CV for Mechanical Engineer with 12+ Yrs Experience
1. CURRICULUM VITAE
223/94 D2 Sriram Illam,
Trichy Road, Anna Nagar,
Palladam. Coimbaore.
Mob.No: 9715672301
rajan_rajaram@rediffmail.com
RAJAN R BOOPATHI
Bachelor of Engineering - MECHANICAL
Career Objective:
To be a successfulprofessional ambitious to grow with the organization.
Total Experience: 12 Years
Academic Records:
Class/Degree Year Board/University Marks
B.E(Mechanical)
1997-
2001
Maharaja Engineering College, Bharathiyar
University, Coimbatore, India
66%
(1ST CLASS)
HSC 1997 P.VK.N.H.S.S Tamilnadu Board, India
74.3 %
(1ST CLASS)
SSC 1995 P.VK.N.H.S.S Tamilnadu Board, India
80%
(1ST CLASS)
Specialized Courses:
Class/Degree Year Board/University Marks
PRO/E 2001
AU-FRG INSTITUTE FOR CAD/CAM, Anna
University, Chennai.India
72%
EDM-DIE
SINKING
ROBOFORM-
CNC
2001
UMS-CHARMILLS EDM CENTER,
COIMBATORE, India
-
DIP IN CAD /
CAM / CAE
2003 ECIT-CITD MUMBAI, India 75 %
GME 2005
Singapore Maritime Academy / Singapore
Polytechnic, Singapore
-
ISO
14001Internal
Audit Certificate
2013 LRQA, Dubai Pass
OSHAS 18001 –
Internal Audit
Certificate
2013 LRQA, Dubai Pass
Professional
Project
Management
Program
2013 Cambridge Education, Dubai Pass
SAP - PP 2012 AlFanar Electrical Systems LLC, Dubai.
Internal
Training
2. MACHINE PROFICIENCY:
S.No Machine
1
CNCSheetMetal PunchingMachine Make:Trumpf /
Amadapunchingmachine
2
CNCSheetMetal bendingMachine Make:Trumpf /
AmadaBendingmachine
3
CNCBusbar PunchingMachine Make:EHRT Busbar
PunchingMachine
4
CNCBusbar BendingMachine Make:EHRT Busbar
BendingMachine
5 DrillingMachine
6 LiquidGasketMachine
7 Roll FormingMachine
Computer Software Proficiency:
Expert in MS Project , AutoCAD, SAP-PP/MM ,Pro-e Wildfire4.0 , Solid Works ,MS Office
Professional Experiences:
Company: Al Fanar Electrical Systems LLC, Dubai.
Switchgear Low Voltage Factory
http://www.alfanar.com
Duration: Apr2010- May2015.
Designation: Sr. Production Planning Engineer - Project
Domain: Product Design and Manufacturing – Sheet Metal Works / Assembly of
Switchgear Components. (Project Based)
Products: LVP, MCC, SMDB, DB, Capacitor Bank, Meter Cabinets, ATS
Panels.
Job Profile:
Get Projectdetails from differentcustomers requirements for Switchgear orders for tall
raise buildings /hotels / Villas / hospitals /schools etc.
Clearly understand each customer’s projectrequirements oftailor made requirements.
Generate monthly/ weekly Production plan matching to each customers projects
requirements and yield to get delivery dates of each projects .
SAP – PP Module use MTO process to manage demand and supplyof customer
Project orders.
Used SAP to check new projectorders and materials availabilityand initiate for
procurement.
Create BOM / Routing for new project orders.
Create master plan for the month and initiate meetings with internal departments.
Release projectproduction orders as per master plan based on materials availability
and production to start.
Highlight/ Conductweekly meeting to monitor planned Vs actual progress to find
bottle necks.
Daily follow-up for shortage ofmaterials with procurements team.
Check and ensure production to follow GA arrangements (IPXX / FORM1 to FORM4)
/ Technical drawings as per customer requirements.
