MW
DB
10
9 9
9
11
11
12
13
GRANT HEPBURN
DESIGNS
DATE: PROJECT: DRAWING: SCALE:
DRAWING NUMBER:
AUTHOR:
NOTES &
SPECIFICATIONS
CLIENT: PLOT:









SIGNED:
SITE PLAN 1:500
G HEPBURN
PAGE:
A1 (portrait)
KWALAPE TOURS & SAFARIS
(MR M KHACHANA)
PHASE 2 DEVELOPMENT OF KWALAPE LODGE - ADDITION OF 18 ROOM UNIT
(12 STANDARD ROOMS + 6 DELUXE ROOMS); 2 X THREE BEDROOM + 3 X TWO
BEDROOM SELFCATERING UNITS; LAUNDRY; LINEN AND GARDEN STOREROOMS.
CONTACT:
+ 267 71 482929
KL-P2-SP-M-1
CLIENT ADDRESS:
JUNE 2011
77-RO KAZANGULA
WASTE WATER DISPOSAL
SYSTEM
5M BUILDING SETBACK








 


 

 

 











EXISTING BUILDINGS ON
SITE




































This plan shows new additions
and changes to the original
proposal submitted and
approved on the 20th of
November 2008.
Consent Reference No .
- 30/2000
BOMA AREA
MAIN WATER
FEATURE
17
parking
bays
21
parking
bays
17
parking
bays
CAMP SITE AREA
CAMP SITE AREA
2 sets of 6.5m x 2m
x 1.5m conservancy
tank + double
sceptic tanks
IC
IC
IC
IC
IC
IC
IC
IC
IC
4 disabled
parking bays +
8 parking bays
1
2
3
4
4
4
4
4
4
4
4
4
4
5
5
6
7
8
5
parking
bays
3 parallel
parking
bays
bus
parking
MAIN ROAD
TO
KAZANGULA
TO KASANE
EXCLUSIVE
RESIDENTPARKING
RE
IC
IC
IC
COUNCIL
WATER
CONNECTION
IE
to
campsites
water
affairs
manhole
EXISTING
ACCESS
BPC
CONNECTION
LO
AD
ING
BAY
waste
disposal
area
4
4
5
PROPOSED ROAD 20M
PROPOSED
ACCESS
FIRE SYSTEM
RESEVOIR
TANK
6MROAD
CAMP SITE AREA
CAMP SITE AREA
POOL


 

 

 

 

 
PROPOSED BUILDINGS ON
SITE
IC
IC
VEGETATED
EARTH
W
ALL
IC
IC
IC
IC IC
IC
IC
IC
IC
IC
IE
IE
LOADING
BAY
BOX 505
KASANE
Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 Expansion

More Related Content

What's hot

Agenda november 2017
Agenda   november 2017Agenda   november 2017
Agenda november 2017gscplanning
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015City Brandon
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 
Fieldstone apartments williamstown
Fieldstone apartments   williamstownFieldstone apartments   williamstown
Fieldstone apartments williamstownSteve Shriver
 
2010-RTA Corona Transit Center Update
2010-RTA Corona Transit Center Update2010-RTA Corona Transit Center Update
2010-RTA Corona Transit Center UpdateDarrell Talbert
 
City of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland stCity of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland stCity of Port Phillip
 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationCrosstown TO
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases ISven Maedler
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIStudent
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveFairfax County
 
Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11VasconEngineers
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 

What's hot (20)

Green Screen Parking Structure
Green Screen Parking StructureGreen Screen Parking Structure
Green Screen Parking Structure
 
Agenda november 2017
Agenda   november 2017Agenda   november 2017
Agenda november 2017
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015
 
Scott Smith-CV
Scott Smith-CVScott Smith-CV
Scott Smith-CV
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
Fieldstone apartments williamstown
Fieldstone apartments   williamstownFieldstone apartments   williamstown
Fieldstone apartments williamstown
 
2010-RTA Corona Transit Center Update
2010-RTA Corona Transit Center Update2010-RTA Corona Transit Center Update
2010-RTA Corona Transit Center Update
 
2018 Planning
2018 Planning2018 Planning
2018 Planning
 
City of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland stCity of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland st
 
Illumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier BridgeIllumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier Bridge
 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting Presentation
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAI
 
McKinney Place Garage
McKinney Place GarageMcKinney Place Garage
McKinney Place Garage
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
 
Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11
 
2000_Charleston_cement
2000_Charleston_cement2000_Charleston_cement
2000_Charleston_cement
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
Electromech
Electromech Electromech
Electromech
 
Lloyd ppt
Lloyd pptLloyd ppt
Lloyd ppt
 

Viewers also liked

Last Eden Eco Bush Lodge
Last Eden Eco Bush LodgeLast Eden Eco Bush Lodge
Last Eden Eco Bush LodgeGrant Hepburn
 
Jooste House Expansion
Jooste House ExpansionJooste House Expansion
Jooste House ExpansionGrant Hepburn
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush LodgeGrant Hepburn
 
Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseGrant Hepburn
 
Tlalanyane Residence Proposal
Tlalanyane Residence ProposalTlalanyane Residence Proposal
Tlalanyane Residence ProposalGrant Hepburn
 
Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations BaseGrant Hepburn
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteGrant Hepburn
 
The Grotto Room Addition
The Grotto Room AdditionThe Grotto Room Addition
The Grotto Room AdditionGrant Hepburn
 
Camp Kazuma Bush Lodge As Built
Camp Kazuma Bush Lodge As BuiltCamp Kazuma Bush Lodge As Built
Camp Kazuma Bush Lodge As BuiltGrant Hepburn
 
Kopane Courts Mixed Use
Kopane Courts Mixed UseKopane Courts Mixed Use
Kopane Courts Mixed UseGrant Hepburn
 
Lebantsho Guesthouse
Lebantsho GuesthouseLebantsho Guesthouse
Lebantsho GuesthouseGrant Hepburn
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 
Mwandi View As Built Plans
Mwandi View As Built PlansMwandi View As Built Plans
Mwandi View As Built PlansGrant Hepburn
 
Chobe Game Lodge Extension + Remodel
Chobe Game Lodge Extension + RemodelChobe Game Lodge Extension + Remodel
Chobe Game Lodge Extension + RemodelGrant Hepburn
 
3 Baobabs Lodge As Built
3 Baobabs Lodge As Built3 Baobabs Lodge As Built
3 Baobabs Lodge As BuiltGrant Hepburn
 
Actividades1
Actividades1Actividades1
Actividades1simy mon
 

Viewers also liked (20)

Last Eden Eco Bush Lodge
Last Eden Eco Bush LodgeLast Eden Eco Bush Lodge
Last Eden Eco Bush Lodge
 
Jooste House Expansion
Jooste House ExpansionJooste House Expansion
Jooste House Expansion
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt House
 
Mukusi Guesthouse
Mukusi GuesthouseMukusi Guesthouse
Mukusi Guesthouse
 
Tlalanyane Residence Proposal
Tlalanyane Residence ProposalTlalanyane Residence Proposal
Tlalanyane Residence Proposal
 
Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations Base
 
Lesoma Farm Houses
Lesoma Farm HousesLesoma Farm Houses
Lesoma Farm Houses
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + Site
 
The Grotto Room Addition
The Grotto Room AdditionThe Grotto Room Addition
The Grotto Room Addition
 
Camp Kazuma Bush Lodge As Built
Camp Kazuma Bush Lodge As BuiltCamp Kazuma Bush Lodge As Built
Camp Kazuma Bush Lodge As Built
 
Kopane Courts Mixed Use
Kopane Courts Mixed UseKopane Courts Mixed Use
Kopane Courts Mixed Use
 
Africa Avantu Lodge
Africa Avantu LodgeAfrica Avantu Lodge
Africa Avantu Lodge
 
Lebantsho Guesthouse
Lebantsho GuesthouseLebantsho Guesthouse
Lebantsho Guesthouse
 
Khupe River Lodge
Khupe River LodgeKhupe River Lodge
Khupe River Lodge
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
Mwandi View As Built Plans
Mwandi View As Built PlansMwandi View As Built Plans
Mwandi View As Built Plans
 
Chobe Game Lodge Extension + Remodel
Chobe Game Lodge Extension + RemodelChobe Game Lodge Extension + Remodel
Chobe Game Lodge Extension + Remodel
 
3 Baobabs Lodge As Built
3 Baobabs Lodge As Built3 Baobabs Lodge As Built
3 Baobabs Lodge As Built
 
Actividades1
Actividades1Actividades1
Actividades1
 

Similar to Kwalape Lodge Phase 2 Expansion

Document Transmittal form of a construction
Document Transmittal form of a constructionDocument Transmittal form of a construction
Document Transmittal form of a constructionZumraOzdemir
 
Shopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdf
Shopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdfShopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdf
Shopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdfacamiaconsvn
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONcyberyogi07
 
CV-BASHIR-2016
CV-BASHIR-2016CV-BASHIR-2016
CV-BASHIR-2016Bashir Dc
 
Power Point Presentation for PPA 30
Power Point Presentation for PPA 30Power Point Presentation for PPA 30
Power Point Presentation for PPA 30TABREZ AKHTAR
 
Power Point Presentation for PPA 30
Power Point Presentation for PPA 30Power Point Presentation for PPA 30
Power Point Presentation for PPA 30TABREZ AKHTAR
 
Signature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D GurgaonSignature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D GurgaonOrion Realtors
 
Vishrantwadi & Ghorpadi GAD-Tender docss
Vishrantwadi & Ghorpadi GAD-Tender docssVishrantwadi & Ghorpadi GAD-Tender docss
Vishrantwadi & Ghorpadi GAD-Tender docssSachinPawar510423
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdfMODI20077
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 sMike Darwich
 
Clive Goodacre AS Built Residential
Clive Goodacre AS Built ResidentialClive Goodacre AS Built Residential
Clive Goodacre AS Built ResidentialGrant Hepburn
 
Fairgrounds Permit Application Amend Phase 1 11-15-2010
Fairgrounds Permit Application Amend Phase 1 11-15-2010Fairgrounds Permit Application Amend Phase 1 11-15-2010
Fairgrounds Permit Application Amend Phase 1 11-15-2010Adam Cohen
 

Similar to Kwalape Lodge Phase 2 Expansion (20)

Document Transmittal form of a construction
Document Transmittal form of a constructionDocument Transmittal form of a construction
Document Transmittal form of a construction
 
Masters s
Masters sMasters s
Masters s
 
Shopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdf
Shopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdfShopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdf
Shopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdf
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
 
CV-BASHIR-2016
CV-BASHIR-2016CV-BASHIR-2016
CV-BASHIR-2016
 
Power Point Presentation for PPA 30
Power Point Presentation for PPA 30Power Point Presentation for PPA 30
Power Point Presentation for PPA 30
 
Power Point Presentation for PPA 30
Power Point Presentation for PPA 30Power Point Presentation for PPA 30
Power Point Presentation for PPA 30
 
Signature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D GurgaonSignature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D Gurgaon
 
final project_FINAL
final project_FINALfinal project_FINAL
final project_FINAL
 
Vishrantwadi & Ghorpadi GAD-Tender docss
Vishrantwadi & Ghorpadi GAD-Tender docssVishrantwadi & Ghorpadi GAD-Tender docss
Vishrantwadi & Ghorpadi GAD-Tender docss
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s
 
Low invest projects-191214
Low invest projects-191214Low invest projects-191214
Low invest projects-191214
 
Low invest projects-191214
Low invest projects-191214Low invest projects-191214
Low invest projects-191214
 
Clive Goodacre AS Built Residential
Clive Goodacre AS Built ResidentialClive Goodacre AS Built Residential
Clive Goodacre AS Built Residential
 
P15921-1(22) ground Floor Plan Proposed
P15921-1(22) ground Floor Plan ProposedP15921-1(22) ground Floor Plan Proposed
P15921-1(22) ground Floor Plan Proposed
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Fairgrounds Permit Application Amend Phase 1 11-15-2010
Fairgrounds Permit Application Amend Phase 1 11-15-2010Fairgrounds Permit Application Amend Phase 1 11-15-2010
Fairgrounds Permit Application Amend Phase 1 11-15-2010
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
layout
layoutlayout
layout
 

Kwalape Lodge Phase 2 Expansion

  • 1. MW DB 10 9 9 9 11 11 12 13 GRANT HEPBURN DESIGNS DATE: PROJECT: DRAWING: SCALE: DRAWING NUMBER: AUTHOR: NOTES & SPECIFICATIONS CLIENT: PLOT:          SIGNED: SITE PLAN 1:500 G HEPBURN PAGE: A1 (portrait) KWALAPE TOURS & SAFARIS (MR M KHACHANA) PHASE 2 DEVELOPMENT OF KWALAPE LODGE - ADDITION OF 18 ROOM UNIT (12 STANDARD ROOMS + 6 DELUXE ROOMS); 2 X THREE BEDROOM + 3 X TWO BEDROOM SELFCATERING UNITS; LAUNDRY; LINEN AND GARDEN STOREROOMS. CONTACT: + 267 71 482929 KL-P2-SP-M-1 CLIENT ADDRESS: JUNE 2011 77-RO KAZANGULA WASTE WATER DISPOSAL SYSTEM 5M BUILDING SETBACK                                EXISTING BUILDINGS ON SITE                                     This plan shows new additions and changes to the original proposal submitted and approved on the 20th of November 2008. Consent Reference No . - 30/2000 BOMA AREA MAIN WATER FEATURE 17 parking bays 21 parking bays 17 parking bays CAMP SITE AREA CAMP SITE AREA 2 sets of 6.5m x 2m x 1.5m conservancy tank + double sceptic tanks IC IC IC IC IC IC IC IC IC 4 disabled parking bays + 8 parking bays 1 2 3 4 4 4 4 4 4 4 4 4 4 5 5 6 7 8 5 parking bays 3 parallel parking bays bus parking MAIN ROAD TO KAZANGULA TO KASANE EXCLUSIVE RESIDENTPARKING RE IC IC IC COUNCIL WATER CONNECTION IE to campsites water affairs manhole EXISTING ACCESS BPC CONNECTION LO AD ING BAY waste disposal area 4 4 5 PROPOSED ROAD 20M PROPOSED ACCESS FIRE SYSTEM RESEVOIR TANK 6MROAD CAMP SITE AREA CAMP SITE AREA POOL                 PROPOSED BUILDINGS ON SITE IC IC VEGETATED EARTH W ALL IC IC IC IC IC IC IC IC IC IC IE IE LOADING BAY BOX 505 KASANE