1. KENNY TAYLOR
21 WOODSIDE
COWDENBEATH
FIFE
KY4 9JW
D.O.B: 30/01/1977
TEL HOME: +441383 511445
TEL MOBILE: +447837700156
EMAIL: k70ndo@gmail.com
kenny.taylor@exxonmobil.com
PERSONAL PROFILE
A responsible, reliable individual who is seeking a position which will allow me to utilise my
Practical/Supervisory skills and knowledge to their full potential. I enjoy both the team and
individual role. I display a flexible, diligent approach to my workload and am confident of my
ability to adapt to a new environment.
I have 18 years experience in fabrication , installation , testing , completions and
commissioning of pipework systems within the oil and gas , power , petrochemical and
pharmaceutical industries.
SUMMARY
Currently , I am supervising the day to day maintenance and repair of the mechanical work
in Exxonmobil Plant at Mossmorran. Qualified in the Exxons PTW systems able to build ,
submit , raise and sign-off permits. I cascade safety information at morning toolbox talks ,
then organise the work group and assign tasks , jobs and projects . Solve daily routing
problems whilst building trust and working relationship with team members . Enforce rules
and compliance to procedures and specifications ensuring safe working practices are
adapted at all times.
EMPLOYMENT EXPERIENCE
February 2011 – Present Project: Exxon Mobil, Fife Ethelyne Plant,
Mossmorran, Fife.
Company: Deborah Services Ltd.
Position: Piping Chargehand/Piping Superviser.
August 2010 – October 2010 Project: Biomass Energy Centre, Cameron Bridge
Distillery, Windygates.
Company: Wellman Robey/Heads Engineering.
Position: Adv Pipefitter.
2. August 2006 – May 2010 Projects: AZ3 Syngenta, Grangemouth; Unit Outages
1,2,3 & 4, Longannet Power Station; GSK Montrose;
Ineos Hydrocracker TAR; BP Dalmeny TAR.
Company: Doosan Babcock Energy Ltd.
Position: Adv Pipefitter.
May 2006 – August 2006 Project: Long Lake Project, Fort McMurray, Alberta,
Canada.( Oil Sands ).
Company: Flint Energy Services Ltd.
Position: Adv Pipefitter/Piping Superviser.
October 2005 – April 2006 Project: Resolution, BP Kinneil, Grangemouth.
Company: Mitsui Babcock Energy Ltd.
Position: Adv Pipefitter.
September 2005 – October 2005 Shutdown: Total Lyndsey Oils, Immingham.
Company: Amec Group Ltd.
Position: Adv Pipefitter.
June 2005 – September 2005 Outage: Unit 3, Longannet Power Station.
Company: Mitsui Babcock Energy Ltd.
Position: Adv Pipefitter.
October 2004 – June 2005 Project: Nexen Buzzard Field Development,
Methil Rig Yard, Methil.
Company: Burntisland Fabrications Ltd.
Position: Adv Pipefitter.
January 2004 – October 2004 Projects: Hydrofiner TAR; Green Oil Project;
F.C.C.U. Project, BP Grangemouth.
Company: Mistui Babcock Energy Ltd.
Position: Adv Pipefitter.
July 2003 – October 2003 Shutdowns: PEX/PP3 TAR, BP Grangemouth; SC2
& Butyl Polymers TAR, Exxon Mobil, Fawley.
Company: Amec Group Ltd.
Position: Adv Pipefitter.
May 2003 – June 2003 Shutdowns: G4 & BE3 TAR, BP Grangemouth.
Company: Mistui Babcock Energy Ltd.
Position: Adv Pipefitter.
April 2003 – May 2003 Shutdown: Shell Oil Refinery, Stenungsund,
Gothenburg, Sweden.
3. Company: Konstruction Svets Ltd.
Position: Adv Pipefitter.
May 2002 – September 2002 Projects: Various locations fitting A/C & Refrigeration
Pipework in Scotland.
Company: Coolforce Refrigeration Ltd.
Position: Adv Pipefitter.
August 2001 – February 2002 Projects: Refit HMS Liverpool/Invincible/Dumbarton
Castle & Iron Duke Ships, Royal Rosyth Dockyard.
Company: Acetech Ltd.
Position: Adv Pipefitter.
January 2000 – August 2001 Projects: PEX/PP3 Project, BP Grangemouth;
Avecia/Zeneca Maintenance, Grangemouth.
Company: Amec Capital Projects Ltd.
Position: Adv Pipefitter.
January 1997 – January 2000 Projects: NSDS Traineeship in Exxon, Mossmorran;
BP Grangemouth; Avecia/Zeneca Grangemouth.
Companies: Amec/ Kvaerner & Mitsui Babcock Ltd.
Position: Trainee Pipefitter.
TRAINING
E.C.I.T.B. NVQ Engineering Construction – Level 2 (QFN20/1).
E.C.I.T.B. NVQ Engineering Construction - Installing Plant & Pipework
Systems – Level 3 (QPF30/2).
SVQ Level 3 in Management at SCQF Level 7.
RED SEAL QUALIFICATION CERTIFICATE, CANADA – Pipefitter/Steamfitter Journeyman.
MEWP IPAF Licence No. (OP/0441103).
First Aid at Work Certificate – HSE No: (25/99).
I.O.S.H. Managing Safely Certificate – No: 41814.
(further details can be provided)
ADDITIONAL INFORMATION
I also possess a Full UK Driving Licence and access to my own transport. I also possess CCNSG
Safety Passport Cert No. (688374); ACE/CSCS Skills Card No. (106865) and a Full UK Passport.
REFERENCES
Rab Morgan – Piping Engineer: 01383 511730.
4. Calum Gallacher – Site Superintendent: 01383 846497.
Mob: 07935196180.