SlideShare a Scribd company logo
1 of 5
Download to read offline
Copyright: The information in this document is copyright. Apart from any fair dealing for the purpose of study, research, criticism or review as permitted
under the Copyright Act no part may be reproduced by any process without the written permission of the Director Safety and Standards Sydney Trains. Partnering industry for Better Safety for all
Network Rules
and Procedures
Amendments
Effective 29 September 2019
Briefing for
Sydney Trains, NSW Trains,
TfNSW Employees,
Contractors and
Private Operators
www.railsafe.org.au
This flyer summarises important changes to
Sydney Trains’ Network Rules and Network
Procedures.
Amendments to the Network Rules and
Network Procedures will come into effect at
00:01 hours on Sunday, 29 September 2019.
All users of the Network Rules and Network
Procedures should familiarise themselves
with these changes, and ensure their copies
of the Network Rules and Network
Procedures are amended accordingly.
For further information:
email: NRU@transport.nsw.gov.au
web: www.railsafe.org.au
NGE 204 Network communication
Terminology updated from "check box" to "numbered box".
NWT 300 Planning work in the Rail Corridor
Terminology updated from "trained workers" to "Qualified
Workers".
Added:
• instructions that the Protection Officer must be the only
person to brief workers about worksite protection and
safety measures before work begins and if protection
and safety measures change and before additional
workers join the worksite
• additional factors to consider when a Protection Officer
makes a safety assessment relating to rail traffic risks on
lines next to, near to or close to the work on track
• reference to:
− NWT 320 Signal Key Switch (SKS) Blocking
− NPR 753 Using Signal Key Switch Blocking
− NPR 754 Using a signal key switch.
Network Rules and Procedures Amendments Effective 29 September 2019
Copyright: The information in this document is copyright. Apart from any fair dealing for the purpose of study, research, criticism or review as permitted
under the Copyright Act no part may be reproduced by any process without the written permission of the Director Safety and Standards Sydney Trains. Partnering industry for Better Safety for all
NWT 302 Local Possession Authority
Incorporated instructions for:
• establishing and managing coordinated worksites.
• a Coordinating Protection Officer.
Added instructions:
• that the Protection Officer must be the only person to
brief workers about worksite protection and safety
measures before work begins and if protection and
safety measures change and before additional workers
join the worksite
• to place blocking facilities to prevent exit from an LPA
• relating to possession limit markers and worksite
protection markers
• for extending an LPA
• protection at intermediate access points
• establishing a worksite within 500m of an LPA limit.
NWT 306 Track Work Authority
Revised references used to nominate the worksite location
aligned with the references used in ASB.
Added:
• instructions for using Automatic signals fitted with a
signal key switch as TWA protection
• reference to NPR 754 Using a signal key switch.
NWT 312 Infrastructure Booking Authority
Revised when it is required to compile NRF 003
Infrastructure Booking Authority (IBA) form.
NWT 320 Signal key switch blocking
New Rule prescribing the rules for Signal Key Switch
Blocking.
NTR 400 Protecting rail traffic
Added instructions for placing track-circuit shorting clips on
adjacent or obstructed lines if unable to contact Signaller.
Removed:
• reference to NPR 709 Using railway track signals
• instructions for placing railway track signals to protect
rail traffic.
NSY 512 Manual Block Working
Incorporated instructions for:
• affected signal used as the entry-end limit or exit-end
limit not having trains stops suppressed or be included
on the CAN form as signals that may be passed at
STOP
• for placing clearance Handsignallers.
NPR 700 Using a Local Possession Authority
Added:
• instructions for managing coordinated worksites
• Coordinating Protection Officer responsibilities
• instructions for protecting the LPA limits and
intermediate access points
• instructions for using possession limit markers, worksite
limit markers and worksite delineation markers
• perspective figures.
NPR 702 Using a Track Work Authority
Revised references used to nominate the worksite location
aligned with the references used in ASB.
Added:
• instructions for using Automatic signals fitted with a
signal key switch as TWA protection
• reference to NPR 754 Using a signal key switch.
NPR 712 Protecting work from rail traffic on adjacent lines
Added:
• definition of adjacent lines
• defined/reinforced the purpose of a dedicated worker
• use of SKS blocking to protect work from rail traffic on
adjacent lines.
NPR 713 Placing temporary speed signs
Corrected typographical errors.
NPR 720 Protecting rail traffic
Revised text for protecting adjacent or obstructed lines.
Added intructions for:
• for placing track-circuit shorting clips on adjacent or
obstructed lines if unable to contact Signaller
• for placing a Qualified Worker to towards the direction
of approach of assiting rail traffic
• for Driver or Track Vehicle Operator of assisting rail
traffic
• for protecting obstructions using railway track signals.
Removed intructions for:
• responding to delayed rail traffic
• placing railway track signals to protect rail traffic.
NPR 725 Using a large pilot staff
Revised instructions when to compile NRF 011 Worksite
Warning form.
NPR 726 Using half pilot staffs
Revised instructions when to compile NRF 011 Worksite
Warning form.
NPR 753 Using Signal Key Switch Blocking
New Procedure prescribing the process for using Signal Key
Switch Blocking.
NPR 754 Using a signal key switch
New Procedure prescribing the process for operating a
signal key switch.
