SlideShare a Scribd company logo
1 of 3
Seasoned engineer with over 26 years of proven success in management and power plant operations, an expertise in commissioning,
coordination, startup, and operations enhancement, and exemplary leadership acumen seeking position to contribute to organization’s
further success as an Commissioning/ Startup Manager of combined cycle power plants and in the oil and gas industries.
SUMMARY OF QUALIFICATIONS
Relationship-Builder | Team-Player | Self-Motivated | Analytically Minded | Problem-Solver | Achiever Result-Oriented | Exemplary Work Ethics |
Ambitious & Goal Driven | Talented Time Manager
PROFESSIONAL EXPERIENCE
Spencer Ogden assigned to Southern Company/Mississippi Power, Title: Mechanical Commissioning Coordinator Mechanical Commissioning
Coordinator
• Mississippi Power Company (MPC) is constructing an advanced coal technology project in Kemper County, Mississippi that
incorporates the air-blown Transport Integrated Gasifier (TRIGTM
) technology. The project is a lignite-fueled 2-on-1 Integrated
Gasification Combined-Cycle (IGCC) facility. The IGCC plant will employ state-of-the-art emission controls and will be owned and
operated by Mississippi Power Company (MPC). The estimated nameplate capacity of the plant will be 830 MW, with an estimated net
output capability of 582 MW at a heat rate of 11,529 Btu/kWh (29.6 percent efficiency – HHV basis).
I help write the Startup procedures for the Solids Handling System, Worked with the (AGR) Acid Gas Recovery in receiving Selexol,
worked with the Compressor Group with flushing their equipment. Go between Air Liquide and Southern Company and work with the
Nitrogen Group with preparation and conducting air blows and pressure tests. 04/2014 - Present
Mechanical Commissioning Specialist at the R. M. Schahfer FGD & WWT Project located in Wheatfield Indiana, Title: Senior Associate 1
• Commissioning and Start up of the Limestone Slurry Forced Oxidation Flue Gas Desulphurization (FGD) .One FGD system is provided
per unit to treat the flue gas produced by NIPSCO Schahfer Units 14 & 15 coal fired boilers. Also started up the (DSI) Dry Sorbent
Injection System, and worked WWT Waste Water System. 07/2013 – 4/2014
Mechanical Operation’s Engineer.
Kiewit (DWP) Department of Water and Power Long Beach Ca.
The project are start-up six (6) GE’s LMS100 New High Efficiency Simple Cycle Gas Turbine. 12/19/2012 – 5/2013
• Directed and counseled client supervisory personnel during the commissioning and initial start-up through acceptance of the project;
represented organization to senior level client personnel during the pre-commissioning, commissioning, test run, and acceptance of the
six GE LMS100.
THE SHAW GROUP
Commissioning Engineer
Dan River Project, Eden, NC 01/2012- 08/2012
Duke Buck Project, Salisbury NC 06/2011- 01/2012
Nevada Power, Harry Allen Project, Las Vegas Nevada 01/2011-06/2011
• The projects are Two GE 7FA’s Gas Turbines, Two Volt HRSG’s located at the exhaust end of the combustion turbine on a Combined
Cycle Plant with other support equipment
• Held full accountability for the job duties planning, prioritization, and delegation
• Directed and counseled client supervisory personnel during the commissioning and initial start-up through acceptance of the project;
represented organization to senior level client personnel during the pre-commissioning, commissioning, test run, and acceptance of the
plant
SHAW STONE AND WEBSTER ASIA (SWAI)
EPCT Project Lockout Tag-out Coordinator 02/09- 12/10
• Played a pivotal role in the Castle Peak Power Station Emissions Control Project through resourceful coordination and management of
permits with Construction, Commissioning, and Production Operations
• Acted as the focal point for Construction and Commissioning Teams to ensure adherence to safe work systems (Permit to Works,
SIMOPS, Task Risk Assessments, etc.); maintained PTW registers and controlled Long Term Isolation and Bypass Safety Device
