Contract and Project Management




David Sowden, The University of Hull
17
57086
Contract and Project Management

Change Control




David Sowden, The University of Hull
Overview

• Change Control
 – Purpose
 – Project Issue Management
 – Issue and Change Control procedure
 – Change Budget
 – Integrity of change
 – Management




                              3
Change Control - Purpose

• Change in a project is highly likely
• All project change should be managed - as a formal Project
  Issue
• Control of change means assessment of:
  – impact of potential change
  – importance
  – cost
• Approved changes must be reflected in project documentation




                                 4
Project Issue Management

 The objective is to capture, log
 and categorise all Project Issues,
 these may be raised at any time
 during the project, by anyone
 with an interest in the project or
 its outcome.


                       5
What could a Project Issue be?
• A change of requirements, however minor
• A change in the environment applicable to the project
• A problem occurring or being identified that was not
  anticipated during risk analysis
• An anticipated but unavoidable risk occurring
• A problem or error occurring in work completed or currently
  under way
• Advice of a new risk
• A query about any aspect of the project




                                6
Managing Project Issues will involve:
• Capturing and formally logging the Project Issue (in the Issue Log)
• Assessing the Project Issue to decide on the type and therefore
  what action is required
• Investigating the required actions
• Documenting the actions and confirming their completion
• Reviewing the Issue Log on a regular basis to monitor progress
  on outstanding Project Issues.




                                   7
Change Budget

 – As well as considering where authority lies, the Project
   Board must consider:
    • How will changes be funded?
    • Will the Project Board go back to corporate or programme
      management to vary funding, timetable or scope each time a
      change is desired?




                                 9
Integrity of Change
• Project Issues should not be considered in isolation
  – Benefit/Business Case driven
  – The Risk Log
  – Time/cost/risk function balance
                                 Change
                                                         Risks
                                                         Cost
                                                         Time
           Advantage
            Saving




  – Where the project is part of a programme.
                                10
Management

 Project Managers should constantly be
 looking for ways to take advantage of events
 to improve on project costs, schedule or
 performance.
 These should be recorded as Project Issues
 (and the final outcome should be recorded in
 the Lessons Learnt Log)


                      11
TASK


Review Project Issues within
your own project, are these
       documented?

More Related Content

What's hot

Project Scope Management Knowledge Area
Project Scope Management Knowledge AreaProject Scope Management Knowledge Area
Project Scope Management Knowledge AreaJoshua Render
 
Project Management Plan
Project Management Plan Project Management Plan
Project Management Plan Pracas Infosys
 
PMP Training Project Integration Management Part 2
PMP Training Project Integration Management Part 2PMP Training Project Integration Management Part 2
PMP Training Project Integration Management Part 2Skillogic Solutions
 
PMP Training Course - Project Management Framework
PMP Training Course - Project Management FrameworkPMP Training Course - Project Management Framework
PMP Training Course - Project Management FrameworkSkillogic Solutions
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2Mazhar Poohlah
 
Best Practices - Project Management & Implementation
Best Practices - Project Management & ImplementationBest Practices - Project Management & Implementation
Best Practices - Project Management & ImplementationSynerion North America Inc.
 
Telco Implementation Project Management
Telco Implementation Project ManagementTelco Implementation Project Management
Telco Implementation Project Managementanwarizal
 
Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1p6academy
 
Quality Management Knowledge Area
Quality Management Knowledge AreaQuality Management Knowledge Area
Quality Management Knowledge AreaJoshua Render
 
Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5Highmark Health
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Processeklaksh
 
Developing the project management plan
Developing the project management planDeveloping the project management plan
Developing the project management planbadrux
 

What's hot (17)

Project Scope Management Knowledge Area
Project Scope Management Knowledge AreaProject Scope Management Knowledge Area
Project Scope Management Knowledge Area
 
Project Management Plan
Project Management Plan Project Management Plan
Project Management Plan
 
7.3 Determine Budget
7.3 Determine Budget7.3 Determine Budget
7.3 Determine Budget
 
PMP Training Project Integration Management Part 2
PMP Training Project Integration Management Part 2PMP Training Project Integration Management Part 2
PMP Training Project Integration Management Part 2
 
PMP Prep Handout_Integration
PMP Prep Handout_IntegrationPMP Prep Handout_Integration
PMP Prep Handout_Integration
 
PMP Training Course - Project Management Framework
PMP Training Course - Project Management FrameworkPMP Training Course - Project Management Framework
PMP Training Course - Project Management Framework
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2
 
Best Practices - Project Management & Implementation
Best Practices - Project Management & ImplementationBest Practices - Project Management & Implementation
Best Practices - Project Management & Implementation
 
