Form # HSEQ – HSEA (Rev 0 – Aug 16)
HSE ALERT # 35
Air Conditioners at Site Offices, Stores
& Facilities
Airconditionershave beenacause of fire incidentsatsite offices,storesandfacilitiesmainlybecause
of poorcondition of the AirConditionersand/orthe electrical connections.The following
requirements mustbe ensuredat all projectsites:
 TemporaryElectricconnectionsforAirConditionersmustbe designedbyElectrical Engineerand
installed by competent Electricians.
 Earth Leakage Circuit Breakers must be installed for Air Conditioner connections.
 Air Conditioners and their connections to be inspected everymonth by a competent Electrician
for damage and inspection records must be maintained.
 All airconditionersinunsafeconditionmustbe immediatelyremovedfromsite andreplacedwith
new ones.
 Air Conditioners must be switched off when the room is not occupied and at the end of shift.
Arabtec Construction
HSEQ & Org. Risk Dept.

More Related Content

What's hot

Electrical safety in photovoltaic plants
Electrical safety in photovoltaic plantsElectrical safety in photovoltaic plants
Electrical safety in photovoltaic plants
Del Valle Aguayo, S.A.
 

What's hot (13)

Photovoltaic Training Course - Module 2.3 - Electrical installation
Photovoltaic Training Course - Module 2.3 - Electrical installationPhotovoltaic Training Course - Module 2.3 - Electrical installation
Photovoltaic Training Course - Module 2.3 - Electrical installation
 
When the Heat is On, Control with Wireless
When the Heat is On, Control with WirelessWhen the Heat is On, Control with Wireless
When the Heat is On, Control with Wireless
 
1.3 wiring accessories
1.3 wiring accessories1.3 wiring accessories
1.3 wiring accessories
 
Electrical safety in photovoltaic plants
Electrical safety in photovoltaic plantsElectrical safety in photovoltaic plants
Electrical safety in photovoltaic plants
 
Fluke1748 - power quality measurements on overhead lines
Fluke1748 - power quality measurements  on overhead lines Fluke1748 - power quality measurements  on overhead lines
Fluke1748 - power quality measurements on overhead lines
 
A6 Mikes Mar
A6   Mikes   MarA6   Mikes   Mar
A6 Mikes Mar
 
Operating Temperature for Electrical Equipment
Operating Temperature for Electrical EquipmentOperating Temperature for Electrical Equipment
Operating Temperature for Electrical Equipment
 
B4 omniksol pqd-datasheet_en
B4 omniksol pqd-datasheet_enB4 omniksol pqd-datasheet_en
B4 omniksol pqd-datasheet_en
 
SCR PROTECTION PART 2
SCR PROTECTION PART 2SCR PROTECTION PART 2
SCR PROTECTION PART 2
 
MOUNTING OF SCR
MOUNTING OF SCRMOUNTING OF SCR
MOUNTING OF SCR
 
carbonTRACK at Unstoppables / The Amazon 2016
carbonTRACK at Unstoppables / The Amazon 2016carbonTRACK at Unstoppables / The Amazon 2016
carbonTRACK at Unstoppables / The Amazon 2016
 
Photovoltaic Training Course - Module 4.3 - Types of maintenance
Photovoltaic Training Course - Module 4.3 - Types of maintenancePhotovoltaic Training Course - Module 4.3 - Types of maintenance
Photovoltaic Training Course - Module 4.3 - Types of maintenance
 
The first step - accurate heating and cooling load calculations
The first step - accurate heating and cooling load calculationsThe first step - accurate heating and cooling load calculations
The first step - accurate heating and cooling load calculations
 

Similar to Hse alert 35 2018 air conditioners at site offices stores & facilities

Samsung fjm installation manual
Samsung fjm installation manualSamsung fjm installation manual
Samsung fjm installation manual
Rui Caçoete
 