registers
Shift Supervisor- EPC Global-Bechtel, Cheniere LNG Gas Plant. Cameron, LA. Sabine Pass LNG Plant. 07/2008-08/2008
General Electric Inland Empire Energy Center, LLC Romoland, CA
Mechanical Startup Engineer 01/2008-
05/2008
● Responsibilities included assisting with Flushing EHC Systems, ACW, CCW, CD, BFP commissioning and startup of each system for n
Washington Group International, San Juan Repowering Project, San Juan, Puerto Rico
Startup Engineer/ Shift Supervisor 3/2007-12/2007
• Responsible for assisting the start-up commissioning teams with all aspects of power plant operations.
• Worked as a Shift Supervisor during commissioning to train the local Puerto Rican Operators how to operate all plant systems.
• Two one-over-one Ansaldo Combustion Turbine associated with an Ansaldo Duel Pressure Integral Reheat Horizontal Stack HRSG.
• With a Siemens Westinghouse (SW) Tandem Compound Steam Turbine.
Penpower USA Commissioning Engineer Gas Turbine Centerline. 05/2005-03/2006
· Assisted General Electric (GE) with the commissioning and startup of GE (109 FA) Combustion Turbine and GE (AH14 HP/RH/LP )
Steam Turbine. Galway, Ireland
PPN Operator Gila River Energy Combined Cycle Project 07/2004-09/2004
B R A N D O N D . S T E E L E , S R .
162 Savannah LN | Calera, Al. 35040
(205) 451-9087/ (205)746-6749 | (205) 663-3927 |
brandonsteele@earthlink.net
• Demonstrated dedication to excellence while contributing to daily plant operations and assisting with consistent performance
enhancement efforts; worked in conjunction with peers during overhaul and PMs of plant equipment.
• Plant consisted of 8 GE 207 FA Hydrogen Cooled Combustion Turbine, and 4 D11 Hydrogen Cooled Steam Turbines, as well as an
Ovation DCS System to operate the plant
Startup, Commissioning, and Operation Dominion Fairless Energy Combined Cycle Project 03/2004-05/2004
• Facility consisted of 4 GE MS7001FA Gas Turbines, 2 STAG 207FA Steam Turbines, and 4 NEM HRSG’S
• Tasked with the units’ commissioning and startup oeprations support, while assisting and training the plant operators using a GE Mark
VI DCS system
• Administered the commissioning of the Close Cycle Cooling system (CCW), Service Water system (SW), Instrument / Plant Air system
(IA), Condensate System (CO), and Air Ejector System
Jamaica Public Service Company (JPS) Startup/ Commissioning/ Operation 06/2003-01/2004
• Facility consisted of Two GE 6FA 40mw Gas Turbine supplying Two ATS HRSG and one Nuevo Pignone 40mw Steam Turbine, along
with BOP equipment
• Commissioned the BOP section of the plant and led the startup of the GT’s and Steam Turbine; coordinated the chemical cleaning of
both HRSG, as well as steam blows; leveraged subject matter expertise to train operators and developed training documentation for
Jamaica Public Service Company training program
Charleston, MA. Startup/ Commissioning/Operation 07/2002-05/2003
• Facility consisted of Four (4) Mitsubishi Heavy Industries (MHI) 501G Hydrogen Cooled Combustion Turbine (GT), each associated
with a Deltak Triple Pressure Horizontal Stack Heat Recovery Steam Generator (HRSG); steam from both HRSG’s HP steam system is
fed to the high pressure side of a single Mitsubishi Heavy Industries Tandem Compound Hydrogen Cooled Steam Turbine (STG)
Responsible for Chemical Cleaning 2 of the 4 HRSG and the associated piping, Air and Steam Blows, Piping restoration after Steam
and Air Blows
• Assisted with the plant operators training, efficiently deploying Foxboro DCS system; tasked with the Close Cycle Cooling system
(CCW), Service Water system (SW), Instrument / Plant Air system (IA), Condensate System (CO), and Air Ejector System
commissioning
DFD, Moss Landing, CA Commissioning and Startup 04/2002-06/2002
• Served at DFD, Moss Landing, CA; facility consists of 4 x 7FA GE gas turbines and 2 GE stream turbines, Alstom HRSG and Foxboro
DCS.; assisted with each unit commissioning and start up, while educating and training 16 operators
