Generator Ratings
Understanding ISO 8528-1
Not Limited Limited
Constant
Variable
Operating
hours
Load
COP
PRP
LTP
ESP
Purpose : All genset manufacturer to speak the same
language
International Standard for reciprocating internal combustion engine driven
alternating current generating sets
ISO8528 – Modes of Operation
-Four combinations of two variables
 Continuous Operation at Constant Load
– Example – Base load in parallel with the utility such as a
combined heat and power plant.
 Continuous Operation at Varying Load
– Example – Primary source of power where there is no utility
present (or an unreliable utility).
 Limited Time Operation at Constant Load
– Example – Base load in parallel with the utility only during
periods of peak power consumption.
 Limited Time Operation at Varying Load
– Example – Backup power when the utility fails.
Continuous Power (COP)
Continuous Power is defined as being the maximum power which
the generating set is capable of delivering continuously while
supplying a Constant Load when operated for an Unlimited
number of hours a year .
COP
UNLIMITED Hrs per year
100% Avg. Load Factor
CONSTANT Elect Load
Examples of COP Applications
 The COP Rating Genset is generally used when
paralleled to the utility.
 Base Loading
 Co-generation heat and power (CHP)
Prime Power (PRP)
Prime power is defined as being the maximum power which a
generating set is capable of delivering continuously while supplying a
Variable electrical load when operated for an Unlimited number of
hours per year.
PRP
UNLIMITED Hrs per Year
70% Avg. Load Factor
VARIABLE Elect Load
Application:
Kone Cranes
500kVA generator powers
the dockside rubber tyred
gantry cranes.
Examples of PRP Applications
 Applications that use on–site
generation in lieu of a utility
electricity supply, typically where
utility power is not available.
 Peak shaving and rate
curtailment.
Limited Time running Power (LTP)
Limited-time running power is defined as the maximum power
available, under the agreed operating conditions, for which the
generating set is capable of delivering for up to 500 hours of
operation per year.
LTP
500 Hours per Year
100% Avg. Load Factor
CONSTANT Elect Load
Examples of LTP Applications
 Base Loading
Application:
9 – C2000D6 Prime rated units
Location: Santo Domingo,
Dominican Repbulic
Emergency Standby Power (ESP)
Emergency Standby Power is defined as the maximum power available
during a variable electrical power sequence, under the stated operating
conditions, for which a generating set is capable of delivering in the
event of a utility power outage or under test conditions for up to 200
hours of operation per year.
ESP
200 Hours per Year
70% of Avg. Load Factor
VARIABLE Elect Load
Example ESP Applications
Application:
Fully Integrated standby power
system containing 2 C2250D5
Location:
UK
 Emergency Hospital (such as backup to Life Safety, legally
required or critical loads)
Example C1675D5
1028
1400 1400
1675
0
200
400
600
800
1000
1200
1400
1600
1800
COP LTP PRP ESB
ISO Ratings
kVA
De-rate on a Gen-set is caused by:
Ambient Air Temperature , affects:
Engine induction
Engine & Radiator cooling capacity (LAT)
Alternator temperature rise
Circuit breaker de-rate
Air Density (Altitude), affects:
Engine induction air
Radiator cooling capacity
Alternator cooling capacity
Humidity
Only naturally aspirated engines de-rate in high humidity.
Rating Conditions
Exceeding ISO8528
 Nominal vs. Guaranteed
– ISO don’t define the minimum power value. The
Cummins ratings are a guaranteed minimum.
– A Cummins generator is guaranteed to produce
enough power to either meet or exceed the published
rating value.
– Some competitors publish a nominal rating with a
tolerance. Their actual power output capability could
be below their published rating value.
Radiator Power
– ISO8528-1 paragraph 13.1 states:
• The power of the generating set is the power output available
for consumer loads at the generating set terminals excluding
the electrical power absorbed by the essential independent
auxiliaries.
– A Cummins generator will drive its radiator and supply the full
published kW value at the same time
– When using an electrically driven remote radiator, be sure the
alternator is sized for customer load plus the radiator load.
Data Center Continuous Rating
 Definition: The maximum power which the generator is capable of
delivering continuously to a constant or varying electrical load for
unlimited hours in a data center application.
 No run time limit! Required by The Uptime Institute.
 www.cumminsdatapower.com
White Paper

More Related Content

What's hot

5.15 Typical electronic digital aircraft systems
5.15 Typical electronic digital aircraft systems5.15 Typical electronic digital aircraft systems
5.15 Typical electronic digital aircraft systems
lpapadop
 
