SlideShare a Scribd company logo
1 of 6
Duane Pooley
Project Manager
As Project Manager, Duane Pooley is responsible for overseeing the construction projects. My
duties included ensuring that Project achieves the planned safety, quality, productivity and
financial goals on each assigned construction project. As Project Manager, He has proven abilities
and skills in leadership and management of people, training, negotiations, planning, organization,
estimating, Hard Dollar, Suretrack, Primavera P3 and P6 CPM project scheduling. I have NCCER
Cranes and Rigging Certifications, capable of crane lift planning and approving. 24 hour MSHA
Training. Job cost forecasting responsible for P & L on all my Projects. Problem solving and
reporting, contract negotiations and administration. I will set standards of excellence in
leadership, safety, quality and productivity for my areas of responsibility and will be able to
communicate and enforce your Company philosophies, policies, practices and procedures on all
assigned projects.
EXPERIENCE
I have worked in the construction industry for over 36 year.
Senior Estimator,
I was stationed out of the Englewood, Co. office working on Industrial
estimates and managing bid proposals for TIC. 2012- 2013
Project Manager
Project Phoenix Mt. Pass, Ca. The owner is MolyCorp. This is a Rare Earths
mine the largest in the US. We installed 3 Crushers 1 Jaw, 2 Cones, Screens,
conveyors, Feeders, Stackers, Ball Mill, Flotation circuit, Concentration
system, Paste Tails Plant with 3 large Filter Presses 30’x 8’, 82’ Thickener,
and a Veolia Water Treatment Plant. Peak Manpower was just over 500. CV
$85M. 2011- 2012
Senior Estimator,
Project/Mechanical estimating in the Tucson office for 1 year. I typically did
this between Projects. 2009- 2011
Project Manager
Springerville Unit 4 Project, this is a sub- critical pulverized coal steam-
electric generating station designed for a base load operation with a
nominal net power output of 400 MW. We installed all the Electrical and
Instrumentation, all Piping including the High Energy Chrome piping lines, all
BOP Mechanical including the Steam Condenser and Boiler Feed Pumps,
Coal Handling System, Bag House, Water Treatment System upgrade. Peak
Manpower just over 400, Total hours worked just under 1 Million. CV $95M
Pooley, Duane
Page 2
Finished ahead of Schedule and $8M under Budget. 2007- 2009
Construction Manager at the Phoenix Mill Project in Battle Mt. Nv. For Newmont Mining
Corporation. I worked for the general contractor on the installation of a 35,000 TPD gold process
concentrator. we installed 2 Ball Mills 21’x 33’, 1 Gearless Sag Mill 36’x 16.5’, 1 Gyratory Crusher
50”x 65”, 1 Cone Crusher, Conveyors, 2 Stackers, 4 Feeders, Flotation Cells, CIP Cells, a Gold Refinery,
Filtration Units, Copper Concentrate Load Out and BOP Equipment. Peak Man Power over 300, Total
hours worked over ½ Million. CV $60M. 2007-2008
Construction Manager, Santan Expansion Project, Gilbert, Arizona, location; Salt River Project,
owner; Sargent & Lundy, engineers. I worked for the general contractor on the installation of
Electrical, Mechanical Equipment and Above Ground Piping for a 2 on 1 GE 7 FA 550MW
Combined Cycle Power Plant. 2 Alstom HRSGs with Duct Firing Burners and SCRs. Peak Man
Power over 500, a new Water Treatment Plant. Steam Blows and Start-up. Total hours worked
over ¾ of a Million. CV $43M
Construction Manager, Kyrene Expansion Project, Tempe, Arizona, location; Salt River Project,
owner; Stanley Consultants Inc. engineer. We performed the mechanical and electrical Heat
Recovery Steam Generator and Balance of Plant installations for a 1 on 1 - 250 MW Combined
Cycle Power Plant. The power generation equipment installed was a GE 7FA Combustion
Turbine/Generator and a GE A10 Steam Turbine/Generator installed by others. The major
equipment installed was an Alstom 2x5-3 pressure level boiler, Alstom Condenser, GSU
