SlideShare a Scribd company logo
1 of 3
GS EP LSO 209, REV 01
LIFE JACKETS & IMMERSION SUITS
SPECIFICATIONS
GS EP LSO 209 REV01 :
LIFE JACKETS AND IMMERSION SUITS SPESIFICATIONS
• The purpose of this document is to define the rules to be applied for
the selection of any personal floating device (immersion suits, anti-
exposure suits, life-jackets and work vests) for offshore installation’s
evacuation, transfer of personnel by watercraft between watercrafts
and/or fixed offshore structures and overboard jobs.
Purpose:
• The provisions of this document apply in all Operated Exploration-
Production subsidiaries, whenever national rules and regulations
either fail to cover the subject or are less biding.
Application:
• Reference documents
• Acronyms and Definitions
• Rules
• Specifications of Personal Floating Devices for escape and
evacuation
• Personnel Floating Devices specifications for personnel transfer
by watercraft to and from installations/ watercrafts
• Personal Floating Device Specifications for work overboard
Contains:
2 SEP/2014
3 SEP/2014
OBJECTIVES
The objective of the revision 04 of this Company Rule is as follows :
• To update applicable rules :
– International Rules applicable for escape and evacuation
– Internal Rules applicable for personnel transfer and for working overboard.
• To update specifications of personal floating devices for :
– Escape and evacuation
– Personnel transfer by watercraft to and from installations/ watercrafts
– Work overboard.
BENEFITS OF THIS GS UPDATE :
• The revision of the GS makes the requirements clear, helping to avoid personnel interpretations and
brining harmonization to all affiliates
• Reduce and optimize the amount of the derogations requests
• Update with products in line with best practices and BAT (Best Available Technologies).
GS EP LSO 209 REV01 :
LIFE JACKETS AND IMMERSION SUITS SPESIFICATIONS

More Related Content

Similar to GS EP LSO 209 Presentation.pptx

6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)MAHESH PANDIT
 
Southern Transport Service SOP
Southern Transport Service SOPSouthern Transport Service SOP
Southern Transport Service SOPRichard Gibbens
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsJean-Francois Saint-Marcoux
 
Rating pressure vessel.pptx
Rating pressure vessel.pptxRating pressure vessel.pptx
Rating pressure vessel.pptxRemmyTorresVega2
 
Presentation on Bonga 2.pptx
Presentation on Bonga 2.pptxPresentation on Bonga 2.pptx
Presentation on Bonga 2.pptxJusticeGodson1
 
User specification requirements (urs) rash
User specification requirements (urs) rashUser specification requirements (urs) rash
User specification requirements (urs) rashRASHMINasare
 
The art of surgery today: The last supper
The art of surgery today: The last supperThe art of surgery today: The last supper
The art of surgery today: The last supperGeorge Trellopoulos
 
Appointed Person Overhead Overseas.ppt
Appointed Person  Overhead Overseas.pptAppointed Person  Overhead Overseas.ppt
Appointed Person Overhead Overseas.pptMo'tasem Serdaneh
 
Decommissioning of Offshore Installations
Decommissioning of Offshore InstallationsDecommissioning of Offshore Installations
Decommissioning of Offshore InstallationsMuanisa Waras
 
Paper: Life Extension of Aging Petroleum Production Facilities Offshore
Paper: Life Extension of Aging Petroleum Production Facilities Offshore Paper: Life Extension of Aging Petroleum Production Facilities Offshore
Paper: Life Extension of Aging Petroleum Production Facilities Offshore E.ON Exploration & Production
 
cranes_derricks9-30-10-2.ppt
cranes_derricks9-30-10-2.pptcranes_derricks9-30-10-2.ppt
cranes_derricks9-30-10-2.pptRickBellew1
 
ARCO IRATA Manual 2019.pdf
ARCO IRATA Manual 2019.pdfARCO IRATA Manual 2019.pdf
ARCO IRATA Manual 2019.pdfIlgarKarimov3
 
MARİTİME CONVECTİON
MARİTİME CONVECTİONMARİTİME CONVECTİON
MARİTİME CONVECTİONHakan Küçük
 
Lifting Integrity Division Services
Lifting Integrity Division ServicesLifting Integrity Division Services
Lifting Integrity Division ServicesRyan Gillespie
 

Similar to GS EP LSO 209 Presentation.pptx (20)

6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
6 71-0051 rev. 4 standard specification for pipeline construction (onshore)
 
Rg div presentation.
Rg div presentation.Rg div presentation.
Rg div presentation.
 
