SlideShare a Scribd company logo
1 of 4
Page 1 of 4
CHANDRAMOULI DEV
S/o Late Ram Vijay Kumar, Yamuna-2, Vastu-Vihar Colony, Phase-1, Industrial Area CIPET Road, Hajipur-844101, Bihar.
Contact: +91- 9199759998; Email: - cmelect@gmail.com; DOB: 11th
Sep 1978; CTC- 3.75 Lakhs/Annum.
Telecom Industry Professional
SUMMARY
I am industrious professional with experience of over 11 years across Testing, Installation & Commissioning,
Operation & Maintenance, Site coordination, Project Execution, Safety and Team Management. I have been
instrumented in troubleshooting, servicing and operation & maintenance to ensure maximum operational availability of
telecommunication/electrical/electronic- equipment / systems.
I have demonstrated strength in implementing planned, preventive and predictive maintenance practices to optimize
efficiency with constant endeavours to realize zero downtime. I have proven competencies in managing team
performance by constantly monitoring quality aspects and empowering members to achieve and surpass goals.
Gifted with a creative aptitude and attention to detail, I have proven track of making significant contributions by
deploying and setting systems,atthe same time bringing about considerable cost reductions, while ensuring efficiency and
quality benchmark of Telecommunication Engineering with flexibility to adapt to new situations, I always look forward to
adopt and adapt the new wave of technology for its day-to-day application. I am adroit in identifying faults and have
ability to handle the entire range of troubleshooting activities. I have demonstrated ability in drawing well -balanced
conclusions whilst dealing with complexservice and maintenance issues and interpreting procedures and guidelines in order
to resolve them.
Driven by the key values of leadership, innovation and responsiveness, I always ensure to implement
measures for cost rationalization and increase productivity. My unique approach is to emphasize on restructuring core areas
to enhance competency and thereby add a value to the business. I have proven competencies in judiciously managing
manpower, machines and materials resources to generate maximum operational efficiency as well as capable of
maintaining harmonious industrial relations to ensure hassle free business operations.
SKILLS
* Project Management, Liaising & Co-ordination * Vendor Management * Bill Vetting * Manpower Management * Site
Co-ordination * MIS Coordination * Crisis Management * Project Liaising * Training and Development * Cross
Functional Coordination * BSS Network * ESS Network * Preventive, Reactive and Corrective Maintenance *
Telecom/Industrial Electrical Maintenance * Payroll Management * Materials Management * Commissioning,
Installation and Integration- BTS, PDH/SDH Microwave Media, PLC, Sensors, Switchgears, AMF Panels, HT/LT
installations, Transformers, SMPS & Battery Banks, UPS, Diesel Generator, Solar Panels, Domestic
Electrical/Electronic Repairing & Maintenance.
Experiences
1. Electro Mechnico Projects Pvt. Ltd.
Duration: From Sep. 2014 To till Date.
Location:- Haldia.
Designation: Site In-charge.
-:Key Responsibilities:-
1. On Behalf of Indian Oil looking after comprehensive Electrical Maintenance job of a Township, of 1500 Quarters,
Club and Guest House with 20 Groups of Electrical licensed workers.
2. Resolve Electrical Distribution problems, Resolve customer complains, Procurement of materials as per
requirements, provide HT/LT Inter-Connection during Rectification/Preventive Maintenance, allots jobs to
Manpower for 24X7 basis to rectify Electrical complains and No Power event.
3. Preventive & Corrective Maintenance of 11KVA Kiosk Panel, Motorized LT Distribution Panels, Earthling
System, 500KVA Transformers, LED/SV Lamp Street Lights, XLPE Armored cables and joints and other
electrical home appliances power rectification and installations. Geyser, Fan, Air-condition Preventive
Maintenance and Workshop.
4. Analyze Root cause of a fault for permanent solution. Planning of Preventive Maintenance of all Electrical Panels,
and MIS record generation for the same.
5. Payroll Management, Billing, and payment realization and utilization of full work as per work order.
6. Provide Technical Support and resolve issues among the team. Focus on customer satisfaction, and Teamsafety.
2. P. K Industry.
Duration: From Dec. 2012 To Aug 2014.
Location: Patna.
Designation: Site In-charge.
-:Key Responsibilities:-
Page 2 of 4
1. Installation and Commissioning of APFC Panel and Capacitors Bank with Switchgears arrangements &
Programming HPL and L&T APFC embedded Meters to achieve P.F >=99.9.
