SlideShare a Scribd company logo
1 of 4
Download to read offline
CURRICULAM VITAE – VIRESH JUGALI (Projects & Utility Maintenance)
1 | P a g e
VIRESH JUGALI
EMAIL
kwviresh@gmail.com
MOBILE
+91-998-115-7776
COMPUTER SKILLS
 Working knowledge of ERP
software SAP.
 MS Projects
 MS Office suites
PERCEIVED STRENGTHS
 Analytical skills & Objective
approach
 Positive attitude & Team spirit
 Ability to work under pressure
 Negotiation skills, Interpersonal
skills, troubleshooting
 Committed, Result oriented &
ingenuous outlook
 Inter-functional operation skills
 Ability to learn, unlearn and relearn
D.O.B.
23
rd
December 1988
PERMANENT ADDRESS
Pontemol Plaza Bldg., Flat No.FF1
Pontemol, Curchorem
Goa - 403706
 +91-998-115-7776
AVAILABILITY
1 Month notice period.
MARITAL STATUS
Single
LINGUISTIC PROFICIENCY
English ,Hindi, Marathi, Kannada &
Konkani
OBJECTIVE
To undertake challenges while maintaining the competitive edge in a dynamic
environment through sustained learning and value addition to the organization
EDUCATION
QUALIFICATION INSTITUTE
PASSING
YEAR
PERCENTAGE
B.E (E&E)
Goa College of
Engineering (Goa
University)
2010 81.4%
HSSC Cuncolim United 2006 66.6%
SSC Assumpta Convent 2004 67.8%
EXPERIENCE SUMMARY-Total Work-Ex : 6 Years 2 Month
ORGANIZATION DESIGNATION
TOTAL
WORK-Ex
WORK
PERIOD
VE Commercial Vehicles
Ltd. (A 50-50 joint
venture), Indore
Assistant Manager
(SG-Special Grade)
(Lead –Utility
Maintenance,
Projects &
Manufacturing
Excellence WCM)
3 Year 7
Months
Apr’13-
Till date
TATA Autocomp Systems
Limited, Pune
Assistant Manager
(Plant Maintenance)
1 year 9
Month
July’11
– Apr’13
TATA Autocomp Systems
Limited, Pune
GET (Plant
Maintenance & ISO
systems)
1 Year
July’10-
July’11
JOB DESCRIPTION
(A) Lead – Utility & Plant Maintenance (Apr’13 – Till Date)
Working as Lead for Utility Maintenance.
To accomplish this my profile includes;
 Planning & procurement of all Utility Equipment spares.
 Inventory management.
 To ensure timely maintenance of all the equipment (HT/LT Panels,
VCB/ACB, DG sets, Transformer, Compressor, Hydrant system, HVAC,
Lighting systems, Shop machines) & maintain equipment history.
 To initiate and implement process improvements in shop.
 Monitor man hrs, review analysis for losses & action plan to reduce the
same.
 Resolving man & method related maintenance issues.
 Monitoring breakdown sequences of machines. Breakdown, power cost
monitoring & analysis.
 Provide support to team for resolving critical issues. Implementation of PM &
ENV pillar of WCM in plant.
 Multiskilling of blue collars in shop.
 To ensure discipline & safety in shop.
 Capex budgeting & implementation.
 Implementation of various systems viz. ISO TS 16949, ISO 18001 OHSAS,
ISO 14001 EMS, ISO 50001 EnMS, VPS (Volvo Production System).
CURRICULAM VITAE – VIRESH JUGALI (Projects & Utility Maintenance)
2 | P a g e
(A)Current Utility Roles & Responsibilities
 Supervise the Utility maintenance team & manage Preventive Maintenance as well as breakdown
maintenance of Utility plant equipment’s & machines, Use of tools like EWO (Emergency Work
Order), 5W, 5W1H and CAPA, 4M methods to reduce equipment breakdown losses.
 Implement VPS (Volvo Production System, reached up to Step 2 in VECV), AM, Kaizen, OPL,
EnMS (Energy Management System), utility & spare parts cost saving activities, safety & 5S
activities in the Dept.
 Expert in implementing and handling Audits like: OHSAS 18001, ISO 14001, ISO/TS 16949 and ISO
50001 certification.
 Carrying out Preventive Maintenance of DG sets, Compressor, transformer, LT/HT panels,
ACB/VCB’s, ASU, Air conditioning units, pump house and hydrant system, Cranes, hoists, EMS
(Electric monorail system), forklifts, etc.
 Daily monitoring & analysis of all utilities, e.g. Electricity, diesel, LPG, Argon, Co2, Nitrogen, water,
etc.
 Energy saving projects and continuous improvements to create a green environment.
 Leading as a Dy. MR for successful implementation of ISO 50001:2001 (Energy Management
system)
 Installation and commissioning of the new machines arrival in the plant and providing necessary
utilities required.
 Responsible for calibration of instruments used in machines and renew them on time.
 Responsible for looking after AMC of various utility machines and clearance before due dates.
 Monthly analysis on energy and utility consumption and take corrective actions for reducing costs
 Planning & scheduling PM plans and improvements.
 Daily monitoring of utility resource consumption and order scheduling of required resources on time.
 Yearly, Quarterly, Monthly & Weekly Preventive Maintenance adherence as per schedule and
improvements.
 Monitor and maintain the spare parts of individual machines up to date with consideration of Min
Max levels and lead time with cost management.
 Coordinate with Production & Manufacturing engineering Dept. for continuous improvements on the
production line, Improve OEE of machine and kaizens.
 Prepare all graphs and analysis of our department KPI’s (Key Performing Indices) for Monthly
Review meetings with plant head and final action plan to meet the targets
 Plan, Implement & Control the maintenance inventory within the target limit & do saving projects to
reduce costs.
 Very good exposure to repair and maintenance pneumatic operated air tools and welding machines.
Focus Areas
 Effective plant utilization