Telco Implementation Project Management
Telco Implementation Project ManagementTelco Implementation Project Management
Telco Implementation Project Management
 
Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1
 
Quality Management Knowledge Area
Quality Management Knowledge AreaQuality Management Knowledge Area
Quality Management Knowledge Area
 
Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5
 
11.7 Monitor Risks
11.7 Monitor Risks11.7 Monitor Risks
11.7 Monitor Risks
 
Prioritising Initiatives Tool
Prioritising Initiatives ToolPrioritising Initiatives Tool
Prioritising Initiatives Tool
 
Cost
CostCost
Cost
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
 
Developing the project management plan
Developing the project management planDeveloping the project management plan
Developing the project management plan
 

Viewers also liked (8)

57086 22 comic_relief
57086 22 comic_relief57086 22 comic_relief
57086 22 comic_relief
 
57086 23 goldratt
57086 23 goldratt57086 23 goldratt
57086 23 goldratt
 
Glossary
GlossaryGlossary
Glossary
 
57086 16 configuration_management
57086 16 configuration_management57086 16 configuration_management
57086 16 configuration_management
 
57086 19 change_controltechniques
57086 19 change_controltechniques57086 19 change_controltechniques
57086 19 change_controltechniques
 
57086 20 quality_review
57086 20 quality_review57086 20 quality_review
57086 20 quality_review
 
Differentiation - strategic management - Manu Melwin Joy
Differentiation -  strategic management - Manu Melwin JoyDifferentiation -  strategic management - Manu Melwin Joy
Differentiation - strategic management - Manu Melwin Joy
 
57086 18 product-based_planning
57086 18 product-based_planning57086 18 product-based_planning
57086 18 product-based_planning
 

Similar to 57086 17 change_control_01

Topic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdfTopic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdfHuyNguyen657394
 
Project Management - PMI Approach
Project Management - PMI ApproachProject Management - PMI Approach
Project Management - PMI ApproachZaur Ahmadov, PMP
 
Implementing agile iterative project delivery approach and achieving business...
Implementing agile iterative project delivery approach and achieving business...Implementing agile iterative project delivery approach and achieving business...
Implementing agile iterative project delivery approach and achieving business...Alan McSweeney
 
Project management pocket skills
Project management   pocket skillsProject management   pocket skills
Project management pocket skillsrdlteam
 
LECTUR~1.PPT
LECTUR~1.PPTLECTUR~1.PPT
LECTUR~1.PPTShanOther
 
Atoha PMPPRO S1 - Foundation.pdf
Atoha PMPPRO S1 - Foundation.pdfAtoha PMPPRO S1 - Foundation.pdf
Atoha PMPPRO S1 - Foundation.pdfLe Duong
 
Project Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesProject Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesThink For A Change
 
Fundamentalsof PM.pptx
Fundamentalsof PM.pptxFundamentalsof PM.pptx
Fundamentalsof PM.pptxagathamarlinee
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management Qussay Karam
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management Yesica Adicondro
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsJacobs Engineering
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project managementprakashnachnani
 
Project Management and Control Techniques
Project Management and Control TechniquesProject Management and Control Techniques
Project Management and Control Techniquesssuser8e973a
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]OyetadeTobi
 
D22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxD22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxkiranroy6777
 
Topic 1 - Introduction of Project Management.pdf
Topic 1 - Introduction of Project Management.pdfTopic 1 - Introduction of Project Management.pdf
Topic 1 - Introduction of Project Management.pdfHuyNguyen657394
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.abuzertaju
 

Similar to 57086 17 change_control_01 (20)

project introduction.pdf
project introduction.pdfproject introduction.pdf
project introduction.pdf
 
Topic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdfTopic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdf
 
Project Management - PMI Approach
Project Management - PMI ApproachProject Management - PMI Approach
Project Management - PMI Approach
 
Implementing agile iterative project delivery approach and achieving business...
Implementing agile iterative project delivery approach and achieving business...Implementing agile iterative project delivery approach and achieving business...
Implementing agile iterative project delivery approach and achieving business...
 
