SlideShare a Scribd company logo
1 of 4
CV
Nadim Ahmad Siddique
ICA Engineer
Mechanical, Electrical & Process Engineering (MEP) Department
Email:- nadim7862@gmail.com
Mob:- +91-9540754635
Profile Key experience Profession
Nadim Ahmad Siddique is an Instrumentation
& Control Engineer with over 8 years’
experience mostof which was gathered in the
Proposal & Design.He also has project
experience in the Oil & Gas sector.
His key areas ofexpertise include:
 Proposal (tendering),
 Detailed Design Engineering,
 Preparation of Equipment
Specifications
 Technical coordination.
 Possess domain understanding
of operations including
Estimation and Costing of
Complete Instrument’s and
Electrical Package.
 Water Intake and Pipelines,
Water Treatment
Plants/STP/ETP ,Pumping
Stations
 DevelopmentofBasic Eng.
Package.
 Preparation of Technical
Specification for Instrumentation
and Electrical
 DevelopmentofEquipment
Specs and Evaluation
 Proven success in Installation
and commissioning ofPLC,
SCADA system,Foundation
Field Bus Instruments
ICA Engineer,Member IET,
I Eng.(IET)
Proposal & Design Exp.
Feb’ 2010 to till date
Nationality / Languages
Indian
Qualifications
B.Tech (Instrumentation
Engg)2007,Dip.In Engg.
(Instrumentation)2004,Pursuing
PGDBM
Professional associations
MIET, IEng
Experience with Atkins (December 2012 – Current)
ICA Engineer - Mechanical, Electrical and Process (MEP) Engineering Division. :
Currently busy with detail designing ofcomplete E&I system for WessexWater Pumping Stations Scheme (UK),Air Main
Unit, Mogdan, Thames Water,completed Detail Design ofElectrical & Instrumentation for Complete Pumping stations for
RESC Riyadh Saudi Arabia and have technically helped for PreliminaryDesign for Instrumentation ofPumping stations
for North Wathba , Abu Dhabi . Have completed Detail Designing ofInstrumentation and control for Camp Hill Pumping
Station, UK. Part of Tendering Team for Bidding.
Involved in following projects Instrument & Control Preliminary / Detailed Engineering
 Eastergate, Westergate & Farlington WTW UV Treatment Scheme, Portsmouth Water plc, UK:
Comprise of new UV treatment plants for Eastergate and Westergate facilities for the inactivation of
cryptosporidium and to deal with turbidity issues at the sources. Portsmouth Water (PW) has
included an improvement scheme at Farlington WTW (100 MLD) in their AMP 6 business plan. The
improvements at Farlington included replacement of the existing membrane filtration plant with
ultraviolet (UV) disinfection.
In charge of detail design and contract documents for interfacing new PLC with existing SCADA
system.
 Wivelsfield WTW detail design, Morrison Utility Services, Southern Water, U.K : The proposed
refurbishment involves the replacement of the main site MCC / switchboard to cope with the
CV
increased electrical load, new intermediate submersible pumping station, new standby generator,
modifications to the percolating filters distribution chamber, new humus tanks distribution chamber,
new airlift auto-desludging to the Primary Settlement Tanks (PSTs) and humus tanks, new 9m
diameter radial flow humus tank, new final effluent and flow measurement chamber, pumped
recirculation line and new collection manholes.
In charge of detail design and contract documents for interfacing new PLC with existing SCADA
system. Worked closely with the contractor to develop control philosophy, cable & Instrument
schedule, Field Instrument data sheet, Instrument Hook-Up drawings etc for above scheme.
 Farmersville WWTP, City of Farmersville, California, USA: Technical review of the Facilities Plan,
Atkins considered a number of scenarios for consideration for the future wastewater treatment needs
of the City of Farmersville. These included the options of Oxidation Ditch, Aeration Lanes, Primary
Treatment/Anaerobic Digestion and a Retrofit to the Biolac to Aeration Ponds.
Involved with 60% design work and developed PLC System Architecture interfacing with SCADA,
Typical Loop Wiring Drawings and outline field instrument data sheets from concept design.
 Development of North Al Wathba Infrastructure, Abu Dhabi: Preliminary & Detailed Design
Packages for PLC based Pump Stations of Potable Water Reservoirs (Capacity 66,500 MLD) to
cater to the entire development of Residential and Commercial Infrastructure comprising of