 Energy Savings & Productivity Improvement
 Implementation of VPS (Volvo Production System) Lean manufacturing, ISO/TS 16949, OHSAS
18001, ISO 14001, ISO 50001 and Green Building Certification.
 Ensuring safe practices in the plant
CURRICULAM VITAE – VIRESH JUGALI (Projects & Utility Maintenance)
3 | P a g e
(B) PROJECTS & FACILITY PLANNING – GREEN FIELD PROJECT (JUN’15 – Till Date)
Working in Projects (Capex Plan worth over 200 MINR) as an Assistant Manager Projects for coordination
and to provide Process Engineering support for E&C of Special Purpose Machineries (SPM) for Utility
Equipment’s, Structure Shop & Assembly line, Paint Shop: such as LPG & Shielding Gas storage and
supply facility, DG & UPS Back up, Compressed Air Supply, Fume Extraction Systems, EOTs, Jib Cranes, EMS,
STPs, Robotic Welding & Painting, Ovens, HVAC etc. while ensuring a superior product quality through
adoption of world class manufacturing processes.
To achieve this, my profile involved:
 Leading a workforce of 40 workmen to achieve targeted milestones
 Job Allocation to workmen as per project plan. Planning of project activities as per budget; control
and monitoring of related activities to maintain effective line balancing
 Establishing & monitoring the end processes of Vendors
 Generating reports such as costing of land and other equipment’s, setting up land acquisition pattern
and equipment procurement scheduling, releasing 3 MRP etc.
 Responsible for the successful delivery of the project.
 Sending out the daily progress report to senior management.
 Handling escalation calls and further escalation to senior management at the right time, if required.
 Prepare project plans, schedules, roadmaps and strategies.
 Being part of the status calls & design review calls.
 Reviewing everyday progress provided by the execution teams and E2E team by comparing with the
design documents and Low level Documents and doing Gap analysis
 Rate negotiation with manufacturers, suppliers & contractors.
 Managing and controlling the inventory of raw materials and spares, procurement of spares.
 Coordination with Finance Dept., regarding preparation of CIJs, IPRs, POs, Advance Payments,
Release of Work Completion Certificates and final payments with complete adherence to PO terms
and conditions.
 Follow up of the reports and information to be received from consultants on daily, weekly and
monthly basis.
 Managing the payments of the customers and other vendors.
 Labour Management and public relations.
 Zero Based Costing (ZBC Analysis), Root Cause Analysis (RCA), E2E Defect analysis, Technical &
Commercial Comparisons, Supplier & Manufacturer Health Analysis.
 Preparation of Project Feasibility Report, Capital investment justifications, investment purchase
requests etc. and other project financials.
 Preparation of Daily progress reports (DPR), Check Sheets, Maintenance Schedules and other
knowledge based Maintenance Patterns.
 Organizing meetings for Design for Approval (DFA) with technical experts and consultants.
 Supplier shortlisting, preparation of KT Matrix (KTM), Vendor Evaluation, Vendor Development.
CURRICULAM VITAE – VIRESH JUGALI (Projects & Utility Maintenance)
4 | P a g e
PROFESSIONAL ACCOMPLISHMENTS
 Single handedly managed & supervised the Erection & Commissioning of Utility Equipment’s &
Special Purpose Machineries for the entire plant and demonstrated smooth performance of entire
process within the set time frame
 Appointed as a Deputy Manager for Implementation of ISO 50001 (Energy Management System)
and successfully implemented the same.
 Lead Internal Auditor for certification of ISO/TS 16949, ISO 14001 and OHSAS 18001
 VPS(Volvo Production System) Pillar Leader for Environmental & PM Pillars for implementation of
WCM @ VE Commercial Vehicles Ltd
 Energy saving project on compressed air system. Total saving of 4MINR yearly accomplished
 Motor testing kit, relay testing kit, and PLC training board prepared.
 Major cost saving done in assembly shop pneumatic tools, developed local vendors for spares
required
 Major role in achieving “Green Building Certification” (Platinum score) for the plant in the year 2016.
 Poka-yoke implemented on Mobile Column Lift Machine HMI to prevent accidents.
 Panel reconditioning new panel design in-house.
 Lay-outing the complete new plant in coordination with Projects requirements.
 Certification audits for ISO TS 16949, 18001, 14001 & 50001 & Green Building Certifications
PROFESSIONAL CERTIFICATION
 Certificate of “PLC Certified Engineer” for Mitsubishi & Allen Bradley PLC – Prolific Institute, Pune.
OTHER ACHIEVEMENTS & VOLUNTARY EXPERIENCES:
 Organized CSR Awareness Camps
 Organizing various cultural activities
 Organizing various Business Meets, Launching, Inaugurations, Team & Family Get togethers etc.
 Served as an executive member of the departmental activities.
 Represented school, college and university in the cricket, football and badminton tournaments.
TRAINING ATTENDED
 7 days training on Manufacturing Excellence (VPS) at VEPT & VEPDC, Pithampur
 7 days training on ABB IRB 5000 Painting robot.
 Certified as Internal Auditor for ISO/TS 16949, ISO 14001, OHSAS 18001 & ISO 50001 from TUV
SUD Germany.
 5 days training programme on Mitsubishi PLC & Interface.
 Training in soft skills and “Sankalp Projects” in VECV
PLACE: INDORE (INDIA) Date: 24 September 2016