NRF 000 General information about Network forms
Terminology updated from:
• "check box" to ""numbered box"
• “Train Controller" to ""Network Controller".
NRF 003 Infrastructure Booking Authority (IBA)
Revised text when it is required to compile NRF 003
Infrastructure Booking Authority (IBA) form.
Terminology updated from:
• "Number" to "IBA Number"
• "Location of equipment" to "Equipment"
• "check box" to "numbered box"
• "temporary or permanent removal" to "temporarily
booked out of use or permanently removed".
Added:
• instructions for numbering forms
• instructions for using form to record details for using
uncommissioned infrastructure
• updated specimen form.
Revised form items and structure.
Added form item Using uncommissioned infrastructure.
NRF 004 Condition Affecting the Network (CAN)
Plain English edits.
Terminology updated from:
• "check box" to numbered box"
• "Train Controller" to "Network Controller".
Added:
• instructions for numbering forms
• updated specimen form.
Revised form items and structure.
NRF 005 Special Proceed Authority (SPA)
Terminology updated from:
• "check box" to assurance box"
• "check box" to numbered box".
Added:
• instructions for numbering forms
• updated specimen form
NRF 007 Pilot Staff Ticket
Terminology updated from "Number to Ticket Number".
Added:
• instructions for numbering forms
• updated specimen form.
Network Rules and Procedures Amendments Effective 29 September 2019
Copyright: The information in this document is copyright. Apart from any fair dealing for the purpose of study, research, criticism or review as permitted
under the Copyright Act no part may be reproduced by any process without the written permission of the Director Safety and Standards Sydney Trains. Partnering industry for Better Safety for all
NRF 008 Pilot Staff Notice (PSN)
Revised form items order.
Terminology updated from:
• "Number" to "PSN Number"
• "Pilot staff working has been introduced" to "Pilot staff
working is authorised"
• "Automatic road and pedestrian level crossings" to
"Active control level crossings"
• "check box" to numbered box"
• "other conditions" to "special instructions".
Added:
• instructions for numbering forms
• updated specimen form.
Revised form items and structure.
NRF 010 Pilot Staff Working Introduction
Revised:
• form items ordered
• assurances to align with Rule.
Terminology updated from:
• "Number" to "Introduction Number"
• "check box" to assurance box"
• "check box" to numbered box".
Added:
• instructions for numbering forms
• form item "As a result of"
• form item "Issued to"
• updated specimen form.
Revised form items and structure.
NRF 011 Worksite Warning
Revised:
• form items order
• in line with changes to NRF 008 Pilot Staff Notice form.
Terminology updated from "check box" to numbered box".
Added updated specimen form.
Revised form structure.
NRF 013 Temporary Rail Bond Approval
Terminology updated from:
• "Reference No." to "Reference Number"
• "Reason for bonding" to "Reason for temporary rail
bond"
• "Approved by" to "Approved by Signals Engineering
Representative".
Added:
• instructions for numbering forms
• updated specimen form.
Revised form structure.
NRF 014 Worksite Protection Pre-work Briefing
Terminology updated from "Site Supervisor" to "Workplace
Supervisor".
Added:
• instructions for:
− the Workplace Supervisor must make sure that all
WHS and rail safety hazards have controls
− the Protection Officer and the Workplace
Supervisor to make sure that all workers are briefed
about worksite protection and the work to be
performed before workers access the worksite
− completing the Workplace Supervisor
Acknowledgement on the Worksite Protection
Pre-work briefing form.
• updated specimen form.
Revised form items.
NRF 015 Worksite Protection Plan
Revised text for providing or attaching a diagram/map.
Added:
• new Worksite Protection Plan NRF 015D for Track Work
Authority/Signal Key Switch Protection
• instruction when to compile the different Worksite
Protection Plans
• updated specimen forms.
NRF 015A Worksite Protection Plan
Terminology updated from "Site Supervisor" to "Workplace
Supervisor".
added options for:
• work within a stabling yard
• work within a maintenance centre.
Removed:
• completely within field relating to worksite location
• options for TWA and work within a shunting yard.
NRF 015B Worksite Protection Plan
Terminology updated from "Site Supervisor" to "Workplace
Supervisor".
Removed completely within field relating to worksite
location.
NRF 015C Worksite Protection Plan
Terminology update from:
• "ASB Number" to "Protection Number"
• "clear of the line" to "clear of the Danger Zone".
Removed completely within field relating to worksite
location.
NRF 015D Worksite Protection Plan
New Form to record the Worksite Protection Plan for a
Track Work Authority or Signal Key Switch protection.
NRF 016 Protection Officers Log
Unit and Form withdrawn from publication with
introduction of NRF 015D.
NRF 018 Absolute Signal Blocking (ASB)
Terminology update from "Rail traffic inspection/repair" to
"Activities associated with in-service rail traffic".
Revised instructions for completing form Item 2 "Worksite
Location".
Added updated specimen form.
Removed completely within field relating to worksite
location.
Withdrawal of Permanent SAFE Notices
Some of the changes contained in this amendment pack
are current, having already been implemented by
Permanent SAFE Notices.
With the implementation of these amendments, the
Permanent SAFE Notices listed in the table below will
become obsolete and subsequently withdrawn at
00:01 hours on Sunday, 29 September 2019.
Number Topic
008-2019 Trial of protection markers in a Local
Possession Authority (LPA)
010-2019 NSY 512 Manual block working
Sydney Trains
Level 4
36 – 46 George Street
Burwood NSW 2134
PO Box K349
Haymarket NSW 1238
Australia
Email: NRU@transport.nsw.gov.au
Website: www.railsafe.org.au

