1. Resume for : Electrical Engineer
ROYAPPAN JOSEPH JESU RAJA
284-C, Vimala Lane,
Raja cross Street,
Kanmai Karai,
Madurai – Tamilnadu,
India. - 625016.
Emails : jose6112004@rediffmail.com,
: roym_joseph@yahoo.com
Mobile Phone No: +91 9003736502
CAREER OBJECTIVE
Erection and Installation of Electrical Transmission towers, Equipments, Switching
operations of High voltage switch gears &Transformers and Substation equipments
of the Facility’s via Scada/DCS Systems with power plants.
Ability to follow the IEC Standards and Codes for DCS Systems and specification
of earthling systems and calibration and Transmission line Survey
Familiarity with application of the HSE Management System with PTW Systems.
To be associated with a progressive organization that gives me scope to contribute
my knowledge, Experience and skill in the area of Electrical Instrumentation
Construction and Installations &Commissioning and hand over to the claiant.
VALID CERTIFICATES FOR OFFSHORE AND ONSHORE
*Sea Survival (BOSIET) OPITTO,
*Hv/Lv Switching Certificate,(Electrical Compatency)
*Offshore Medical,(OGUK)
*fully familiar the Ex zones classification and IP
*Experienced in PLC, SCADA, DCS, and HMI.
*familiar the Computerized Maintenance Management systems
QUALIFICATION
TOTOL EXPERANCE: 19Years
1, NTC2, NTC-Electrical Engineering, Singapore (Government of Singapore).
ITE-Bedok, Singapore.
3, VOCATIONAL TRADE CERTIFICATE IN ELECTRICAL (NCVT) Loyola
Poly Tech collage, Madurai-Tamilnadu. (Issued by Government of India)
2, Diploma in Electrical Engineering
KSO University, India, Electrical Competency Certificate. (High voltage)
4, “C” License Issued by State Government of Tamilnadu. (India.)
ADDITIONAL QUALIFICATIONS:
Windows XP, Windows & Dos Operating System,
Microsoft Power point, MS- Office and Word
AutoCAD millennium 2000
2. Resume for : Electrical Engineer
Languages Known to Speak and Write
Speak and Write : Tamil, English
Speak : Hindi, Arabic
Professional Experience
Right now I m working in Economic Engineering Company in India
Position: Electrical Engineer
Client: TNEB, ELGI, V-GREEP and power plants,turbines Industrial Group of Company’s
.
Details of Experience
11kv, 33kv, 66kv 110kv, 230kv-Transmission line Survey, Transmission line Construction,
Electrical Transmission Towers Installation Commissioning related substation equipment
installation, Switching operations. Maintenance and troubleshooting of high voltage
Transformers and switch gears, motors and Starters and inverters and Battery and Related
Instruments and control circuits in industrial sectors. And transformer oil testing, high pot
testing and Trouble shooting and repair of Transformer Control system, and fire alarms
Repair and service of electrical-equipment and Telephone, PA (announce system)
maintaining and repairing.dcs systems Trouble shoot and maintaining electrical
instruments. Fire sensors and emergency Generators. Maintaining with proper and safe
work procedure.
Employer: STG-DP3,
Vessel Name: Jascon-28, DP3
Position : Electrical Engineer
Duration : From December 2/2014 to March 30/2015
Accamandation vessel in Nigeria as Electrical Engineer, Testing of all Thruster and msb,
ups, motors trouble shooting and repairing maintenance additional facilities communication
net working doom installation and commissioning activities
Employer : Cal dive International (USA)
Vessel Name: Sea Horizon Rig/Derik and pipe laying vassal
Rotation : 3month Maintenance job
Position : Senior Electrical Supervisor and Tensioning machine operations.
Client : ONGC Worked as a Senior Electrician in Pipe Laying Barge in Gujarat offshore
Duration : From January 2/2014 to may 5/2014
Details of Experience
Maintaining the Power Generators, motors and inverters, Battery’s, Maintenance and
routine testing of fire sensors and emergency batteries. Power generation synchronizing
and distribution, blackout restoring. Maintaining and repairing of electrical deck crane and
overhead crane electrical motors and control system. Jacking motors torque check and
equalizing, D.C. Brake operation. Checks and maintenance. Power and lighting
arrangements for Jacket &Platform piling, welding and cementing Also giving training for
the trainees and guide the technicians for proper and safe work procedure.
Employer: Subsea7
Vessel Name: Antares Pipe Laying Barge
3. Resume for : Electrical Engineer
Position : Senior Electrical Technician in pipe laying department
Rotation : 35/35 Rotation job
Client : Chevron-ESCRAVOS GAS PROJECT PHASE ‘B’,
: Port hare court Exxon Mobile Platform pipe lay project.