More Related Content

What's hot

Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryNishant Patil
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011tbshaver
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_15Asdfghjkl
 
Cv RogéRio Tavares English
Cv RogéRio Tavares EnglishCv RogéRio Tavares English
Cv RogéRio Tavares EnglishRocata70
 
Bob Kendall Resume 2015 current
Bob Kendall Resume 2015 currentBob Kendall Resume 2015 current
Bob Kendall Resume 2015 currentRobert Kendall
 
Resume final(17.11.16) of Anoop Gupta
Resume  final(17.11.16) of Anoop GuptaResume  final(17.11.16) of Anoop Gupta
Resume final(17.11.16) of Anoop GuptaAnoop Gupta
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Mohamed Ali
 
Resume of SureshKumar_V1
Resume of SureshKumar_V1Resume of SureshKumar_V1
Resume of SureshKumar_V1suresh kumar v
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineerMohammed Obeidat, I.A
 
Carl schuetts resume
Carl schuetts resumeCarl schuetts resume
Carl schuetts resumeCarl Schuett
 
About Andrew Avgousti
About Andrew AvgoustiAbout Andrew Avgousti
About Andrew Avgoustiaavgousti
 
Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow
 

What's hot (19)

Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
Cv RogéRio Tavares English
Cv RogéRio Tavares EnglishCv RogéRio Tavares English
Cv RogéRio Tavares English
 
anil
anilanil
anil
 
resume
resumeresume
resume
 
Bob Kendall Resume 2015 current
Bob Kendall Resume 2015 currentBob Kendall Resume 2015 current
Bob Kendall Resume 2015 current
 
