SlideShare a Scribd company logo
1 of 5
MUHAMMAD RIZWAN
(BScELECTRONICS ENGINEER)
Address: H#73, street #190 MULTANI Colony College
Road near SHALLER Chowk, Baghbanpura Lahore. Pakistan
Mobile:+92 333 6363807 / +92 42 36885314 /+92 305 4113822
Marital Status:Married
D.O.B:January 01 1985
Domicile: Lodhran, Punjab
Pakistan Engineering Council# ELECTRO/ 11728
NIC#43504-0343360-7
E-mail: m.rizwan2342@gmail.com / rizwan_2342@hotmail.com
EDUCATION
BSc Electronics Engineering 2006
Institution: UniversityCollege ofEngineering& Technology (UET),
The Islamia University, Bahawalpur.
Grades: (First Division).
Higher Secondary School Certificate 2002
Institution:Wapda degree College Guddu, Pakistan.
Grades: (First Division).
SecondarySchool Certificate 2000
Institution:Wapda high school Guddu, Pakistan.
Grades: (First Division).
Primavera P3Professional ProjectManagement 2010
Institution: PakistanEngineeringCongress.
Grade: (First Division)
Electrical Audit& Electrical SafetyTraining: 2015
Institute: SGS
SAP (B1)PlantOperation &Maintenance ModuleTrainingand Implementation 2015
Institution: Abacus Consultant
PERSONALSUMMARY
Self-motivated peak-performing professionals with 10 years of progressive managerial and Technical experience in
all phase of the process and maintenance industry. Effective problem solver who enjoy the challenge of achieving
goals and accomplishing objectives, career history of consistent achievement based on motivational tactics,
reputational for taking technical complex objectives from inception to completion. Ability to streamline procedures
that improve maintenance of plant, safety levels, productivity and control costs through expertise in:
 Team Building and Leader ship
 Organizational and team management
 Budgeting and finance
 Equipment Maintenance and repair
 Project Planning and scheduling
 Safety and compliance management
 Productivity planning and scheduling
 Strategic Maintenance planning and implementation
 Blueprint analysis
 Vender management
 Preventive management
 Stress Management
PROFESSIONAL EXPERIENCE
I have experience of Maintenance, Production, project management & Scheduling, Designing, installation and
troubleshooting of electrical/electronic & mechanical control systems of Electrical Insulator, Tile processing plant,
corrugation packaging plant, 3.7& 10 Ton/Hr boiler, RO Water treatment Plants, 4MW Electrical substation,
54MMBTU/hr Synthetic Natural Gas (SNG) plant, Natural gas pressure booster plant, pet cock plant, firing kilns,
spray dryers, Compressors, Air Dryers, Chillers, heat exchangers, cooling towers, electrical generators, transformers,
LV, MV and HT controlpanels, hydraulic and pneumatic control systems,installation & commissioning of PLC ,DCS
control system, Servo drive ,stepperdrive, invertors, MCC circuit, RLC, PID,Flow control, Pressure, level measuring,
proximity and photo sensors based control systems. Expertise in Designing, programming, installation and
troubleshooting of PLC (Omron, Feteck, Siemens, Allenbredlly, Mitsubishi), HMI, DCS, SCADA control systems.
EMPLOYMENT HISTORY
ROSHAN PACKAGES(PVT)LIMITED
Manager Electrical & Instrumentation May 2014 – Present
Responsibility
 Lead the Electrical substation, Instrumentation,Maintenance department.
 To Plan, organize and implement the predictive / preventive maintenance schedules for identifying areas of plant
and reducing machinery downtime to minimum.
 Determining, calculating and analyzing various maintenance cost.
 Provide reports to General Manager/Director concerning any equipment-related issues that may interfere with
plant operations.
 Manages the plant operations, maintenance & projects including spare parts,inventory, budget,and compliance
with environmental and safety regulations.
 Responsible for costing, estimating and planning projects.
 Preparing Project Initiation documentation.
 Responsible for ensuring best value is obtained for the project including supplier base,use ofinternal and external
resources.
 Maintaining and completing Project Key Performance Indicators.
 Writing detailed and summarized project progress reports.
 Identifying, costing and processing any contract variations.
 Tracking activities against the detailed project plans.
 Updating project plans to include agreed changes.
 Producing accurate financial reports.
 Monitoring actual expenditure figures against project budgets.
 Organizing and facilitating Project Steering / Operating Committees meetings.