Duration : From 1st November- 2011 to January 2013
Details of Experience in Subsea7
Performed installation, commissioning and Daily inspection and trouble shooting and repair
all the electrical systems and gear to inspect across the complete power plant and barge and
production platforms of new and repaired electrical equipment and Maintenance, well
heads in the offshore. Tested and validated the rigs electrical systems on a regular basis and
process required situations For Repaired, tested, troubleshoot, installed and connected
power supplies appliances, switchgear and voltage regulators and all type of relays also
solid state relays, all the type of AC motors of centrifugal pumps, compressors, sea water
pumps, Chain hoists and winches …etc., and their control circuits. Troubleshooting of all
electrical equipment’s, power and lighting panels. Preventive and break down maintenance
of D.C. and A.C. Motors with. Their related control instruments trouble shooting and
repairing and servicing of air conditioners and Battery charger, UPS and solar power panels
and lights and equipments installation and trouble shoot and repair for unmanned platforms.
HVAC System Installation and trouble shoot repair in the barge as well as process
platforms Worked as direct staff position in ‘SubSea7’ in Antares pipe lay Vessel in
Nigerian offshore in Chevron oil gas field, also worked in port Harcourt Exxon Mobile
platform pipe lay project. Pipe lay operation’s and all electrical and instrument’s
maintenance and trouble shooting and modifications of field requirements Winches, Chain
Hoists, motor and starters maintenance of pipe Tensioners, pot testing all the portable
equipments
Employer: WNPOC (with DietsmannTechnologies)
Client : WNPOG- south Sudan oilfields (PETRONAS MALAYSIA)
Position : Electrical Supervisor
Duration : From 19th May- 2006 to 5th Feb -2011
Rotation : 35/35 Rotation
Responsibility Details of Experience.
Maintenance of Power plant diesel combined with crude turbines produces 11kv output
with strep up substations 11/33kv,33/66kv with strep up substations using Transmission
towers transmit to 6o km surrounding area-RMU/CSS (Ring Main Unit/Compact
Substations,33kv/11kv/6.6/.430kv Systems), related with 150,400hp, 200hp, 250hp motors
for Esp. and PCP Drives pumps And CPF (Central Process Facility) 11/6/6kv to 6.6/.415 kv
to different voltages. And HT Pumps 6.6kv, entire substation 33kv panels& breakers
Transformers-1l/33kv, 33/6.6kv,6.6/.415kv, .250Kva to 25Mva and soft starters, VFD,
VSD Also Installations and commissioning and troubleshoot of compressors and water
injection plants for well heads and Ro-plant, desalination plant installation and maintenance
and running for back wash and membranes quality checks and better production yielding
for CPF and temporary installation for rigs and wellheads.
4. Resume for : Electrical Engineer
Especially attending break down maintenance of ACB,transmission tower insulator
corrective maintenance, periodic maintenance in this facility and experience in
construction and commissioning, inspection and as well us using measuring equipments
(ex) high pot, meggering, phasing, and continuity, ph sequence and Transformer oil
dielectric strength Testing as per IEC standards of commissioning and Start-up, and
maintains of transformers HT, LT, Breakers, Protection Relays, vacuum and sf6 and air
circuit Breakers to related control circuits alarms and signals checking and full loop
checking of inputs and output DCS Signals, LV/HV motors, LV/HV switchgear, If any
power interruption occurs in the systems trouble shoot as soon as possible make it healthy
and normalize the power for all areas. And maintaining the power and HVAC System and
MDB, Fire Alarm system, cathodes production, Heat Tracing System, Chemical Injection
Skids, multi Phase flowmetor and flow Instruments without failure for all the well heads
and CPF facilities and accomantaitions
Employer: Dynamac Engineering-co, FPSO Construction &Commissioning Projects
Singapore.
Role : E&I Supervisor
Main contractor: Single Bouy Mooring Inch
Owner : PETRO BRAZIL
Duration : August 2003 to November 2005
Responsibility & Details of Experience
Worked As an E&I SUPERVISOR Involved Installation of cable ladder and tray
instrument supports and module lighting and enclosure (Ex.D Flam Roof) for lighting and
electrical & instruments. Switchgears and Control panels and compressors for instruments
air also different purpose Motor’s, solar panels related equipments and Transformers (ExE,
ExO) as per our client requirement (IEC standards) in the facility. As per P&ID drawings
and commissioning of electrical and instruments all over the projects, productive Relays
Testing & commissioning as per ANCI code and all the Equipments’ calibration in the
FPSO, estimated time schedule in heavy Pressures and coordinating with Electrical and
instruments technicians to do proper way of installation and commissioning. And guide the
contractors to do their work in staff & fallow the Standards and good environmental
condition, and issuing the Drawings and preparing the material and scheduling the work for
correct time and date and maintaining the quality control and quality assurance in this
project.