transformers, new water treatment facilities, 2500 HP boiler feed and 800 HP circulating water
pumps, and miscellaneous pumps, transformers, and electrical equipment. Steam Blows and Start-
up. Peak Manpower 250 CV $34M
Construction Manager, West Phoenix Unit 4 Expansion Project, location; Phoenix, Arizona,
owner; Pinnacle West Energy, Engineer; Utility Engineers. We were a joint venture partner with
UE for the plant design, construction and balance of for a 1 on 1- 120 Mw Combined Cycle
Power Plant Expansion. Upgraded the Water Treatment Plant. Peak Manpower 120 CV $30M
We Finished 2 months ahead of schedule.
Construction Manager, Oxygen Plant, Carlin, Nevada, location; Air Products and Chemicals, Inc.,
owner/engineer. I worked for the general contractor on installation of the mechanical, piping, E&I
for an 1100 TPD Oxygen Plant that supplies oxygen to the Newmont Roster.
Construction Manager, Low Nox Burner Project, Moapa, Nevada, location; Nevada Power
Company, owner, Foster Wheeler Energy Corporation, Construction Manager and Engineer. TIC
was the general contractor for installation of the low Nox Burners, ancillary equipment, all
electrical and Instrumentation, Rebuilt 2 -100 MW Coal Fired Boilers, and upgraded to a DCS
Controls System at the Reid Gardner Station Units 1 & 2. It is located 50 north of Las Vegas,
Pooley, Duane
Page 3
Nv.
Construction Manager, Ruby Hill Gold Mine, Eureka, Nevada, location; Homestake Mining
Company, owner; Kilborn International, Inc., construction manager and engineer. TIC was the
general contractor for the construction of a 3,500 TPD Gold Mill utilizing Crushing, Grinding,
leaching and refining to produce gold. We constructed a new water treatment plant. This was a
grass-roots project with two ore bodies, low grade (to a leach field) and a high-grade ore
processed by conventional means. We installed 1 used Kue-ken jaw Crusher, 1 Cone Crusher, 1
used Ball Mill 10.5’x 16’, several Conveyors, 2 Belt Filters, Agglomeration Drum, Feeders, BOP
Equipment. A new Truck Shop for the Mine Haul Trucks. Peak Manpower 100, CV $15M
Project Manager, Reclaim Modifications, Ely, Nevada, location; BHP Copper, Inc., owner; ICF
Kaiser Engineers, Inc., engineers. I worked for the general contractor on modifications to the
Coarse Ore System which included Rebuilding the reclaim tunnel. Three primary belt feeders
were removed by disassembling and removing through the existing ore slots of the reclaim tunnel.
Replaced the Feeder support Steel with heaver members. Concrete penthouses were demolished
and the concrete ore slots extended. Electrical work included installation of a new duct bank
from the electrical room to the reclaim tunnel cable tray, saw cut new openings in 6’ thick
concrete reclaim tunnel, and all associated connections for the by-pass conveyor and new Apron
feeders. During this work the Plant ran full production using a temp by-pass Conveyor we
installed. This work was preformed over an operating Sag Mill Feed Conveyor and we never had
an unplanned shut-down.
Project Manager, Production Shaft Head frame, Golconda, Nevada, location; FirstMiss Gold,
Inc., owner and engineer. TIC was the general contractor for the construction of an estimated
2,000' mineshaft head frame. This included construction of the No. 2 shaft collar, subcollar and
hoist
House, erection of the No. 2 shaft head frame and backlegs which included 330 tons of owner-
supplied structural steel. Rebuild and install used Hoist.
Mechanical/Structural Superintendent, Robinson Project, Ely, Nevada, location; Magma Nevada
Mining Company, owner; ICF-Kaiser Engineers, Inc., engineers. Scope of work was construction
of a 46,000 TPD sulfide copper concentrator facility utilizing crushing, reclaim, grinding, flotation
and loadout circuits to produce 600 to 700 TPD copper concentrate. I was over all the Structural
and Mechanical work. 2 BALL MILLS 20’X 30’ each had a 8750 HP Drive Motor, 1 SAG MILL
32’X 15’ with 2-5000 HP Drive Motors, 2 Tower Mills 11’x 40’, 1 Gyratory Crusher 54’x 74’,
