1. VIVEK KUMAR SINGH
Mobile: +91-9009799817~E-Mail: vivek_04123@rediffmail.com
JOB OBJECTIVE
Seeking senior level assignments in Mechanized (TBM) Tunnelling, Energy Management, Installation & Commissioning /
Operations & Maintenance / Process Enhancement / Team Management with an organisation of high repute.
PROFILE SUMMARY
· Nearly 8 years of experience in Electrical Energy Action Planning, Operations & Maintenance, Installation, Commissioning
&Testing (H.T & L.T switchgears ,Drives,PLC’s ,Sensors, & Electromechanical Instruments ), Process Enhancement and
Team Management with Primary (Beginner) knowledge of PLC Programming and SCADA.
· Expertise in Electrical Energy Management (Load Management, Tariff Analysis and Saving Electricity Consumption in
terms of Electricity Bill & Fuel in Power Generating Sets.)
· Experience in proper selection of Electric Energy Facility/Utility, Cable Scheduling for Power, Control & Instrument Cable
for the entire plant & Bare Conductor for overhead Transmission.
· Expertise in coordinating, planning and implementing changes to technology, machinery and equipment, process
methodology, direction of quality assurance and control systems & reporting procedures
· Experience in managing maintenance operations for reducing breakdown / downtime & enhancing operational
effectiveness of equipment
· An effective communicator with excellent relationship management skills and strong analytical, leadership, decision
making, problem solving & organizational abilities
· Nearly 02 years technical teaching experience.
CORE COMPETENCIES
· Monitoring cost & time over-runs to ensure execution of projects within budget and preparing various project reports, etc.
· Spearheading activities involving working out requirements & monitoring plant operations for ensuring timely completion
· Ensuring execution of preventive maintenance schedules to ensure trouble free and seamless plant operations
· Preparing project reports for identifying areas of obstruction, conducting troubleshooting and repair to rectify equipment
· Anchoring on-site installation & commissioning activities to ensure completion of project within the time & cost
parameters and effective resource utilisation to maximise the output
· Identifying scope for planning / implementing technological changes to enhance efficiency, modifications in equipment,
process flow, working practices, consumables, etc.
· Leading, mentoring & monitoring performance of team members to ensure efficiency in operations and meeting of targets
· Good Liaisoning skills for smooth functioning of project.
· Good understanding for Indian Electricity Rules & Indian Electricity Act.
ORGANISATIONAL EXPERIENCE
Since March 2010 : Coastal Projects Ltd., H.O. Hydrabad (A.P.) as Sr. Dy. Manager Tunnel/ (Electrical)
Role: TBM Tunnelling
· Managing erection of 3100 KVA X 02, 2000 KVA X01 Air Cooled Transformers and Control Circuitry of E.P.B machine
with ROBBINS.
· Material Planning, Handling Logistics, Production Planning for Tunnel.
· Planning & Execution for 33 KV Cable Joint, Operation & Maintenance for Electrical/Automation, Dewatering setup in
the TBM.
· Erection ,Commissioning ,O&M For Hany Make 800 litre capacity Grout Plant along with Gantry & EOT Cranes, Atlas
Copco Compressors,R.O Plant,Ventillation Drives ,Conveyor system & other related activities, equipments related to
TBM Tunnelling.
INTERVENTION FOR CUTTERHEAD
2. · Commissioning, Operation & Maintenance, Organizing & Conducting Cutter head Intervention in Hyperbaric mode in
consultation with a) Tony Ridley Hyperbaric Associates b) Robbins Expat c) Frogman underwater services.
· Overall System Setup which includes Samson Valves, PID Controllers, Pipe Line for Compressed air, Man Lock Chamber
& Equipment Chamber. Well equipped with Programming for PID Controllers.
· Qualified for working in Hyperbaric Condition for changing Cutters in EPB Mode, tested up to 1.6 Bar.
· Looking after activities for networking (I.L.P & LAN) and communication at the site and inside the Tunnel.
From Feb 2009 to March 2010: Coastal Projects Limited: As a Deputy Manager (Electrical)
· Developing electrical drawings under I.E. norms and interacting with the Govt. Dept. for approval and Power-Permission.
· Responsible for handling construction power, carrying out de-watering rate analysis and deciding necessary operations
for the same.
· Working on Crusher Plant (250 T.P.H, Puzolana), Batching Plant (60 m cub, Swing –Stetter), Compressor GA110 and GA75
complete electrification, commissioning & operation & maintenance.