Southern Transport Service SOP
Southern Transport Service SOPSouthern Transport Service SOP
Southern Transport Service SOP
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 
Rating pressure vessel.pptx
Rating pressure vessel.pptxRating pressure vessel.pptx
Rating pressure vessel.pptx
 
Presentation on Bonga 2.pptx
Presentation on Bonga 2.pptxPresentation on Bonga 2.pptx
Presentation on Bonga 2.pptx
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
 
User specification requirements (urs) rash
User specification requirements (urs) rashUser specification requirements (urs) rash
User specification requirements (urs) rash
 
The art of surgery today: The last supper
The art of surgery today: The last supperThe art of surgery today: The last supper
The art of surgery today: The last supper
 
Towingrecomends.pdf
Towingrecomends.pdfTowingrecomends.pdf
Towingrecomends.pdf
 
Towingrecomends
TowingrecomendsTowingrecomends
Towingrecomends
 
Appointed Person Overhead Overseas.ppt
Appointed Person  Overhead Overseas.pptAppointed Person  Overhead Overseas.ppt
Appointed Person Overhead Overseas.ppt
 
Decommissioning of Offshore Installations
Decommissioning of Offshore InstallationsDecommissioning of Offshore Installations
Decommissioning of Offshore Installations
 
Paper: Life Extension of Aging Petroleum Production Facilities Offshore
Paper: Life Extension of Aging Petroleum Production Facilities Offshore Paper: Life Extension of Aging Petroleum Production Facilities Offshore
Paper: Life Extension of Aging Petroleum Production Facilities Offshore
 
cranes_derricks9-30-10-2.ppt
cranes_derricks9-30-10-2.pptcranes_derricks9-30-10-2.ppt
cranes_derricks9-30-10-2.ppt
 
Sdcs 02 part1
Sdcs 02 part1Sdcs 02 part1
Sdcs 02 part1
 
ARCO IRATA Manual 2019.pdf
ARCO IRATA Manual 2019.pdfARCO IRATA Manual 2019.pdf
ARCO IRATA Manual 2019.pdf
 
Company Brochures
Company BrochuresCompany Brochures
Company Brochures
 
MARİTİME CONVECTİON
MARİTİME CONVECTİONMARİTİME CONVECTİON
MARİTİME CONVECTİON
 
Lifting Integrity Division Services
Lifting Integrity Division ServicesLifting Integrity Division Services
Lifting Integrity Division Services
 

More from Boris518712

Edospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptEdospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptBoris518712
 
Curso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptCurso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptBoris518712
 
Charla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptCharla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptBoris518712
 
GS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxGS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxBoris518712
 
GS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxGS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxBoris518712
 
GS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxGS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxBoris518712
 
GS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxGS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxBoris518712
 
GS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxGS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxBoris518712
 
GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxBoris518712
 
GS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxGS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxBoris518712
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxBoris518712
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptxBoris518712
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxBoris518712
 
GS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxGS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxBoris518712
 
GS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxGS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxBoris518712
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxBoris518712
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxBoris518712
 
GS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxGS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxBoris518712
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxBoris518712
 
GS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptxGS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptxBoris518712
 

More from Boris518712 (20)

Edospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.pptEdospina-agua-desmineralizada.ppt
Edospina-agua-desmineralizada.ppt
 
Curso Lideres de Procesos.ppt
Curso Lideres de Procesos.pptCurso Lideres de Procesos.ppt
Curso Lideres de Procesos.ppt
 