Rajan_SG_CV (1)
Rajan_SG_CV (1)Rajan_SG_CV (1)
Rajan_SG_CV (1)
 
Resume final(17.11.16) of Anoop Gupta
Resume  final(17.11.16) of Anoop GuptaResume  final(17.11.16) of Anoop Gupta
Resume final(17.11.16) of Anoop Gupta
 
Marcus Mansour CV
Marcus Mansour CVMarcus Mansour CV
Marcus Mansour CV
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015
 
CV D. Maimbolwa
CV D. MaimbolwaCV D. Maimbolwa
CV D. Maimbolwa
 
Cv uppili
Cv uppili Cv uppili
Cv uppili
 
Resume of SureshKumar_V1
Resume of SureshKumar_V1Resume of SureshKumar_V1
Resume of SureshKumar_V1
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
 
Carl schuetts resume
Carl schuetts resumeCarl schuetts resume
Carl schuetts resume
 
About Andrew Avgousti
About Andrew AvgoustiAbout Andrew Avgousti
About Andrew Avgousti
 
Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015
 
055 KPI'S Success Factor
055 KPI'S Success Factor 055 KPI'S Success Factor
055 KPI'S Success Factor
 

Viewers also liked

Vishal chaudhary mech miaintenance engineer
Vishal chaudhary mech miaintenance engineerVishal chaudhary mech miaintenance engineer
Vishal chaudhary mech miaintenance engineerVishal Chaudhary
 
La grandeur dans toute chose. french. français
La grandeur dans toute chose. french. françaisLa grandeur dans toute chose. french. français
La grandeur dans toute chose. french. françaisHarunyahyaFrench
 
Διατροφικό 12ωρο
Διατροφικό 12ωροΔιατροφικό 12ωρο
Διατροφικό 12ωροTINA MANTIKOU
 
Newsletter dated 23th November, 2015
Newsletter dated 23th November, 2015Newsletter dated 23th November, 2015
Newsletter dated 23th November, 2015Rajiv Bajaj
 
Rooftop Overview
Rooftop OverviewRooftop Overview
Rooftop OverviewRooftop
 
παροιμίες για όσπρια
παροιμίες για όσπριαπαροιμίες για όσπρια
παροιμίες για όσπριαTINA MANTIKOU
 
SISG Services - Overview 2016
SISG Services - Overview 2016SISG Services - Overview 2016
SISG Services - Overview 2016Dave Getty
 
Trends in de zakelijke dienstverlening
Trends in de zakelijke dienstverleningTrends in de zakelijke dienstverlening
Trends in de zakelijke dienstverleningFay van den Bos
 
Παρουσίαση Antonis Masson: Να φτιάξουμε ένα Ρομπότ!!!
Παρουσίαση Antonis Masson: Να φτιάξουμε ένα Ρομπότ!!!Παρουσίαση Antonis Masson: Να φτιάξουμε ένα Ρομπότ!!!
Παρουσίαση Antonis Masson: Να φτιάξουμε ένα Ρομπότ!!!TINA MANTIKOU
 
Makers in Education--Georgia STEM Forum
Makers in Education--Georgia STEM ForumMakers in Education--Georgia STEM Forum
Makers in Education--Georgia STEM ForumKim Moore
 

Viewers also liked (14)

Vishal chaudhary mech miaintenance engineer
Vishal chaudhary mech miaintenance engineerVishal chaudhary mech miaintenance engineer
Vishal chaudhary mech miaintenance engineer
 
La grandeur dans toute chose. french. français
La grandeur dans toute chose. french. françaisLa grandeur dans toute chose. french. français
La grandeur dans toute chose. french. français
 
Διατροφικό 12ωρο
Διατροφικό 12ωροΔιατροφικό 12ωρο
Διατροφικό 12ωρο
 
Newsletter dated 23th November, 2015
Newsletter dated 23th November, 2015Newsletter dated 23th November, 2015
Newsletter dated 23th November, 2015
 
Projecte del mar
Projecte del marProjecte del mar
Projecte del mar
 
Rooftop Overview
Rooftop OverviewRooftop Overview
Rooftop Overview
 
CV- KARTHIK
CV- KARTHIKCV- KARTHIK
CV- KARTHIK
 
παροιμίες για όσπρια
παροιμίες για όσπριαπαροιμίες για όσπρια
παροιμίες για όσπρια
 
oooo
oooooooo
oooo
 
SISG Services - Overview 2016
SISG Services - Overview 2016SISG Services - Overview 2016
SISG Services - Overview 2016
 