 Implements a wide variety of engineering solutions to increase equipment availability, increase net operating rate,
reduce operation losses,and achieve standard and acceptable production rates
 Implementation of SAP Maintenance module in Maintenance department.
 Introduced and developed an approach to maintenance incorporating principles of the Kaizen philosophy, and
then created plans, programs, and strategies for personneland equipment improvement.
 Conducting Study & Detail Engineering for Automation Process; developing Automation Tools for HMI
Applications like screen creation, database configuration, replication work, etc.
 Monitoring the implementation & commissioning of Electrical and mechanical Systems & conducting tests to
ensure operational efficiencies of equipments.
 Performing basic engineering activities like designing layouts, preparing diagrams, charts, equipment list and
technical specifications.
 Monitoring Daily, weekly, monthly & yearly plan maintenance activity ofmachines and optimize the maintenance
cost respectively.
AMBER CAPACITOR LIMITEDLAHOREPAKISTAN
Manager Maintenance November 2013-May 2014
EMCOINDUSTRIESLIMITEDLAHORE,PAKISTAN
(ELECTRICALEQUIPMENTMANUFACTURINGCOMPANY)
Deputy ManagerMaintenance (Electrical & Mechanical) & Production: January 2008 – November 2013
Electrical Equipment Manufacturing Co. Ltd was established in 1954 and is ISO 9001:2008 Certified. EMCO involved
in trading of electrical goods and tiles. EMCO is first insulator electrical insulator manufacturing plant in Pakistan.
the company has facilities and capabilities for design and manufacturing of a wide range of insulators and tiles(wall
and Floor Tiles) like Suspension Insulators, Pin Type Insulators, Post Insulators, Transformer Bushings, Surge
Arrestor(11KVA,132KVA) and export more than 60% in Saudi Arabia, England, UAE, Kuwait, etc.
July 2011 – November 2013 EMCO Industries Limited Lahore Pakistan
Designation Deputy Manager Maintenance& Production
July 2009 to June 2011 EMCO Industries Limited Lahore Pakistan
Designation Assistant Manager Electronics
January 2008 to June 2009 EMCO Industries Limited Lahore Pakistan
Designation Electronics & Instrument Engineer
Experience
 Programming, Designing and troubleshooting of PLC (Omron Sysmac CPM2AH, CPM1A), FATEK (FB
series), Siemens, Allenbredlly and Mitsubishi.
 Programming and troubleshooting of Inverter (Omron, Mitsubishi 500 and 700 Series, YASKAWA, SEW,
Fuji, Yeskawa).
 Programming of PLC based electrical and instrumentation control systemof SNG (Synthetic Natural Gas)
Plant Kilns, dryers,production lines, Control systemand synchronization ofHydraulic presses,B&T Robotic
Machines, production lines, spray dryers
 Programming &and troubleshooting oflocal DCS control system.
 Experience on designing and troubleshooting of instruments like PID control system, Level sensors, Load
Cells, Flow meters, Temperature sensors (J,K,S, PT100) & Pressure Sensors, proximity sensors, photo
sensors,and close and open loop control systems.
 Designing, troubleshooting and installation of RLC and MCC control panels. .
 Programming wentech8000i and Omron Touch screen for HMI.
 Programming and troubleshooting of PID Controller(OMRON ,Pan Glob,Ascon)
 AC induction Motors,stepperMotors,and DC servo motors control systems.
 Creating a list for Parameter Setting of the Touch screens that it used at the Plant.
 LT, HT panels and overhead Line Distribution, installation and Commissioning.
 Installation and troubleshooting ofElectrical generators (630KVA, 350KVA, 500KVA, 100KVA).
 Designing and manufacturing of ATS panels for generators (Impac, Orient, Perkin, and Puma).
 Experience of Installation and troubleshooting ofTransformer (3000KVA and 2000KVA)
 Experience of erection, Installation, commissioning and troubleshooting of SNG (Synthetic Natural Gas)
Plant.
 Graphics development and troubleshooting of HMI (Human Machine Interface) units of EASYVEIW
(MT500, MT600, MT800 series).
 Graphics development software Easybuilder8000 for EasyVeiw HMI machine.
 Programming and troubleshooting of HMI (Human Machine Interface) units of OMRON.
 Interfacing of HMI units with PLC control systemand with local area network.
 Designing and installation of power factor panel, HT and LT panels for 4MW Electrical Substation.
Responsibility:
 Lead the Electrical substation, Instrumentation department, mechanical workshop and production
department.