Conveyors, 760’ Stacking Conveyor with a 750 hp drive motor, Water Treatment Plant, Feeders,
Tanks, Sumps, Flotation, Filtration, Copper Concentrate Load Out, 2-230’diameter Tailings
Thickeners, bop, ect.. We erected over 4,700 tons of steel. Peak manpower 447, Total man hours
spent just over 1 Million. CV $65M
Project Superintendent, Reona Project - Crushing Plant, Battle Mountain, Nevada, location;
Pooley, Duane
Page 4
Battle Mountain Gold Company, owner. Construction of a 10,000 ton/day crushing and
screening facility.
1 Jaw Crusher and 1 Cone Crusher, several Conveyors and Feeders.
Project Superintendent, Sulfide Plant, Valmy, Nevada, location; Lone Tree Mining, Inc., owner;
Kilborn Engineering, engineer. TIC was the contractor for the Lone Tree 2500 TPD sulfide mill.
We installed all Piping, Electrical, Instrumentation, Structural Steel, 1 Autoclave, Geho Autoclave Feed
Pumps, 1 Boiler and bop Equipment.
Project Superintendent, Oxygen Plant, Valmy, Nevada, location; Air Products & Chemicals, Inc.,
owner/engineer. TIC was the general contractor for the construction of a 225 TPD oxygen plant.
We installed all Concrete, Structural Steel, E&I, Piping, Insulation, Plant Equipment, and Start-
up.
Area Superintendent, Rye Patch Geothermal, Humboldt, Nevada, location; Rye Patch Ltd.
Partnership, owner. TIC was the EPC contractor for the construction of a 12.5 Mw geothermal
power plant including plant and gathering system and substation.
Project Superintendent, North Block Leaching Facility, Carlin, Nevada, location; Barrick
Goldstrike Mines, Inc., owner; Kilborn Management Services, Inc., engineer. This was a “State of
the art” Heap Leach Process. Scope of work included the installation of the leach area pond
pumping, piping, all E&I work, Structural Steel, Plant Equipment for the gold absorption
facilities.
Project Superintendent, Phase II, Barrick Gold Strike Mines, Inc., owner; Kilborn Management
Services, engineer. TIC was the general contractor for Barrick Goldstrike Mines, Phase II
Expansion including additional grinding circuit and two new autoclaves with associated leaching,
stripping and refining systems. I was over the grinding circuit, 1 ball mill 16.5’x 30.5’,1 sag mill
12’x 24’ 1 cone crusher, 1 rotary kiln upgrade the cil area, and bop.
Area Superintendent, Barrick Grinding Facility, Carlin, Nevada, location; Barrick Goldstrike
Mines, Inc., owner; Kilborn Management Services, Inc., engineer. TIC was the general contractor
for installation of grinding facilities including SAG mill, ball mill and conveyor system and related
piping and pumping systems.
Project Superintendent, Second Sleeper Mill Expansion Project, Winnemucca, Nevada, location;
Nevada Gold Mining, Inc., owner; BEI Engineers. TIC was the general contractor to expand the
milling capacity of the existing Sleeper Gold Project, from 1500 TPD to 3000. WE ADDED A
Pooley, Duane
Page 5
USED BALL MILL, AND BOP. We preformed all with plant running in full operation.
Project Superintendent, Denton-Rawhide Tertiary Crusher Addition, Fallon, Nevada, location;
Kennecott Rawhide Mining Company, owner; Roberts & Schaefer Company, architect. Scope of
work included the electrical portion of the addition of two-tertiary crushers, two conveyors and
associated sub-systems. We added 2 cone crushers and conveyors, 2 vibratory screens and bop;
we preformed all work with plant running at full operation.
Pooley, Duane
Page 5
USED BALL MILL, AND BOP. We preformed all with plant running in full operation.
Project Superintendent, Denton-Rawhide Tertiary Crusher Addition, Fallon, Nevada, location;
Kennecott Rawhide Mining Company, owner; Roberts & Schaefer Company, architect. Scope of
work included the electrical portion of the addition of two-tertiary crushers, two conveyors and
associated sub-systems. We added 2 cone crushers and conveyors, 2 vibratory screens and bop;
we preformed all work with plant running at full operation.