· Anchoring erection, testing, commissioning and maintenance of 33/.433 KV (2 MVAX 02, 1 MVA X 02), 11/.433 KV (200
KVA) S/S with 15 KM overhead 33 KV H. T. Line (Sanctioned Maximum Demand of 6 MVA)
· Monitoring electrical power consumption, meter reading & electric bill and taking necessary actions to reduce the losses,
thereby, minimising the electric bill (following M.P. tariff)
· Ensuring smooth functioning and executing calibration of instrumentation required to access level of energy consumption
· Managing the complete responsibility for Electrical Dept., starting from manpower, planning, estimating and costing,
implementations and monitoring safety aspects & decision making
·
Highlights:
· Initiated cost savings through energy conservation by 8 - 10%, increased power factor from 0.85 to 0.99 & lower the
Demand up to 1000 KVA.
· Exercised control over the manpower and successfully achieved the desired results
· Worked on prefeasibility report of 60 MW HEP in Nepal for estimating Annual Energy Generation, PLF and Tariff
Calculation from given Financial Data.
Project Handled:
· Salemabad Carrier Canal Project, 13 km Open Canal and 12 km Underground Tunnel (10 m dia.) with TBM (E.P.B.)
Katni, (Madhya Pradesh)
Jun’07 – Feb’09 Patel Engineering Ltd., H.O. Mumbai (Maharashtra) as Assistant Engineer (Electrical, for H.R.T)
Role: Manual Tunnelling
· Handled HEAD RACE TUNNEL with 02 No. Adits ,right from conceptualization to Commissioning for Electrical
Installations, planning, and handling manpower for both the shifts
· Executed the electrical installations, commissioning & maintenance 05 Nos. 11/.440 KV Distribution Transformers at the
Portal and inside the tunnel.
· Executed electrification / commissioning, operations and maintenance of Crusher-Plant (120 T.P.H., NAWA), Batching
Plant (30 m cub. AJAX FIORI), Boomer’s , Air-Compressors (GA 90, ATLAS COPCO) & Ventilation System for the Tunnel
Highlights:
· Gained exposure over V.F.D’s, Soft Starters & PLC Panels (Installation & Programming)’, and Different type of Sensors &
Transducers along with parameter settings, calibration and troubleshooting.
Project Handled:
· Loharinag-Pala Hydro Electric Project (600 MW.) with NTPC Ltd. Bhatwari, Uttarkashi (Uttarakhand)
PROFESSIONAL TRAINING
· Undergone one month training program in Veligonda Tunnel 1 and 2 in Dornala in AndraPradesh for TBM with Robins
(American) and UKT (German) from Coastal
· Undergone implant training in Electrical and Instrumentation section from Ordnance Factory Chanda Estate, Bhadrawati
· Certified PLC Programmer through Prolific Systems & Technologies Pvt. Ltd. (one month training Course).Modules
covered ALLEN BRADELY & SIMENS PLC, SCADA (WONDERWARE). (Beginner)
EDUCATION
3. · Master of Engineering in Instrumentation & Control from B.I.T., Mesra, Ranchi in 2007 with 8.0 CGPA
· Bachelor of Engineering in Electronics from S.G.G.S.C.E. &T, Nanded in 2002 with 67.23%
PROFESSIONAL ENHANCEMENT
· Certified ENERGY MANAGER, National Certification Examination on the behalf of the Bureau of Energy Efficiency Ministry
of Power Govt. of India. (Reg.No. EA-15135, Year of Passing-Sep’12)
· ‘A’ Class Electrical Supervisory License through Govt.of Madhya Pradesh (License No. 6667)
IT SKILLS
· Well versed with MS Office, word, power point, Internet Applications & good exposure to e-tendering.
· Well versed with LAN & Wireless Router System at the project site with (troubleshooting & setting router for proper
functioning)
PERSONAL DETAILS
Date of Birth : 28 September, 1979
Present Address : 01-Harsh Nagar, Near Collectorate, Katni, M.P (483501
Permanent Address : Village: Siktha, Post - Dheena, District – Chandaulli, (U.P.)
Languages Known : Engilish and Hindi
Present Package : Rs 83278/ per month +, Boarding at near
Site. Transportation, Insurance, P.F., Bonous, as per company
Rules & relegations.
Expected Package : Negotiable and depends upon working environment.
Joining Time : 30 days after getting joining letter.
Pass Port No. : L3955380
Place: Katni (Madhya Pradesh) Vivek Kumar Singh
Date: 10/11/2014