Trends in de zakelijke dienstverlening
Trends in de zakelijke dienstverleningTrends in de zakelijke dienstverlening
Trends in de zakelijke dienstverlening
 
Conte de la zum zum
Conte de la zum zumConte de la zum zum
Conte de la zum zum
 
Παρουσίαση Antonis Masson: Να φτιάξουμε ένα Ρομπότ!!!
Παρουσίαση Antonis Masson: Να φτιάξουμε ένα Ρομπότ!!!Παρουσίαση Antonis Masson: Να φτιάξουμε ένα Ρομπότ!!!
Παρουσίαση Antonis Masson: Να φτιάξουμε ένα Ρομπότ!!!
 
Makers in Education--Georgia STEM Forum
Makers in Education--Georgia STEM ForumMakers in Education--Georgia STEM Forum
Makers in Education--Georgia STEM Forum
 

Similar to Viresh Jugali CV (20)

Vijayaraj CV
Vijayaraj CVVijayaraj CV
Vijayaraj CV
 
Resume new
Resume newResume new
Resume new
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
 
Manish Gujarathi - Copy
Manish Gujarathi  - CopyManish Gujarathi  - Copy
Manish Gujarathi - Copy
 
Rsume
RsumeRsume
Rsume
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
SURESH MANICKAM
SURESH MANICKAMSURESH MANICKAM
SURESH MANICKAM
 
praveen
praveenpraveen
praveen
 
Diener Adrian Arellanes - Curriculum
Diener Adrian Arellanes - CurriculumDiener Adrian Arellanes - Curriculum
Diener Adrian Arellanes - Curriculum
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016
 
Suresh cen
Suresh cenSuresh cen
Suresh cen
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro Resume
 
Faikcan Altiparmak_Resume
Faikcan Altiparmak_ResumeFaikcan Altiparmak_Resume
Faikcan Altiparmak_Resume
 