Mosques, Schools, Healthcare Facilities, Community Facilities, Hotels etc.
In charge of Preliminary and Detailed design for interfacing new PLC with SCADA system, P&ID
(C&I Part Only), System Architecture. I/O List, Instrument Index, Instrument Schedule, Control
Philosophy, Loop wiring drawing, Instrument Hook-Up drawing, Instrument Installation drawing,
HMI Screen, Field Instrument data sheet, Instrument Location drawing, Cable Schedule, Logic
Diagram
 Design calculation oftransformer sizing
 DG sizing, motor sizing,cable sizing, battery Sizing, battery charger,lighting calculation, earthing calculation.
 Preparation of SLD , cable schedule ,electrical load list
 Termination Detail
 Data sheetof Various Electrical equipment’s
 Preparation of P&ID Instrumentdatasheets
 Preparation of Cable Schedule / Terminations,
 I/O Schedule. Instrument schedule, Control Philosophy, Instrument PI&D, System Architecture, Cable Schedule.
Experience with Jindal Water Infrastructure Ltd. . (Feb 2010 – Nov 2012)
As Sr. Engineer –Instrumentation Looking after Proposal & Design Engineering:
Major Job Responsibilities; Pre Bid Engineering,Detailed Engineering.
Detail Engineering Includes:
 Preparation of P&ID
 Instrumentdatasheets
 Preparation of Cable Schedule / Terminations
 Detail Engineering drawings & documents
 Handling ofTechno-Commercial matters related to projectexecution.
 Preparation of BOQ Preparation of Hook – up diagram Instrumentschedule Generation and Review of of Loop
Drawings Wiring Diagrams and Location Drawings Planning and progress monitoring.
 Proposal DocumentagainstTender.
 Preparation of technical specifications Preparation ofData sheets ofall electrical equipment’s.
 Design Calculation ofTransformer sizing,DGsizing , Motor sizing , cable sizing , Battery Sizing , Battery
charger , Lighting Calculation ,Earthing calculation.
 Preparation of SLD , Cable schedule ,electrical load list,Termination Detail ,Data sheetof Various Electrical
equipment’s
CV
Proposal Work:
 Preparation of Detailed BOQ ,Estimation & Costing with Specification
 Pre Tendering Engineering ofElectrical & instrumentation,Including Queryand Data Sheet
 Knowledge ofTender documents both Commercial and Technical.Such as General & Special condition of
contract, drawings,specification to understand projectrequirements.
 To Prepare quantity take-offs and price schedules Issue requestfor quotations (RFQs) for tenders from
suppliers and subcontractors
 Preparation of Electrical & Instrumentation BOQfrom the available drawings and documentdetails directlyor
with the help of engineering team after identifying major work scope etc.
 Follow-up and with Vendors / Manufacturer to expedite timely proposal for special supplyitems and technical
discussion in case ofany queries.
 Attain Pre bid technical meeting with Client & Consultantfor discussion on technical and commercial
clarification.
 Co-ordination with Client/Consultant& Project sites for various requirements.
 Commercial Negotiations,fixing the scope & Placing of orders on Short-listed vendors.
 Prepare estimation costfor tender bid projects (including materials,equipments,labours,managements,
consumables,& etc.)
 Prepare technical and commercial proposals.
PROJECT’S:
 Utility project (Intake Water System) for O.P Jindal super Thermal Power Plant (4x600MW) at
Chhattisgarh.
 Thermal Power Plant Utility Project for Raj west Power Ltd. Barmer Rajasthan
 Sitarganj Common Effluent Treatment Plant (BOOT) Project, Uttarakhand.
VATECH Wabag Ltd (March2009 – Feb 2010)
Junior Engineer Instrumentation & Control :
Key Responsibility Areas
 Supervision and surveillance ofon-site Erection & installation ofinstruments,control system (PLC & SCADA),
 Panel wiring system,cable laying, Impulse piping fabrication,Erection ofTray & Junction box, as per P&ID,
hook up diagrams, design specification and Specific Projectrequirements
 Design specification and Specific Projectrequirements.
 Various Instruments such as SMART Transmitters (DPT,PT,TT) ,Corollis Mass Flow Meter , Thermal Mass
Flow Meter, Senior Orifice ,LT(Radar & Wave Guided),Magnetic Flow Meter etc.
 Loops checking and verification/modification oflogic/interlocks
 Interfacing of I&C system with mechanical & electrical equipments.
 Pre commissioning and commissioning activities.
 Preparation of Total Documentation related to Project.

