SlideShare a Scribd company logo
1 of 3
VIVEK KUMAR SINGH 
Mobile: +91-9009799817~E-Mail: vivek_04123@rediffmail.com 
JOB OBJECTIVE 
Seeking senior level assignments in Mechanized (TBM) Tunnelling, Energy Management, Installation & Commissioning / 
Operations & Maintenance / Process Enhancement / Team Management with an organisation of high repute. 
PROFILE SUMMARY 
· Nearly 8 years of experience in Electrical Energy Action Planning, Operations & Maintenance, Installation, Commissioning 
&Testing (H.T & L.T switchgears ,Drives,PLC’s ,Sensors, & Electromechanical Instruments ), Process Enhancement and 
Team Management with Primary (Beginner) knowledge of PLC Programming and SCADA. 
· Expertise in Electrical Energy Management (Load Management, Tariff Analysis and Saving Electricity Consumption in 
terms of Electricity Bill & Fuel in Power Generating Sets.) 
· Experience in proper selection of Electric Energy Facility/Utility, Cable Scheduling for Power, Control & Instrument Cable 
for the entire plant & Bare Conductor for overhead Transmission. 
· Expertise in coordinating, planning and implementing changes to technology, machinery and equipment, process 
methodology, direction of quality assurance and control systems & reporting procedures 
· Experience in managing maintenance operations for reducing breakdown / downtime & enhancing operational 
effectiveness of equipment 
· An effective communicator with excellent relationship management skills and strong analytical, leadership, decision 
making, problem solving & organizational abilities 
· Nearly 02 years technical teaching experience. 
CORE COMPETENCIES 
· Monitoring cost & time over-runs to ensure execution of projects within budget and preparing various project reports, etc. 
· Spearheading activities involving working out requirements & monitoring plant operations for ensuring timely completion 
· Ensuring execution of preventive maintenance schedules to ensure trouble free and seamless plant operations 
· Preparing project reports for identifying areas of obstruction, conducting troubleshooting and repair to rectify equipment 
· Anchoring on-site installation & commissioning activities to ensure completion of project within the time & cost 
parameters and effective resource utilisation to maximise the output 
· Identifying scope for planning / implementing technological changes to enhance efficiency, modifications in equipment, 
process flow, working practices, consumables, etc. 
· Leading, mentoring & monitoring performance of team members to ensure efficiency in operations and meeting of targets 
· Good Liaisoning skills for smooth functioning of project. 
· Good understanding for Indian Electricity Rules & Indian Electricity Act. 
ORGANISATIONAL EXPERIENCE 
Since March 2010 : Coastal Projects Ltd., H.O. Hydrabad (A.P.) as Sr. Dy. Manager Tunnel/ (Electrical) 
Role: TBM Tunnelling 
· Managing erection of 3100 KVA X 02, 2000 KVA X01 Air Cooled Transformers and Control Circuitry of E.P.B machine 
with ROBBINS. 
· Material Planning, Handling Logistics, Production Planning for Tunnel. 
· Planning & Execution for 33 KV Cable Joint, Operation & Maintenance for Electrical/Automation, Dewatering setup in 
the TBM. 
· Erection ,Commissioning ,O&M For Hany Make 800 litre capacity Grout Plant along with Gantry & EOT Cranes, Atlas 
Copco Compressors,R.O Plant,Ventillation Drives ,Conveyor system & other related activities, equipments related to 
TBM Tunnelling. 
INTERVENTION FOR CUTTERHEAD
· Commissioning, Operation & Maintenance, Organizing & Conducting Cutter head Intervention in Hyperbaric mode in 
consultation with a) Tony Ridley Hyperbaric Associates b) Robbins Expat c) Frogman underwater services. 
· Overall System Setup which includes Samson Valves, PID Controllers, Pipe Line for Compressed air, Man Lock Chamber 
& Equipment Chamber. Well equipped with Programming for PID Controllers. 
· Qualified for working in Hyperbaric Condition for changing Cutters in EPB Mode, tested up to 1.6 Bar. 
· Looking after activities for networking (I.L.P & LAN) and communication at the site and inside the Tunnel. 
From Feb 2009 to March 2010: Coastal Projects Limited: As a Deputy Manager (Electrical) 
· Developing electrical drawings under I.E. norms and interacting with the Govt. Dept. for approval and Power-Permission. 