Utpal bose resume
Utpal bose resumeUtpal bose resume
Utpal bose resume
 

Viresh Jugali CV

  • 1. CURRICULAM VITAE – VIRESH JUGALI (Projects & Utility Maintenance) 1 | P a g e VIRESH JUGALI EMAIL kwviresh@gmail.com MOBILE +91-998-115-7776 COMPUTER SKILLS  Working knowledge of ERP software SAP.  MS Projects  MS Office suites PERCEIVED STRENGTHS  Analytical skills & Objective approach  Positive attitude & Team spirit  Ability to work under pressure  Negotiation skills, Interpersonal skills, troubleshooting  Committed, Result oriented & ingenuous outlook  Inter-functional operation skills  Ability to learn, unlearn and relearn D.O.B. 23 rd December 1988 PERMANENT ADDRESS Pontemol Plaza Bldg., Flat No.FF1 Pontemol, Curchorem Goa - 403706  +91-998-115-7776 AVAILABILITY 1 Month notice period. MARITAL STATUS Single LINGUISTIC PROFICIENCY English ,Hindi, Marathi, Kannada & Konkani OBJECTIVE To undertake challenges while maintaining the competitive edge in a dynamic environment through sustained learning and value addition to the organization EDUCATION QUALIFICATION INSTITUTE PASSING YEAR PERCENTAGE B.E (E&E) Goa College of Engineering (Goa University) 2010 81.4% HSSC Cuncolim United 2006 66.6% SSC Assumpta Convent 2004 67.8% EXPERIENCE SUMMARY-Total Work-Ex : 6 Years 2 Month ORGANIZATION DESIGNATION TOTAL WORK-Ex WORK PERIOD VE Commercial Vehicles Ltd. (A 50-50 joint venture), Indore Assistant Manager (SG-Special Grade) (Lead –Utility Maintenance, Projects & Manufacturing Excellence WCM) 3 Year 7 Months Apr’13- Till date TATA Autocomp Systems Limited, Pune Assistant Manager (Plant Maintenance) 1 year 9 Month July’11 – Apr’13 TATA Autocomp Systems Limited, Pune GET (Plant Maintenance & ISO systems) 1 Year July’10- July’11 JOB DESCRIPTION (A) Lead – Utility & Plant Maintenance (Apr’13 – Till Date) Working as Lead for Utility Maintenance. To accomplish this my profile includes;  Planning & procurement of all Utility Equipment spares.  Inventory management.  To ensure timely maintenance of all the equipment (HT/LT Panels, VCB/ACB, DG sets, Transformer, Compressor, Hydrant system, HVAC, Lighting systems, Shop machines) & maintain equipment history.  To initiate and implement process improvements in shop.  Monitor man hrs, review analysis for losses & action plan to reduce the same.  Resolving man & method related maintenance issues.  Monitoring breakdown sequences of machines. Breakdown, power cost monitoring & analysis.  Provide support to team for resolving critical issues. Implementation of PM & ENV pillar of WCM in plant.  Multiskilling of blue collars in shop.  To ensure discipline & safety in shop.  Capex budgeting & implementation.  Implementation of various systems viz. ISO TS 16949, ISO 18001 OHSAS, ISO 14001 EMS, ISO 50001 EnMS, VPS (Volvo Production System).
  • 2. CURRICULAM VITAE – VIRESH JUGALI (Projects & Utility Maintenance) 2 | P a g e (A)Current Utility Roles & Responsibilities  Supervise the Utility maintenance team & manage Preventive Maintenance as well as breakdown maintenance of Utility plant equipment’s & machines, Use of tools like EWO (Emergency Work Order), 5W, 5W1H and CAPA, 4M methods to reduce equipment breakdown losses.  Implement VPS (Volvo Production System, reached up to Step 2 in VECV), AM, Kaizen, OPL, EnMS (Energy Management System), utility & spare parts cost saving activities, safety & 5S activities in the Dept.  Expert in implementing and handling Audits like: OHSAS 18001, ISO 14001, ISO/TS 16949 and ISO 50001 certification.  Carrying out Preventive Maintenance of DG sets, Compressor, transformer, LT/HT panels, ACB/VCB’s, ASU, Air conditioning units, pump house and hydrant system, Cranes, hoists, EMS (Electric monorail system), forklifts, etc.  Daily monitoring & analysis of all utilities, e.g. Electricity, diesel, LPG, Argon, Co2, Nitrogen, water, etc.  Energy saving projects and continuous improvements to create a green environment.  Leading as a Dy. MR for successful implementation of ISO 50001:2001 (Energy Management system)  Installation and commissioning of the new machines arrival in the plant and providing necessary utilities required.  Responsible for calibration of instruments used in machines and renew them on time.  Responsible for looking after AMC of various utility machines and clearance before due dates.  Monthly analysis on energy and utility consumption and take corrective actions for reducing costs  Planning & scheduling PM plans and improvements.  Daily monitoring of utility resource consumption and order scheduling of required resources on time.  Yearly, Quarterly, Monthly & Weekly Preventive Maintenance adherence as per schedule and improvements.  Monitor and maintain the spare parts of individual machines up to date with consideration of Min Max levels and lead time with cost management.  Coordinate with Production & Manufacturing engineering Dept. for continuous improvements on the production line, Improve OEE of machine and kaizens.  Prepare all graphs and analysis of our department KPI’s (Key Performing Indices) for Monthly Review meetings with plant head and final action plan to meet the targets  Plan, Implement & Control the maintenance inventory within the target limit & do saving projects to reduce costs.  Very good exposure to repair and maintenance pneumatic operated air tools and welding machines. Focus Areas  Effective plant utilization  Energy Savings & Productivity Improvement  Implementation of VPS (Volvo Production System) Lean manufacturing, ISO/TS 16949, OHSAS 18001, ISO 14001, ISO 50001 and Green Building Certification.  Ensuring safe practices in the plant