Basics of ups seminar presentation
Basics of ups   seminar presentationBasics of ups   seminar presentation
Basics of ups seminar presentation
Murali Krishnan
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1
Vijay Raskar
 

What's hot (20)

Electric Vehicle Chargers
Electric Vehicle ChargersElectric Vehicle Chargers
Electric Vehicle Chargers
 
5.15 Typical electronic digital aircraft systems
5.15 Typical electronic digital aircraft systems5.15 Typical electronic digital aircraft systems
5.15 Typical electronic digital aircraft systems
 
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisPreventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
 
RTCC & AVR
RTCC & AVRRTCC & AVR
RTCC & AVR
 
Experiences with Collaborative System Architecture Development within a Joint...
Experiences with Collaborative System Architecture Development within a Joint...Experiences with Collaborative System Architecture Development within a Joint...
Experiences with Collaborative System Architecture Development within a Joint...
 
Flight data recorder
Flight data recorderFlight data recorder
Flight data recorder
 
B737 NG Engines
B737 NG EnginesB737 NG Engines
B737 NG Engines
 
Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...
Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...
Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...
 
Earth Resistance Testing
Earth Resistance TestingEarth Resistance Testing
Earth Resistance Testing
 
Thermal Power Plant Safety
Thermal Power Plant SafetyThermal Power Plant Safety
Thermal Power Plant Safety
 
Energy conservation in electric drives
Energy conservation in electric drives Energy conservation in electric drives
Energy conservation in electric drives
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Basics of ups seminar presentation
Basics of ups   seminar presentationBasics of ups   seminar presentation
Basics of ups seminar presentation
 
Power Transformer Parts And Functions
Power Transformer Parts And FunctionsPower Transformer Parts And Functions
Power Transformer Parts And Functions
 
Generator set design parameters
Generator set design parametersGenerator set design parameters
Generator set design parameters
 
testing formats
testing formatstesting formats
testing formats
 
Base Load Plants and Peak Load Plant
Base Load Plants and Peak Load PlantBase Load Plants and Peak Load Plant
Base Load Plants and Peak Load Plant
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
Ais 038(rev.1)
Ais 038(rev.1)Ais 038(rev.1)
Ais 038(rev.1)
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1
 

Viewers also liked

Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
michaeljmack
 
Ats powerpoint presentation
Ats powerpoint presentationAts powerpoint presentation
Ats powerpoint presentation
atsops
 
Global mkt this is cpg - final extended version - april2013
Global mkt   this is cpg - final extended version - april2013Global mkt   this is cpg - final extended version - april2013
Global mkt this is cpg - final extended version - april2013
Cummins Power Generation
 
Plc presentation
Plc presentationPlc presentation
Plc presentation
Akshay Modi
 

Viewers also liked (20)

Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
 
Ats powerpoint presentation
Ats powerpoint presentationAts powerpoint presentation
Ats powerpoint presentation
 
Cummins Customer Engineering Presentation
Cummins Customer Engineering PresentationCummins Customer Engineering Presentation
Cummins Customer Engineering Presentation
 
Critical power: Transfer switches and switchgear
Critical power: Transfer switches and switchgearCritical power: Transfer switches and switchgear
Critical power: Transfer switches and switchgear
 
Automatic transfer switch (ats)
Automatic transfer switch (ats)Automatic transfer switch (ats)
Automatic transfer switch (ats)
 
Global mkt this is cpg - final extended version - april2013
Global mkt   this is cpg - final extended version - april2013Global mkt   this is cpg - final extended version - april2013
Global mkt this is cpg - final extended version - april2013
 
This is Cummins Power Generation 2011
This is Cummins Power Generation 2011This is Cummins Power Generation 2011
This is Cummins Power Generation 2011
 
Rotor resistance
Rotor resistanceRotor resistance
Rotor resistance
 
Visit To Manjung
Visit To ManjungVisit To Manjung
Visit To Manjung
 
Plc presentation
Plc presentationPlc presentation
Plc presentation
 
Internship presentation
Internship presentationInternship presentation
Internship presentation
 
LTE Testing | 4G Testing
LTE Testing | 4G TestingLTE Testing | 4G Testing
LTE Testing | 4G Testing
 
Plc presentation.
Plc presentation.Plc presentation.
Plc presentation.
 