PROJECT’S:
 62.5 MLD STP at Jaipur Delawas, for Jaipur Municipal Corporation, Rajasthan.
 50 MLD STP at Jaipur Jaisinghpura KHOR for Jaipur Municipal Corporation, Rajasthan.
 100 MLD WTP at Dwarka for Delhi Jal Board Corpoation . New Delhi
New Era Automation (P) Ltd (May 2007 – March 2009)
Site Engineer Instrumentation & Control :
Key Responsibility Areas
 Supervision and surveillance ofon-site Erection & installation ofinstruments,control system (PLC & SCADA),
 Panel wiring system,cable laying, Impulse piping fabrication,Erection ofTray & Junction box, as per P&ID,
hook up diagrams,Design specification and Specific Projectrequirements
 Panel wiring system,cable laying, Impulse piping fabrication,Erection ofTray & Junction box, as per P&ID,
hook up diagrams,Design specification and Specific Projectrequirements.
 Various Instruments such as SMART Transmitters (DPT,PT,TT) ,Corollis Mass Flow Meter , Thermal Mass
Flow Meter, Senior Orifice ,LT(Radar & Wave Guided),Magnetic Flow Meter etc.
 Loops checking and verification/modification oflogic/interlocks
 Interfacing of I&C system with mechanical & electrical equipments.
 Pre commissioning and commissioning activities.
 Calibration & adjustmentofinstruments,commissioning ofinstrumentpanel.
 Review and certification of Field InstrumentTestReports.

