Statutory
Requirements
for
Energizing
Substation
MLIP CL-XII
Why all the statutory rules to be
followed?????
– Electricity Generation, Supply and Consumption comes under the Indian Penal
Category. Hence, to generate, transmit and distribute the electrical energy
different license is required.
– Moreover, all electrical installations need to be checked by the different
government appointed authorities before its energization. This is a statutory
requirement.
– All our installation are being inspected Electrical Inspector and there officers.
Qualification for being Electrical
Inspector
– He possesses a degree in electrical engineering or its equivalent from
recognised University or Institution; and
– He has been regularly engaged for a period of at least eight years in the practice
of electrical engineering of which not less than two years have been spent in an
electrical or mechanical engineering workshop or,
– in generation or transmission or distribution of electricity, or in the
administration of the Act and these rules, in a position of responsibility.
Qualification for Officers to
assist the Electrical Inspector
– (i) He possesses a Degree in Electrical Engineering or its equivalent from a
recognized University or Institution; and (ii) He has been regularly engaged for a
period of at least three years in the practice of electrical engineering, of which not
less than one year has been spent in an electrical or mechanical engineering
workshop or in generation or transmission or distribution of electricity, or in the
administration of the Act and these rules, in a position of responsibility; Provided
that the appropriate Government may relax the requirements of experience in case
of officers otherwise well qualified.] Or
– (i) He possesses a diploma in electrical engineering or its equivalent from a
recognized institution; and (ii) He has been regularly engaged for a period of at least
six years in the practice of electrical engineering, of which not less than two years
have been spent in an electrical or mechanical engineering workshop or in
generation or transmission or distribution of electricity or in the administration of
the Act and these rules, in a position of responsibility
Vetting of Drawings and Details
– Before construction of any Substation, it is always recommended to get all the
major drawings of substation approved by Electrical Inspector viz. Equipment
Layout, Earthing Drawings, Lighting Drawings etc.
– These drawings should be submitted to EI after paying the requisite Inspection
Fees. In our case it is Rs. 400 per drawing.
– Electrical Inspector will approve these drawings with reference to Central
Electricity Authority, 2010.
– Any deviation as noted by him, will be corresponded through letter. Same shall
be incorporated in the drawing by EDRC.
Design Criteria for Selection of
Substation Land
Offering Inspection of Electrical
Installation in Sub-station
– Once the Installation is complete in all respect, it will be offered for Inspection to Electrical
Inspector.
– Following Documents need to be submitted to Electrical Inspector for offering the Inspection:
a. Job Completion Certificate duly signed by Licensed Contractor and its Supervisor.
b. Layout of Transmission Line with Pole Numbering.
c. Equipment List with requisite Inspection fees.
d. Print Out of Inspection Fees Challan.
e. Routine Test Report of all Electrical Equipment.
f. Power Supply Permission from concerned DISCOM.
Offering Inspection of Electrical
Installation in Sub-station
– Based upon submission of above docs, the Inspector will give one probable date
for Inspection of Electrical Installations.
– We have to ensure all Routine Testing Kit, Approve Drawings and Power Supply
Permission is available at site with us at the time of Inspection.
– Temporary Power supply should also be kept ready for scheme check, if EI asks.
What Electrical Inspector will
check?????
Mainly, electrical inspector will check the installations from electrical safety point of
view. During his inspection he will cover the following points mainly in
– Whether Job has been executed as per the approved drawings or, not?
– Whether all electrical clearances has been maintained as pee the IE rules or, not for
transmission line and outdoor Equipment?
– Whether transmission line are laid properly or, not using standard material as per
approved drawings and standards.
– Whether IR value of transmission line is OK, or not?
– All safety equipment are in place or, not for Transmission line viz. Danger Board, Anti
Climbing Device, Guarding in case of Road & Line crossing, Earthing etc.
What Electrical Inspector will
check?????
– As the transformer is the major equipment in SS, PI test is being recommended by EI
almost each time. Apart from this, they may ask for other routine tests of
transformer also.
– Earthing and Lightning protection will also be checked.
– In control room, EI will check for side clearance, back clearance and front clearance
of all installed panels.
– Whether proper nomenclature of panels are done or, not.
– Apart from these all safety equipment should be available at site which must include
Shock Treatment Chart, Fire Extinguisher at strategic locations, Rubber Mat, Single
Line Diagram, First Aid Kit, Insulated Hand Gloves, Equipment Layout properly
displayed at site.
Post Inspection Formalities
– After Inspection of the all installations, Electrical Inspector will give a report
about the identified observations.
– These observations need to be complied and a compliance report should be
submitted to Electrical Inspector within the scheduled time.
– Once we get the report from EI, Power supply agreement is done with DISCOM.
– Now, we have to recheck our Installations before energizing. Once it’s healthy
we can Energize the Substation.
Thank You