• Developed and implemented diverse system procedures, resulting in performance efficiency enhancement
DFD, Eddystone, PA Lead Mechanical / Operation 10/2001-04/2002
• Assigned to DFD, Eddystone, PA; facility consists of 2 x 168.6MW GE Frame 7FA hydrogen cooled gas turbine generators with
Selected Catalytic Reduction for turbine exhaust emission control, 188.4MW. Toshiba hydrogen cooled steam turbine generator, two
HRSG’s with supplemental duct burners, cooling tower, Foxboro DCS, and all associated power block and BOP equipment; steered and
controlled fitters and labors mechanical work, while assisting with commissioning
• Issued lockout / tag-out clearance, as well as effectively monitored plan operations to ensure flawless performance
ABB Alstom, San Marcos, TX Shift Charge Engineer 06/2001-10/2001
• Acted as an integral part of the team at ABB Alstom, San Marcos, TX; facility consists of 1000MW plant, four ABB GT24/GT26 class
gas turbines, four ABB once through (HRSG) HRSG’s, two HP/LP (OTC) Once Through Cooler, air-cooling system, and ABB Advant
Power Control (DCIS) system; monitored plant operations and provided compelling leadership for the shift workers to facilitate effective
execution of assigned duties and ensure proper handling of arousing performance challenges
Nuevo Pignone, Dakar, Senegal, Africa Operations Supervisor 01/2001-05/2001
• Worked at Nuevo Pignone., Dakar, Senegal, Africa; facility consists of Nuevo Pignone/GE Frame 6 gas turbine, 21MS GE steam
turbine, and CCT dual pressure HRSG, and Moore DCS
• Created and integrated innovative procedures, as well as wrote turnover package; supervised shit operators
Florida Power & Light, Kissimmee, Florida Turn Over Package Coordinator 10/2000-12/2000
• Collected data upon job completion to ensure compliance with the P&ID’s, Mechanical, Piping, and Electrical Drawing; performed
fuel and oil system checks to sustain 100% service readiness
• Created a detailed list to track items, turned over back to construction for completion; units were three GE frame 6 Simple Cycle
Combustion Turbine
GE Contractual Services, Tri Energy IPP Project at Ratchaburi, Thailand Startup Mechanical/Operator 09/1999-08/2000
• Facility consists of 750MW combine cycle plant, two GE MS9001FA gas turbines, hydrogen cooled generator, two Nooter Erikson triple
pressure HRSG’s with reheat, one reheat steam turbine, two Combustion turbine generators (CTs) and the steam turbine/generator
(ST), and associated water treatment plant and auxiliaries with total plant capacity of 750 MW, Mark V and Bailey Infi-90/Symphony
(DCIS) systems
• Provided comprehensive assistance for the start-up commissioning teams with all aspects of power plant operations
• Worked as a Shift Supervisor during commissioning to train the local Thai Operators plant systems oeprations
• Cooperated resourcefully with the GE management staff to develop operating procedures and create an efficient qualification/training
program.
Aqua-Chem, Inc. Qarn Alam Crestal Steam Injection Project. Oman Process Control Operator 088/1998-08/1999
• Facility consists of two Thermo tic gas fired steam generators utilizing Aqua-Chem seed slurry brine concentrator, water treatment
plant, and Foxboro DCS system.
• Spearheaded the refurbishment, startup, and operation efforts; coordinate the injection of the steam into ground to raise temperature of
earth to cause trapped oil flow to reservoirs to be pumped to storage tanks
• Managed the provision of water for steam generators and potable water system for camps and villages in surrounding areas; monitored
related activities
OTHER EMPLOYMENT
Plant Manager • Galax Energy Concepts, LLC • 11/1996-08/1998 Control Room Operator/Shift Supervisor • Hydra-Co Operation • 06/1990-
10/1996
CERTIFICATIONS
Energy Factors, Inc. Steam Plant Training. Class II Certification • 1987 | Waukesha Engine School, Waukesha, WI • 1986
Energy Factors, Inc. Calgon Chemistry Class. Certification • 1986
References Available Upon Request

