.
8.4 Company Name : Okisho Kogyo
Job Title : QA/QC Electrical Inspector/Supervisor
Projects : Various Industrial and Commercial Buildings/Electrical
Location : Kanagawa, Japan
Period : 21 Months (January 1996 to September 1999)
Pages 3 of 4
4. Responsibilities : Verifiy methods of testing instrument calibration and
evaluation for performing designated inspection and testing.
Interprets engineering drawings, schematic diagrams, or
formulas to apply quality standards. Ensures that all materials
and equipment installed on site conforms to the contract
documents 0r MSS. Check material installations as per
specifications and proper tools to be used during installation
process. Record test data, applying statistical quality control
procedures. Evaluate data and writes reports to validate or
indicate deviation from existing standards. Ensure that all
aspect of quality control in relation to contract documents are
identified and observed. Ensure close communication lines
with the Project Manager, Consultant and Subcontractors.
Conduct commissioning of equipment, systems and
completed works by the subcontractors with direct
supervision of the consultants and in presence of the
maintenance.
8.5 Company Name : Sakane Sangyo
Job Title : Electrical Site Supervisor
Location : Kanagawa, Japan
Period : 67 Months (May 1990 to Dec. 1996)
Responsibilities : Review approved shop plans/shop drawings and
specifications. Prepares bill of quantities, manpower and
work schedule for implementation. Supervise installation of
new electrical equipments and related facilities on high-rise
buildings and projects and conduct/supervise testing of
various materials ,equipments and instruments upon
delivery, prior and after installation. Recommend
modifications on drawings with discrepancies on
specifications. Coordinate with main contractor’s project
manager and project engineers in connection with materials
and equipment schedule as per revision. Perform other
assigned tasks.
9. Professional Societies : Institute Of Integrated Electrical Engineers (ERCSA-KSA)
10. Computer Skills : MS Office
Signature: __________________________
Date: ____________________________
Saudi Oger Ltd. Pages 4 of 4