Resume 02
Resume 02Resume 02
Resume 02
 
6. litar schematic
6. litar schematic6. litar schematic
6. litar schematic
 
Upload3
Upload3Upload3
Upload3
 
Seminar Android - Pengenalan PhoneGap
Seminar Android - Pengenalan PhoneGapSeminar Android - Pengenalan PhoneGap
Seminar Android - Pengenalan PhoneGap
 
Electricity
ElectricityElectricity
Electricity
 
5. litar elektrik asas
5. litar elektrik asas5. litar elektrik asas
5. litar elektrik asas
 
Automatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- Delay
Automatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- DelayAutomatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- Delay
Automatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- Delay
 

Similar to 2. genset ratings (3)

Ratings and Load Factor - B. Egan Sep2016 no spkr notes ar.ppt
Ratings and Load Factor - B. Egan Sep2016 no spkr notes ar.pptRatings and Load Factor - B. Egan Sep2016 no spkr notes ar.ppt
Ratings and Load Factor - B. Egan Sep2016 no spkr notes ar.ppt
e05dinuka
 
ENERGY EFFICIENT MOTORS AND POWER FACTOR IMPROVEMENT
ENERGY EFFICIENT MOTORS AND POWER FACTOR IMPROVEMENTENERGY EFFICIENT MOTORS AND POWER FACTOR IMPROVEMENT
ENERGY EFFICIENT MOTORS AND POWER FACTOR IMPROVEMENT
kypameenendranathred
 
So Tay Bao Duong Dong Co Dien
So Tay Bao Duong Dong Co DienSo Tay Bao Duong Dong Co Dien
So Tay Bao Duong Dong Co Dien
Man_Ebook
 
EC Motors & Controllers March 2016
EC Motors & Controllers March 2016EC Motors & Controllers March 2016
EC Motors & Controllers March 2016
Peter Korosec
 

Similar to 2. genset ratings (3) (20)

Ratings and Load Factor - B. Egan Sep2016 no spkr notes ar.ppt
Ratings and Load Factor - B. Egan Sep2016 no spkr notes ar.pptRatings and Load Factor - B. Egan Sep2016 no spkr notes ar.ppt
Ratings and Load Factor - B. Egan Sep2016 no spkr notes ar.ppt
 
Acoustics & Generator Ratings
Acoustics & Generator RatingsAcoustics & Generator Ratings
Acoustics & Generator Ratings
 
ENERGY EFFICIENT MOTORS AND POWER FACTOR IMPROVEMENT
ENERGY EFFICIENT MOTORS AND POWER FACTOR IMPROVEMENTENERGY EFFICIENT MOTORS AND POWER FACTOR IMPROVEMENT
ENERGY EFFICIENT MOTORS AND POWER FACTOR IMPROVEMENT
 
Energy in Factory Automation and the Role of Industrial Networks
Energy in Factory Automation and the Role of Industrial NetworksEnergy in Factory Automation and the Role of Industrial Networks
Energy in Factory Automation and the Role of Industrial Networks
 
Energy in Factory Automation and the Role of Industrial Networks
Energy in Factory Automation and the Role of Industrial Networks Energy in Factory Automation and the Role of Industrial Networks
Energy in Factory Automation and the Role of Industrial Networks
 
Unit_No_6.pptx
Unit_No_6.pptxUnit_No_6.pptx
Unit_No_6.pptx
 
Economic dispatch
Economic dispatch  Economic dispatch
Economic dispatch
 
Understanding generator set ratings
Understanding generator set ratings   Understanding generator set ratings
Understanding generator set ratings
 
PMSM.pdf
PMSM.pdfPMSM.pdf
PMSM.pdf
 
Shreelakshmi(power).pptx
Shreelakshmi(power).pptxShreelakshmi(power).pptx
Shreelakshmi(power).pptx
 
So Tay Bao Duong Dong Co Dien
So Tay Bao Duong Dong Co DienSo Tay Bao Duong Dong Co Dien
So Tay Bao Duong Dong Co Dien
 
Variable Frequency Drives
Variable Frequency DrivesVariable Frequency Drives
Variable Frequency Drives
 
Variable Frequency Drives
Variable Frequency DrivesVariable Frequency Drives
Variable Frequency Drives
 
Selecting efficiency and estimating savings
Selecting efficiency and estimating savingsSelecting efficiency and estimating savings
Selecting efficiency and estimating savings
 
Perkins 10KVA Engine Model 403A-11G1
Perkins 10KVA Engine Model 403A-11G1Perkins 10KVA Engine Model 403A-11G1
Perkins 10KVA Engine Model 403A-11G1
 