More Related Content

Similar to September 2019 amendments flyer

Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
Bathrinath mangalamoorthi
 
411_en_LW_Autoline_400
411_en_LW_Autoline_400411_en_LW_Autoline_400
411_en_LW_Autoline_400
Eric Andersson
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revert
Mike Lewin
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013
Joseph Melanson
 
S ananthakrishnan resume 3_10_16
S ananthakrishnan resume 3_10_16S ananthakrishnan resume 3_10_16
S ananthakrishnan resume 3_10_16
Kowshik San
 
Controller Area Network (CAN) Training
Controller Area Network (CAN) TrainingController Area Network (CAN) Training
Controller Area Network (CAN) Training
Tonex
 
kumaresan_SAS Engg
kumaresan_SAS Enggkumaresan_SAS Engg
kumaresan_SAS Engg
Kumaresan T
 

Similar to September 2019 amendments flyer (20)

Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
 
411_en_LW_Autoline_400
411_en_LW_Autoline_400411_en_LW_Autoline_400
411_en_LW_Autoline_400
 
Keynote: EASA regulation changes and the impact on MRO software
Keynote: EASA regulation changes and the impact on MRO softwareKeynote: EASA regulation changes and the impact on MRO software
Keynote: EASA regulation changes and the impact on MRO software
 
374504b
374504b374504b
374504b
 
Licensing
LicensingLicensing
Licensing
 
Services Master
Services MasterServices Master
Services Master
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revert
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
 