More Related Content

What's hot (20)

JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Max Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History Details
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
0001 RICHARD_V_SHAFFER - Latest Resume Jan 2017
0001 RICHARD_V_SHAFFER -  Latest Resume Jan 20170001 RICHARD_V_SHAFFER -  Latest Resume Jan 2017
0001 RICHARD_V_SHAFFER - Latest Resume Jan 2017
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
DMacLellan2015
DMacLellan2015DMacLellan2015
DMacLellan2015
 
Cantrell Steve H
Cantrell Steve HCantrell Steve H
Cantrell Steve H
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIR
 
CV Shukla
CV ShuklaCV Shukla
CV Shukla
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
BDSResume1
BDSResume1BDSResume1
BDSResume1
 

Viewers also liked

Viewers also liked (6)

Resume_Monica
Resume_MonicaResume_Monica
Resume_Monica
 
piendel resume-2014
piendel resume-2014piendel resume-2014
piendel resume-2014
 
Eric VanAuken detailed resume
Eric VanAuken detailed resumeEric VanAuken detailed resume
Eric VanAuken detailed resume
 
RESUME_SOPHIA OH JIA YING
RESUME_SOPHIA OH JIA YINGRESUME_SOPHIA OH JIA YING
RESUME_SOPHIA OH JIA YING
 
Careerpath resume
Careerpath resumeCareerpath resume
Careerpath resume
 
WFH Resume
WFH ResumeWFH Resume
WFH Resume
 

Similar to Duane Pooley's 36-Year Construction Project Management Experience

Similar to Duane Pooley's 36-Year Construction Project Management Experience (20)

Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Sampling of Eagle West Wind Energy Projects
Sampling of Eagle West Wind Energy ProjectsSampling of Eagle West Wind Energy Projects
Sampling of Eagle West Wind Energy Projects
 
Engineering Experience Scott Bullock August 2016
Engineering Experience Scott Bullock August 2016Engineering Experience Scott Bullock August 2016
Engineering Experience Scott Bullock August 2016
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015
 
Michael Craig company resume
Michael Craig company resume Michael Craig company resume
Michael Craig company resume
 
CV_Rockandel_08-2015
CV_Rockandel_08-2015CV_Rockandel_08-2015
CV_Rockandel_08-2015
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CV
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdf
 
C.V.
C.V.C.V.
C.V.
 
CSorochak CV 1411
CSorochak CV 1411CSorochak CV 1411
CSorochak CV 1411
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
KASHIF DADA - Projects List
KASHIF DADA - Projects ListKASHIF DADA - Projects List
KASHIF DADA - Projects List
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 