Troubleshooting ofmaterials /manpower requirements.
Conducttechnical interviews for new joiners / technicians for new recruitments.
Prepare Screening testfor new joiners /technicians for new recruitments.
Busbar assemblyshortcircuittest withstand capacityanalysis done by using Ansys
before type test.
3. Assisted and partof core team for Type Testpanels from startto end of the project
completed successfully.
Analyzes plantcapacity data and performs mathematical calculations to determine
manufacturing processes.
Executed jobs up to 30 Million value projects annuallymeeting yearly targets.
Prepare and monitor Master plan/delivery, production schedules and yield to determine
daily production status. Run MRP to cross check materials availability.
Create Purchase Requestand follow up with procurementto get materials on time
withouteffecting production functions.
Analysis of cost of materials and manpower and do value engineering to reduce cost.
Communicate with vendors incase anydelay in materials to give alternatives.
Follow-up for production orders approvals as per ERP process using SAP.
Take monthlyinventory and produce reportof nonmoving materials and take action.
Co-ordinate with the ProjectEngineers for all delivery schedules and priorityitems to
determine expected date of completion in production & confer any problem thataffects
delivery date commitments.
Prepare & Modify BOM to provide correct inputin material planning requirements (MRP)
Prepare & Modify routing to provide correct production scheduling.
Release production orders according to master projectproduction schedule.
Expedites operations thatdelay schedules and alter schedules to meetunforeseen
conditions.
Control and monitor Process efficiency,productivity, quality of commitments (KPI).
Analyze & Optimize materials flow from stores to production execution.
Implemented FIFO/ JIT and eliminate obsolete materials stock.
Implemented safetystock & setreorder point in SAP based on lead time of procurement
of each item.
Generated weekly / monthlyreport of stock status KPIs inventory turnover, NCR ,
Production missing items,stock status value in store as per materials category.
Co-ordinate and liaise with Material Planner,Purchase and Production Staff to provide
the materials atthe right time and at the right quantity.
Prepare monthlyreport to monitor production efficiency and productivity.
Assistin stock inventory and annual stock take to determine actual stock level.
Analyze production efficiency / productivity / commitments
CNC Machine scheduling and monitor efficiency.
Optimize production man-hours matching with operations
Check for production missing parts in ERP system match with actuals.
Taken additional responsibilityact as Switch Gear Production Manager.
CNC busbar Punching Machine / Bending machine feasibilitystudy done before
procurement.
Attended EHRT – CNC Busbar Punching Machine / Bending Machine training.
CNC sheetmetal punching /bending machine (ThumpfMachine,Germany) case study
before procurement.
Attended training and Certified Internal Auditor For ISO 9001,OHSAS 18001,ISO
14001(Done Integration ofthis two process)
Under gone Project Management Training (PMP).
Under gone SAP-PP module power user internal training have complete knowledge
aboutfull cycle MTO process.
SAP-PP module user training given to all functional staff after completing SAP power
user training.
Check and analyze machine / Manpower efficiency and productivity.
HSE Responsibilities:
Follow QHSE Rules & Regulations
Conducted Risk Assessmentfor production section.
Created Risk register complywith Dubai Municipality Laws.
4. Conducted number of internal audits for QHSE
Monitor monthly KPIs (Zero Accident / Near Miss / IncidentReports).
Participate & communicate in QHSE Matters like risk assessmenttrainings meetings etc
For internal and external communication as applicable ·
Ensure usage ofapplicable personnel protective equipment’s ·
Follow the emergencyprocedure and participate in mock drills.
Plan the schedule in such a way that it will not affect the health of the employees.
To plan the site schedule effectively through enough man power etc by considering the
risk/nature of site.
Actively complywith hygiene requirements.
Preserve the resources and environment.
Minimize the waste generation.
Participated in managementprogram for waste reduction.
Implement3 Rs - Reduce, Reuse,Recycle.
