Needs, motivations, goals and principles that led to the creation or modification
of the document:
• General updated necessary to follow the technology improvements, and the standards
evolution.
• Some parts redundant or contradictory with GS EP TEL 410, 414 and 700.
Nature of changes:
• Updated the data rates up to n x STM-1, STM-4 or more.
• Revised the listed norms and standards, and updated the superseded and cancelled ones.
• Revised the Design Conditions, and included the possibility to have auto-tracking
stabilized antennas for offshore links
• Revised the Technical Requirements, and simplified the duplicated requirements
• Revised the Technical Documents , and simplified the duplicated requirements
• Revised the Glossary
Support document - 10/ 2013 1
GS EP TEL 120 06 – POINT TO POINT MICROWAVE LINKS 10/2013

More Related Content

Similar to GS EP TEL 120 DA .pptx

Industrial manufacturing OEMs face financial and operational challenges in th...
Industrial manufacturing OEMs face financial and operational challenges in th...Industrial manufacturing OEMs face financial and operational challenges in th...
Industrial manufacturing OEMs face financial and operational challenges in th...Genpact Ltd
 
What LTE Parameters need to be Dimensioned and Optimized
What LTE Parameters need to be Dimensioned and OptimizedWhat LTE Parameters need to be Dimensioned and Optimized
What LTE Parameters need to be Dimensioned and OptimizedHoracio Guillen
 
Ardeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modifiedArdeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modifiedArdeshir Tolouei
 
September 2019 amendments flyer
September 2019 amendments flyerSeptember 2019 amendments flyer
September 2019 amendments flyerGarry Pepper
 
GSM BSS dimensioning Alcatel
GSM BSS dimensioning AlcatelGSM BSS dimensioning Alcatel
GSM BSS dimensioning AlcatelRohit Chhabra
 
Field Services Brochure_WEB
Field Services Brochure_WEBField Services Brochure_WEB
Field Services Brochure_WEBJohn Greig
 
Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz Hoyos-McGrath
 
Service Chaining overview (English) 2015/10/05
Service Chaining overview (English) 2015/10/05Service Chaining overview (English) 2015/10/05
Service Chaining overview (English) 2015/10/05Kentaro Ebisawa
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba
 
CCIE Service Provider Techtorial
CCIE Service Provider Techtorial CCIE Service Provider Techtorial
CCIE Service Provider Techtorial Cisco Canada
 
2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)MICHAEL MORGAN
 
Rp b401 cathodic protection design-2005
Rp b401 cathodic protection design-2005Rp b401 cathodic protection design-2005
Rp b401 cathodic protection design-2005Anh Anh
 
Rp b401 cathodic protection design-2005
Rp b401 cathodic protection design-2005Rp b401 cathodic protection design-2005
Rp b401 cathodic protection design-2005Anh Anh
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlBathrinath mangalamoorthi
 
AFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dadosAFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dadosN.A. Tecnologia
 

Similar to GS EP TEL 120 DA .pptx (20)

Industrial manufacturing OEMs face financial and operational challenges in th...
Industrial manufacturing OEMs face financial and operational challenges in th...Industrial manufacturing OEMs face financial and operational challenges in th...
Industrial manufacturing OEMs face financial and operational challenges in th...
 
What LTE Parameters need to be Dimensioned and Optimized
What LTE Parameters need to be Dimensioned and OptimizedWhat LTE Parameters need to be Dimensioned and Optimized
What LTE Parameters need to be Dimensioned and Optimized
 
Ardeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modifiedArdeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modified
 
September 2019 amendments flyer
September 2019 amendments flyerSeptember 2019 amendments flyer
September 2019 amendments flyer
 
GSM BSS dimensioning Alcatel
GSM BSS dimensioning AlcatelGSM BSS dimensioning Alcatel
GSM BSS dimensioning Alcatel
 
Field Services Brochure_WEB
Field Services Brochure_WEBField Services Brochure_WEB
Field Services Brochure_WEB
 
Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012
 
Service Chaining overview (English) 2015/10/05
Service Chaining overview (English) 2015/10/05Service Chaining overview (English) 2015/10/05
Service Chaining overview (English) 2015/10/05
 
Full_Experience_Resume
Full_Experience_ResumeFull_Experience_Resume
Full_Experience_Resume
 
Full experience resume
Full experience resumeFull experience resume
Full experience resume
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDM
 
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and ReliabilityPlanning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
 
CCIE Service Provider Techtorial
CCIE Service Provider Techtorial CCIE Service Provider Techtorial
CCIE Service Provider Techtorial
 
2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)
 
Rp b401 cathodic protection design-2005
Rp b401 cathodic protection design-2005Rp b401 cathodic protection design-2005
Rp b401 cathodic protection design-2005
 
Rp b401 cathodic protection design-2005
Rp b401 cathodic protection design-2005Rp b401 cathodic protection design-2005
Rp b401 cathodic protection design-2005
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
 
Ian Bullen-CV
Ian Bullen-CVIan Bullen-CV
Ian Bullen-CV
 
Standard detailed drawings
Standard detailed drawingsStandard detailed drawings
Standard detailed drawings
 
AFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dadosAFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dados
 

More from Boris518712

Edospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptEdospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptBoris518712
 
Curso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptCurso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptBoris518712
 
Charla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptCharla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptBoris518712
 
GS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxGS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxBoris518712
 
GS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxGS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxBoris518712
 
GS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxGS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxBoris518712
 
GS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxGS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxBoris518712
 
GS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxGS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxBoris518712
 
GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxBoris518712
 
GS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptxGS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptxBoris518712
 
GS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxGS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxBoris518712
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxBoris518712
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptxBoris518712
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxBoris518712
 
GS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxGS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxBoris518712
 
GS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxGS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxBoris518712
 
GS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxGS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxBoris518712
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxBoris518712
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxBoris518712
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxBoris518712
 

More from Boris518712 (20)

Edospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptEdospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.ppt
 
Curso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptCurso Lideres de Procesos.ppt
Curso Lideres de Procesos.ppt
 
Charla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptCharla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.ppt
 
GS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxGS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptx
 
GS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxGS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptx
 
GS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxGS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptx
 
GS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxGS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptx
 
GS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxGS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptx
 
GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptx
 
GS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptxGS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptx
 
GS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxGS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptx
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptx
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptx
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptx
 
GS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxGS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptx
 
GS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxGS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptx
 
GS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxGS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptx
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptx
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptx
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptx
 

Recently uploaded

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 

Recently uploaded (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

GS EP TEL 120 DA .pptx

  • 1. Needs, motivations, goals and principles that led to the creation or modification of the document: • General updated necessary to follow the technology improvements, and the standards evolution. • Some parts redundant or contradictory with GS EP TEL 410, 414 and 700. Nature of changes: • Updated the data rates up to n x STM-1, STM-4 or more. • Revised the listed norms and standards, and updated the superseded and cancelled ones. • Revised the Design Conditions, and included the possibility to have auto-tracking stabilized antennas for offshore links • Revised the Technical Requirements, and simplified the duplicated requirements • Revised the Technical Documents , and simplified the duplicated requirements • Revised the Glossary Support document - 10/ 2013 1 GS EP TEL 120 06 – POINT TO POINT MICROWAVE LINKS 10/2013