 To ensure the smooth operations of electrical substation,mechanical workshop and production department.
 To plan, organize, monitor and control the activities regarding Preventive maintenance, corrective
maintenance and production planning of all plant.
 To arrange and monitor machinery inspections when required.
 Directly supervise all department employees and assign work in department
 To improve the efficiency & Performance of Electrical Generator, SNG (Synthetic Natural Gas) Plant, Air
Compressor.
 Determining, calculating and analyzing various maintenance cost
 Provide reports to General Manager concerning any equipment-related issues that may interfere with plant
operations
 Recommend equipment upgrades,improvements and / or new purchases.
 Oversee all repairs and troubleshooting ofequipment failures as well as root cause analysis of failures.
 Daily, weekly, and monthly plan maintenance activity of machines and optimize the maintenance cost
 Maintain inventory level at optimum level.
 Development and purchase of locally prepared parts.
 Reducing downtime on all the machines (Operational and Maintenance)
 Pay attention to safety precaution provided by manufacturers and organization.
 To improve all aspect of production-related problems training and motivation.
 Implementation of Autonomous Maintenance Plan for all Equipment.
ACHIEVEMENTS
1- To plan, organize and Designing of 4MW electrical substation.
2- Successfully planning , installation and execution of 54MMBTU SNG plant project
3- Successfully planned and installation of Pakistan’s2nd largest Tile manufacturing plant project.
4- To actively participation in Project planning and scheduling in installation and commissioning of Pakistan’s
first largest corrugation plant.
5- Increase the productivity of plant at least 10% .
6- Increase the availability of utilities of plant 99.9% .
7- Reduce down time of plant from 10% to 1.5% by betterplanning,preventive maintenance of plant and good
team work.
8- Reduce maintenance cost at least 30 % (10Million) in a year.
9- Reduce utility (COMPRESSOR, GENERATOR, ELECTRICITY AND BOILER) cost of plant at least 15%
in a year.
10- Designing and programming of Reboot for loading and unloading Boxes
11- Programming of control systemof burner of firing Furnas in PLC.
12- Convert SMD card base electronic control panels in PLC based control systems.
13- Design centralized control systemof plant to control and monitor all parameters.
14- Designing and programming in PLC of ignition/burner control systemof boiler.
15- Programming of feed water and slip pump for spray dryers.
16- Programming of auto stacker conveyersystem.
17- Programming and designing of conveyersystemof printing machines.
18- Programming and designing of auto control system of hydraulic press and furnaces.
19- Designing and programming of auto down time recording systemof plant.
20- Zero electrical/mechanical accident in five years.
KCN Telecom Islamabad, Pakistan
BSS Engineer February 2007 – January 2008
Responsibilities:
 Installation and commissioning of Ericson (Phase 5 and Phase 6) equipment on Warid sites.
 Operation & Maintenance ofBTS, BSC, DTRU, MW Links panels,battery banks DG Sets,Air Conditioning,
Power System through channelized preventive & corrective maintenance implementation by Field
Operations team.
 Link Engineering, Site survey, Drive Test, System Optimization
Coordination with vendorfor technical & logistic support for ensuring smooth network operation.
 Coordination with other cellular companies for media connectivity & sharing sites.
 Coordination with telecom regularity authority (PTA) for coverage / complaint issues.
 Coordination with Power Company for power issues.
 Coordination with security companies for availability and vigilant checks on guard due to prevailing security
issues in the country.
 Fault localization and troubleshooting of Access network in cooperation with OMC-R
Environmental Equipment (DG Sets / Air Conditioner / Power System/ Fire Fighting) maintenance
 Off line & on line PAR of BTS, BSC and transmission equipment.
 Snag removal for commercial launched sites with vendor.
Technical Skills
 Operating systems : Windows XP, 7,NT, 2008 Server
 PLC and HMI Control Programming Software : CX Programmer, Fetak, wenteck, Simatic pro v13,
Win cc flexible 2008, GX IEC Developer 7.04,
 Programs : Office Tools , AutoCAD
 PLC Programming : Ladder Diagram
 PC Networking : Very good
 PC HW maintenance : Experienced
REFERENCES: will be furnished on demand