More Related Content

What's hot

JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJames Stults
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 
CASE STUDY: Two Harbors Municipal Power Plant
CASE STUDY: Two Harbors Municipal Power PlantCASE STUDY: Two Harbors Municipal Power Plant
CASE STUDY: Two Harbors Municipal Power PlantAditi Paul
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad GilbertThad Gilbert
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.Russell Bruce
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas MathewThomas Mathew
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine SystemPeter Bright
 
CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016timmy o'donoghue
 

What's hot (19)

CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
CASE STUDY: Two Harbors Municipal Power Plant
CASE STUDY: Two Harbors Municipal Power PlantCASE STUDY: Two Harbors Municipal Power Plant
CASE STUDY: Two Harbors Municipal Power Plant
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
WARREN2016AFebResume
WARREN2016AFebResumeWARREN2016AFebResume
WARREN2016AFebResume
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
SENTHIL PANDIAN CV
SENTHIL PANDIAN CVSENTHIL PANDIAN CV
SENTHIL PANDIAN CV
 
RES
RESRES
RES
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine System
 
CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016
 

Similar to BDSResume1

Similar to BDSResume1 (20)

William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
JESEDLOPECCV042017
JESEDLOPECCV042017JESEDLOPECCV042017
JESEDLOPECCV042017
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
Zhanyun Liu - CV standard
Zhanyun Liu - CV standardZhanyun Liu - CV standard
Zhanyun Liu - CV standard
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.Reda CV
M.Reda CVM.Reda CV
M.Reda CV
 
Sudhanshu Final
Sudhanshu FinalSudhanshu Final
Sudhanshu Final
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
TPCIL VIVEK
TPCIL VIVEKTPCIL VIVEK
TPCIL VIVEK
 
abid1
abid1abid1
abid1
 
Rudy CV2-1
Rudy CV2-1Rudy CV2-1
Rudy CV2-1
 
Resume-Warsame March 2016
Resume-Warsame March 2016Resume-Warsame March 2016
Resume-Warsame March 2016
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
dipankar bandyopadhyay_6787_GR_A
dipankar bandyopadhyay_6787_GR_Adipankar bandyopadhyay_6787_GR_A
dipankar bandyopadhyay_6787_GR_A
 