EC Motors & Controllers March 2016
EC Motors & Controllers March 2016EC Motors & Controllers March 2016
EC Motors & Controllers March 2016
 
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the PipelineVirtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
 
UNIT-4-PPT.ppt
UNIT-4-PPT.pptUNIT-4-PPT.ppt
UNIT-4-PPT.ppt
 
Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1
 
Economic load dispatch
Economic load  dispatchEconomic load  dispatch
Economic load dispatch
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 

Recently uploaded (20)

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 

2. genset ratings (3)

  • 2. Understanding ISO 8528-1 Not Limited Limited Constant Variable Operating hours Load COP PRP LTP ESP Purpose : All genset manufacturer to speak the same language International Standard for reciprocating internal combustion engine driven alternating current generating sets
  • 3. ISO8528 – Modes of Operation -Four combinations of two variables  Continuous Operation at Constant Load – Example – Base load in parallel with the utility such as a combined heat and power plant.  Continuous Operation at Varying Load – Example – Primary source of power where there is no utility present (or an unreliable utility).  Limited Time Operation at Constant Load – Example – Base load in parallel with the utility only during periods of peak power consumption.  Limited Time Operation at Varying Load – Example – Backup power when the utility fails.
  • 4. Continuous Power (COP) Continuous Power is defined as being the maximum power which the generating set is capable of delivering continuously while supplying a Constant Load when operated for an Unlimited number of hours a year . COP UNLIMITED Hrs per year 100% Avg. Load Factor CONSTANT Elect Load
  • 5. Examples of COP Applications  The COP Rating Genset is generally used when paralleled to the utility.  Base Loading  Co-generation heat and power (CHP)
  • 6. Prime Power (PRP) Prime power is defined as being the maximum power which a generating set is capable of delivering continuously while supplying a Variable electrical load when operated for an Unlimited number of hours per year. PRP UNLIMITED Hrs per Year 70% Avg. Load Factor VARIABLE Elect Load
  • 7. Application: Kone Cranes 500kVA generator powers the dockside rubber tyred gantry cranes. Examples of PRP Applications  Applications that use on–site generation in lieu of a utility electricity supply, typically where utility power is not available.  Peak shaving and rate curtailment.
  • 8. Limited Time running Power (LTP) Limited-time running power is defined as the maximum power available, under the agreed operating conditions, for which the generating set is capable of delivering for up to 500 hours of operation per year. LTP 500 Hours per Year 100% Avg. Load Factor CONSTANT Elect Load
  • 9. Examples of LTP Applications  Base Loading Application: 9 – C2000D6 Prime rated units Location: Santo Domingo, Dominican Repbulic
  • 10. Emergency Standby Power (ESP) Emergency Standby Power is defined as the maximum power available during a variable electrical power sequence, under the stated operating conditions, for which a generating set is capable of delivering in the event of a utility power outage or under test conditions for up to 200 hours of operation per year. ESP 200 Hours per Year 70% of Avg. Load Factor VARIABLE Elect Load
  • 11. Example ESP Applications Application: Fully Integrated standby power system containing 2 C2250D5 Location: UK  Emergency Hospital (such as backup to Life Safety, legally required or critical loads)
  • 13. De-rate on a Gen-set is caused by: Ambient Air Temperature , affects: Engine induction Engine & Radiator cooling capacity (LAT) Alternator temperature rise Circuit breaker de-rate Air Density (Altitude), affects: Engine induction air Radiator cooling capacity Alternator cooling capacity Humidity Only naturally aspirated engines de-rate in high humidity. Rating Conditions
  • 14. Exceeding ISO8528  Nominal vs. Guaranteed – ISO don’t define the minimum power value. The Cummins ratings are a guaranteed minimum. – A Cummins generator is guaranteed to produce enough power to either meet or exceed the published rating value. – Some competitors publish a nominal rating with a tolerance. Their actual power output capability could be below their published rating value.
  • 15. Radiator Power – ISO8528-1 paragraph 13.1 states: • The power of the generating set is the power output available for consumer loads at the generating set terminals excluding the electrical power absorbed by the essential independent auxiliaries. – A Cummins generator will drive its radiator and supply the full published kW value at the same time – When using an electrically driven remote radiator, be sure the alternator is sized for customer load plus the radiator load.
  • 16. Data Center Continuous Rating  Definition: The maximum power which the generator is capable of delivering continuously to a constant or varying electrical load for unlimited hours in a data center application.  No run time limit! Required by The Uptime Institute.  www.cumminsdatapower.com White Paper