Conducted So many safety training / 5S / Lean manufacturing training /Team building
Training to technicians.(40 head count).
ConductHealth and safety meeting to all technicians /Staffs weeklybases.
Actually participated in emergencymock drill as observer and give feedback.
ConductHealth and safety meeting to all technicians /Staffs weeklybases
Software Used; MS Project,Pro/e, Autocad,Pro/Wind-chill, Navision (ERP), MS Office, SAP- PP /
MM module.
Total Number of Reported: 5 Staff + 40 Technicians.
Company: LARSEN & TOUBRO LIMITED, MUMBAI / COIMBATORE
Electrical Systems & Equipment’s
Switchgear Low Voltage Factory
http://www.LNTEBG.COM
Duration: FEB 2008- Mar 2010
Designation: Asst Manager- Design
Domain: Product Design
Products: LVP, MCC, SMDB, DB, Capacitor Bank, Meter Cabinets, ATS
Panels.
Job Profile:
Worked at L&T - SDDC ( Switchgear Design and development Center) as Design Engineer.
Production BOM creation for customized LV switch boards
New product development of Low Voltage Panels and accessories.
Cross Check Mechanism of the product operation.
Design of sheet metal components and copperbusbarsystem.
Design verification of new products by using engineering calculations and analysis software.
Preparation of Type test Panels for IP54 / Short Circuit / measurement of Heat Generated
during operations
Participated in Testing of type test panels at ERDA ( Electrical Research and Development
Association)
Project plan prepare & implementation.
Actively participated in after successfultype test roll out for production standardization of
drawings and work instructions for assembly during production.
Raw material calculation & advance planning of materials
Cost estimation of all production order panels
Design Electrical & mechanical components location as per customer requirement.
Cross checking of all design release 2D drawings for manufacturing.
Cross check design as per international standard IEC61439.
Troubleshooting of current projects underproduction.
Cross functional team activity.
Test panels design & development.
Costing would be calculated for invoice purpose to customers
5. Material Inventory would be taken periodically to monitor any shortage as per our project
plan.
Updating of design changes in PDM
As an job rotation got in to assembly production responsibility.
Pro/e & AutoCAD Software installation and data base management
Repotting to Sr.DGM about project status &issues
Coordinating with customers for any feedbacks & issues
Coordinating with vendors for manufacturing issues & vendor development.
SAP implementation of the project
Assembly instruction is prepared by using Pro/e Animation
Coordinating with junior engineers & draftsman to train up them and get the work done.
Six-Sigma / Value Engineering (VE) implementation in our project
Implement 5S in shop floor & Project.
Software Used; Pro/e, Catia, Autocad,Pro/Wind-chill, Solid Works, SAP R/3- PP .MS Project
Total Number of Team Members: 6
Software Used: Proe, AutoCAD,Ansys.
Company: M/S CADSYS SIMULATIONS (P) Ltd., MUMBAI
Duration: APR 2003- SEP 2005 (Total 3.3yrs)
APR 2007- FEB 2008
Designation: Design Engineer (Sheet Metal / Busbar System)
Domain: Product Design
Products: LVP, MCC, SMDB, DB, ATS Panels.
Job Profile:
I did onsite project with LARSEN & TOURBO LIMITED in Electrical & Electronics
Division –Swith Gear Design and Development Center (SDDC) in LV switchgear control
panels design for different ratings.
New product development of PCC & MCC switch gear design & development.
Mechanism design in MCC panel design.
Animations file creation for management presentation.
Design of structure with different variants.
Busbar calculation for all different custommade switch boards.
Design & development of all sheet metal components.
3D/2D drawing creation for all components.
Weight & cost calculation of ongoing project.
PRO/E MODELS and AutoCAD drawing should be created according to project requirement
and it should be placed in the assembly
Any problems regarding mismatching and fouling should be pointed and solved.
Co-ordination with vendors for proto type components manufacturing & modifications
Proto type components should be assembled as per the design and testing should be carried
out for different ratings.