JANARDAN
JANARDANJANARDAN
JANARDAN
 

BDSResume1

  • 1. Seasoned engineer with over 26 years of proven success in management and power plant operations, an expertise in commissioning, coordination, startup, and operations enhancement, and exemplary leadership acumen seeking position to contribute to organization’s further success as an Commissioning/ Startup Manager of combined cycle power plants and in the oil and gas industries. SUMMARY OF QUALIFICATIONS Relationship-Builder | Team-Player | Self-Motivated | Analytically Minded | Problem-Solver | Achiever Result-Oriented | Exemplary Work Ethics | Ambitious & Goal Driven | Talented Time Manager PROFESSIONAL EXPERIENCE Spencer Ogden assigned to Southern Company/Mississippi Power, Title: Mechanical Commissioning Coordinator Mechanical Commissioning Coordinator • Mississippi Power Company (MPC) is constructing an advanced coal technology project in Kemper County, Mississippi that incorporates the air-blown Transport Integrated Gasifier (TRIGTM ) technology. The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility. The IGCC plant will employ state-of-the-art emission controls and will be owned and operated by Mississippi Power Company (MPC). The estimated nameplate capacity of the plant will be 830 MW, with an estimated net output capability of 582 MW at a heat rate of 11,529 Btu/kWh (29.6 percent efficiency – HHV basis). I help write the Startup procedures for the Solids Handling System, Worked with the (AGR) Acid Gas Recovery in receiving Selexol, worked with the Compressor Group with flushing their equipment. Go between Air Liquide and Southern Company and work with the Nitrogen Group with preparation and conducting air blows and pressure tests. 04/2014 - Present Mechanical Commissioning Specialist at the R. M. Schahfer FGD & WWT Project located in Wheatfield Indiana, Title: Senior Associate 1 • Commissioning and Start up of the Limestone Slurry Forced Oxidation Flue Gas Desulphurization (FGD) .One FGD system is provided per unit to treat the flue gas produced by NIPSCO Schahfer Units 14 & 15 coal fired boilers. Also started up the (DSI) Dry Sorbent Injection System, and worked WWT Waste Water System. 07/2013 – 4/2014 Mechanical Operation’s Engineer. Kiewit (DWP) Department of Water and Power Long Beach Ca. The project are start-up six (6) GE’s LMS100 New High Efficiency Simple Cycle Gas Turbine. 12/19/2012 – 5/2013 • Directed and counseled client supervisory personnel during the commissioning and initial start-up through acceptance of the project; represented organization to senior level client personnel during the pre-commissioning, commissioning, test run, and acceptance of the six GE LMS100. THE SHAW GROUP Commissioning Engineer Dan River Project, Eden, NC 01/2012- 08/2012 Duke Buck Project, Salisbury NC 06/2011- 01/2012 Nevada Power, Harry Allen Project, Las Vegas Nevada 01/2011-06/2011 • The projects are Two GE 7FA’s Gas Turbines, Two Volt HRSG’s located at the exhaust end of the combustion turbine on a Combined Cycle Plant with other support equipment • Held full accountability for the job duties planning, prioritization, and delegation • Directed and counseled client supervisory personnel during the commissioning and initial start-up through acceptance of the project; represented organization to senior level client personnel during the pre-commissioning, commissioning, test run, and acceptance of the plant SHAW STONE AND WEBSTER ASIA (SWAI) EPCT Project Lockout Tag-out Coordinator 02/09- 12/10 • Played a pivotal role in the Castle Peak Power Station Emissions Control Project through resourceful coordination and management of permits with Construction, Commissioning, and Production Operations • Acted as the focal point for Construction and Commissioning Teams to ensure adherence to safe work systems (Permit to Works, SIMOPS, Task Risk Assessments, etc.); maintained PTW registers and controlled Long Term Isolation and Bypass Safety Device registers Shift Supervisor- EPC Global-Bechtel, Cheniere LNG Gas Plant. Cameron, LA. Sabine Pass LNG Plant. 07/2008-08/2008 General Electric Inland Empire Energy Center, LLC Romoland, CA Mechanical Startup Engineer 01/2008- 05/2008 ● Responsibilities included assisting with Flushing EHC Systems, ACW, CCW, CD, BFP commissioning and startup of each system for n Washington Group International, San Juan Repowering Project, San Juan, Puerto Rico Startup Engineer/ Shift Supervisor 3/2007-12/2007 • Responsible for assisting the start-up commissioning teams with all aspects of power plant operations. • Worked as a Shift Supervisor during commissioning to train the local Puerto Rican Operators how to operate all plant systems. • Two one-over-one Ansaldo Combustion Turbine associated with an Ansaldo Duel Pressure Integral Reheat Horizontal Stack HRSG. • With a Siemens Westinghouse (SW) Tandem Compound Steam Turbine. Penpower USA Commissioning Engineer Gas Turbine Centerline. 05/2005-03/2006 · Assisted General Electric (GE) with the commissioning and startup of GE (109 FA) Combustion Turbine and GE (AH14 HP/RH/LP ) Steam Turbine. Galway, Ireland PPN Operator Gila River Energy Combined Cycle Project 07/2004-09/2004 B R A N D O N D . S T E E L E , S R . 162 Savannah LN | Calera, Al. 35040 (205) 451-9087/ (205)746-6749 | (205) 663-3927 | brandonsteele@earthlink.net
