CHANGES -
PROCESS MODEL
• Designers, engineers and other professionals have to
make assumptions based on existing available
information and their experience.
CHANGES -
PROCESS MODEL
• Lack of knowledge is considered to be a main source
of changes in construction.
CHANGES -
PROCESS MODEL
• There should be a Change identification and
evaluation model to provide an early warning to the
management team.
CHANGES -
PROCESS MODEL
• The design of a process model
should consider all the influential
factors such as :
CHANGES -
PROCESS MODEL
• What causes the change?
CHANGES -
PROCESS MODEL
•The likelihood of change
occurrence.
CHANGES -
PROCESS MODEL
•The change consequences.
CHANGES -
PROCESS MODEL
• Changes in themselves do not decrease
productivity or efficiency, it is the manpower
involved in the process.
CHANGES -
PROCESS MODEL
• If a change occurs in the final stage of a
construction project the crew must stop
working until the changes are carried out first.
CHANGES -
PROCESS MODEL
• On average, there is a 30% loss of efficiency
when changes are being performed, although
it is possible to carry out many changes
without a loss of efficiency.
CHANGES -
PROCESS MODEL
• The variables affecting efficiency are believed
to be the time of the change.
CHANGES -
PROCESS MODEL
• A major change may cause consecutive
delays in project schedule Re-estimation of
work statement Additional demands of
equipment Materials Labour Changes.
CHANGES -
PROCESS MODEL
• If not resolved through a formalized change
management process, can become the major
source of contract disputes, which is a severe
risk contributing to project failure.
It can be caused by either internal or external
Factors (ARETHEY AVOIDABLE?).
In construction projects, a change refers to an
alteration or a modification to pre-existing
conditions, assumptions or requirements.
A process model can help management team to manage changes
better.
External causes may be due to technological change
(AVOIDABLE?).
Different changes may have different effects or consequences.
The objective of change management is to forecast
possible changes.
Most researchers distinguish
three kinds of changes:
Rework
change order
and Construction
Change Directive
Initiate change management
Select change management
The main requirements are:
Sufficient resources for change management function
Approaches towards
change management
Align project elements to
change management process
The main functions that these
requirements should provide,
are:
Project baseline
detailed cost plan
detailed time plan
The project
programme
should be developed
to manipulate change
(cost, time, quality, safety, Customer
satisfaction, constructability, sustainable
construction,..)
Knowledge base
This must includes criteria for deciding on
change and evaluation in terms of : KPI’s
Integrated system for
design management
An Architect's change may
change the mechanical work
layout or electrical works.
3-D
modelling
• It will assists the
impact of proposed
construction changes
in a more logical
mannor.
Procurement
routes
• A good selection of procurement
should consider change.
• The likelihood of changes
becomes a criterion for selecting
the procurement route.
• A civil engineering project V
building project.
VE andVM
•Value management
(VM) andValue
Engineering (VE)
systems.
IT
communication
•Advance
communication
system
Dispute resolution
mechanism
•A fully developed
dispute
resolution
method.
 RMS must indicate:
 Various risks that may occur at different times
within the project life cycle.
 The possibility of change occurrence that can be
reasonably foreseen should be estimated
(including its timing).
 Risk analysis at an early stage will enable
appropriate procedures to be established and
appropriate contingencies to be prepared.
 Scenario planning will help represent these
changes.
Monitor deviations
from project
programme
Analyse and consider
implications of
identified deviations
Develop mitigation
strategy for change
event
Update change
management
repository
The need to
rework
The volume
of rework due
to change in
terms of
costing and
duration
Size of disruption
to the workflow
Pre-
change
plan
Main
functions
Methods
to identify
change
Carry
out
change
Financial models
that incorporate
financial
parameters to
control the
operation at any
one time
Linear models
where decision
criteria are
subjectively
weighted and rated
by a decision-maker
and combined into
a single measure
Linear
models
• incorporating multiple ratings
that add the corresponding
probabilities for the multiple
ratings of a given criterion and
measures the imprecision and
uncertainty associated with
the process
Multi-attribute
utility models
• Combines qualitative
and quantitative
decision criteria that are
aggregated to arrive at
an expected utility
Social
Factors
Technological
Factors
Managerial
Factors
Modification in
physical
properties
Changes in
control
systems
Changes in
processes
Project and
organisational
performance criteria
Analyse work
inactivity and
ineffective work
Resources
Scope
Goals
Removeany Ambiguity
Leadership
Co-ordination
communication
Team work
Resources
Scope
Goals
Remove any Ambiguity
Leadership
Co-ordination
communication
Team work