Duane Pooley's 36-Year Construction Project Management Experience

  • 1. Duane Pooley Project Manager As Project Manager, Duane Pooley is responsible for overseeing the construction projects. My duties included ensuring that Project achieves the planned safety, quality, productivity and financial goals on each assigned construction project. As Project Manager, He has proven abilities and skills in leadership and management of people, training, negotiations, planning, organization, estimating, Hard Dollar, Suretrack, Primavera P3 and P6 CPM project scheduling. I have NCCER Cranes and Rigging Certifications, capable of crane lift planning and approving. 24 hour MSHA Training. Job cost forecasting responsible for P & L on all my Projects. Problem solving and reporting, contract negotiations and administration. I will set standards of excellence in leadership, safety, quality and productivity for my areas of responsibility and will be able to communicate and enforce your Company philosophies, policies, practices and procedures on all assigned projects. EXPERIENCE I have worked in the construction industry for over 36 year. Senior Estimator, I was stationed out of the Englewood, Co. office working on Industrial estimates and managing bid proposals for TIC. 2012- 2013 Project Manager Project Phoenix Mt. Pass, Ca. The owner is MolyCorp. This is a Rare Earths mine the largest in the US. We installed 3 Crushers 1 Jaw, 2 Cones, Screens, conveyors, Feeders, Stackers, Ball Mill, Flotation circuit, Concentration system, Paste Tails Plant with 3 large Filter Presses 30’x 8’, 82’ Thickener, and a Veolia Water Treatment Plant. Peak Manpower was just over 500. CV $85M. 2011- 2012 Senior Estimator, Project/Mechanical estimating in the Tucson office for 1 year. I typically did this between Projects. 2009- 2011 Project Manager Springerville Unit 4 Project, this is a sub- critical pulverized coal steam- electric generating station designed for a base load operation with a nominal net power output of 400 MW. We installed all the Electrical and Instrumentation, all Piping including the High Energy Chrome piping lines, all BOP Mechanical including the Steam Condenser and Boiler Feed Pumps, Coal Handling System, Bag House, Water Treatment System upgrade. Peak Manpower just over 400, Total hours worked just under 1 Million. CV $95M
  • 2. Pooley, Duane Page 2 Finished ahead of Schedule and $8M under Budget. 2007- 2009 Construction Manager at the Phoenix Mill Project in Battle Mt. Nv. For Newmont Mining Corporation. I worked for the general contractor on the installation of a 35,000 TPD gold process concentrator. we installed 2 Ball Mills 21’x 33’, 1 Gearless Sag Mill 36’x 16.5’, 1 Gyratory Crusher 50”x 65”, 1 Cone Crusher, Conveyors, 2 Stackers, 4 Feeders, Flotation Cells, CIP Cells, a Gold Refinery, Filtration Units, Copper Concentrate Load Out and BOP Equipment. Peak Man Power over 300, Total hours worked over ½ Million. CV $60M. 2007-2008 Construction Manager, Santan Expansion Project, Gilbert, Arizona, location; Salt River Project, owner; Sargent & Lundy, engineers. I worked for the general contractor on the installation of Electrical, Mechanical Equipment and Above Ground Piping for a 2 on 1 GE 7 FA 550MW Combined Cycle Power Plant. 2 Alstom HRSGs with Duct Firing Burners and SCRs. Peak Man Power over 500, a new Water Treatment Plant. Steam Blows and Start-up. Total hours worked over ¾ of a Million. CV $43M Construction Manager, Kyrene Expansion Project, Tempe, Arizona, location; Salt River Project, owner; Stanley Consultants Inc. engineer. We performed the mechanical and electrical Heat Recovery Steam Generator and Balance of Plant installations for a 1 on 1 - 250 MW Combined Cycle Power Plant. The power generation equipment installed was a GE 7FA Combustion Turbine/Generator and a GE A10 Steam Turbine/Generator installed by others. The major equipment installed was an Alstom 2x5-3 pressure level boiler, Alstom Condenser, GSU transformers, new