CV
PROJECT’S:
 Wide SCADA Project OF ABB LTD for ONGC, Ankleshwer (oil & gas) for various GGS, CTF, Well’s
through New Era Automation P Ltd.

More Related Content

What's hot

4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...Bajaj Electricals Ltd
 
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical EnginnerNikhil Garde
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Mohammed Fazaluddin
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer Parth Tailor
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis
 
Rajmohan_Sep_2015
Rajmohan_Sep_2015Rajmohan_Sep_2015
Rajmohan_Sep_2015Rajmohan R
 

What's hot (20)

2016_bismoyo_oct
2016_bismoyo_oct2016_bismoyo_oct
2016_bismoyo_oct
 
DIPESH KUMAR
DIPESH KUMARDIPESH KUMAR
DIPESH KUMAR
 
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...
 
vyasVP
vyasVPvyasVP
vyasVP
 
noorCV
noorCVnoorCV
noorCV
 
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical Enginner
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
CV_Krishnanand
CV_KrishnanandCV_Krishnanand
CV_Krishnanand
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
Resume
ResumeResume
Resume
 
Rajmohan_Sep_2015
Rajmohan_Sep_2015Rajmohan_Sep_2015
Rajmohan_Sep_2015
 

Similar to Nadim Siddique CV

Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016paul joshua
 
Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)Rajib Sharma
 
Resume-Rajib Sharma
Resume-Rajib SharmaResume-Rajib Sharma
Resume-Rajib SharmaRajib Sharma
 
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_expNakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_expNakul Bhatt
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh newkaptan singh
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceNagaraj Maradi
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ Nitin Niwariya
 

Similar to Nadim Siddique CV (20)

Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016
 
Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)
 
Resume-Rajib Sharma
Resume-Rajib SharmaResume-Rajib Sharma
Resume-Rajib Sharma
 
AK+CV
AK+CVAK+CV
AK+CV
 
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_expNakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
Nakul bhatt c.v_(electrical_design_engineer)-4.11 years_exp
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of Experinece
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Athavulla khan (2)
Athavulla khan (2)Athavulla khan (2)
Athavulla khan (2)
 
Athavulla khan (2)
Athavulla khan (2)Athavulla khan (2)
Athavulla khan (2)
 
Sougata Chatterjee_Resume
Sougata Chatterjee_ResumeSougata Chatterjee_Resume
Sougata Chatterjee_Resume
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _
 
BHARATH KUMAR REDDY
BHARATH KUMAR REDDYBHARATH KUMAR REDDY
BHARATH KUMAR REDDY
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
Ajit Singh_CV
Ajit Singh_CVAjit Singh_CV
Ajit Singh_CV
 
Electrical Engineer 2
Electrical Engineer 2Electrical Engineer 2
Electrical Engineer 2
 