More Related Content

What's hot (20)

CV of Partha 2015 (2)
CV of Partha 2015 (2)CV of Partha 2015 (2)
CV of Partha 2015 (2)
 
Mukesh_Kumar_(1)
Mukesh_Kumar_(1)Mukesh_Kumar_(1)
Mukesh_Kumar_(1)
 
JC Ramos Sup
JC Ramos SupJC Ramos Sup
JC Ramos Sup
 
IRJET- Modelling and Control of Variable Frequency Drive using PLC and Ma...
IRJET-  	  Modelling and Control of Variable Frequency Drive using PLC and Ma...IRJET-  	  Modelling and Control of Variable Frequency Drive using PLC and Ma...
IRJET- Modelling and Control of Variable Frequency Drive using PLC and Ma...
 
Curriculum Vitae - Hasan
Curriculum Vitae - HasanCurriculum Vitae - Hasan
Curriculum Vitae - Hasan
 
IRJET - Better Monitoring and Fault Response of Motor Drive using SMTP of Scada
IRJET - Better Monitoring and Fault Response of Motor Drive using SMTP of ScadaIRJET - Better Monitoring and Fault Response of Motor Drive using SMTP of Scada
IRJET - Better Monitoring and Fault Response of Motor Drive using SMTP of Scada
 
My final resume
My final resumeMy final resume
My final resume
 
NTAMC
NTAMCNTAMC
NTAMC
 
pronay CV 08052016
pronay CV 08052016pronay CV 08052016
pronay CV 08052016
 
c&i24.12.1014
c&i24.12.1014c&i24.12.1014
c&i24.12.1014
 
Resume_Rajeev
Resume_RajeevResume_Rajeev
Resume_Rajeev
 
Hatem aldawi CV
Hatem  aldawi CVHatem  aldawi CV
Hatem aldawi CV
 
DINESH parmar resume
DINESH parmar resumeDINESH parmar resume
DINESH parmar resume
 
Cv
CvCv
Cv
 
RESUME_RAGHUNATH
RESUME_RAGHUNATH RESUME_RAGHUNATH
RESUME_RAGHUNATH
 
KAPIL.Oct
KAPIL.OctKAPIL.Oct
KAPIL.Oct
 
Rao cv supervisor
Rao cv supervisorRao cv supervisor
Rao cv supervisor
 
Resume
ResumeResume
Resume
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
Update CV
Update CVUpdate CV
Update CV
 

Similar to Muhammad Rizwan.

Similar to Muhammad Rizwan. (20)

Skm Nov. 2016
Skm  Nov. 2016Skm  Nov. 2016
Skm Nov. 2016
 
RESUME
RESUMERESUME
RESUME
 
ASHIQ.CV.
ASHIQ.CV.ASHIQ.CV.
ASHIQ.CV.
 
Resume_Akhilesh
Resume_AkhileshResume_Akhilesh
Resume_Akhilesh
 
Radhe_Resume
Radhe_ResumeRadhe_Resume
Radhe_Resume
 
Pramod cv 04 feb2016
Pramod cv 04 feb2016Pramod cv 04 feb2016
Pramod cv 04 feb2016
 
sajid cv.
sajid cv.sajid cv.
sajid cv.
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
deo@dipankar.doc
deo@dipankar.docdeo@dipankar.doc
deo@dipankar.doc
 
Resume_Umesh jagtap
Resume_Umesh jagtapResume_Umesh jagtap
Resume_Umesh jagtap
 
Siddhartha_Saxena_25_Feb_2016
Siddhartha_Saxena_25_Feb_2016Siddhartha_Saxena_25_Feb_2016
Siddhartha_Saxena_25_Feb_2016
 
Mohamed Saleh fathy final cv.doc
Mohamed Saleh fathy  final cv.docMohamed Saleh fathy  final cv.doc
Mohamed Saleh fathy final cv.doc
 
Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016
 
Resume Electrical
Resume ElectricalResume Electrical
Resume Electrical
 
Amit Wanjari Electrical Engineer.
Amit Wanjari Electrical Engineer.Amit Wanjari Electrical Engineer.
Amit Wanjari Electrical Engineer.
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
New - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpNew - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year Exp
 
Muhammad Faisal
Muhammad FaisalMuhammad Faisal
Muhammad Faisal
 
Mohammad Profile
Mohammad  ProfileMohammad  Profile
Mohammad Profile
 

Muhammad Rizwan.