If required components should be analyzed to with stand different load conditions by using
Ansys Software.
If any failure in the design analysis design should be changed accordingly.
As per the instructions Code of Practice (COP) should be followed to match with
manufacturing requirement
If required drawings should be created for manufacturing of proto types.
6. Project target should be completed with in the time frame
Software Using; Pro/e,Catia, Solid Works, Autocad,Pro/Wind-chill, SAP R/3 , MS Project
Total Number of Team Members: 2
Software Used: Proe, AutoCAD.
Company: M/S EAGLE SHIPPING Pte LTD, SINGAPORE.
Duration: JULY 2006- FEB 2007 (7 Months)
Designation: Assistant Engineer.
Job Profile:
The job is basically on foreign going OIL TANKERS from North America to South
America as a staff to look after the heavy machinery like Diesel Generators, Boiler, Main
Engine, Purifiers, Pumps and motors, Heaters, IG Systems, Cargo System, Fresh Water
Generator, etc.,
Monitor Oil & water level at different tanks & take corrective action.
Take care of all pipe lines in the engine room for any leakages & maintenance
To ensure safety & prevent marine pollution.
Periodic safety drills related to safety firefighting, first aid etc.
Periodic checking of all fire fighting equipments & fire lines.
Closely monitor all equipments status from control room
Switch gear equipment readings periodically, to attend any fault alarms in equipments. Switch
gear breakdown or maintenance.
Closely monitor running machines during tx`x`he sailing time and in the port.
If required maintenance work should be carried out to keep the machinery in good running
condition.
Keep watch keeping during cargo loading/discharge
Look after the safety of the ship from any hazards
Report to the seniors about the status ofmachinery
Look after the cargo in good condition during voyage
Learned actual practical difficulties during mounting dismounting of machineries
Safety work practices always kept in mind
Undergone Training: Under gone job oriented training at Singapore Maritime Academy –
Singapore Polytechnic
Total Number of Team Members: 8
Company: M/S MALHOTRA SHAVING (P) LTD, MUMBAI.
Duration: JAN 2002- MAR 2003 (1 Year and 3 months)
Designation: Design Engineer.
Domain: Product Design
Job Profile:
Involved in Designing and modification of Special Purpose Machines (SPM) for various new
equipment related to Razor blade manufacturing, cold rolling mill, Product development,
Process development, etc.
3D Modeling , Assembling, Drafting & Reporting
Implementing & Involved in various projects on new products,new processes,machine
modification, Automation etc.
Co-ordination and Interaction with Senior Design Engineers, Senior Design Managers.
7. List of projects done:
Slitting line Assembly
Punch press Assembly
Pusher plate Assembly
Entry guide Assembly
Razor blade handle design
Software Used; Pro/e Part Modeling, Pro/Surface, Pro/Assembly, Pro/Sheet metal, Pro/Detail
Total Number of Team Members: 8
Software Used: Proe, AutoCAD.
Additional Information:
I actively participated implemented LEAN MANUFACTURING CONCEPTS at SWITCHGEAR
FACTORY. I am expert in Japanese concept 5S auditing skills, Work Flow
TAKT Time, Value Stream Mapping, Elimination of Wastes,Inventory Management & Kanban
SMED and 5S, Work Flow,TPM (Total Productive Maintenance) / OEE (Overall Equipment
Efficiency) ,Kaizen & Continuous Improvement
Achievement :
District level BASE BALL PLAYER in schooldistrict level
Also Foot Ball player in schooland college level.
SPORTS AND GAMES:
Cricket, Volley ball, Foot ball….
Personal Information:
Date of Birth : 23rd June 1980
Marital Status : Married
Hobbies : Reading & Cooking
Passport number: B3765897
Passport Valid until: 14.10.2020
Nationality: Indian
UAE Driving License: Yes
Reference can be given as per request
Yours truly,
RAJAN R B