Nadim Siddique CV

  • 1. CV Nadim Ahmad Siddique ICA Engineer Mechanical, Electrical & Process Engineering (MEP) Department Email:- nadim7862@gmail.com Mob:- +91-9540754635 Profile Key experience Profession Nadim Ahmad Siddique is an Instrumentation & Control Engineer with over 8 years’ experience mostof which was gathered in the Proposal & Design.He also has project experience in the Oil & Gas sector. His key areas ofexpertise include:  Proposal (tendering),  Detailed Design Engineering,  Preparation of Equipment Specifications  Technical coordination.  Possess domain understanding of operations including Estimation and Costing of Complete Instrument’s and Electrical Package.  Water Intake and Pipelines, Water Treatment Plants/STP/ETP ,Pumping Stations  DevelopmentofBasic Eng. Package.  Preparation of Technical Specification for Instrumentation and Electrical  DevelopmentofEquipment Specs and Evaluation  Proven success in Installation and commissioning ofPLC, SCADA system,Foundation Field Bus Instruments ICA Engineer,Member IET, I Eng.(IET) Proposal & Design Exp. Feb’ 2010 to till date Nationality / Languages Indian Qualifications B.Tech (Instrumentation Engg)2007,Dip.In Engg. (Instrumentation)2004,Pursuing PGDBM Professional associations MIET, IEng Experience with Atkins (December 2012 – Current) ICA Engineer - Mechanical, Electrical and Process (MEP) Engineering Division. : Currently busy with detail designing ofcomplete E&I system for WessexWater Pumping Stations Scheme (UK),Air Main Unit, Mogdan, Thames Water,completed Detail Design ofElectrical & Instrumentation for Complete Pumping stations for RESC Riyadh Saudi Arabia and have technically helped for PreliminaryDesign for Instrumentation ofPumping stations for North Wathba , Abu Dhabi . Have completed Detail Designing ofInstrumentation and control for Camp Hill Pumping Station, UK. Part of Tendering Team for Bidding. Involved in following projects Instrument & Control Preliminary / Detailed Engineering  Eastergate, Westergate & Farlington WTW UV Treatment Scheme, Portsmouth Water plc, UK: Comprise of new UV treatment plants for Eastergate and Westergate facilities for the inactivation of cryptosporidium and to deal with turbidity issues at the sources. Portsmouth Water (PW) has included an improvement scheme at Farlington WTW (100 MLD) in their AMP 6 business plan. The improvements at Farlington included replacement of the existing membrane filtration plant with ultraviolet (UV) disinfection. In charge of detail design and contract documents for interfacing new PLC with existing SCADA system.  Wivelsfield WTW detail design, Morrison Utility Services, Southern Water, U.K : The proposed refurbishment involves the replacement of the main site MCC / switchboard to cope with the
  • 2. CV increased electrical load, new intermediate submersible pumping station, new standby generator, modifications to the percolating filters distribution chamber, new humus tanks distribution chamber, new airlift auto-desludging to the Primary Settlement Tanks (PSTs) and humus tanks, new 9m diameter radial flow humus tank, new final effluent and flow measurement chamber, pumped recirculation line and new collection manholes. In charge of detail design and contract documents for interfacing new PLC with existing SCADA system. Worked closely with the contractor to develop control philosophy, cable & Instrument schedule, Field Instrument data sheet, Instrument Hook-Up drawings etc for above scheme.  Farmersville WWTP, City of Farmersville, California, USA: Technical review of the Facilities Plan, Atkins considered a number of scenarios for consideration for the future wastewater treatment needs of the City of Farmersville. These included the options of Oxidation Ditch, Aeration Lanes, Primary Treatment/Anaerobic Digestion and a Retrofit to the Biolac to Aeration Ponds. Involved with 60% design work and developed PLC System Architecture interfacing with SCADA, Typical Loop Wiring Drawings and outline field instrument data sheets from concept design.  Development of North Al Wathba Infrastructure, Abu Dhabi: Preliminary & Detailed Design Packages for PLC based Pump Stations of Potable Water Reservoirs (Capacity 66,500 MLD) to cater to the entire development of Residential and Commercial Infrastructure comprising of Mosques, Schools, Healthcare Facilities, Community Facilities, Hotels etc. In charge of Preliminary and Detailed design for interfacing new PLC with SCADA system, P&ID (C&I Part Only), System Architecture. I/O List, Instrument Index, Instrument Schedule, Control Philosophy, Loop wiring drawing, Instrument Hook-Up drawing, Instrument Installation drawing, HMI Screen, Field Instrument data sheet, Instrument Location drawing, Cable Schedule, Logic Diagram  Design calculation oftransformer sizing  DG sizing, motor sizing,cable sizing, battery Sizing, battery charger,lighting calculation, earthing calculation.  