  • 1. MUHAMMAD RIZWAN (BScELECTRONICS ENGINEER) Address: H#73, street #190 MULTANI Colony College Road near SHALLER Chowk, Baghbanpura Lahore. Pakistan Mobile:+92 333 6363807 / +92 42 36885314 /+92 305 4113822 Marital Status:Married D.O.B:January 01 1985 Domicile: Lodhran, Punjab Pakistan Engineering Council# ELECTRO/ 11728 NIC#43504-0343360-7 E-mail: m.rizwan2342@gmail.com / rizwan_2342@hotmail.com EDUCATION BSc Electronics Engineering 2006 Institution: UniversityCollege ofEngineering& Technology (UET), The Islamia University, Bahawalpur. Grades: (First Division). Higher Secondary School Certificate 2002 Institution:Wapda degree College Guddu, Pakistan. Grades: (First Division). SecondarySchool Certificate 2000 Institution:Wapda high school Guddu, Pakistan. Grades: (First Division). Primavera P3Professional ProjectManagement 2010 Institution: PakistanEngineeringCongress. Grade: (First Division) Electrical Audit& Electrical SafetyTraining: 2015 Institute: SGS SAP (B1)PlantOperation &Maintenance ModuleTrainingand Implementation 2015 Institution: Abacus Consultant PERSONALSUMMARY Self-motivated peak-performing professionals with 10 years of progressive managerial and Technical experience in all phase of the process and maintenance industry. Effective problem solver who enjoy the challenge of achieving goals and accomplishing objectives, career history of consistent achievement based on motivational tactics, reputational for taking technical complex objectives from inception to completion. Ability to streamline procedures that improve maintenance of plant, safety levels, productivity and control costs through expertise in:  Team Building and Leader ship  Organizational and team management  Budgeting and finance  Equipment Maintenance and repair  Project Planning and scheduling  Safety and compliance management  Productivity planning and scheduling  Strategic Maintenance planning and implementation  Blueprint analysis  Vender management  Preventive management  Stress Management
  • 2. PROFESSIONAL EXPERIENCE I have experience of Maintenance, Production, project management & Scheduling, Designing, installation and troubleshooting of electrical/electronic & mechanical control systems of Electrical Insulator, Tile processing plant, corrugation packaging plant, 3.7& 10 Ton/Hr boiler, RO Water treatment Plants, 4MW Electrical substation, 54MMBTU/hr Synthetic Natural Gas (SNG) plant, Natural gas pressure booster plant, pet cock plant, firing kilns, spray dryers, Compressors, Air Dryers, Chillers, heat exchangers, cooling towers, electrical generators, transformers, LV, MV and HT controlpanels, hydraulic and pneumatic control systems,installation & commissioning of PLC ,DCS control system, Servo drive ,stepperdrive, invertors, MCC circuit, RLC, PID,Flow control, Pressure, level measuring, proximity and photo sensors based control systems. Expertise in Designing, programming, installation and troubleshooting of PLC (Omron, Feteck, Siemens, Allenbredlly, Mitsubishi), HMI, DCS, SCADA control systems. EMPLOYMENT HISTORY ROSHAN PACKAGES(PVT)LIMITED Manager Electrical & Instrumentation May 2014 – Present Responsibility  Lead the Electrical substation, Instrumentation,Maintenance department.  To Plan, organize and implement the predictive / preventive maintenance schedules for identifying areas of plant and reducing machinery downtime to minimum.  Determining, calculating and analyzing various maintenance cost.  Provide reports to General Manager/Director concerning any equipment-related issues that may interfere with plant operations.  Manages the plant operations, maintenance & projects including spare parts,inventory, budget,and compliance with environmental and safety regulations.  Responsible for costing, estimating and planning projects.  Preparing Project Initiation documentation.  Responsible for ensuring best value is obtained for the project including supplier base,use ofinternal and external resources.  Maintaining and completing Project Key Performance Indicators.  Writing detailed and summarized project progress reports.  Identifying, costing and processing any contract variations.  Tracking activities against the detailed project plans.  Updating project plans to include agreed changes.  Producing accurate financial reports.  Monitoring actual expenditure figures against project budgets.  Organizing and facilitating Project Steering / Operating Committees meetings.  