S ananthakrishnan resume 3_10_16
S ananthakrishnan resume 3_10_16S ananthakrishnan resume 3_10_16
S ananthakrishnan resume 3_10_16
 
Controller Area Network (CAN) Training
Controller Area Network (CAN) TrainingController Area Network (CAN) Training
Controller Area Network (CAN) Training
 
operational-telecom-network-connected-pipeline-design-guide.pdf
operational-telecom-network-connected-pipeline-design-guide.pdfoperational-telecom-network-connected-pipeline-design-guide.pdf
operational-telecom-network-connected-pipeline-design-guide.pdf
 
Avnet Service Brief: Commercial Interconnect Assembly
Avnet Service Brief: Commercial Interconnect AssemblyAvnet Service Brief: Commercial Interconnect Assembly
Avnet Service Brief: Commercial Interconnect Assembly
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
CV Selby Khoza
CV Selby KhozaCV Selby Khoza
CV Selby Khoza
 
Fiber optic network design
Fiber optic network designFiber optic network design
Fiber optic network design
 
kumaresan_SAS Engg
kumaresan_SAS Enggkumaresan_SAS Engg
kumaresan_SAS Engg
 
Ain overview
Ain overviewAin overview
Ain overview
 
PetroSync_-_API_570_Piping_Inspector_Course_2023.pdf
PetroSync_-_API_570_Piping_Inspector_Course_2023.pdfPetroSync_-_API_570_Piping_Inspector_Course_2023.pdf
PetroSync_-_API_570_Piping_Inspector_Course_2023.pdf
 

More from Garry Pepper

Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
Garry Pepper
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
Garry Pepper
 

More from Garry Pepper (20)

Laha memo
Laha memoLaha memo
Laha memo
 
Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0
 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003
 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112
 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009
 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toa
 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07
 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204
 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191
 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027
 
Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0
 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206
 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019
 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EA
 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175
 
Safe notice permanent 007
Safe notice permanent 007Safe notice permanent 007
Safe notice permanent 007
 
Mandatory wpp review checklist completion
Mandatory wpp review checklist completionMandatory wpp review checklist completion
Mandatory wpp review checklist completion
 

Recently uploaded

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 

Recently uploaded (20)

