1. JOSEPH LAQUI GAON (ME-67793)
544 Dita, Cuenca, Batangas
0935-5302163/ 0906-2522773
josefmech@yahoo.com.ph
OBJECTIVE
A position in a results oriented company that seeks an ambitious and career conscious person whose
acquired skills and education in advanced engineering will be utilized toward continued growth and
advancement.
POSITION APPLIED
Mechanical Engineer
QUALIFICATIONS
• Assists and supervised field employees assigned to a particular construction discipline work area, i.e.,
electrical, piping installation, erection of structural steel, rebar, duct work, etc
• Present oneself as team lead and enforcing instructions to the subordinates to complete the project
• Coordinating activities with other construction disciplines and project coordinator as necessary
• Provide JOB LOSS ANALYSIS (JLA’s) for the Hazards Identification of Work
• Interpret Mechanical/ As built Piping drawings / P&ID /site activities
• Knowledgeable in using AutoCAD 2008
• Knowledgeable in handling and operation of machine shop equipments.
• Knowledge in basic marketing and strategies in dealing with employee-customer relationship
• Proficient in Computer applications Microsoft Office: Word, Excel and PowerPoint.
• A hard working personnel who is eager to learn direction easily and willing to invest time and effort to
complete a certain task.
AutoCAD Certification at Meralco Foundation (60 hrs 2D-3D training) with TESDA Accreditation
WORK EXPERIENCE
• South Luzon Thermal Energy Corporation (SLTEC )
Km. 117 National Road, Phoenix Industrial Park – Phase 2
Puting Bato West, Calaca 4212, Batangas Philippines
2x135MW CFB Power Plant
Testing and Commissioning (MECHANICAL)
March 2, 2015 – present
Duties and Responsibilities
1. Directly involved in the pre-commissioning and commissioning activities of the mechanical equipment (BTG
and BPO’s)
2. Work under the supervision of POYRY-Commissioning Manager (Neil Reynolds) during commissioning
activities of 2x135MW CFB Power Plant
3. Attends vendor informal training to ensure that the equipment is fit for purpose
4. Do site inspection and review of the P&ID’s handed by the contractor and ensure the system is installed as
per approved drawings.
5. Review of Turn over Packages (drawings, test sheets, commissioning procedure and related documents).
6. Do field inspection report and punch list items for the equipment/system to be commissioned.
7. Performing welding inspection activity, NDT and hydrostatic/pneumatic test for the related piping system.
8. Does visual inspection to ensure workmanship meets the standards used in the project.
9. Capable of using software like TEKLA and Navisworks model of the plant.
10. Directly involved for the Performance testing of the Plant
2. • Atlantic, Gulf & Pacific (AG&P)
San Roque, Bauan Batangas
Project Involve with Ichthy’s LNG
Structural Field Engineer
May 22, 2014 – February 27, 2015
• Atlantic, Gulf & Pacific (AG&P)
San Roque, Bauan Batangas
Project Involve with Fluor Dow – PDH-1 Propane De-Hydrogenation (Dow Chemical Company/Fluor)
Field Engineer/ Piping Engineer
January 8, 2014 – February 28, 2014
Duties and Responsibilities
1. Reviews plans, specifications and engineering drawings prior to fabrication.
2. Oversees that project activities are within schedule, designed plans & specifications and are in accordance
to the project quality objectives.
3. Checks if project documents and drawings are in its latest registered revision.
4. Processes material requirements for a project.
5. Discusses to concerned team/personnel the activities to be performed during erection and construction.
6. Reports to concerned departments variations in fabrication and erection works.
7. Prepares field queries about possible re-works based on actual site checking.
8. Does visual inspection to ensure workmanship meets the standards used in the project.
9. Prepares daily progress report, monthly report & balance material report for proper monitoring of the
project.
10. Assists Construction Manager in performing construction engineering works and in other day-to-day
project activities.
11. Performs other duties as may be assigned from time to time.
12. Do survey and measurement at field with surveyors and client side.
13. Do inventory of tools, materials and consumables as required
14. Contributes to team effort by accomplishing related results as needed
15. Prepares project status reports by collecting, analyzing, and summarizing information and trends;
recommending actions.