More Related Content

What's hot

Practical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansPractical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and Technicians
Living Online
 
High Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating ProceduresHigh Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating Procedures
Living Online
 

What's hot (20)

Safety precautions for electrical appliances
Safety precautions for electrical appliances Safety precautions for electrical appliances
Safety precautions for electrical appliances
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
ELECTRICAL SAFETY PRESENTATION.ppt
ELECTRICAL SAFETY PRESENTATION.pptELECTRICAL SAFETY PRESENTATION.ppt
ELECTRICAL SAFETY PRESENTATION.ppt
 
OHS Risk Assessment and Hierarchy of Control
OHS Risk Assessment and Hierarchy of ControlOHS Risk Assessment and Hierarchy of Control
OHS Risk Assessment and Hierarchy of Control
 
Electrical Safety In The Workplace
Electrical Safety In The WorkplaceElectrical Safety In The Workplace
Electrical Safety In The Workplace
 
Electrical Hazards and their safety
Electrical Hazards and their safetyElectrical Hazards and their safety
Electrical Hazards and their safety
 
Basic safety introduction
Basic safety introductionBasic safety introduction
Basic safety introduction
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Electrical safety slideshare
Electrical safety slideshareElectrical safety slideshare
Electrical safety slideshare
 
Practical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansPractical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and Technicians
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
High Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating ProceduresHigh Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating Procedures
 
Basic electrical safety
Basic electrical safetyBasic electrical safety
Basic electrical safety
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Safety Action Guide for Foundry Industry
Safety Action Guide for Foundry IndustrySafety Action Guide for Foundry Industry
Safety Action Guide for Foundry Industry
 
Electrical maintenance
Electrical maintenanceElectrical maintenance
Electrical maintenance
 
Emergency Response Plan
Emergency Response PlanEmergency Response Plan
Emergency Response Plan
 
Electrical Safety and Risk Assessments
Electrical Safety and Risk AssessmentsElectrical Safety and Risk Assessments
Electrical Safety and Risk Assessments
 
All About Workplace Electrical Safety
All About Workplace Electrical SafetyAll About Workplace Electrical Safety
All About Workplace Electrical Safety
 

Similar to Statutory requirement of charging of substation

151223 CV BEN AMOR Z-Ing English .
151223 CV BEN AMOR Z-Ing English .151223 CV BEN AMOR Z-Ing English .
151223 CV BEN AMOR Z-Ing English .
Zouhaier Ben Amor
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
usman ahmed
 

Similar to Statutory requirement of charging of substation (20)

a presenattion of PHILIPPINE ELECTRICAL CODE.pptx
a presenattion of PHILIPPINE ELECTRICAL CODE.pptxa presenattion of PHILIPPINE ELECTRICAL CODE.pptx
a presenattion of PHILIPPINE ELECTRICAL CODE.pptx
 
EICR Inspection Guide for Landlords and Tenants
EICR Inspection Guide for Landlords and TenantsEICR Inspection Guide for Landlords and Tenants
EICR Inspection Guide for Landlords and Tenants
 
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptxFinal_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
 
Irfan - Elec Engr
Irfan - Elec EngrIrfan - Elec Engr
Irfan - Elec Engr
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Commission resume
Commission resumeCommission resume
Commission resume
 
Understanding The Basics of EICR Testing Report and Its Codes
Understanding The Basics of EICR Testing Report and Its CodesUnderstanding The Basics of EICR Testing Report and Its Codes
Understanding The Basics of EICR Testing Report and Its Codes
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
151223 CV BEN AMOR Z-Ing English .
151223 CV BEN AMOR Z-Ing English .151223 CV BEN AMOR Z-Ing English .
151223 CV BEN AMOR Z-Ing English .
 
Alaa QA-QC last Applicant CV-2
Alaa QA-QC  last Applicant CV-2Alaa QA-QC  last Applicant CV-2
Alaa QA-QC last Applicant CV-2
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
RESUME - Copy
RESUME - CopyRESUME - Copy
RESUME - Copy
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
R Venkatesan
R VenkatesanR Venkatesan
R Venkatesan
 
Eng Kamran zfp
Eng Kamran zfpEng Kamran zfp
Eng Kamran zfp
 
Nec and oesc-8
Nec and oesc-8Nec and oesc-8
Nec and oesc-8
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
 
Sespl Profile for Energy Auditing
Sespl Profile for Energy AuditingSespl Profile for Energy Auditing
Sespl Profile for Energy Auditing
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Design and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data ScienceDesign and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data Science
 
ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptx
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overview
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern Enterprise
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptx
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptx
 