Project management pocket skills
Project management   pocket skillsProject management   pocket skills
Project management pocket skills
 
LECTUR~1.PPT
LECTUR~1.PPTLECTUR~1.PPT
LECTUR~1.PPT
 
Atoha PMPPRO S1 - Foundation.pdf
Atoha PMPPRO S1 - Foundation.pdfAtoha PMPPRO S1 - Foundation.pdf
Atoha PMPPRO S1 - Foundation.pdf
 
Project Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesProject Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management Processes
 
Fundamentalsof PM.pptx
Fundamentalsof PM.pptxFundamentalsof PM.pptx
Fundamentalsof PM.pptx
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management
 
1. introduction
1. introduction1. introduction
1. introduction
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project management
 
Project Management and Control Techniques
Project Management and Control TechniquesProject Management and Control Techniques
Project Management and Control Techniques
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 
D22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxD22MB040_Unit_6.pptx
D22MB040_Unit_6.pptx
 
Topic 1 - Introduction of Project Management.pdf
Topic 1 - Introduction of Project Management.pdfTopic 1 - Introduction of Project Management.pdf
Topic 1 - Introduction of Project Management.pdf
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.
 

More from Engineering Department (15)

57086 15 quality
57086 15 quality57086 15 quality
57086 15 quality
 
57086 14 management_ofrisk
57086 14 management_ofrisk57086 14 management_ofrisk
57086 14 management_ofrisk
 
57086 13 controls
57086 13 controls57086 13 controls
57086 13 controls
 
57086 12 plans
57086 12 plans57086 12 plans
57086 12 plans
 
57086 09 planning
57086 09 planning57086 09 planning
57086 09 planning
 
57086 11 organisation
57086 11 organisation57086 11 organisation
57086 11 organisation
 
57086 10 business_case
57086 10 business_case57086 10 business_case
57086 10 business_case
 
57086 08 closing_a_project
57086 08 closing_a_project57086 08 closing_a_project
57086 08 closing_a_project
 
57086 07 managing_a_stageboundary
57086 07 managing_a_stageboundary57086 07 managing_a_stageboundary
57086 07 managing_a_stageboundary
 
57086 05 managing_productdelivery
57086 05 managing_productdelivery57086 05 managing_productdelivery
57086 05 managing_productdelivery
 
57086 05 controlling_a_stage
57086 05 controlling_a_stage57086 05 controlling_a_stage
57086 05 controlling_a_stage
 
58086 04 directing_a_project
58086 04 directing_a_project58086 04 directing_a_project
58086 04 directing_a_project
 
57086 03 initiating_a_project
57086 03 initiating_a_project57086 03 initiating_a_project
57086 03 initiating_a_project
 
57086 02 starting_upa_project
57086 02 starting_upa_project57086 02 starting_upa_project
57086 02 starting_upa_project
 
57086 01 introduction
57086 01 introduction57086 01 introduction
57086 01 introduction
 

Recently uploaded

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 

Recently uploaded (20)

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 

57086 17 change_control_01

  • 1. 17 57086 Contract and Project Management David Sowden, The University of Hull
  • 2. 17 57086 Contract and Project Management Change Control David Sowden, The University of Hull
  • 3. Overview • Change Control – Purpose – Project Issue Management – Issue and Change Control procedure – Change Budget – Integrity of change – Management 3
  • 4. Change Control - Purpose • Change in a project is highly likely • All project change should be managed - as a formal Project Issue • Control of change means assessment of: – impact of potential change – importance – cost • Approved changes must be reflected in project documentation 4
  • 5. Project Issue Management The objective is to capture, log and categorise all Project Issues, these may be raised at any time during the project, by anyone with an interest in the project or its outcome. 5
  • 6. What could a Project Issue be? • A change of requirements, however minor • A change in the environment applicable to the project • A problem occurring or being identified that was not anticipated during risk analysis • An anticipated but unavoidable risk occurring • A problem or error occurring in work completed or currently under way • Advice of a new risk • A query about any aspect of the project 6
  • 7. Managing Project Issues will involve: • Capturing and formally logging the Project Issue (in the Issue Log) • Assessing the Project Issue to decide on the type and therefore what action is required • Investigating the required actions • Documenting the actions and confirming their completion • Reviewing the Issue Log on a regular basis to monitor progress on outstanding Project Issues. 7
  • 8.
  • 9. Change Budget – As well as considering where authority lies, the Project Board must consider: • How will changes be funded? • Will the Project Board go back to corporate or programme management to vary funding, timetable or scope each time a change is desired? 9
  • 10. Integrity of Change • Project Issues should not be considered in isolation – Benefit/Business Case driven – The Risk Log – Time/cost/risk function balance Change Risks Cost Time Advantage Saving – Where the project is part of a programme. 10
  • 11. Management Project Managers should constantly be looking for ways to take advantage of events to improve on project costs, schedule or performance. These should be recorded as Project Issues (and the final outcome should be recorded in the Lessons Learnt Log) 11
  • 12. TASK Review Project Issues within your own project, are these documented?