16. Maintains project schedule by monitoring project progress; coordinating activities; resolving problems
Part- time instructor at Golden Gate Colleges
Engineering Department/Faculty
Work load- 6 units
2nd
semester year 2013
Carlos M. Ilagan Contractor Inc.
Sta. Rita. Batangas City
Field Engineer (Directly Reporting at Chevron Batangas Terminal)
September 2012 – January 6, 2014
Project Involve with @ Batangas Terminal –Chevron:
Oil Wharf-Installation of Product Recovery System (PRS) line piping for Berth 2 and 3
Batangas Terminal Customer Service (BTCS) - Installation of piping for JET-A1, KERO, MR and Diesel
line and installation of new filter
Pump House- Piping Modification/Installation of Denaturant Lines
Tank Farm- Miscellaneous piping works and installation of related piping @ vessel Install of new stub
at shell include cutting of shell and testing (hydro test, die test, air test)
Maintenance Shop- Fabrication and miscellaneous hot work activities and hydro testing
3. Duties and Responsibilities
1. Line survey and measurement /Monitor piping fabrication/ hydro testing and do inspection of fabricated
spool/ supervised installation for conformance to piping drawings as required.
2. Assist Project Superintendent by enforcing quality control, expediting subcontractors.
3. Continually update drawings with changes and checked as built in field as issued by Surveyor.
4. Find solutions to conflicts in drawings and specifications by conferring with the Project Manager. Coordinate
these solutions with the various sub-trades.
5. Preparing material requisitions for tools and consumables.
6. Coordinate inspections with consultants and authorities as required by the contract.
7. Inspect false work for conformance to design drawings.
8. Review shop drawings for conformance with the contract and ensure information is communicated to
Foreman and Superintendent.
9. Present oneself as team lead and enforcing instructions to the subordinates to complete the project.
10. Provide technical engineering information and interpretation of plans, detail sheets and specifications for
contractors.
11. Ensure materials and equipment’s are performing well before and after the operation.
12. Act as safety officer to ensure there is compliance on the job operations and check the safety of employee
to eliminate unforeseen events during working hours.
13. Supervising and directing subordinate personnel on planned activities
Sunpower Phils. Mfg. Ltd. (SPML)
FPIP – Sto. Tomas Batangas
Production Engineer - FGA/PLM
June 24, 2008 – September 5, 2012
Apprenticeship program- MRL Equipment team – FGA/P-Drive
• Assist Equipment Tech on duty in wts problem (MGI,GLA).
• Support equipment team in their major and minor activities (MRL). Troubleshoot equipment problem in
wafer transfer system at FGA.
• being part of the tool install support for rantex/damage process at fab2C
• knowledge in A330 process
• daily operation of MRL tool (Forming Gas Anneal); checked/monitoring N2 and O2 curtain in the process ,
conduct monitoring checklist and evaluate qualification run of equipment under direct responsibility
before going to mass production, lot tracking
• attends regular SPC meeting for self improvement towards work
• attends employees training (FMEA analysis, 8D workshop, Process Nodal Flow, CATSWEB, Customer Care
Program and 7QC tools)
Cross-trained process- PLM
5’S Focal- FGA Team
SUB- MEMBER- Delivery Team
SUB-GROUP MEMBER- FGA TEAM- participate 9th SPML CORPORATE AUDIT
Mould Technician (Eng’g Dept. / Mould Section)
Fabrication Team-(Feb.2007-June 2008)
SOHBI KOHGEI (Phils.), Inc.
SEZ, Lima Technology Center Lipa City, Batangas
Duties and Responsibilities
• Directly inspects the incoming and outgoing dies for shipping.
• Prepare and monitor the machine parts, tools and accessories for order.
• Perform the KAIZEN activity for the development and 5’S program in the company.
4. • Perform daily operation of CNC Machine used for the fabrication of mould / die. (Master Cam V9.1, and
CNC Machining / Programming)
• Plan and implement the fabrication of dies in order to meet the desired target plan need by customers.
• Modification / development of incoming dies that needs adjustments before endorsing to production.
