This document provides a list of major projects led by Kashif Dada between 2010-2014. It summarizes 10 projects from various sectors including oil and gas, engineering, and agriculture. Key details provided for each project include the client, location, timelines, and how Mr. Dada successfully completed projects on time and under budget by expediting engineering, coordinating construction, and assisting with design.
Roadmap to Membership of RICS - Pathways and Routes
KASHIF DADA - Projects List
1. MAJOR PROJECTS LIST
Water Treatment and Injection Facility – Husky Energy, Lloydminster, Alberta
This project required the conversion of a heavy oil production facility into a produced water treatment &
injection facility within a record time of 6 months due to the expiration of the water injection license. I
was able to successfully expedite the engineering and construction of the project in order to meet the
challenging deadline and I was able to do it within the project budget.
Mar 2014-
Aug 2014
Gas Compressor & Flowline risers – Husky Energy, Lloydminster, Alberta
The startup deadline of another project was dependent on the successful of completion of this project
within 2 months. I was able to expedite the engineering & work with the construction crews so that we
were able to supply gas to the other project’s generator within the deadline and 15% under budget.
July 2014-
Aug 2014
Produced Water Truck-In, Storage and Processing Facility – CNRL, Lindbergh, Alberta
This project involved 2 other EPC firms & my part of the project was successfully completed under budget
& 1 month ahead of schedule. I coordinated the project & assisted in the process design, sizing,
specification & procurement of mechanical equipment & instrumentation. I also provided construction
support & engaged with the fabricators, construction crew & all other stakeholders of the project.
Mar 2013-
Nov 2013
Cavern Wash Pump Facility – CNRL, Frog Lake, Alberta
This project required the design & installation of a 1000 HP cavern wash pump & its associated electrical
building & flow lines to the disposal well. I designed the process, selected & procured all equipment and
instrumentation & coordinated site construction. I led the electrical, drafting & civil departments to ensure
successful project completion.
Oct 2012-
Feb 2013
New Logo & Website – Integra Engineering, Lloydminster, Alberta
I had volunteered to lead this project. I was responsible for the design, content & launch of the new
website. I worked with the Website developer & the company management in order to develop content &
generate the design for the new Website. I also created the new Logo options for the company from which
one was successfully chosen.
Aug 2012-
Apr 2013
Sales Oil Heat Exchangers Facility – CNRL, Lindbergh, Alberta
The project consisted of installing 2 new Heat Exchangers at an existing facility. I made sure the new
exchangers seamlessly integrated with the existing process. I selected the heat exchangers and coordinated
construction for the project. I also procured all the instrumentation and mechanical equipment that was
needed.
Feb 2012-
Dec 2012
Customized Heavy Oil Treater – Northern Blizzard, Cactus Lake, Saskatchewan
I researched into the root cause for the past treater failures & helped in successfully designing a uniquely
designed treater to overcome the issue. I also performed sizing & specification of all equipment &
instrumentation. I provided technical support & led the vessel fabricators, drafting & electrical design
teams to meet client deadlines. The new treater design resulted in an annual cost savings of $1 million.
Mar 2012-
May 2013
Drilling Mud Disposal Facility – CNRL, Elk Point, Alberta
This was CNRL’s very first drilling mud disposal facility. I coordinated the project & assisted in the
process design, equipment & instrumentation sizing, specification & procurement. I also provided
technical support to the fabricators, site construction crew, PLC design, drafting & electrical design teams.
The project was successfully commissioned within schedule.
Jan 2012-
Mar 2013
Fertilizer Blending & Shipping Facility – Cargill AgHorizons, North Battleford, Saskatchewan
This project consisted of upgrading a 40 year old plant into a modern facility. I was the field engineer &
was acting as the liaison between the EPC company & Cargill Head office. I developed site construction
progress, status, forecast & trend reports and assisted the site inspector with design, schedule and cost
issues. I also coordinated interruptions between the facility’s current operations and the new construction.
Oct 2010-
Feb 2011