· Responsible for handling construction power, carrying out de-watering rate analysis and deciding necessary operations 
for the same. 
· Working on Crusher Plant (250 T.P.H, Puzolana), Batching Plant (60 m cub, Swing –Stetter), Compressor GA110 and GA75 
complete electrification, commissioning & operation & maintenance. 
· Anchoring erection, testing, commissioning and maintenance of 33/.433 KV (2 MVAX 02, 1 MVA X 02), 11/.433 KV (200 
KVA) S/S with 15 KM overhead 33 KV H. T. Line (Sanctioned Maximum Demand of 6 MVA) 
· Monitoring electrical power consumption, meter reading & electric bill and taking necessary actions to reduce the losses, 
thereby, minimising the electric bill (following M.P. tariff) 
· Ensuring smooth functioning and executing calibration of instrumentation required to access level of energy consumption 
· Managing the complete responsibility for Electrical Dept., starting from manpower, planning, estimating and costing, 
implementations and monitoring safety aspects & decision making 
· 
Highlights: 
· Initiated cost savings through energy conservation by 8 - 10%, increased power factor from 0.85 to 0.99 & lower the 
Demand up to 1000 KVA. 
· Exercised control over the manpower and successfully achieved the desired results 
· Worked on prefeasibility report of 60 MW HEP in Nepal for estimating Annual Energy Generation, PLF and Tariff 
Calculation from given Financial Data. 
Project Handled: 
· Salemabad Carrier Canal Project, 13 km Open Canal and 12 km Underground Tunnel (10 m dia.) with TBM (E.P.B.) 
Katni, (Madhya Pradesh) 
Jun’07 – Feb’09 Patel Engineering Ltd., H.O. Mumbai (Maharashtra) as Assistant Engineer (Electrical, for H.R.T) 
Role: Manual Tunnelling 
· Handled HEAD RACE TUNNEL with 02 No. Adits ,right from conceptualization to Commissioning for Electrical 
Installations, planning, and handling manpower for both the shifts 
· Executed the electrical installations, commissioning & maintenance 05 Nos. 11/.440 KV Distribution Transformers at the 
Portal and inside the tunnel. 
· Executed electrification / commissioning, operations and maintenance of Crusher-Plant (120 T.P.H., NAWA), Batching 
Plant (30 m cub. AJAX FIORI), Boomer’s , Air-Compressors (GA 90, ATLAS COPCO) & Ventilation System for the Tunnel 
Highlights: 
· Gained exposure over V.F.D’s, Soft Starters & PLC Panels (Installation & Programming)’, and Different type of Sensors & 
Transducers along with parameter settings, calibration and troubleshooting. 
Project Handled: 
· Loharinag-Pala Hydro Electric Project (600 MW.) with NTPC Ltd. Bhatwari, Uttarkashi (Uttarakhand) 
PROFESSIONAL TRAINING 
· Undergone one month training program in Veligonda Tunnel 1 and 2 in Dornala in AndraPradesh for TBM with Robins 
(American) and UKT (German) from Coastal 
· Undergone implant training in Electrical and Instrumentation section from Ordnance Factory Chanda Estate, Bhadrawati 
· Certified PLC Programmer through Prolific Systems & Technologies Pvt. Ltd. (one month training Course).Modules 
covered ALLEN BRADELY & SIMENS PLC, SCADA (WONDERWARE). (Beginner) 
EDUCATION
· Master of Engineering in Instrumentation & Control from B.I.T., Mesra, Ranchi in 2007 with 8.0 CGPA 
· Bachelor of Engineering in Electronics from S.G.G.S.C.E. &T, Nanded in 2002 with 67.23% 
PROFESSIONAL ENHANCEMENT 
· Certified ENERGY MANAGER, National Certification Examination on the behalf of the Bureau of Energy Efficiency Ministry 
of Power Govt. of India. (Reg.No. EA-15135, Year of Passing-Sep’12) 
· ‘A’ Class Electrical Supervisory License through Govt.of Madhya Pradesh (License No. 6667) 
IT SKILLS 
· Well versed with MS Office, word, power point, Internet Applications & good exposure to e-tendering. 
· Well versed with LAN & Wireless Router System at the project site with (troubleshooting & setting router for proper 
functioning) 
PERSONAL DETAILS 
Date of Birth : 28 September, 1979 
Present Address : 01-Harsh Nagar, Near Collectorate, Katni, M.P (483501 
Permanent Address : Village: Siktha, Post - Dheena, District – Chandaulli, (U.P.) 
Languages Known : Engilish and Hindi 
Present Package : Rs 83278/ per month +, Boarding at near 
Site. Transportation, Insurance, P.F., Bonous, as per company 
Rules & relegations. 
Expected Package : Negotiable and depends upon working environment. 
Joining Time : 30 days after getting joining letter. 
Pass Port No. : L3955380 
Place: Katni (Madhya Pradesh) Vivek Kumar Singh 
Date: 10/11/2014

