1. GS EP SPS 028 Rev. 01
Obsolescence Management Plan for Subsea Production Control
System
EP/DEV/TEC/SPS
2. 2 - EP/DEV/TEC/SPS
Modifications follow-up (1/1)
Re-write in conjunction with joint operator (Total, Shell, BP, Statoil, and
Chevron) collaboration. This GS version will now be used by all
participating operators with our common subsea system
manufacturers.