2. Regular monitoring LT Electrical Meter reading of sump house for change in Inductive and Capacitive load and
program APFC meter accordingly for the best power utilization.
3. Installation and Maintenance work of 25KVA to 100KVA of Transformers including Earthling at various rural
areas in Bihar, Including Survey, taking NOC from EB board regarding BOQ, Installation of AB switch and LA
and take Shutdown permission with Bihar Electricity authority.
4. To maintain Power Factor P.F >=0.99 of APFC Panel for 24 No.’s Sump House of Bihar Rajya Jal Parisad.
5. Preventive & Corrective Maintenance of Star-Delta/DOL motor starter Panels of Sump-House.
6. Marketing and promotion activity of our Electrical products like Geysers, Decorative Lights, LED Lights and other
Electrical products make: - Hevells/Bajaj/Crompton etc.
3. Vo da f o n e Es s a r S pa ce t e l Lt d.
Duration: From August 2008 to Nov. 2012.
Location: Patna, Bhagalpur, Daltonganj.
Designation: Executive in Network. (BSS)
-:Key Responsibilities:-
1. To maintain Uptime of Network Availability of Vodafone RNA >= 99.98% of my B.S.C of almost 200 Sites.
2. On-Site/Off-site BTS and Electrical complain resolution, 24X7 Basis Site monitoring as per information from
OMCR/NMS.
3. BTS is commissioning and Microwave alignments, Trx addition/deletion as per Network demand, Site and all
working sectors monitoring from my BSC.
4. Necessary preventive & corrective action of Passive & Active Infra to avoid major breakdown.
5. Maintenance of 250 Electrified sites comprises of 25KVA Transformers and 15KVA Diesel Engines.
6. Proper utilization of Vendors as per P.O. contract of SLA involved in daily OAM activities.
7. MIS generation of all Network Parameters & Asset. MIS of Equipment complains and status pending from OEM
or Vendor and its escalation to upper level with Liaising OEM for close before the SLA.
8. Data Records of Servicing, Maintenance and Fuel filling of DGs and EB bills, Also verification of Utilities bills
and tally it to field Data and Vendor bill vetting.
9. Site Acquisition according as per RF plan, Acceptance Test of On-Aired new sites. BTS Alarm Rectification with
the co-ordination to OMCR to improve BSS KPI and Maintained my BSC TCH Block < 2%, SDCCH Block < 1%,
TCH Drop < 1.5%, SDCCH Drop <= 1.5%. Supervision of OFC Network and Project work.
10. Resolution of Customer complaint like Coverage Issue and Call Drops. Implementation of Repeaters and IBS at
low coverage area.
11. BTS-Alarm rectification and Site-Automation.
4. Re l i a n ce In t e g ra t e d S e rvi ce s Pvt . Li m i t e d.
Duration: Mar. 2008 to Aug. 2008.
Location: Purina, Forbisganj, Araria, Kishanganj and Katihar.
Designation: Zonal In charge
-:Key Responsibilities:-
Leading a Technical team consisting of Seven Engineers, fifteen riggers & electricians, for the
Installation & Commissioning of PDH/SDH- Telecom Media Transmission Equipments and OAM of the CDMA/
GSM Network.
1. NEC and Ceragon Microwave (PDH/SDH) Radio Equipments Installations to achieve Wireless Network
Transport of STM-1 Capacity SDH Ring for Site E1 distribution for mobile and data communications as per RF
plan.
2. IP Implementation and Router and Switch Installation for NMS, and AT before finally H/O to OAM.
3. E1 DDF Rack and Optical Rack Installations, Labeling Cables and Optical codes etc. Worked on Paso link+, NEC,
Ceragon SDH/PDH, Alcatel and Lucent BTS.
5. N o k i a S i e m e n s N e t wo rk ( f o r Ai r t e l - O & M) .
Duration: June 2007 to Feb. 2008.
Location: Sitamarhi, Darbhanga.
Designation: Electrical System Supervisor (ESS)
-:Key Responsibilities:-
Infra and Electrical System maintenance of 300 cell sites including three BSCs of Darbhanga, Sitamarhi and
Jale, with the co-ordination of OAM vendor supports, consisting of Twenty three (23) Technicians/Electricians to
Maintain the quality of Network and Electrical Infra by actively monitoring and rectification on 24X7 basis to
Acquire minimum downtime of the Electrical Equipment’s.