Design jigs for customer product and evaluate part drawings
• Knowledgeable in operation of machine shop equipments
• Awarded as best technician in fabrication team for 5 months for meeting the target plan of fabrication
of dies
On the Job Training
GENERAL MILLING CORPORATION (Soya Bean Refinery Plant)
Tabangao, Batangas City
Under Maintenance Section, Mechanical Department-(November 2004- April 2005)
• Worked with the personnel in charge for the maintenance of machineries and equipments of refinery and
mill plant and assigned as assistant in boiler section. Inspect pump installations.
• Conduct monitoring inspection for the pump and water system generation for the refinery.
SEMINARS ATTENDED
• Working at Heights Training- AG&P
• Incident and Injury Free Training- AG&P
• Safe Work Practices SWP/Safety Orientaion Program Carlos M. Ilagan Contractors Inc.
• E-Colors Training by Equilibria- Chevron Batangas Terminal- Personality and Behavioral Diversity
• Respiratory Training Chevron- Batangas Terminal
• Statistical Process Control Trainings (SunPower Phils. Mfg. Ltd)
• Customer Care Program (SunPower Phils. Mfg. Ltd)
• CatsWeb Training (SunPower Phils. Mfg. Ltd)
• Safety Handling and Operation of Overhead Crane (SOHBI KOHGEI (Phils.), Inc
• Environment Sanitary and Health Program / Safety Policy (SOHBI KOHGEI (Phils.), Inc
• Factors Affecting Tool Life in Cold work Application- ASSAB Seminar Course – SOHBI KOHGEI (Phils.), Inc.
SEZ, Lima Tech. Center ( Nov. 9, 2007)
• Understanding Diesel Generators- Institute of Integrated and Electrical Engineers of the
Philippines,Inc(IIEE),LightIndustryScience Park-1, Cabuyao Laguna (May 12, 2006)
• Power Plant Operation and Maintenance- Coal-Fired Thermal Power Plant, NPC- Calaca (January 26,
2006)
• Combined Cycle Gas Turbine Power Plant- Siemens Power Corporation, Sta. Rita Batangas (January 06,
2006)
• CNC Milling and Programming Appreciation Course- MIRDC Bicutan, Taguig Metro, Manila ( October 11,
2004)
EDUCATIONAL BACKGROUND
BATANGAS STATE UNIVERSITY- Bachelor of Science in Mechanical Engineering
Alangilan, Batangas City (2001-2006)
FERMIN LA ROSA NATIONAL HIGH SCHOOL
Dita, Cuenca, Batangas (1997-2001)
COL. P. PASIA MEM. SCHOOL
Dita, Cuenca, Batangas (1991-1997)
5. OTHER INFORMATION
- Licensed Mechanical Engineer, 2006 (80.5% ave.)
- Member, Philippine Society of Mechanical Engineers (PSME)
CHARACTER REFERENCES
ENGR. NEIL REYNOLDS
Commissioning Manager (POYRY)
2x135MW CFB Power Plant
Calaca, Batangas
Moble No. 0917-631-0182
ENGR. MARK LESTER GARING
Field Engineer- Bechtel Corporation
Mobile No. 0906-5512-781
ENGR. ROMEO DIMAAPI
Construction Manager – Ichthy’s Project
AG&P
Mobile No. 0917-769-9068
I hereby certify that the above information is true and correct for the best of my knowledge and belief.
Joseph L. Gaon, RME-67793
Applicant’s Signature
6. OTHER INFORMATION
- Licensed Mechanical Engineer, 2006 (80.5% ave.)
- Member, Philippine Society of Mechanical Engineers (PSME)
CHARACTER REFERENCES
ENGR. NEIL REYNOLDS
Commissioning Manager (POYRY)
2x135MW CFB Power Plant
Calaca, Batangas
Moble No. 0917-631-0182
ENGR. MARK LESTER GARING
Field Engineer- Bechtel Corporation
Mobile No. 0906-5512-781
ENGR. ROMEO DIMAAPI
Construction Manager – Ichthy’s Project
AG&P
Mobile No. 0917-769-9068
I hereby certify that the above information is true and correct for the best of my knowledge and belief.
Joseph L. Gaon, RME-67793
Applicant’s Signature