Charla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.pptCharla de Especificación de Bombas Centrifugas.ppt
Charla de Especificación de Bombas Centrifugas.ppt
 
GS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptxGS EP GEO 402 Follow up.pptx
GS EP GEO 402 Follow up.pptx
 
GS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptxGS EP INS 106 Fiche de création.pptx
GS EP INS 106 Fiche de création.pptx
 
GS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptxGS EP INS 108 Follow up.pptx
GS EP INS 108 Follow up.pptx
 
GS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptxGS EP INS 150 Modification follow-up.pptx
GS EP INS 150 Modification follow-up.pptx
 
GS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptxGS EP INS 196 Modification follow-up.pptx
GS EP INS 196 Modification follow-up.pptx
 
GS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptxGS EP INS 197 Modification follow-up.pptx
GS EP INS 197 Modification follow-up.pptx
 
GS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptxGS EP LSO 131 Presentation REV02.pptx
GS EP LSO 131 Presentation REV02.pptx
 
GS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptxGS EP LSO 204 Presentation.pptx
GS EP LSO 204 Presentation.pptx
 
GS EP LSO 205 REV.pptx
GS EP LSO 205  REV.pptxGS EP LSO 205  REV.pptx
GS EP LSO 205 REV.pptx
 
GS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptxGS EP LSO 206 Presentation.pptx
GS EP LSO 206 Presentation.pptx
 
GS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptxGS EP SAF 226 DocAcc.pptx
GS EP SAF 226 DocAcc.pptx
 
GS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptxGS EP SAF 341 rev 3.pptx
GS EP SAF 341 rev 3.pptx
 
GS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptxGS EP SDV 102 PPT.pptx
GS EP SDV 102 PPT.pptx
 
GS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptxGS EP SPS 028 Follow up.pptx
GS EP SPS 028 Follow up.pptx
 
GS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptxGS EP TEL 120 DA .pptx
GS EP TEL 120 DA .pptx
 
GS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptxGS EP TEL 190 DA .pptx
GS EP TEL 190 DA .pptx
 
GS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptxGS EP TEL 191 DA .pptx
GS EP TEL 191 DA .pptx
 

Recently uploaded

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 

Recently uploaded (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 

GS EP LSO 209 Presentation.pptx

  • 1. GS EP LSO 209, REV 01 LIFE JACKETS & IMMERSION SUITS SPECIFICATIONS
  • 2. GS EP LSO 209 REV01 : LIFE JACKETS AND IMMERSION SUITS SPESIFICATIONS • The purpose of this document is to define the rules to be applied for the selection of any personal floating device (immersion suits, anti- exposure suits, life-jackets and work vests) for offshore installation’s evacuation, transfer of personnel by watercraft between watercrafts and/or fixed offshore structures and overboard jobs. Purpose: • The provisions of this document apply in all Operated Exploration- Production subsidiaries, whenever national rules and regulations either fail to cover the subject or are less biding. Application: • Reference documents • Acronyms and Definitions • Rules • Specifications of Personal Floating Devices for escape and evacuation • Personnel Floating Devices specifications for personnel transfer by watercraft to and from installations/ watercrafts • Personal Floating Device Specifications for work overboard Contains: 2 SEP/2014
  • 3. 3 SEP/2014 OBJECTIVES The objective of the revision 04 of this Company Rule is as follows : • To update applicable rules : – International Rules applicable for escape and evacuation – Internal Rules applicable for personnel transfer and for working overboard. • To update specifications of personal floating devices for : – Escape and evacuation – Personnel transfer by watercraft to and from installations/ watercrafts – Work overboard. BENEFITS OF THIS GS UPDATE : • The revision of the GS makes the requirements clear, helping to avoid personnel interpretations and brining harmonization to all affiliates • Reduce and optimize the amount of the derogations requests • Update with products in line with best practices and BAT (Best Available Technologies). GS EP LSO 209 REV01 : LIFE JACKETS AND IMMERSION SUITS SPESIFICATIONS