Preparation of SLD , cable schedule ,electrical load list  Termination Detail  Data sheetof Various Electrical equipment’s  Preparation of P&ID Instrumentdatasheets  Preparation of Cable Schedule / Terminations,  I/O Schedule. Instrument schedule, Control Philosophy, Instrument PI&D, System Architecture, Cable Schedule. Experience with Jindal Water Infrastructure Ltd. . (Feb 2010 – Nov 2012) As Sr. Engineer –Instrumentation Looking after Proposal & Design Engineering: Major Job Responsibilities; Pre Bid Engineering,Detailed Engineering. Detail Engineering Includes:  Preparation of P&ID  Instrumentdatasheets  Preparation of Cable Schedule / Terminations  Detail Engineering drawings & documents  Handling ofTechno-Commercial matters related to projectexecution.  Preparation of BOQ Preparation of Hook – up diagram Instrumentschedule Generation and Review of of Loop Drawings Wiring Diagrams and Location Drawings Planning and progress monitoring.  Proposal DocumentagainstTender.  Preparation of technical specifications Preparation ofData sheets ofall electrical equipment’s.  Design Calculation ofTransformer sizing,DGsizing , Motor sizing , cable sizing , Battery Sizing , Battery charger , Lighting Calculation ,Earthing calculation.  Preparation of SLD , Cable schedule ,electrical load list,Termination Detail ,Data sheetof Various Electrical equipment’s
  • 3. CV Proposal Work:  Preparation of Detailed BOQ ,Estimation & Costing with Specification  Pre Tendering Engineering ofElectrical & instrumentation,Including Queryand Data Sheet  Knowledge ofTender documents both Commercial and Technical.Such as General & Special condition of contract, drawings,specification to understand projectrequirements.  To Prepare quantity take-offs and price schedules Issue requestfor quotations (RFQs) for tenders from suppliers and subcontractors  Preparation of Electrical & Instrumentation BOQfrom the available drawings and documentdetails directlyor with the help of engineering team after identifying major work scope etc.  Follow-up and with Vendors / Manufacturer to expedite timely proposal for special supplyitems and technical discussion in case ofany queries.  Attain Pre bid technical meeting with Client & Consultantfor discussion on technical and commercial clarification.  Co-ordination with Client/Consultant& Project sites for various requirements.  Commercial Negotiations,fixing the scope & Placing of orders on Short-listed vendors.  Prepare estimation costfor tender bid projects (including materials,equipments,labours,managements, consumables,& etc.)  Prepare technical and commercial proposals. PROJECT’S:  Utility project (Intake Water System) for O.P Jindal super Thermal Power Plant (4x600MW) at Chhattisgarh.  Thermal Power Plant Utility Project for Raj west Power Ltd. Barmer Rajasthan  Sitarganj Common Effluent Treatment Plant (BOOT) Project, Uttarakhand. VATECH Wabag Ltd (March2009 – Feb 2010) Junior Engineer Instrumentation & Control : Key Responsibility Areas  Supervision and surveillance ofon-site Erection & installation ofinstruments,control system (PLC & SCADA),  Panel wiring system,cable laying, Impulse piping fabrication,Erection ofTray & Junction box, as per P&ID, hook up diagrams, design specification and Specific Projectrequirements  Design specification and Specific Projectrequirements.  Various Instruments such as SMART Transmitters (DPT,PT,TT) ,Corollis Mass Flow Meter , Thermal Mass Flow Meter, Senior Orifice ,LT(Radar & Wave Guided),Magnetic Flow Meter etc.  Loops checking and verification/modification oflogic/interlocks  Interfacing of I&C system with mechanical & electrical equipments.  Pre commissioning and commissioning activities.  Preparation of Total Documentation related to Project.  PROJECT’S:  62.5 MLD STP at Jaipur Delawas, for Jaipur Municipal Corporation, Rajasthan.  50 MLD STP at Jaipur Jaisinghpura KHOR for Jaipur Municipal Corporation, Rajasthan.  100 MLD WTP at Dwarka for Delhi Jal Board Corpoation . New Delhi New Era Automation (P) Ltd (May 2007 – March 2009) Site Engineer Instrumentation & Control : Key Responsibility Areas  Supervision and surveillance ofon-site Erection & installation ofinstruments,control system (PLC & SCADA),  Panel wiring system,cable laying, Impulse piping fabrication,Erection ofTray & Junction box, as per P&ID, hook up diagrams,Design specification and Specific Projectrequirements  Panel wiring system,cable laying, Impulse piping fabrication,Erection ofTray & Junction box, as per P&ID, hook up diagrams,Design specification and Specific Projectrequirements.  Various Instruments such as SMART Transmitters (DPT,PT,TT) ,Corollis Mass Flow Meter , Thermal Mass Flow Meter, Senior Orifice ,LT(Radar & Wave Guided),Magnetic Flow Meter etc.  Loops checking and verification/modification oflogic/interlocks  Interfacing of I&C system with mechanical & electrical equipments.  Pre commissioning and commissioning activities.  Calibration & adjustmentofinstruments,commissioning ofinstrumentpanel.  Review and certification of Field InstrumentTestReports. 
  • 4. CV PROJECT’S:  Wide SCADA Project OF ABB LTD for ONGC, Ankleshwer (oil & gas) for various GGS, CTF, Well’s through New Era Automation P Ltd.