NEXCOM_APPC_1533T-P20s_Exercise_Strict_Control_Monitoring_over_Steelmaking_Qu...
NEXCOM_APPC_1533T-P20s_Exercise_Strict_Control_Monitoring_over_Steelmaking_Qu...NEXCOM_APPC_1533T-P20s_Exercise_Strict_Control_Monitoring_over_Steelmaking_Qu...
NEXCOM_APPC_1533T-P20s_Exercise_Strict_Control_Monitoring_over_Steelmaking_Qu...
Eric Lo
 
Resume Greg M Abinales
Resume  Greg M AbinalesResume  Greg M Abinales
Resume Greg M Abinales
Greg Abinales
 
Resume Greg M Abinales
Resume  Greg M AbinalesResume  Greg M Abinales
Resume Greg M Abinales
Greg Abinales
 

Similar to Hse alert 35 2018 air conditioners at site offices stores & facilities (20)

Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
 
POWER SYSTEM.pdf
POWER SYSTEM.pdfPOWER SYSTEM.pdf
POWER SYSTEM.pdf
 
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS Engineer
 
26 80-00---elevator-electrical-requirements baf21c1ac523
26 80-00---elevator-electrical-requirements baf21c1ac52326 80-00---elevator-electrical-requirements baf21c1ac523
26 80-00---elevator-electrical-requirements baf21c1ac523
 
electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
 
new resume2015
new resume2015new resume2015
new resume2015
 
Samsung fjm installation manual
Samsung fjm installation manualSamsung fjm installation manual
Samsung fjm installation manual
 
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptx
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptxFIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptx
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptx
 
NEXCOM_APPC_1533T-P20s_Exercise_Strict_Control_Monitoring_over_Steelmaking_Qu...
NEXCOM_APPC_1533T-P20s_Exercise_Strict_Control_Monitoring_over_Steelmaking_Qu...NEXCOM_APPC_1533T-P20s_Exercise_Strict_Control_Monitoring_over_Steelmaking_Qu...
NEXCOM_APPC_1533T-P20s_Exercise_Strict_Control_Monitoring_over_Steelmaking_Qu...
 
Lockout Tagout.ppt
Lockout Tagout.pptLockout Tagout.ppt
Lockout Tagout.ppt
 
Fire alarm checklist
Fire alarm checklistFire alarm checklist
Fire alarm checklist
 
15780 english
15780   english15780   english
15780 english
 
1 80 fineshed
1 80 fineshed1 80 fineshed
1 80 fineshed
 
Industrial Temperature Controller System
Industrial Temperature Controller SystemIndustrial Temperature Controller System
Industrial Temperature Controller System
 
2311 s5500 checkout & comm. of elec. equip, rev. a 8
2311 s5500 checkout & comm. of elec. equip, rev. a 82311 s5500 checkout & comm. of elec. equip, rev. a 8
2311 s5500 checkout & comm. of elec. equip, rev. a 8
 
2311 s5500 checkout & comm. of elec. equip, rev. a 8
2311 s5500 checkout & comm. of elec. equip, rev. a 82311 s5500 checkout & comm. of elec. equip, rev. a 8
2311 s5500 checkout & comm. of elec. equip, rev. a 8
 
RA CV Current
RA CV CurrentRA CV Current
RA CV Current
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
Resume Greg M Abinales
Resume  Greg M AbinalesResume  Greg M Abinales
Resume Greg M Abinales
 
Resume Greg M Abinales
Resume  Greg M AbinalesResume  Greg M Abinales
Resume Greg M Abinales
 

More from Dwarika Bhushan Sharma

PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docxPRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
Dwarika Bhushan Sharma
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
Dwarika Bhushan Sharma
 
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docxLIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
Dwarika Bhushan Sharma
 
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docxLABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
Dwarika Bhushan Sharma
 
INCIDENT INVESTIGATION REPORT Form # HSEQ - IIR Rev 9 -.docx
INCIDENT INVESTIGATION REPORT  Form # HSEQ - IIR Rev 9 -.docxINCIDENT INVESTIGATION REPORT  Form # HSEQ - IIR Rev 9 -.docx
INCIDENT INVESTIGATION REPORT Form # HSEQ - IIR Rev 9 -.docx
Dwarika Bhushan Sharma
 