Implements a wide variety of engineering solutions to increase equipment availability, increase net operating rate, reduce operation losses,and achieve standard and acceptable production rates  Implementation of SAP Maintenance module in Maintenance department.  Introduced and developed an approach to maintenance incorporating principles of the Kaizen philosophy, and then created plans, programs, and strategies for personneland equipment improvement.  Conducting Study & Detail Engineering for Automation Process; developing Automation Tools for HMI Applications like screen creation, database configuration, replication work, etc.  Monitoring the implementation & commissioning of Electrical and mechanical Systems & conducting tests to ensure operational efficiencies of equipments.  Performing basic engineering activities like designing layouts, preparing diagrams, charts, equipment list and technical specifications.  Monitoring Daily, weekly, monthly & yearly plan maintenance activity ofmachines and optimize the maintenance cost respectively.
  • 3. AMBER CAPACITOR LIMITEDLAHOREPAKISTAN Manager Maintenance November 2013-May 2014 EMCOINDUSTRIESLIMITEDLAHORE,PAKISTAN (ELECTRICALEQUIPMENTMANUFACTURINGCOMPANY) Deputy ManagerMaintenance (Electrical & Mechanical) & Production: January 2008 – November 2013 Electrical Equipment Manufacturing Co. Ltd was established in 1954 and is ISO 9001:2008 Certified. EMCO involved in trading of electrical goods and tiles. EMCO is first insulator electrical insulator manufacturing plant in Pakistan. the company has facilities and capabilities for design and manufacturing of a wide range of insulators and tiles(wall and Floor Tiles) like Suspension Insulators, Pin Type Insulators, Post Insulators, Transformer Bushings, Surge Arrestor(11KVA,132KVA) and export more than 60% in Saudi Arabia, England, UAE, Kuwait, etc. July 2011 – November 2013 EMCO Industries Limited Lahore Pakistan Designation Deputy Manager Maintenance& Production July 2009 to June 2011 EMCO Industries Limited Lahore Pakistan Designation Assistant Manager Electronics January 2008 to June 2009 EMCO Industries Limited Lahore Pakistan Designation Electronics & Instrument Engineer Experience  Programming, Designing and troubleshooting of PLC (Omron Sysmac CPM2AH, CPM1A), FATEK (FB series), Siemens, Allenbredlly and Mitsubishi.  Programming and troubleshooting of Inverter (Omron, Mitsubishi 500 and 700 Series, YASKAWA, SEW, Fuji, Yeskawa).  Programming of PLC based electrical and instrumentation control systemof SNG (Synthetic Natural Gas) Plant Kilns, dryers,production lines, Control systemand synchronization ofHydraulic presses,B&T Robotic Machines, production lines, spray dryers  Programming &and troubleshooting oflocal DCS control system.  Experience on designing and troubleshooting of instruments like PID control system, Level sensors, Load Cells, Flow meters, Temperature sensors (J,K,S, PT100) & Pressure Sensors, proximity sensors, photo sensors,and close and open loop control systems.  Designing, troubleshooting and installation of RLC and MCC control panels. .  Programming wentech8000i and Omron Touch screen for HMI.  Programming and troubleshooting of PID Controller(OMRON ,Pan Glob,Ascon)  AC induction Motors,stepperMotors,and DC servo motors control systems.  Creating a list for Parameter Setting of the Touch screens that it used at the Plant.  LT, HT panels and overhead Line Distribution, installation and Commissioning.  Installation and troubleshooting ofElectrical generators (630KVA, 350KVA, 500KVA, 100KVA).  Designing and manufacturing of ATS panels for generators (Impac, Orient, Perkin, and Puma).  Experience of Installation and troubleshooting ofTransformer (3000KVA and 2000KVA)  Experience of erection, Installation, commissioning and troubleshooting of SNG (Synthetic Natural Gas) Plant.  Graphics development and troubleshooting of HMI (Human Machine Interface) units of EASYVEIW (MT500, MT600, MT800 series).  Graphics development software Easybuilder8000 for EasyVeiw HMI machine.