water treatment facilities, 2500 HP boiler feed and 800 HP circulating water pumps, and miscellaneous pumps, transformers, and electrical equipment. Steam Blows and Start- up. Peak Manpower 250 CV $34M Construction Manager, West Phoenix Unit 4 Expansion Project, location; Phoenix, Arizona, owner; Pinnacle West Energy, Engineer; Utility Engineers. We were a joint venture partner with UE for the plant design, construction and balance of for a 1 on 1- 120 Mw Combined Cycle Power Plant Expansion. Upgraded the Water Treatment Plant. Peak Manpower 120 CV $30M We Finished 2 months ahead of schedule. Construction Manager, Oxygen Plant, Carlin, Nevada, location; Air Products and Chemicals, Inc., owner/engineer. I worked for the general contractor on installation of the mechanical, piping, E&I for an 1100 TPD Oxygen Plant that supplies oxygen to the Newmont Roster. Construction Manager, Low Nox Burner Project, Moapa, Nevada, location; Nevada Power Company, owner, Foster Wheeler Energy Corporation, Construction Manager and Engineer. TIC was the general contractor for installation of the low Nox Burners, ancillary equipment, all electrical and Instrumentation, Rebuilt 2 -100 MW Coal Fired Boilers, and upgraded to a DCS Controls System at the Reid Gardner Station Units 1 & 2. It is located 50 north of Las Vegas,
  • 3. Pooley, Duane Page 3 Nv. Construction Manager, Ruby Hill Gold Mine, Eureka, Nevada, location; Homestake Mining Company, owner; Kilborn International, Inc., construction manager and engineer. TIC was the general contractor for the construction of a 3,500 TPD Gold Mill utilizing Crushing, Grinding, leaching and refining to produce gold. We constructed a new water treatment plant. This was a grass-roots project with two ore bodies, low grade (to a leach field) and a high-grade ore processed by conventional means. We installed 1 used Kue-ken jaw Crusher, 1 Cone Crusher, 1 used Ball Mill 10.5’x 16’, several Conveyors, 2 Belt Filters, Agglomeration Drum, Feeders, BOP Equipment. A new Truck Shop for the Mine Haul Trucks. Peak Manpower 100, CV $15M Project Manager, Reclaim Modifications, Ely, Nevada, location; BHP Copper, Inc., owner; ICF Kaiser Engineers, Inc., engineers. I worked for the general contractor on modifications to the Coarse Ore System which included Rebuilding the reclaim tunnel. Three primary belt feeders were removed by disassembling and removing through the existing ore slots of the reclaim tunnel. Replaced the Feeder support Steel with heaver members. Concrete penthouses were demolished and the concrete ore slots extended. Electrical work included installation of a new duct bank from the electrical room to the reclaim tunnel cable tray, saw cut new openings in 6’ thick concrete reclaim tunnel, and all associated connections for the by-pass conveyor and new Apron feeders. During this work the Plant ran full production using a temp by-pass Conveyor we installed. This work was preformed over an operating Sag Mill Feed Conveyor and we never had an unplanned shut-down. Project Manager, Production Shaft Head frame, Golconda, Nevada, location; FirstMiss Gold, Inc., owner and engineer. TIC was the general contractor for the construction of an estimated 2,000' mineshaft head frame. This included construction of the No. 2 shaft collar, subcollar and hoist House, erection of the No. 2 shaft head frame and backlegs which included 330 tons of owner- supplied structural steel. Rebuild and install used Hoist. Mechanical/Structural Superintendent, Robinson Project, Ely, Nevada, location; Magma Nevada Mining Company, owner; ICF-Kaiser Engineers, Inc., engineers. Scope of work was construction of a 46,000 TPD sulfide copper concentrator facility utilizing crushing, reclaim, grinding, flotation and loadout circuits to produce 600 to 700 TPD copper concentrate. I was over all the Structural and Mechanical work. 2 BALL MILLS 20’X 30’ each had a 8750 HP Drive Motor, 1 SAG MILL 32’X 15’ with 2-5000 HP Drive Motors, 2 Tower Mills 11’x 40’, 1 Gyratory Crusher 54’x 74’, Conveyors, 760’ Stacking Conveyor with a 750 hp drive motor, Water Treatment Plant, Feeders, Tanks, Sumps, Flotation, Filtration, Copper Concentrate Load Out, 2-230’diameter Tailings Thickeners, bop, ect.. We erected over 4,700 tons of steel. Peak manpower 447, Total man hours spent just over 1 Million. CV $65M Project Superintendent, Reona Project - Crushing Plant, Battle Mountain, Nevada, location;