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 

September 2019 amendments flyer

  • 1. Copyright: The information in this document is copyright. Apart from any fair dealing for the purpose of study, research, criticism or review as permitted under the Copyright Act no part may be reproduced by any process without the written permission of the Director Safety and Standards Sydney Trains. Partnering industry for Better Safety for all Network Rules and Procedures Amendments Effective 29 September 2019 Briefing for Sydney Trains, NSW Trains, TfNSW Employees, Contractors and Private Operators www.railsafe.org.au This flyer summarises important changes to Sydney Trains’ Network Rules and Network Procedures. Amendments to the Network Rules and Network Procedures will come into effect at 00:01 hours on Sunday, 29 September 2019. All users of the Network Rules and Network Procedures should familiarise themselves with these changes, and ensure their copies of the Network Rules and Network Procedures are amended accordingly. For further information: email: NRU@transport.nsw.gov.au web: www.railsafe.org.au NGE 204 Network communication Terminology updated from "check box" to "numbered box". NWT 300 Planning work in the Rail Corridor Terminology updated from "trained workers" to "Qualified Workers". Added: • instructions that the Protection Officer must be the only person to brief workers about worksite protection and safety measures before work begins and if protection and safety measures change and before additional workers join the worksite • additional factors to consider when a Protection Officer makes a safety assessment relating to rail traffic risks on lines next to, near to or close to the work on track • reference to: − NWT 320 Signal Key Switch (SKS) Blocking − NPR 753 Using Signal Key Switch Blocking − NPR 754 Using a signal key switch.
  • 2. Network Rules and Procedures Amendments Effective 29 September 2019 Copyright: The information in this document is copyright. Apart from any fair dealing for the purpose of study, research, criticism or review as permitted under the Copyright Act no part may be reproduced by any process without the written permission of the Director Safety and Standards Sydney Trains. Partnering industry for Better Safety for all NWT 302 Local Possession Authority Incorporated instructions for: • establishing and managing coordinated worksites. • a Coordinating Protection Officer. Added instructions: • that the Protection Officer must be the only person to brief workers about worksite protection and safety measures before work begins and if protection and safety measures change and before additional workers join the worksite • to place blocking facilities to prevent exit from an LPA • relating to possession limit markers and worksite protection markers • for extending an LPA • protection at intermediate access points • establishing a worksite within 500m of an LPA limit. NWT 306 Track Work Authority Revised references used to nominate the worksite location aligned with the references used in ASB. Added: • instructions for using Automatic signals fitted with a signal key switch as TWA protection • reference to NPR 754 Using a signal key switch. NWT 312 Infrastructure Booking Authority Revised when it is required to compile NRF 003 Infrastructure Booking Authority (IBA) form. NWT 320 Signal key switch blocking New Rule prescribing the rules for Signal Key Switch Blocking. NTR 400 Protecting rail traffic Added instructions for placing track-circuit shorting clips on adjacent or obstructed lines if unable to contact Signaller. Removed: • reference to NPR 709 Using railway track signals • instructions for placing railway track signals to protect rail traffic. NSY 512 Manual Block Working Incorporated instructions for: • affected signal used as the entry-end limit or exit-end limit not having trains stops suppressed or be included on the CAN form as signals that may be passed at STOP • for placing clearance Handsignallers. NPR 700 Using a Local Possession Authority Added: • instructions for managing coordinated worksites • Coordinating Protection Officer responsibilities • instructions for protecting the LPA limits and intermediate access points • instructions for using possession limit markers, worksite limit markers and worksite delineation markers • perspective figures. NPR 702 Using a Track Work Authority Revised references used to nominate the worksite location aligned with the references used in ASB. Added: • instructions for using Automatic signals fitted with a signal key switch as TWA protection • reference to NPR 754 Using a signal key switch. NPR 712 Protecting work from rail traffic on adjacent lines Added: • definition of adjacent lines • defined/reinforced the purpose of a dedicated worker • use of SKS blocking to protect work from rail traffic on adjacent lines.
  • 3. NPR 713 Placing temporary speed signs Corrected typographical errors. NPR 720 Protecting rail traffic Revised text for protecting adjacent or obstructed lines. Added intructions for: • for placing track-circuit shorting clips on adjacent or obstructed lines if unable to contact Signaller • for placing a Qualified Worker to towards the direction of approach of assiting rail traffic • for Driver or Track Vehicle Operator of assisting rail traffic • for protecting obstructions using railway track signals. Removed intructions for: • responding to delayed rail traffic • placing railway track signals to protect rail traffic. NPR 725 Using a large pilot staff Revised instructions when to compile NRF 011 Worksite Warning form. NPR 726 Using half pilot staffs Revised instructions when to compile NRF 011 Worksite Warning form. NPR 753 Using Signal Key Switch Blocking New Procedure prescribing the process for using Signal Key Switch Blocking. NPR 754 Using a signal key switch New Procedure prescribing the process for operating a signal key