More Related Content

What's hot (17)

Doc3
Doc3Doc3
Doc3
 
041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)
 
Presentation
PresentationPresentation
Presentation
 
5 MRP-II.pptx
5 MRP-II.pptx5 MRP-II.pptx
5 MRP-II.pptx
 
Change management
Change managementChange management
Change management
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3
 
Cost management plan
Cost management planCost management plan
Cost management plan
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Ebbpa3 b ch 9
Ebbpa3 b   ch 9Ebbpa3 b   ch 9
Ebbpa3 b ch 9
 
Cost
CostCost
Cost
 
Systems Life Cycle
Systems Life CycleSystems Life Cycle
Systems Life Cycle
 
Chapt10
Chapt10Chapt10
Chapt10
 
Chapt12
Chapt12Chapt12
Chapt12
 
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
 
Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)
 
Tqm unit 4
Tqm unit 4Tqm unit 4
Tqm unit 4
 

Similar to 015 changes-process model

Project control and process instrumentation
Project control and process instrumentationProject control and process instrumentation
Project control and process instrumentationKuppusamy P
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDrFereydounDejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementdrdej19
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDrFereydounDejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
Product innovation & process innovation
Product innovation & process innovationProduct innovation & process innovation
Product innovation & process innovationVijayKrKhurana
 
04. Project Management
04. Project Management04. Project Management
04. Project ManagementBhuWan Khadka
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueChris Carson
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueChris Carson
 
Lect6 life cycle phases
Lect6 life cycle phasesLect6 life cycle phases
Lect6 life cycle phasesmeena466141
 
Project integration management
Project integration managementProject integration management
Project integration managementSaad Al Jabri
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsJacobs Engineering
 

Similar to 015 changes-process model (20)

Project control and process instrumentation
Project control and process instrumentationProject control and process instrumentation
Project control and process instrumentation
 
4 integration
4 integration4 integration
4 integration
 
Process models
Process modelsProcess models
Process models
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
Product innovation & process innovation
Product innovation & process innovationProduct innovation & process innovation
Product innovation & process innovation
 
04. Project Management
04. Project Management04. Project Management
04. Project Management
 
CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1
 
CAD _ UNIT 1.pptx
CAD _ UNIT 1.pptxCAD _ UNIT 1.pptx
CAD _ UNIT 1.pptx
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned Value
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 
Lect6 life cycle phases
Lect6 life cycle phasesLect6 life cycle phases
Lect6 life cycle phases
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Project plan overview
Project plan overviewProject plan overview
Project plan overview
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
 
test
testtest
test
 

More from drdej19

069 managing people
069 managing people069 managing people
069 managing peopledrdej19
 
070 material management
070 material management070 material management
070 material managementdrdej19
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentalsdrdej19
 
067 management
067 management067 management
067 managementdrdej19
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the designdrdej19
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivitydrdej19
 
065 management information system
065 management information system065 management information system
065 management information systemdrdej19
 
064 management accounting
064 management accounting064 management accounting
064 management accountingdrdej19
 
063 management theory
063 management theory063 management theory
063 management theorydrdej19
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivitydrdej19
 
059 lean construction
059 lean construction059 lean construction
059 lean constructiondrdej19
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chaindrdej19
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factordrdej19
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environmentdrdej19
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)drdej19
 
056 labour productivity
056 labour productivity056 labour productivity
056 labour productivitydrdej19
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management systemdrdej19
 
050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructabilitydrdej19
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructabilitydrdej19
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivationdrdej19
 

More from drdej19 (20)

069 managing people
069 managing people069 managing people
069 managing people
 
070 material management
070 material management070 material management
070 material management
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentals
 
067 management
067 management067 management
067 management
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the design
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivity
 
065 management information system
065 management information system065 management information system
065 management information system
 
064 management accounting
064 management accounting064 management accounting
064 management accounting
 
063 management theory
063 management theory063 management theory
063 management theory
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivity
 
059 lean construction
059 lean construction059 lean construction
059 lean construction
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chain
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factor
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environment
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)
 
056 labour productivity
056 labour productivity056 labour productivity
056 labour productivity
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management system
 
050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructability
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructability
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivation
 

Recently uploaded

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 

Recently uploaded (20)

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 

015 changes-process model