More Related Content

What's hot

BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEERBE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEERGanesan Raja
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resumeprasunkishoreroy
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))MOHAMMAD KHALID MUSTAFA
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
 
New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume AjayAjay kumar
 

What's hot (20)

BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEERBE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resume
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Commission resume
Commission resumeCommission resume
Commission resume
 
New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume Ajay
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
 
CHANDER PRAKASH
CHANDER PRAKASHCHANDER PRAKASH
CHANDER PRAKASH
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 

Similar to NEW CV (20)

Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Resume
ResumeResume
Resume
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
venkatCV
venkatCVvenkatCV
venkatCV
 
deo@dipankar.doc
deo@dipankar.docdeo@dipankar.doc
deo@dipankar.doc
 
Bhushan warghane 1_
Bhushan warghane 1_Bhushan warghane 1_
Bhushan warghane 1_
 
Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
My resume
My resumeMy resume
My resume
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
Loganathan Resume
Loganathan ResumeLoganathan Resume
Loganathan Resume
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
sathish kannan EEE
sathish kannan EEEsathish kannan EEE
sathish kannan EEE
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
 
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
 
Cv
CvCv
Cv
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 

NEW CV

  • 1. VIVEK KUMAR SINGH Mobile: +91-9009799817~E-Mail: vivek_04123@rediffmail.com JOB OBJECTIVE Seeking senior level assignments in Mechanized (TBM) Tunnelling, Energy Management, Installation & Commissioning / Operations & Maintenance / Process Enhancement / Team Management with an organisation of high repute. PROFILE SUMMARY · Nearly 8 years of experience in Electrical Energy Action Planning, Operations & Maintenance, Installation, Commissioning &Testing (H.T & L.T switchgears ,Drives,PLC’s ,Sensors, & Electromechanical Instruments ), Process Enhancement and Team Management with Primary (Beginner) knowledge of PLC Programming and SCADA. · Expertise in Electrical Energy Management (Load Management, Tariff Analysis and Saving Electricity Consumption in terms of Electricity Bill & Fuel in Power Generating Sets.) · Experience in proper selection of Electric Energy Facility/Utility, Cable Scheduling for Power, Control & Instrument Cable for the entire plant & Bare Conductor for overhead Transmission. · Expertise in coordinating, planning and implementing changes to technology, machinery and equipment, process methodology, direction of quality assurance and control systems & reporting procedures · Experience in managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment · An effective communicator with excellent relationship management skills and strong analytical, leadership, decision making, problem solving & organizational abilities · Nearly 02 years technical teaching experience. CORE COMPETENCIES · Monitoring cost & time over-runs to ensure execution of projects within budget and preparing various project reports, etc. · Spearheading activities involving working out requirements & monitoring plant operations for ensuring timely completion · Ensuring execution of preventive maintenance schedules to ensure trouble free and seamless plant operations · Preparing project reports for identifying areas of obstruction, conducting troubleshooting and repair to rectify equipment · Anchoring on-site installation & commissioning activities to ensure completion of project within the time & cost parameters and effective resource utilisation to maximise the output · Identifying scope for planning / implementing technological changes to enhance efficiency, modifications in equipment, process flow, working practices, consumables, etc. · Leading, mentoring & monitoring performance of team members to ensure efficiency in operations and meeting of targets · Good Liaisoning skills for smooth functioning of project. · Good understanding for Indian Electricity Rules & Indian Electricity Act. ORGANISATIONAL EXPERIENCE Since March 2010 : Coastal Projects Ltd., H.O. Hydrabad (A.P.) as Sr. Dy. Manager Tunnel/ (Electrical) Role: TBM Tunnelling · Managing erection of 3100 KVA X 02, 2000 KVA X01 Air Cooled Transformers and Control Circuitry of E.P.B machine with ROBBINS. · Material Planning, Handling Logistics, Production Planning for Tunnel. · Planning & Execution for 33 KV Cable Joint, Operation & Maintenance for Electrical/Automation, Dewatering setup in the TBM. · Erection ,Commissioning ,O&M For Hany Make 800 litre capacity Grout Plant along with Gantry & EOT Cranes, Atlas Copco Compressors,R.O Plant,Ventillation Drives ,Conveyor system & other related activities, equipments related to TBM Tunnelling. INTERVENTION FOR CUTTERHEAD