Statutory requirement of charging of substation

  • 2. Why all the statutory rules to be followed????? – Electricity Generation, Supply and Consumption comes under the Indian Penal Category. Hence, to generate, transmit and distribute the electrical energy different license is required. – Moreover, all electrical installations need to be checked by the different government appointed authorities before its energization. This is a statutory requirement. – All our installation are being inspected Electrical Inspector and there officers.
  • 3. Qualification for being Electrical Inspector – He possesses a degree in electrical engineering or its equivalent from recognised University or Institution; and – He has been regularly engaged for a period of at least eight years in the practice of electrical engineering of which not less than two years have been spent in an electrical or mechanical engineering workshop or, – in generation or transmission or distribution of electricity, or in the administration of the Act and these rules, in a position of responsibility.
  • 4. Qualification for Officers to assist the Electrical Inspector – (i) He possesses a Degree in Electrical Engineering or its equivalent from a recognized University or Institution; and (ii) He has been regularly engaged for a period of at least three years in the practice of electrical engineering, of which not less than one year has been spent in an electrical or mechanical engineering workshop or in generation or transmission or distribution of electricity, or in the administration of the Act and these rules, in a position of responsibility; Provided that the appropriate Government may relax the requirements of experience in case of officers otherwise well qualified.] Or – (i) He possesses a diploma in electrical engineering or its equivalent from a recognized institution; and (ii) He has been regularly engaged for a period of at least six years in the practice of electrical engineering, of which not less than two years have been spent in an electrical or mechanical engineering workshop or in generation or transmission or distribution of electricity or in the administration of the Act and these rules, in a position of responsibility
  • 5. Vetting of Drawings and Details – Before construction of any Substation, it is always recommended to get all the major drawings of substation approved by Electrical Inspector viz. Equipment Layout, Earthing Drawings, Lighting Drawings etc. – These drawings should be submitted to EI after paying the requisite Inspection Fees. In our case it is Rs. 400 per drawing. – Electrical Inspector will approve these drawings with reference to Central Electricity Authority, 2010. – Any deviation as noted by him, will be corresponded through letter. Same shall be incorporated in the drawing by EDRC.
  • 6. Design Criteria for Selection of Substation Land
  • 7. Offering Inspection of Electrical Installation in Sub-station – Once the Installation is complete in all respect, it will be offered for Inspection to Electrical Inspector. – Following Documents need to be submitted to Electrical Inspector for offering the Inspection: a. Job Completion Certificate duly signed by Licensed Contractor and its Supervisor. b. Layout of Transmission Line with Pole Numbering. c. Equipment List with requisite Inspection fees. d. Print Out of Inspection Fees Challan. e. Routine Test Report of all Electrical Equipment. f. Power Supply Permission from concerned DISCOM.
  • 8. Offering Inspection of Electrical Installation in Sub-station – Based upon submission of above docs, the Inspector will give one probable date for Inspection of Electrical Installations. – We have to ensure all Routine Testing Kit, Approve Drawings and Power Supply Permission is available at site with us at the time of Inspection. – Temporary Power supply should also be kept ready for scheme check, if EI asks.
  • 9. What Electrical Inspector will check????? Mainly, electrical inspector will check the installations from electrical safety point of view. During his inspection he will cover the following points mainly in – Whether Job has been executed as per the approved drawings or, not? – Whether all electrical clearances has been maintained as pee the IE rules or, not for transmission line and outdoor Equipment? – Whether transmission line are laid properly or, not using standard material as per approved drawings and standards. – Whether IR value of transmission line is OK, or not? – All safety equipment are in place or, not for Transmission line viz. Danger Board, Anti Climbing Device, Guarding in case of Road & Line crossing, Earthing etc.
  • 10. What Electrical Inspector will check????? – As the transformer is the major equipment in SS, PI test is being recommended by EI almost each time. Apart from this, they may ask for other routine tests of transformer also. – Earthing and Lightning protection will also be checked. – In control room, EI will check for side clearance, back clearance and front clearance of all installed panels. – Whether proper nomenclature of panels are done or, not. – Apart from these all safety equipment should be available at site which must include Shock Treatment Chart, Fire Extinguisher at strategic locations, Rubber Mat, Single Line Diagram, First Aid Kit, Insulated Hand Gloves, Equipment Layout properly displayed at site.
  • 11. Post Inspection Formalities – After Inspection of the all installations, Electrical Inspector will give a report about the identified observations. – These observations need to be complied and a compliance report should be submitted to Electrical Inspector within the scheduled time. – Once we get the report from EI, Power supply agreement is done with DISCOM. – Now, we have to recheck our Installations before energizing. Once it’s healthy we can Energize the Substation.