Details of Experience in EMAR Company in IRAQ
Role : PLANT E&I Engineer (ROWPO)
Client : KBR (Kellogg Brown & Root)
Duration: November 2002 may2003
Responsibility & Details of Experience
Plant installation and maintenance and commissioning job for KBR (Kellogg Brown and
Root)in Iraq in various places for KBR clients in Iraq province for Install the water
purification unit and electrical and instruments. Commissioning the equipments and the
PLC Programming and do to the full loop Check and run the plant 24 hour non-stops and
hand over the Kbr the subcontractor is EMAR Kuwait.
5. Resume for : Electrical Engineer
Details of Experience in KURIHARA KOGYO-CO. LTD., Singapore
1, Role : Electrical and Instrumentation Supervisor
Client : Selator Sewerage Treatment Works Phase III Extension project
Duration: October 1996 to December 1998
Responsibility & Details of Experience
Simulation test for overall electrical equipment (Alsthom) VFD and related 400 KW
Motors power & Control system checking and commission. Field Instrument installation,
Calibration and Loop checking as per ENV Specification and quality of standard.
Installation of marshalling cabinet and carried out internal wiring according to the
Approved drawing. To check I/O Points and set points of the tripping and protection
System with the conveyer system and combine with DCS System
2, Role : Electrical and Instrumentation Supervisor
Client : Kanji Sewerage Treatment Works Phase – III
Duration: January 1999 to December 2000
Responsibility & Details of Experience
Leading a team which is involved in installations of instrument, power cable insulation
testing, Loop checking and commissioning process related equipment and instruments.
Trouble shooting DCS processor and card failure, I/O points checking with FOXPRO
System engineers. Preparation of the progress reports, participation in the progress meeting
and submit progress Report to Management Team
Details of Experience in SAUDI ARABIA in Al-Mary contracting –co, ksa
1, Role : Industrial Electrical Foreman
Client : 1, Zuluf wet crude oil handling project (Aram co)
Duration: October 1992to November 1993
Responsibility & Details of Experience
Installing and commissioning of Transformer and switchgears. Supervision of cable
pulling, Glanding and termination. Installation of plant lighting and ups system in the Gas
plant and Honey well DCS system Modification job
2, Role : Industrial Electrical Foreman
Client : 2, Marjan onshore project (Aram co)
Duration: October 1993Novemberto March 1994
Responsibility & Details of Experience
Installation and Commissioning of flame proof equipment and switch gears , transformers ,
Plant lighting and ups system in the gas plant and MCC side relays changed checked the
Trip Amps as per Armco Specification .
Company: Annai Electrical at Madurai, India.
Role : Industrial Electrical Technician
Duration: 1990to 1991
Supervised and Lead a team in different kind of Industrial and domestic equipments
Erection and Installation and Commissioning.
Role : Electrical Technician
Company: Balaji Ferro Industries at Madurai, India.
6. Resume for : Electrical Engineer
Duration : 1988to 1990
Working as an Electrical Technician to carried out the Metal forging Industries equipments
Trouble shooting and single phase & three phase metal forging units control circuit trouble
Shooting and installation of motors with control drives installation and commissioning and
Maintenances of preventive & periodic and corrective up to 200 hp motors and 11/.415 kv
150Kv-up to 500kva Power Transformers.
PERSONAL PROFILE
Name : R.JOSEPH JESU RAJA
Father’s Name : M.ROYAPPAN
Mother’s Name : R.Mary
PERSONAL
Outgoing enthusiastic eager to learn new things, team member and have excellent
Communication skills.
Date of Birth : 05-04-1967
Place of Birth : Michael Pattinam
Marital Status : Married
Nationality : Indian.
PASSPORT DETAILS
Passport No: J4157723 Place of Issue: Madurai.
Date of Issue: 03.12.2011 Date of Expiry: 02:12:2020
REFERENCE
1, Mohammad Rizal
email:rizalpahlavy@yahoo.com
position: Transmission Team leader,
company: WNPOC (PETRONAS)
hand phone:0060163375410.
2, Evans Antony Sam
email:jasevan2012@gmail.com
Company: Economic Engineering Company
Position: Project Engineer
Hand Phone: 00919940926835
DECLARATION
I hereby declare that the above information furnished is true to the best of my
knowledge and belief.
Place : Madurai
Date : 07 April, 2016