Needs, motivations, goals and principles that led to the creation or modification
of the document:
• Compliancy inter General Specification for pre-commissioning and commissioning.
• General update necessary to follow standards evolution.
Nature of changes:
• Update to Opercom references (GS EP EXP 101, GS EP EXP 103, GS EP EXP 105,
GS EP EXP 107).
• Deletion of appendix 2 and 3, which were redundant with reference to Opercom GS
• Addition of specifications for splicing boxes located in hazardous areas
Support document – 10/ 2013 1
GS EP TEL 190 05 – OFFSHORE OPTICAL FIBRES BASED
TELECOMMUNICATIONS
10/2013

More Related Content

More from Boris518712 (15)

GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptx
 
GS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptxGS EP LSO 112 Presentation.pptx
GS EP LSO 112 Presentation.pptx
 
GS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxGS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptx
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptx
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptx
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptx
 
GS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptxGS EP LSO 209 Presentation.pptx
GS EP LSO 209 Presentation.pptx
 
GS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxGS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptx
 
GS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxGS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptx
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptx
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptx
 
GS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxGS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptx
 
GS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptxGS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptx
 
Charla de grua puente.ppt
Charla de grua puente.pptCharla de grua puente.ppt
Charla de grua puente.ppt
 
Empaquetaduras.pptx
Empaquetaduras.pptxEmpaquetaduras.pptx
Empaquetaduras.pptx
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

GS EP TEL 190 DA .pptx

  • 1. Needs, motivations, goals and principles that led to the creation or modification of the document: • Compliancy inter General Specification for pre-commissioning and commissioning. • General update necessary to follow standards evolution. Nature of changes: • Update to Opercom references (GS EP EXP 101, GS EP EXP 103, GS EP EXP 105, GS EP EXP 107). • Deletion of appendix 2 and 3, which were redundant with reference to Opercom GS • Addition of specifications for splicing boxes located in hazardous areas Support document – 10/ 2013 1 GS EP TEL 190 05 – OFFSHORE OPTICAL FIBRES BASED TELECOMMUNICATIONS 10/2013