  • 3. CURRICULAM VITAE – VIRESH JUGALI (Projects & Utility Maintenance) 3 | P a g e (B) PROJECTS & FACILITY PLANNING – GREEN FIELD PROJECT (JUN’15 – Till Date) Working in Projects (Capex Plan worth over 200 MINR) as an Assistant Manager Projects for coordination and to provide Process Engineering support for E&C of Special Purpose Machineries (SPM) for Utility Equipment’s, Structure Shop & Assembly line, Paint Shop: such as LPG & Shielding Gas storage and supply facility, DG & UPS Back up, Compressed Air Supply, Fume Extraction Systems, EOTs, Jib Cranes, EMS, STPs, Robotic Welding & Painting, Ovens, HVAC etc. while ensuring a superior product quality through adoption of world class manufacturing processes. To achieve this, my profile involved:  Leading a workforce of 40 workmen to achieve targeted milestones  Job Allocation to workmen as per project plan. Planning of project activities as per budget; control and monitoring of related activities to maintain effective line balancing  Establishing & monitoring the end processes of Vendors  Generating reports such as costing of land and other equipment’s, setting up land acquisition pattern and equipment procurement scheduling, releasing 3 MRP etc.  Responsible for the successful delivery of the project.  Sending out the daily progress report to senior management.  Handling escalation calls and further escalation to senior management at the right time, if required.  Prepare project plans, schedules, roadmaps and strategies.  Being part of the status calls & design review calls.  Reviewing everyday progress provided by the execution teams and E2E team by comparing with the design documents and Low level Documents and doing Gap analysis  Rate negotiation with manufacturers, suppliers & contractors.  Managing and controlling the inventory of raw materials and spares, procurement of spares.  Coordination with Finance Dept., regarding preparation of CIJs, IPRs, POs, Advance Payments, Release of Work Completion Certificates and final payments with complete adherence to PO terms and conditions.  Follow up of the reports and information to be received from consultants on daily, weekly and monthly basis.  Managing the payments of the customers and other vendors.  Labour Management and public relations.  Zero Based Costing (ZBC Analysis), Root Cause Analysis (RCA), E2E Defect analysis, Technical & Commercial Comparisons, Supplier & Manufacturer Health Analysis.  Preparation of Project Feasibility Report, Capital investment justifications, investment purchase requests etc. and other project financials.  Preparation of Daily progress reports (DPR), Check Sheets, Maintenance Schedules and other knowledge based Maintenance Patterns.  Organizing meetings for Design for Approval (DFA) with technical experts and consultants.  Supplier shortlisting, preparation of KT Matrix (KTM), Vendor Evaluation, Vendor Development.
  • 4. CURRICULAM VITAE – VIRESH JUGALI (Projects & Utility Maintenance) 4 | P a g e PROFESSIONAL ACCOMPLISHMENTS  Single handedly managed & supervised the Erection & Commissioning of Utility Equipment’s & Special Purpose Machineries for the entire plant and demonstrated smooth performance of entire process within the set time frame  Appointed as a Deputy Manager for Implementation of ISO 50001 (Energy Management System) and successfully implemented the same.  Lead Internal Auditor for certification of ISO/TS 16949, ISO 14001 and OHSAS 18001  VPS(Volvo Production System) Pillar Leader for Environmental & PM Pillars for implementation of WCM @ VE Commercial Vehicles Ltd  Energy saving project on compressed air system. Total saving of 4MINR yearly accomplished  Motor testing kit, relay testing kit, and PLC training board prepared.  Major cost saving done in assembly shop pneumatic tools, developed local vendors for spares required  Major role in achieving “Green Building Certification” (Platinum score) for the plant in the year 2016.  Poka-yoke implemented on Mobile Column Lift Machine HMI to prevent accidents.  Panel reconditioning new panel design in-house.  Lay-outing the complete new plant in coordination with Projects requirements.  Certification audits for ISO TS 16949, 18001, 14001 & 50001 & Green Building Certifications PROFESSIONAL CERTIFICATION  Certificate of “PLC Certified Engineer” for Mitsubishi & Allen Bradley PLC – Prolific Institute, Pune. OTHER ACHIEVEMENTS & VOLUNTARY EXPERIENCES:  Organized CSR Awareness Camps  Organizing various cultural activities  Organizing various Business Meets, Launching, Inaugurations, Team & Family Get togethers etc.  Served as an executive member of the departmental activities.  Represented school, college and university in the cricket, football and badminton tournaments. TRAINING ATTENDED  7 days training on Manufacturing Excellence (VPS) at VEPT & VEPDC, Pithampur  7 days training on ABB IRB 5000 Painting robot.  Certified as Internal Auditor for ISO/TS 16949, ISO 14001, OHSAS 18001 & ISO 50001 from TUV SUD Germany.  5 days training programme on Mitsubishi PLC & Interface.  Training in soft skills and “Sankalp Projects” in VECV PLACE: INDORE (INDIA) Date: 24 September 2016