  • 4.  Programming and troubleshooting of HMI (Human Machine Interface) units of OMRON.  Interfacing of HMI units with PLC control systemand with local area network.  Designing and installation of power factor panel, HT and LT panels for 4MW Electrical Substation. Responsibility:  Lead the Electrical substation, Instrumentation department, mechanical workshop and production department.  To ensure the smooth operations of electrical substation,mechanical workshop and production department.  To plan, organize, monitor and control the activities regarding Preventive maintenance, corrective maintenance and production planning of all plant.  To arrange and monitor machinery inspections when required.  Directly supervise all department employees and assign work in department  To improve the efficiency & Performance of Electrical Generator, SNG (Synthetic Natural Gas) Plant, Air Compressor.  Determining, calculating and analyzing various maintenance cost  Provide reports to General Manager concerning any equipment-related issues that may interfere with plant operations  Recommend equipment upgrades,improvements and / or new purchases.  Oversee all repairs and troubleshooting ofequipment failures as well as root cause analysis of failures.  Daily, weekly, and monthly plan maintenance activity of machines and optimize the maintenance cost  Maintain inventory level at optimum level.  Development and purchase of locally prepared parts.  Reducing downtime on all the machines (Operational and Maintenance)  Pay attention to safety precaution provided by manufacturers and organization.  To improve all aspect of production-related problems training and motivation.  Implementation of Autonomous Maintenance Plan for all Equipment. ACHIEVEMENTS 1- To plan, organize and Designing of 4MW electrical substation. 2- Successfully planning , installation and execution of 54MMBTU SNG plant project 3- Successfully planned and installation of Pakistan’s2nd largest Tile manufacturing plant project. 4- To actively participation in Project planning and scheduling in installation and commissioning of Pakistan’s first largest corrugation plant. 5- Increase the productivity of plant at least 10% . 6- Increase the availability of utilities of plant 99.9% . 7- Reduce down time of plant from 10% to 1.5% by betterplanning,preventive maintenance of plant and good team work. 8- Reduce maintenance cost at least 30 % (10Million) in a year. 9- Reduce utility (COMPRESSOR, GENERATOR, ELECTRICITY AND BOILER) cost of plant at least 15% in a year. 10- Designing and programming of Reboot for loading and unloading Boxes 11- Programming of control systemof burner of firing Furnas in PLC. 12- Convert SMD card base electronic control panels in PLC based control systems. 13- Design centralized control systemof plant to control and monitor all parameters. 14- Designing and programming in PLC of ignition/burner control systemof boiler. 15- Programming of feed water and slip pump for spray dryers. 16- Programming of auto stacker conveyersystem. 17- Programming and designing of conveyersystemof printing machines. 18- Programming and designing of auto control system of hydraulic press and furnaces. 19- Designing and programming of auto down time recording systemof plant. 20- Zero electrical/mechanical accident in five years.
  • 5. KCN Telecom Islamabad, Pakistan BSS Engineer February 2007 – January 2008 Responsibilities:  Installation and commissioning of Ericson (Phase 5 and Phase 6) equipment on Warid sites.  Operation & Maintenance ofBTS, BSC, DTRU, MW Links panels,battery banks DG Sets,Air Conditioning, Power System through channelized preventive & corrective maintenance implementation by Field Operations team.  Link Engineering, Site survey, Drive Test, System Optimization Coordination with vendorfor technical & logistic support for ensuring smooth network operation.  Coordination with other cellular companies for media connectivity & sharing sites.  Coordination with telecom regularity authority (PTA) for coverage / complaint issues.  Coordination with Power Company for power issues.  Coordination with security companies for availability and vigilant checks on guard due to prevailing security issues in the country.  Fault localization and troubleshooting of Access network in cooperation with OMC-R Environmental Equipment (DG Sets / Air Conditioner / Power System/ Fire Fighting) maintenance  Off line & on line PAR of BTS, BSC and transmission equipment.  Snag removal for commercial launched sites with vendor. Technical Skills  Operating systems : Windows XP, 7,NT, 2008 Server  PLC and HMI Control Programming Software : CX Programmer, Fetak, wenteck, Simatic pro v13, Win cc flexible 2008, GX IEC Developer 7.04,  Programs : Office Tools , AutoCAD  PLC Programming : Ladder Diagram  PC Networking : Very good  PC HW maintenance : Experienced REFERENCES: will be furnished on demand