  • 2. • Demonstrated dedication to excellence while contributing to daily plant operations and assisting with consistent performance enhancement efforts; worked in conjunction with peers during overhaul and PMs of plant equipment. • Plant consisted of 8 GE 207 FA Hydrogen Cooled Combustion Turbine, and 4 D11 Hydrogen Cooled Steam Turbines, as well as an Ovation DCS System to operate the plant Startup, Commissioning, and Operation Dominion Fairless Energy Combined Cycle Project 03/2004-05/2004 • Facility consisted of 4 GE MS7001FA Gas Turbines, 2 STAG 207FA Steam Turbines, and 4 NEM HRSG’S • Tasked with the units’ commissioning and startup oeprations support, while assisting and training the plant operators using a GE Mark VI DCS system • Administered the commissioning of the Close Cycle Cooling system (CCW), Service Water system (SW), Instrument / Plant Air system (IA), Condensate System (CO), and Air Ejector System Jamaica Public Service Company (JPS) Startup/ Commissioning/ Operation 06/2003-01/2004 • Facility consisted of Two GE 6FA 40mw Gas Turbine supplying Two ATS HRSG and one Nuevo Pignone 40mw Steam Turbine, along with BOP equipment • Commissioned the BOP section of the plant and led the startup of the GT’s and Steam Turbine; coordinated the chemical cleaning of both HRSG, as well as steam blows; leveraged subject matter expertise to train operators and developed training documentation for Jamaica Public Service Company training program Charleston, MA. Startup/ Commissioning/Operation 07/2002-05/2003 • Facility consisted of Four (4) Mitsubishi Heavy Industries (MHI) 501G Hydrogen Cooled Combustion Turbine (GT), each associated with a Deltak Triple Pressure Horizontal Stack Heat Recovery Steam Generator (HRSG); steam from both HRSG’s HP steam system is fed to the high pressure side of a single Mitsubishi Heavy Industries Tandem Compound Hydrogen Cooled Steam Turbine (STG) Responsible for Chemical Cleaning 2 of the 4 HRSG and the associated piping, Air and Steam Blows, Piping restoration after Steam and Air Blows • Assisted with the plant operators training, efficiently deploying Foxboro DCS system; tasked with the Close Cycle Cooling system (CCW), Service Water system (SW), Instrument / Plant Air system (IA), Condensate System (CO), and Air Ejector System commissioning DFD, Moss Landing, CA Commissioning and Startup 04/2002-06/2002 • Served at DFD, Moss Landing, CA; facility consists of 4 x 7FA GE gas turbines and 2 GE stream turbines, Alstom HRSG and Foxboro DCS.; assisted with each unit commissioning and start up, while educating and training 16 operators • Developed and implemented diverse system procedures, resulting in performance efficiency enhancement DFD, Eddystone, PA Lead Mechanical / Operation 10/2001-04/2002 • Assigned to DFD, Eddystone, PA; facility consists of 2 x 168.6MW GE Frame 7FA hydrogen cooled gas turbine generators with Selected Catalytic Reduction for turbine exhaust emission control, 188.4MW. Toshiba hydrogen cooled steam turbine generator, two HRSG’s with supplemental duct burners, cooling tower, Foxboro DCS, and all associated power block and BOP equipment; steered and controlled fitters and labors mechanical work, while assisting with commissioning • Issued lockout / tag-out clearance, as well as effectively monitored plan operations to ensure flawless performance ABB Alstom, San Marcos, TX Shift Charge Engineer 06/2001-10/2001 • Acted as an integral part of the team at ABB Alstom, San Marcos, TX; facility consists of 1000MW plant, four ABB GT24/GT26 class gas turbines, four ABB once through (HRSG) HRSG’s, two HP/LP (OTC) Once Through Cooler, air-cooling system, and ABB Advant Power Control (DCIS) system; monitored plant operations and provided compelling leadership for the shift workers to facilitate effective execution of assigned duties and ensure proper handling of arousing performance challenges Nuevo Pignone, Dakar, Senegal, Africa Operations Supervisor 01/2001-05/2001 • Worked at Nuevo Pignone., Dakar, Senegal, Africa; facility consists of Nuevo Pignone/GE Frame 6 gas turbine, 21MS GE steam turbine, and CCT dual pressure HRSG, and Moore DCS • Created and integrated innovative procedures, as well as wrote turnover package; supervised shit operators Florida Power & Light, Kissimmee, Florida Turn Over Package Coordinator 10/2000-12/2000 • Collected data upon job completion to ensure compliance with the P&ID’s, Mechanical, Piping, and Electrical Drawing; performed fuel and oil system checks to sustain 100% service readiness • Created a detailed list to track items, turned over back to construction for completion; units were three GE frame 6 Simple Cycle Combustion Turbine GE Contractual Services, Tri Energy IPP Project at Ratchaburi, Thailand Startup Mechanical/Operator 09/1999-08/2000 • Facility consists of 750MW combine cycle plant, two GE MS9001FA gas turbines, hydrogen cooled generator, two Nooter Erikson triple pressure HRSG’s with reheat, one reheat steam turbine, two Combustion turbine generators (CTs) and the steam turbine/generator (ST), and associated water treatment plant and auxiliaries with total plant capacity of 750 MW, Mark V and Bailey Infi-90/Symphony (DCIS) systems • Provided comprehensive assistance for the start-up commissioning teams with all aspects of power plant operations • Worked as a Shift Supervisor during commissioning to train the local Thai Operators plant systems oeprations • Cooperated resourcefully with the GE management staff to develop operating procedures and create an efficient qualification/training program. Aqua-Chem, Inc. Qarn Alam Crestal Steam Injection Project. Oman Process Control Operator 088/1998-08/1999 • Facility consists of two Thermo tic gas fired steam generators utilizing Aqua-Chem seed slurry brine concentrator, water treatment plant, and Foxboro DCS system. • Spearheaded the refurbishment, startup, and operation efforts; coordinate the injection of the steam into ground to raise temperature of earth to cause trapped oil flow to reservoirs to be pumped to storage tanks • Managed the provision of water for steam generators and potable water system for camps and villages in surrounding areas; monitored related activities
  • 3. OTHER EMPLOYMENT Plant Manager • Galax Energy Concepts, LLC • 11/1996-08/1998 Control Room Operator/Shift Supervisor • Hydra-Co Operation • 06/1990- 10/1996 CERTIFICATIONS Energy Factors, Inc. Steam Plant Training. Class II Certification • 1987 | Waukesha Engine School, Waukesha, WI • 1986 Energy Factors, Inc. Calgon Chemistry Class. Certification • 1986 References Available Upon Request