switch. NRF 000 General information about Network forms Terminology updated from: • "check box" to ""numbered box" • “Train Controller" to ""Network Controller". NRF 003 Infrastructure Booking Authority (IBA) Revised text when it is required to compile NRF 003 Infrastructure Booking Authority (IBA) form. Terminology updated from: • "Number" to "IBA Number" • "Location of equipment" to "Equipment" • "check box" to "numbered box" • "temporary or permanent removal" to "temporarily booked out of use or permanently removed". Added: • instructions for numbering forms • instructions for using form to record details for using uncommissioned infrastructure • updated specimen form. Revised form items and structure. Added form item Using uncommissioned infrastructure. NRF 004 Condition Affecting the Network (CAN) Plain English edits. Terminology updated from: • "check box" to numbered box" • "Train Controller" to "Network Controller". Added: • instructions for numbering forms • updated specimen form. Revised form items and structure. NRF 005 Special Proceed Authority (SPA) Terminology updated from: • "check box" to assurance box" • "check box" to numbered box". Added: • instructions for numbering forms • updated specimen form NRF 007 Pilot Staff Ticket Terminology updated from "Number to Ticket Number". Added: • instructions for numbering forms • updated specimen form.
  • 4. Network Rules and Procedures Amendments Effective 29 September 2019 Copyright: The information in this document is copyright. Apart from any fair dealing for the purpose of study, research, criticism or review as permitted under the Copyright Act no part may be reproduced by any process without the written permission of the Director Safety and Standards Sydney Trains. Partnering industry for Better Safety for all NRF 008 Pilot Staff Notice (PSN) Revised form items order. Terminology updated from: • "Number" to "PSN Number" • "Pilot staff working has been introduced" to "Pilot staff working is authorised" • "Automatic road and pedestrian level crossings" to "Active control level crossings" • "check box" to numbered box" • "other conditions" to "special instructions". Added: • instructions for numbering forms • updated specimen form. Revised form items and structure. NRF 010 Pilot Staff Working Introduction Revised: • form items ordered • assurances to align with Rule. Terminology updated from: • "Number" to "Introduction Number" • "check box" to assurance box" • "check box" to numbered box". Added: • instructions for numbering forms • form item "As a result of" • form item "Issued to" • updated specimen form. Revised form items and structure. NRF 011 Worksite Warning Revised: • form items order • in line with changes to NRF 008 Pilot Staff Notice form. Terminology updated from "check box" to numbered box". Added updated specimen form. Revised form structure. NRF 013 Temporary Rail Bond Approval Terminology updated from: • "Reference No." to "Reference Number" • "Reason for bonding" to "Reason for temporary rail bond" • "Approved by" to "Approved by Signals Engineering Representative". Added: • instructions for numbering forms • updated specimen form. Revised form structure. NRF 014 Worksite Protection Pre-work Briefing Terminology updated from "Site Supervisor" to "Workplace Supervisor". Added: • instructions for: − the Workplace Supervisor must make sure that all WHS and rail safety hazards have controls − the Protection Officer and the Workplace Supervisor to make sure that all workers are briefed about worksite protection and the work to be performed before workers access the worksite − completing the Workplace Supervisor Acknowledgement on the Worksite Protection Pre-work briefing form. • updated specimen form. Revised form items.
  • 5. NRF 015 Worksite Protection Plan Revised text for providing or attaching a diagram/map. Added: • new Worksite Protection Plan NRF 015D for Track Work Authority/Signal Key Switch Protection • instruction when to compile the different Worksite Protection Plans • updated specimen forms. NRF 015A Worksite Protection Plan Terminology updated from "Site Supervisor" to "Workplace Supervisor". added options for: • work within a stabling yard • work within a maintenance centre. Removed: • completely within field relating to worksite location • options for TWA and work within a shunting yard. NRF 015B Worksite Protection Plan Terminology updated from "Site Supervisor" to "Workplace Supervisor". Removed completely within field relating to worksite location. NRF 015C Worksite Protection Plan Terminology update from: • "ASB Number" to "Protection Number" • "clear of the line" to "clear of the Danger Zone". Removed completely within field relating to worksite location. NRF 015D Worksite Protection Plan New Form to record the Worksite Protection Plan for a Track Work Authority or Signal Key Switch protection. NRF 016 Protection Officers Log Unit and Form withdrawn from publication with introduction of NRF 015D. NRF 018 Absolute Signal Blocking (ASB) Terminology update from "Rail traffic inspection/repair" to "Activities associated with in-service rail traffic". Revised instructions for completing form Item 2 "Worksite Location". Added updated specimen form. Removed completely within field relating to worksite location. Withdrawal of Permanent SAFE Notices Some of the changes contained in this amendment pack are current, having already been implemented by Permanent SAFE Notices. With the implementation of these amendments, the Permanent SAFE Notices listed in the table below will become obsolete and subsequently withdrawn at 00:01 hours on Sunday, 29 September 2019. Number Topic 008-2019 Trial of protection markers in a Local Possession Authority (LPA) 010-2019 NSY 512 Manual block working Sydney Trains Level 4 36 – 46 George Street Burwood NSW 2134 PO Box K349 Haymarket NSW 1238 Australia Email: NRU@transport.nsw.gov.au Website: www.railsafe.org.au