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docHSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
Dwarika Bhushan Sharma
 

More from Dwarika Bhushan Sharma (20)

4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
 
5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf
5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf
5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf
 
3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf
3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf
3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf
 
2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf
2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf
2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf
 
1-HAZARDOUS CHEMICALS.pdf
1-HAZARDOUS CHEMICALS.pdf1-HAZARDOUS CHEMICALS.pdf
1-HAZARDOUS CHEMICALS.pdf
 
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docxPRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
 
FIRE PREVENTION REQUIREMENTS Form # HSEQ - Rev 2.docx
FIRE PREVENTION REQUIREMENTS Form # HSEQ -  Rev 2.docxFIRE PREVENTION REQUIREMENTS Form # HSEQ -  Rev 2.docx
FIRE PREVENTION REQUIREMENTS Form # HSEQ - Rev 2.docx
 
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docxSUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
 
STORE INSPECTION Form # HSEQ - Form 2 Rev 2.docx
STORE INSPECTION Form # HSEQ - Form 2 Rev 2.docxSTORE INSPECTION Form # HSEQ - Form 2 Rev 2.docx
STORE INSPECTION Form # HSEQ - Form 2 Rev 2.docx
 
WITNESS STATEMENT FORM.docx
WITNESS STATEMENT FORM.docxWITNESS STATEMENT FORM.docx
WITNESS STATEMENT FORM.docx
 
PROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docx
PROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docxPROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docx
PROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docx
 
HSE FORMS (COVER PAGE)2 Form # HSEQ - Rev 2.docx
HSE FORMS (COVER PAGE)2 Form # HSEQ -  Rev 2.docxHSE FORMS (COVER PAGE)2 Form # HSEQ -  Rev 2.docx
HSE FORMS (COVER PAGE)2 Form # HSEQ - Rev 2.docx
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
 
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docxLIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
 
MOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docx
MOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docxMOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docx
MOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docx
 
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docxLABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
 
INCIDENT INVESTIGATION REPORT Form # HSEQ - IIR Rev 9 -.docx
INCIDENT INVESTIGATION REPORT  Form # HSEQ - IIR Rev 9 -.docxINCIDENT INVESTIGATION REPORT  Form # HSEQ - IIR Rev 9 -.docx
INCIDENT INVESTIGATION REPORT Form # HSEQ - IIR Rev 9 -.docx
 
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.docHSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
 
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docHSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
 
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxOFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
 

Recently uploaded

ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
ashishpaul799
 

Recently uploaded (20)

Benefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational ResourcesBenefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational Resources
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
 
Open Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPointOpen Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPoint
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
Morse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptxMorse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptx
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resources
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx
 
The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...
 
Gyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptxGyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptx
 
How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 

Hse alert 35 2018 air conditioners at site offices stores & facilities

  • 1. Form # HSEQ – HSEA (Rev 0 – Aug 16) HSE ALERT # 35 Air Conditioners at Site Offices, Stores & Facilities Airconditionershave beenacause of fire incidentsatsite offices,storesandfacilitiesmainlybecause of poorcondition of the AirConditionersand/orthe electrical connections.The following requirements mustbe ensuredat all projectsites:  TemporaryElectricconnectionsforAirConditionersmustbe designedbyElectrical Engineerand installed by competent Electricians.  Earth Leakage Circuit Breakers must be installed for Air Conditioner connections.  Air Conditioners and their connections to be inspected everymonth by a competent Electrician for damage and inspection records must be maintained.  All airconditionersinunsafeconditionmustbe immediatelyremovedfromsite andreplacedwith new ones.  Air Conditioners must be switched off when the room is not occupied and at the end of shift. Arabtec Construction HSEQ & Org. Risk Dept.