v. The correct operation of all shutdown safety devices, such as
limit switches, shall be checked.
w. The proper phasing of all connections and phase rotation of all
rotating machines shall be checked.
x. Motors shall be checked for proper rotation before coupling or
connecting to the load.
3.3.3 Ground System Tests
a. This section covers the minimum testing requirements for
grounding systems. The Contractor is responsible for the
adequate grounding of all equipment in accordance with NFPA
No. 70, National Electrical Code (NEC) and the Technical
Requirements.
b. The resistance between the grounding grid and the following
grounding points shall not exceed 1 ohm:
• Each point used to ground platform lightning protection
equipment.
• Each point used to ground electrical equipment enclosures.
• Each point used to ground wiring support systems such as
cable armor, conduits, and trays.
c. The resistance between the grounding grid and system neutrals
shall not exceed the following:
• 600-volt or less equipment - 1 ohm
• High-resistance ground system - 15 ohms
• Low-resistance ground systems - 1 ohm
3.3.4 Insulation Resistance Tests
a. Insulation resistance tests shall be conducted prior to energizing
the equipment.
b. A 500-volt DC megger shall be utilized for low-voltage
equipment (600 volts and below), and either 1000-volt or 5000-
volt DC megger shall be utilized for high-voltage equipment
(above 600 volts).
c. As applicable, Contractor shall measure and record resistances
of the following on the check sheets:

More Related Content

What's hot

Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPT
Abdullah Al Dushaishi
 

What's hot (20)

EEI_MV_Inverter_1
EEI_MV_Inverter_1EEI_MV_Inverter_1
EEI_MV_Inverter_1
 
power grid synchronization failure detection
power grid synchronization failure detectionpower grid synchronization failure detection
power grid synchronization failure detection
 
Standing type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unitStanding type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unit
 
Automatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage boosterAutomatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage booster
 
Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPT
 
fault detection of transformer using GSM,,,,by YASASWINI.KAGITHALA
fault detection of transformer using GSM,,,,by YASASWINI.KAGITHALAfault detection of transformer using GSM,,,,by YASASWINI.KAGITHALA
fault detection of transformer using GSM,,,,by YASASWINI.KAGITHALA
 
RVR-1(3) automatic step voltage regulator
RVR-1(3) automatic step voltage regulatorRVR-1(3) automatic step voltage regulator
RVR-1(3) automatic step voltage regulator
 
Generator protection
Generator protectionGenerator protection
Generator protection
 
Substations
SubstationsSubstations
Substations
 
Introduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical designIntroduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical design
 
Power Grid Control System
Power Grid Control SystemPower Grid Control System
Power Grid Control System
 
Transformer Diagnostics Technique
Transformer Diagnostics TechniqueTransformer Diagnostics Technique
Transformer Diagnostics Technique
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
signal generator(pradeep to batch 08)
signal generator(pradeep to batch 08)signal generator(pradeep to batch 08)
signal generator(pradeep to batch 08)
 
Grid synchronisation
Grid synchronisationGrid synchronisation
Grid synchronisation
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradun
 
Substation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.pptSubstation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.ppt
 
Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...
 
Nidec asi soft starters-mv-e
Nidec asi soft starters-mv-eNidec asi soft starters-mv-e
Nidec asi soft starters-mv-e
 
07 modelling.electric.motors
07 modelling.electric.motors07 modelling.electric.motors
07 modelling.electric.motors
 

Similar to 2311 s5500 checkout & comm. of elec. equip, rev. a 8

2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised
Basudev patra
 
2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts
Khalid Sithari
 
200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx
AmitNag22
 
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions FinalDo's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
Jim White
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
RAJPRASAD RS
 

Similar to 2311 s5500 checkout & comm. of elec. equip, rev. a 8 (20)

AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised
 
16950
1695016950
16950
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
 
Lecture 3.pdf ,
Lecture 3.pdf                                         ,Lecture 3.pdf                                         ,
Lecture 3.pdf ,
 
electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
 
2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx
 
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
 
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions FinalDo's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
 
11.docx
11.docx11.docx
11.docx
 
Electrical Lessons learned
Electrical Lessons learnedElectrical Lessons learned
Electrical Lessons learned
 
CPUC - General Orders 95, 128 & 165
CPUC - General Orders 95, 128 & 165CPUC - General Orders 95, 128 & 165
CPUC - General Orders 95, 128 & 165
 
Data Teknis Gossen Metrawatt : PROFITEST EMOBILITY
Data Teknis Gossen Metrawatt : PROFITEST EMOBILITYData Teknis Gossen Metrawatt : PROFITEST EMOBILITY
Data Teknis Gossen Metrawatt : PROFITEST EMOBILITY
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihal
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
hublikarsn
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 

2311 s5500 checkout & comm. of elec. equip, rev. a 8

  • 1. Checkout and Commissioning of Electrical Equipment Dibi EPS Offsites M:Engineering2311 DIBI Offsite3 - Engineering3.2 - Specifications2311-S5500 Checkout and Commissioning of Electrical Equipment2311-S5500, Rev. A2311-S5500 Checkout & Comm. of Elec. Equip, Rev. A.doc 11/04/05 Page 8 of 39 v. The correct operation of all shutdown safety devices, such as limit switches, shall be checked. w. The proper phasing of all connections and phase rotation of all rotating machines shall be checked. x. Motors shall be checked for proper rotation before coupling or connecting to the load. 3.3.3 Ground System Tests a. This section covers the minimum testing requirements for grounding systems. The Contractor is responsible for the adequate grounding of all equipment in accordance with NFPA No. 70, National Electrical Code (NEC) and the Technical Requirements. b. The resistance between the grounding grid and the following grounding points shall not exceed 1 ohm: • Each point used to ground platform lightning protection equipment. • Each point used to ground electrical equipment enclosures. • Each point used to ground wiring support systems such as cable armor, conduits, and trays. c. The resistance between the grounding grid and system neutrals shall not exceed the following: • 600-volt or less equipment - 1 ohm • High-resistance ground system - 15 ohms • Low-resistance ground systems - 1 ohm 3.3.4 Insulation Resistance Tests a. Insulation resistance tests shall be conducted prior to energizing the equipment. b. A 500-volt DC megger shall be utilized for low-voltage equipment (600 volts and below), and either 1000-volt or 5000- volt DC megger shall be utilized for high-voltage equipment (above 600 volts). c. As applicable, Contractor shall measure and record resistances of the following on the check sheets: