SlideShare a Scribd company logo
1 of 4
AMARJEET KUMAR
ADDRESS: - Q.no- 115/2/3, G.H Colony chhotagovindpur, Jamshedpur-831015
Mobile : 7798349260,9939542875
E-mail: amarjeetkumar.jsr@rediffmail.com,
QUALIFICATION: -
DIPLOMA – ELECTRICAL ENGINEERING
Career Objective: Deploy my skillsin theavailablefield for optimum utilisation of resources in hand deliver in time for
achievingorganisational goals.
Professional Summary
 Electrical Engineering professional with 7 years of experience in 33kV, 6600 kVA Substation,Energy Management System,
Electrical ProjectDesigning,Planning,Schedulingand Execution.
 Abilities in handlingmultiplepriorities with a bias for action and genuine interest in professional development

IndustriesServed
 Automobile Industry
 Steel & WireRopes
 Copper
Skill Set Snapshot
 Project Management – Done Green Field Project
setup from electrical design to start of operations.
 Maintenance – Preventive, Predictive, Planned and
Breakdown maintenance exposure in steel industry.
 Cost Benefit Analysis – Option analysis, BOQ & BOM
preparation for decision making.
 Contractor & Vendor Finalisation.
 PLC & HMI Programming – Program design and
execution on Mitsubishi platform of Siemens S-7300
PLC, Δ HMI, Relay logic
Working With BEDMUTHA INDUSTRIES LTD (311 CRORE GREEN FIELD PROJECT)
Bedmutha Industries Limited is India's leading manufacturer and exporter of G I Wire, ACSR Wire,
Stay/Guy/Earth Wire 7,19,37 Wire Strands, Spring steel wire, Tyre bead wire, Wire for ropes, Copper coils,
Copper bus bars, foils, Paper Insulated Copper Conductor (PICC), Fabricated Copper Bus Bars for Motor
and Transformer Division and various types of wire and wire products with consolidated revenues of INR
22,620 Lacs in 2013-14. The company's manufacturing base in India is spread across Nasik & Dhule
Designation
Sr. Engineer Project – Electrical
Job Duration From 03-Dec- 2012 till date
TURNKEY PLANNING & DESIGNING OF ELECTRICAL FACILITIES for Wire Drawing & Tyre Bead Plant
 Planning & designing of plant electrical layout.
 Planning& designing of load distribution (SLD) for the complete layout comprising of 52 acres of land with
connected load of 10,000 kWh
 Communication and co-ordination with MEP Consultantfor electrical drawingapprovals and rectification in
drawings as per plant layout
 HT & LT Panel,PDB, Control panel, Switchgear, Cableschedule, Trenches design as per load distribution and
site conditions to optimise the cost of investment into electrical equipments.
 Planning, design development & commissioning of the automatic wireless crane programme of Pickling
Plant with capacity of 276 MT/Day includes online troubleshooting with DRT, Italy.
 Planning and commissioning the electrical equipments of Galvanising Line with Capacity of 120 MT/Day
which includes online zinc coating control, temperature control, fuel & air burner (54) control through
Servo motor and monitoring through DAS (Data Acquisition System) on Wonderware platform, equipment
being imported from FIB, Belgium.
 Planning and commissioning the electrical equipments for OPEN FIRE FURNACE, LEAD BATH, FLUX BATH,
DRYER, WIPING (NITROGEN & PAD) supplied by FIB, Belgium at patenting and annealing temperatures
with online temperature control for 34 burners and servomotor for wiping control.
 Planning and commissioning the electrical equipments for PAY-OFFs (52 No’s) & TAKE UPS (36 No’s)
supplied by M+E, Italy which includes synchronisation of furnace with pay-offs and take-ups for speed and
length control of wire through DAS.
 Planning and commissioning the electrical equipments for Wire Drawing Machines (Roughing, Medium
and Fine) supplied by Swaraj Technocrafts, Assomech, India & MFL, Italy.
 Planning & designing the electrical equipments of Tyre Bead Line with capacity of 800 MT/month includes
inline electro pickling, electro degreasing and bronze coating being imported from Sirio Wire, Italy.
ROPE PLANT
 Accordingly layoutis modified to accommodate the changes required in electrical facility planning at plant.
 Separate Equipment selection like HT & LT Panel, cable schedule making, cable routing, lighting design,
earthing design, MQP, BOQ finalisation, contractor finalisation and execution.
COPPER PLANT Turnkey Electrical Project Design and Execution
 Planning & commissioning of electrical utilities for 250 Ton Upcaster, TLJ – 350, Draw bench, Copper Foil,
150 TR cooling tower, 60 kVA UPS, 150 CFM Kaeser Compressor, 250 kVA D.G. set, etc
GENERAL PROJECT ACTIVITIES
 Currently responsibility for Wire, Rope, Copper and Tyre Bead plant project and plant Maintenance.
 Coordinate with contractor for daily progress report as per given schedule.
 Preparing of Electrical BOQ for project work and finalization for contractor.
 Preparation of Electrical trench, cable layout, in Auto CAD.
 Preparation of Electrical SLD.
 Calculation of fault level of switches gear.
 33 KV HT Panel installationsand commissioning.
 Main LT Panel installation and commissioning.
 Lightning erection and successfully commission.
 Earthingexecution and commissioning,likegrid EarthingTNC, TNS.
 Plantlightinglayoutpreparation,Erection and successfully commission.
 PlantMachineInstallation and commissioning.
 Material planning for execution, according to project planning
MAINTENANCE
 Preparation of Preventive and predictive schedule, Kaizen, why-why analysis etc.
 Preparation of MTTR, MTBF, & Break % of Whole plant.
 Preparation of ISO Document, 14001, TS-16949, BS-OHSAS-18001.
 Troublingshootingof PLC S7-300 PLC.
 CC TV Camera monitor planningand execution.
 Day-to-day maintenance of PicklingPlant,WireDrawingPlant,FurnaceLine, Take-ups and Pay-offs to keep
uptime of the machine to 90% of level.
 Shift planningand manpower planning
 Daily MIS submission to management for machinedowntime analysisand correctiveaction plan.
 Electrical load balancingto keep power factor at100% unity.
Special Achievements
1. Saved approx Rs. 20 Lacs againstthe electrical design charges by the consultantfor rope plantand Rs.
5 Lacs for Copper Plantby designingthe electrical layoutand equipments on our own.
2. Saved 20-25 Lacs in cableschedule,cabletrenches and trays after receipt of the detail drawings from
consultantin project execution.
Worked With Steel Strips Wheels Ltd.
A Group company of Steel Strips Wheels Ltd at Gurgaon H.R. ISO-TS-16949, OHSAH-18001, and EMS-14001
certified company. The world class Manufacturing for sheet wheels Product.
Designation Junior Engineer. (Project &Plant maintenance)
Job Duration From 02-Aug- 2010 to 15-Jun-11
Earlier With Jamna Auto Industries Ltd (A World Leader in Parabolic Leaf Spring Manufacturing)
A World ClassManufacturing(WCM) auto-ancillary havingpractices of international standard aligning the
company to compete in the global market. The company has applied for TPM (Total Productivity
Maintenance) and will be awarded soon.
Designation Junior team leader. (Project &Plant maintenance)
Job Duration From 01-Jan- 2010 to 30-Nov-2012
PAINT SHOP
 Electrical end to end Installation and commissioning of Paint shop
 Major and minor problem have been solved at site.
 Automatic reciprocator installed in Paint shop.
 Done Electrostatic Gun fitment in Reciprocator of paint shop for better painting.
 Have good command in Paint shop Maintenance like that, ARP system, DD booth, Flesh of zone,
Conveyer, Burner, damper setting for temperature, Air, etc.
 Energy consumption data prepared and improvement done in wastage, like that Gas, water, Air etc
 Suggesting Management regarding productivity improvement by VSM Study.
OTHER EQUIPMENTS
 Preparation of PLC Programming of new automation SSP Conveyer and installation and commissioning
for better productivity fully automatic for better productivity.
 Preparation of logic of straightening press self draw drawing, and made Panel.
 Installation and commissioning of Fume killer supplied by Power pollution control Pvt. ltd.
 Installation and commissioning of Band saw SPM make by I.T.L. Indore.
 Day to day planning of fabrication in whole plant for W.C.M.
 500 meter bitumen’s road have made at inside plant.
 Day to day Maintenance of Weld shop Spot welding, Mig welding, Robotic Welding
 Day to day planning of TPM and weekly schedule of M/c as per m/c requirement for TPM.


 Daily to daily Maintenance of PLC and Drive based (Siemens, Allen beadily, Mesung, Mitsubishi) Plant
m/c like that sheet metal Mechanical power Press shop, 40 T to 400 ton capacity Pneumatic type and
hydraulic type,Blanking line (Novastilnec) cut to length line, Blanking line (Cetteneo Italy) , slating ling
WB, NBL, MBL, Robot.
 Day to day Maintenance of Weld shop Spot welding, Mig welding, Robotic Welding,
 Day to day Maintenance of ETO Crane single girder and double girder.
 Kaizen activities handled and total data prepared every month of all Maintenance department.
 Per month working in energy consumption for running cost reduce of Maintenance.
 Ladder logic have made for new PLC installation and commissioning as per M/c requirement, and
correction of logic in PLC for safety, productivity.
 As per Company requirement, MTTR, MTBF Data prepared and show weekly meeting of management.
 Documentation wok prepared of like that Audit requirement TS - 16949, OHSAS – 18001, EMS-14001,
Audit for EHS the data make like that Aspect Impact Analysis.
 Preparation of Monthly preventive schedule, Annual preventive schedule,
 Preventive, store, MTBF, MTTR, update in SAP software
 Daily to daily Manpower planning for break down maintenance, Preventive Maintenance and
settlement.
 D
Education: Three year Diploma in Electrical engineering from Jamshedpur institute of Engineering & Technology.
- Intermediate from A.B.M COLLEGE, JAMSHEDPUR in 2005.
IT Skills:
Operating System: Windows (all platforms)
Packages Known: MS Office (Word, PowerPoint, Excel), SAP Software, M.S Project
PLC SOFTWARE; Knowledge of Gx Developers PLC software, working knowledge of RS logix,
Codesys, Doxminy. And MS Project.
Language: LADDER, STL
Training
Industrial Instrumentation and process control.
Programmable logic controller
Personal Details:
Date of Birth: 08/02/1987
Marital Status: Married
Strengths:
 Excellent interpersonal Skills & dedicated.
 Highly Assiduous and Quick Learner.
Languages: English & Hindi

More Related Content

What's hot

Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Gensol Engineering Limited
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERjongguanzon
 
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical EnginnerNikhil Garde
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATELRakesh patel
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...Bajaj Electricals Ltd
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler ResumePamela Bundros
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSuthar Vinu
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15Mahboob Iqbal
 
Kewal Summary Switchgear
Kewal Summary SwitchgearKewal Summary Switchgear
Kewal Summary Switchgearkewal_975
 
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)Bharjendu vimal
 

What's hot (20)

Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
 
Sidima AG Template_Rev1
Sidima AG Template_Rev1Sidima AG Template_Rev1
Sidima AG Template_Rev1
 
Amit Resume
Amit ResumeAmit Resume
Amit Resume
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical Enginner
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
BHARATH KUMAR REDDY
BHARATH KUMAR REDDYBHARATH KUMAR REDDY
BHARATH KUMAR REDDY
 
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineer
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
Kewal Summary Switchgear
Kewal Summary SwitchgearKewal Summary Switchgear
Kewal Summary Switchgear
 
Sujit Das
Sujit DasSujit Das
Sujit Das
 
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
 

Similar to Amarjeet Copy (20)

Mukesh_Kumar_(1)
Mukesh_Kumar_(1)Mukesh_Kumar_(1)
Mukesh_Kumar_(1)
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
Mohamed Saad Resume
Mohamed Saad ResumeMohamed Saad Resume
Mohamed Saad Resume
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
noorCV
noorCVnoorCV
noorCV
 
Nadim Siddique CV
Nadim Siddique CVNadim Siddique CV
Nadim Siddique CV
 
Rajesh CV -E & I
Rajesh CV -E & IRajesh CV -E & I
Rajesh CV -E & I
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BE
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of Experinece
 
Resume-Chandramouli
Resume-ChandramouliResume-Chandramouli
Resume-Chandramouli
 
Santhu CV Resume.
Santhu CV Resume.Santhu CV Resume.
Santhu CV Resume.
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
Muhammad Rizwan.
Muhammad Rizwan.Muhammad Rizwan.
Muhammad Rizwan.
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_int
 
CV_Mahesh Prajapati
CV_Mahesh PrajapatiCV_Mahesh Prajapati
CV_Mahesh Prajapati
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
Resume 25.09.15
Resume 25.09.15Resume 25.09.15
Resume 25.09.15
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 

Amarjeet Copy

  • 1. AMARJEET KUMAR ADDRESS: - Q.no- 115/2/3, G.H Colony chhotagovindpur, Jamshedpur-831015 Mobile : 7798349260,9939542875 E-mail: amarjeetkumar.jsr@rediffmail.com, QUALIFICATION: - DIPLOMA – ELECTRICAL ENGINEERING Career Objective: Deploy my skillsin theavailablefield for optimum utilisation of resources in hand deliver in time for achievingorganisational goals. Professional Summary  Electrical Engineering professional with 7 years of experience in 33kV, 6600 kVA Substation,Energy Management System, Electrical ProjectDesigning,Planning,Schedulingand Execution.  Abilities in handlingmultiplepriorities with a bias for action and genuine interest in professional development  IndustriesServed  Automobile Industry  Steel & WireRopes  Copper Skill Set Snapshot  Project Management – Done Green Field Project setup from electrical design to start of operations.  Maintenance – Preventive, Predictive, Planned and Breakdown maintenance exposure in steel industry.  Cost Benefit Analysis – Option analysis, BOQ & BOM preparation for decision making.  Contractor & Vendor Finalisation.  PLC & HMI Programming – Program design and execution on Mitsubishi platform of Siemens S-7300 PLC, Δ HMI, Relay logic Working With BEDMUTHA INDUSTRIES LTD (311 CRORE GREEN FIELD PROJECT) Bedmutha Industries Limited is India's leading manufacturer and exporter of G I Wire, ACSR Wire, Stay/Guy/Earth Wire 7,19,37 Wire Strands, Spring steel wire, Tyre bead wire, Wire for ropes, Copper coils, Copper bus bars, foils, Paper Insulated Copper Conductor (PICC), Fabricated Copper Bus Bars for Motor and Transformer Division and various types of wire and wire products with consolidated revenues of INR 22,620 Lacs in 2013-14. The company's manufacturing base in India is spread across Nasik & Dhule Designation Sr. Engineer Project – Electrical Job Duration From 03-Dec- 2012 till date TURNKEY PLANNING & DESIGNING OF ELECTRICAL FACILITIES for Wire Drawing & Tyre Bead Plant  Planning & designing of plant electrical layout.  Planning& designing of load distribution (SLD) for the complete layout comprising of 52 acres of land with connected load of 10,000 kWh  Communication and co-ordination with MEP Consultantfor electrical drawingapprovals and rectification in drawings as per plant layout  HT & LT Panel,PDB, Control panel, Switchgear, Cableschedule, Trenches design as per load distribution and site conditions to optimise the cost of investment into electrical equipments.  Planning, design development & commissioning of the automatic wireless crane programme of Pickling Plant with capacity of 276 MT/Day includes online troubleshooting with DRT, Italy.  Planning and commissioning the electrical equipments of Galvanising Line with Capacity of 120 MT/Day which includes online zinc coating control, temperature control, fuel & air burner (54) control through Servo motor and monitoring through DAS (Data Acquisition System) on Wonderware platform, equipment being imported from FIB, Belgium.
  • 2.  Planning and commissioning the electrical equipments for OPEN FIRE FURNACE, LEAD BATH, FLUX BATH, DRYER, WIPING (NITROGEN & PAD) supplied by FIB, Belgium at patenting and annealing temperatures with online temperature control for 34 burners and servomotor for wiping control.  Planning and commissioning the electrical equipments for PAY-OFFs (52 No’s) & TAKE UPS (36 No’s) supplied by M+E, Italy which includes synchronisation of furnace with pay-offs and take-ups for speed and length control of wire through DAS.  Planning and commissioning the electrical equipments for Wire Drawing Machines (Roughing, Medium and Fine) supplied by Swaraj Technocrafts, Assomech, India & MFL, Italy.  Planning & designing the electrical equipments of Tyre Bead Line with capacity of 800 MT/month includes inline electro pickling, electro degreasing and bronze coating being imported from Sirio Wire, Italy. ROPE PLANT  Accordingly layoutis modified to accommodate the changes required in electrical facility planning at plant.  Separate Equipment selection like HT & LT Panel, cable schedule making, cable routing, lighting design, earthing design, MQP, BOQ finalisation, contractor finalisation and execution. COPPER PLANT Turnkey Electrical Project Design and Execution  Planning & commissioning of electrical utilities for 250 Ton Upcaster, TLJ – 350, Draw bench, Copper Foil, 150 TR cooling tower, 60 kVA UPS, 150 CFM Kaeser Compressor, 250 kVA D.G. set, etc GENERAL PROJECT ACTIVITIES  Currently responsibility for Wire, Rope, Copper and Tyre Bead plant project and plant Maintenance.  Coordinate with contractor for daily progress report as per given schedule.  Preparing of Electrical BOQ for project work and finalization for contractor.  Preparation of Electrical trench, cable layout, in Auto CAD.  Preparation of Electrical SLD.  Calculation of fault level of switches gear.  33 KV HT Panel installationsand commissioning.  Main LT Panel installation and commissioning.  Lightning erection and successfully commission.  Earthingexecution and commissioning,likegrid EarthingTNC, TNS.  Plantlightinglayoutpreparation,Erection and successfully commission.  PlantMachineInstallation and commissioning.  Material planning for execution, according to project planning MAINTENANCE  Preparation of Preventive and predictive schedule, Kaizen, why-why analysis etc.  Preparation of MTTR, MTBF, & Break % of Whole plant.  Preparation of ISO Document, 14001, TS-16949, BS-OHSAS-18001.  Troublingshootingof PLC S7-300 PLC.  CC TV Camera monitor planningand execution.  Day-to-day maintenance of PicklingPlant,WireDrawingPlant,FurnaceLine, Take-ups and Pay-offs to keep uptime of the machine to 90% of level.  Shift planningand manpower planning  Daily MIS submission to management for machinedowntime analysisand correctiveaction plan.  Electrical load balancingto keep power factor at100% unity. Special Achievements 1. Saved approx Rs. 20 Lacs againstthe electrical design charges by the consultantfor rope plantand Rs. 5 Lacs for Copper Plantby designingthe electrical layoutand equipments on our own. 2. Saved 20-25 Lacs in cableschedule,cabletrenches and trays after receipt of the detail drawings from consultantin project execution.
  • 3. Worked With Steel Strips Wheels Ltd. A Group company of Steel Strips Wheels Ltd at Gurgaon H.R. ISO-TS-16949, OHSAH-18001, and EMS-14001 certified company. The world class Manufacturing for sheet wheels Product. Designation Junior Engineer. (Project &Plant maintenance) Job Duration From 02-Aug- 2010 to 15-Jun-11 Earlier With Jamna Auto Industries Ltd (A World Leader in Parabolic Leaf Spring Manufacturing) A World ClassManufacturing(WCM) auto-ancillary havingpractices of international standard aligning the company to compete in the global market. The company has applied for TPM (Total Productivity Maintenance) and will be awarded soon. Designation Junior team leader. (Project &Plant maintenance) Job Duration From 01-Jan- 2010 to 30-Nov-2012 PAINT SHOP  Electrical end to end Installation and commissioning of Paint shop  Major and minor problem have been solved at site.  Automatic reciprocator installed in Paint shop.  Done Electrostatic Gun fitment in Reciprocator of paint shop for better painting.  Have good command in Paint shop Maintenance like that, ARP system, DD booth, Flesh of zone, Conveyer, Burner, damper setting for temperature, Air, etc.  Energy consumption data prepared and improvement done in wastage, like that Gas, water, Air etc  Suggesting Management regarding productivity improvement by VSM Study. OTHER EQUIPMENTS  Preparation of PLC Programming of new automation SSP Conveyer and installation and commissioning for better productivity fully automatic for better productivity.  Preparation of logic of straightening press self draw drawing, and made Panel.  Installation and commissioning of Fume killer supplied by Power pollution control Pvt. ltd.  Installation and commissioning of Band saw SPM make by I.T.L. Indore.  Day to day planning of fabrication in whole plant for W.C.M.  500 meter bitumen’s road have made at inside plant.  Day to day Maintenance of Weld shop Spot welding, Mig welding, Robotic Welding  Day to day planning of TPM and weekly schedule of M/c as per m/c requirement for TPM.    Daily to daily Maintenance of PLC and Drive based (Siemens, Allen beadily, Mesung, Mitsubishi) Plant m/c like that sheet metal Mechanical power Press shop, 40 T to 400 ton capacity Pneumatic type and hydraulic type,Blanking line (Novastilnec) cut to length line, Blanking line (Cetteneo Italy) , slating ling WB, NBL, MBL, Robot.  Day to day Maintenance of Weld shop Spot welding, Mig welding, Robotic Welding,  Day to day Maintenance of ETO Crane single girder and double girder.  Kaizen activities handled and total data prepared every month of all Maintenance department.  Per month working in energy consumption for running cost reduce of Maintenance.  Ladder logic have made for new PLC installation and commissioning as per M/c requirement, and correction of logic in PLC for safety, productivity.  As per Company requirement, MTTR, MTBF Data prepared and show weekly meeting of management.  Documentation wok prepared of like that Audit requirement TS - 16949, OHSAS – 18001, EMS-14001, Audit for EHS the data make like that Aspect Impact Analysis.  Preparation of Monthly preventive schedule, Annual preventive schedule,  Preventive, store, MTBF, MTTR, update in SAP software  Daily to daily Manpower planning for break down maintenance, Preventive Maintenance and settlement.  D
  • 4. Education: Three year Diploma in Electrical engineering from Jamshedpur institute of Engineering & Technology. - Intermediate from A.B.M COLLEGE, JAMSHEDPUR in 2005. IT Skills: Operating System: Windows (all platforms) Packages Known: MS Office (Word, PowerPoint, Excel), SAP Software, M.S Project PLC SOFTWARE; Knowledge of Gx Developers PLC software, working knowledge of RS logix, Codesys, Doxminy. And MS Project. Language: LADDER, STL Training Industrial Instrumentation and process control. Programmable logic controller Personal Details: Date of Birth: 08/02/1987 Marital Status: Married Strengths:  Excellent interpersonal Skills & dedicated.  Highly Assiduous and Quick Learner. Languages: English & Hindi