  • 2. · Commissioning, Operation & Maintenance, Organizing & Conducting Cutter head Intervention in Hyperbaric mode in consultation with a) Tony Ridley Hyperbaric Associates b) Robbins Expat c) Frogman underwater services. · Overall System Setup which includes Samson Valves, PID Controllers, Pipe Line for Compressed air, Man Lock Chamber & Equipment Chamber. Well equipped with Programming for PID Controllers. · Qualified for working in Hyperbaric Condition for changing Cutters in EPB Mode, tested up to 1.6 Bar. · Looking after activities for networking (I.L.P & LAN) and communication at the site and inside the Tunnel. From Feb 2009 to March 2010: Coastal Projects Limited: As a Deputy Manager (Electrical) · Developing electrical drawings under I.E. norms and interacting with the Govt. Dept. for approval and Power-Permission. · Responsible for handling construction power, carrying out de-watering rate analysis and deciding necessary operations for the same. · Working on Crusher Plant (250 T.P.H, Puzolana), Batching Plant (60 m cub, Swing –Stetter), Compressor GA110 and GA75 complete electrification, commissioning & operation & maintenance. · Anchoring erection, testing, commissioning and maintenance of 33/.433 KV (2 MVAX 02, 1 MVA X 02), 11/.433 KV (200 KVA) S/S with 15 KM overhead 33 KV H. T. Line (Sanctioned Maximum Demand of 6 MVA) · Monitoring electrical power consumption, meter reading & electric bill and taking necessary actions to reduce the losses, thereby, minimising the electric bill (following M.P. tariff) · Ensuring smooth functioning and executing calibration of instrumentation required to access level of energy consumption · Managing the complete responsibility for Electrical Dept., starting from manpower, planning, estimating and costing, implementations and monitoring safety aspects & decision making · Highlights: · Initiated cost savings through energy conservation by 8 - 10%, increased power factor from 0.85 to 0.99 & lower the Demand up to 1000 KVA. · Exercised control over the manpower and successfully achieved the desired results · Worked on prefeasibility report of 60 MW HEP in Nepal for estimating Annual Energy Generation, PLF and Tariff Calculation from given Financial Data. Project Handled: · Salemabad Carrier Canal Project, 13 km Open Canal and 12 km Underground Tunnel (10 m dia.) with TBM (E.P.B.) Katni, (Madhya Pradesh) Jun’07 – Feb’09 Patel Engineering Ltd., H.O. Mumbai (Maharashtra) as Assistant Engineer (Electrical, for H.R.T) Role: Manual Tunnelling · Handled HEAD RACE TUNNEL with 02 No. Adits ,right from conceptualization to Commissioning for Electrical Installations, planning, and handling manpower for both the shifts · Executed the electrical installations, commissioning & maintenance 05 Nos. 11/.440 KV Distribution Transformers at the Portal and inside the tunnel. · Executed electrification / commissioning, operations and maintenance of Crusher-Plant (120 T.P.H., NAWA), Batching Plant (30 m cub. AJAX FIORI), Boomer’s , Air-Compressors (GA 90, ATLAS COPCO) & Ventilation System for the Tunnel Highlights: · Gained exposure over V.F.D’s, Soft Starters & PLC Panels (Installation & Programming)’, and Different type of Sensors & Transducers along with parameter settings, calibration and troubleshooting. Project Handled: · Loharinag-Pala Hydro Electric Project (600 MW.) with NTPC Ltd. Bhatwari, Uttarkashi (Uttarakhand) PROFESSIONAL TRAINING · Undergone one month training program in Veligonda Tunnel 1 and 2 in Dornala in AndraPradesh for TBM with Robins (American) and UKT (German) from Coastal · Undergone implant training in Electrical and Instrumentation section from Ordnance Factory Chanda Estate, Bhadrawati · Certified PLC Programmer through Prolific Systems & Technologies Pvt. Ltd. (one month training Course).Modules covered ALLEN BRADELY & SIMENS PLC, SCADA (WONDERWARE). (Beginner) EDUCATION
  • 3. · Master of Engineering in Instrumentation & Control from B.I.T., Mesra, Ranchi in 2007 with 8.0 CGPA · Bachelor of Engineering in Electronics from S.G.G.S.C.E. &T, Nanded in 2002 with 67.23% PROFESSIONAL ENHANCEMENT · Certified ENERGY MANAGER, National Certification Examination on the behalf of the Bureau of Energy Efficiency Ministry of Power Govt. of India. (Reg.No. EA-15135, Year of Passing-Sep’12) · ‘A’ Class Electrical Supervisory License through Govt.of Madhya Pradesh (License No. 6667) IT SKILLS · Well versed with MS Office, word, power point, Internet Applications & good exposure to e-tendering. · Well versed with LAN & Wireless Router System at the project site with (troubleshooting & setting router for proper functioning) PERSONAL DETAILS Date of Birth : 28 September, 1979 Present Address : 01-Harsh Nagar, Near Collectorate, Katni, M.P (483501 Permanent Address : Village: Siktha, Post - Dheena, District – Chandaulli, (U.P.) Languages Known : Engilish and Hindi Present Package : Rs 83278/ per month +, Boarding at near Site. Transportation, Insurance, P.F., Bonous, as per company Rules & relegations. Expected Package : Negotiable and depends upon working environment. Joining Time : 30 days after getting joining letter. Pass Port No. : L3955380 Place: Katni (Madhya Pradesh) Vivek Kumar Singh Date: 10/11/2014