  • 4. Pooley, Duane Page 4 Battle Mountain Gold Company, owner. Construction of a 10,000 ton/day crushing and screening facility. 1 Jaw Crusher and 1 Cone Crusher, several Conveyors and Feeders. Project Superintendent, Sulfide Plant, Valmy, Nevada, location; Lone Tree Mining, Inc., owner; Kilborn Engineering, engineer. TIC was the contractor for the Lone Tree 2500 TPD sulfide mill. We installed all Piping, Electrical, Instrumentation, Structural Steel, 1 Autoclave, Geho Autoclave Feed Pumps, 1 Boiler and bop Equipment. Project Superintendent, Oxygen Plant, Valmy, Nevada, location; Air Products & Chemicals, Inc., owner/engineer. TIC was the general contractor for the construction of a 225 TPD oxygen plant. We installed all Concrete, Structural Steel, E&I, Piping, Insulation, Plant Equipment, and Start- up. Area Superintendent, Rye Patch Geothermal, Humboldt, Nevada, location; Rye Patch Ltd. Partnership, owner. TIC was the EPC contractor for the construction of a 12.5 Mw geothermal power plant including plant and gathering system and substation. Project Superintendent, North Block Leaching Facility, Carlin, Nevada, location; Barrick Goldstrike Mines, Inc., owner; Kilborn Management Services, Inc., engineer. This was a “State of the art” Heap Leach Process. Scope of work included the installation of the leach area pond pumping, piping, all E&I work, Structural Steel, Plant Equipment for the gold absorption facilities. Project Superintendent, Phase II, Barrick Gold Strike Mines, Inc., owner; Kilborn Management Services, engineer. TIC was the general contractor for Barrick Goldstrike Mines, Phase II Expansion including additional grinding circuit and two new autoclaves with associated leaching, stripping and refining systems. I was over the grinding circuit, 1 ball mill 16.5’x 30.5’,1 sag mill 12’x 24’ 1 cone crusher, 1 rotary kiln upgrade the cil area, and bop. Area Superintendent, Barrick Grinding Facility, Carlin, Nevada, location; Barrick Goldstrike Mines, Inc., owner; Kilborn Management Services, Inc., engineer. TIC was the general contractor for installation of grinding facilities including SAG mill, ball mill and conveyor system and related piping and pumping systems. Project Superintendent, Second Sleeper Mill Expansion Project, Winnemucca, Nevada, location; Nevada Gold Mining, Inc., owner; BEI Engineers. TIC was the general contractor to expand the milling capacity of the existing Sleeper Gold Project, from 1500 TPD to 3000. WE ADDED A
  • 5. Pooley, Duane Page 5 USED BALL MILL, AND BOP. We preformed all with plant running in full operation. Project Superintendent, Denton-Rawhide Tertiary Crusher Addition, Fallon, Nevada, location; Kennecott Rawhide Mining Company, owner; Roberts & Schaefer Company, architect. Scope of work included the electrical portion of the addition of two-tertiary crushers, two conveyors and associated sub-systems. We added 2 cone crushers and conveyors, 2 vibratory screens and bop; we preformed all work with plant running at full operation.
  • 6. Pooley, Duane Page 5 USED BALL MILL, AND BOP. We preformed all with plant running in full operation. Project Superintendent, Denton-Rawhide Tertiary Crusher Addition, Fallon, Nevada, location; Kennecott Rawhide Mining Company, owner; Roberts & Schaefer Company, architect. Scope of work included the electrical portion of the addition of two-tertiary crushers, two conveyors and associated sub-systems. We added 2 cone crushers and conveyors, 2 vibratory screens and bop; we preformed all work with plant running at full operation.