1. To maintain the Network availability of Zone>=99.98% aiming to keep minimal down time of Network.
Page 3 of 4
2. Predictive, Preventive and Reactive maintenance of all Incorporate Equipments of GSM sites such as DG, PIU,
SMPS, Battery Bank, Air-Conditioner, Aviation Lamp, Switchgears, Servo-Stabilizers, AMF Panel, lighting
Arrestor, Earth Pits, Shelter Lights, Fire Extinguisher, Surge Protector,
3. Site DG-Automation, BTS Alarms Signals rectification for OMCR Monitoring.
4. Maintenance of 300 Electrified sites comprises of 25KVA Transformer to 63KVA and HT/LT Distributions.
5. Ensure DG servicing on time, optimum utilization of EB supply. Lodging complains of Faulty/Breakdown
Equipments with respective OEM vendors and ensure for rectification as per SLA. Programming SMPS, PIU, Air
conditioner for optimized site operation.
6. Operation and Maintenance of Infra related MIS generation to understand Network’s drawbacks and to reduce
running cost from the power utility aspects, frequently site visit for preventive and corrective maintenance.
7. Monitoring and Controlling BTS sites by Monitoring from BSC logging, checking sites status, and Power Alarms.
6 . EMC O N S En g i n e e ri n g Pvt . Li m i t e d.
Duration: Nov. 2006 to May 2007
Location: Ranchi (Jharkhand)
Designation: Commissioning Engineer.
-:Key Responsibilities:-
1. My responsibility is to Quote Estimate for Automation, Switchgears, AMF Panel, Power factor Rectification
Panel,PLC, AC/DC Drives, HMI Monitors, Switchgears, Proximity sensors, Encoders etc. for Industrial
Automation.
1. Provide GA and control diagram of such Panels in Auto-CAD 2004/2007.
2. Making of BOQ and Procurement of Switchgears after the calculating Rating Currents.
3. Provide offer Quotation of such panels to our customer and liaising for the same.
4. Installation and commissioning of AMF, Motor Starters, Industrial & Residential and APFC Panels at the site. Bill
submission and other liaising.
5. Worked on Allen-Bradley PLC and Drives, Honeywell, Havel’s, L&T, TC, ABB etc. as Switchgears.
7 . S y n e rg y T e l e co m m u n i ca t i o n s Pvt . Li m i t e d .
Duration: Jan. 2006 to Oct 2006
Location: Patna (Bihar)
D e s i g n a t i o n : J u n i o r Ma n a g e r
Get the Installation of Power Interface units a type of programmable embedded system for Telecom Site Automation and
Alarming purpose and Cool Shelters for Telecom BTS, Battery Bank and ensure Acceptance Test of such Electrical
installations.
PIU and Cool Shelter Rooms are used as a solutions aiming to minimize the use of DG Set, maintained the Room
Temperature for Better Battery Bank Life, used for Backup Power to the BTS and ensure uninterrupted, low Maintenance,
Transient free operations of the communication sites. Power Interface Unit integrates all the essential constituents of a site
within a single telecom rack to support total Automation of the site with Voltage Stabilizer.
8 . D AT EX El e ct ro n i cs Pvt . Li m i t e d.
Duration: Feb. 2005 to Dec. 2005.
Location: New Delhi, Patna (Bihar)
D e s i g n a t i o n : Re g i o n a l En g i n e e r .
Job Profile: 500VA to 15KVA On-line/Line I/interactive UPS assembling, card Testing and Quality Check (QC) of UPS,
and installation at customer site. AMC support and Sales support of OFF-Line, ON-Line and Line-Interactive UPS
(Uninterrupted Power Supply). The UPS is based on PLA-IC as a controller and MOSFET & IGBT as a Switching device.
A C H I E V E M E N T S & P R O J E C T S
 Vodafone 100 sites BTS Alarms rectified and brought 150 Sites in Automation in Bhagalpur.
 Vodafone OPEX control in Bhagalpur BSC (150 sites) brought Average Dg consumption from 2.4liters/hour to
2.2liters/hour and Average Dg run from 17hours/day to 15hours/day for 15KVA Genset.
 Reliance communication, Installation and commissioning of 106 Microwave SDH/PDH Hopes.
 Airtel 200 sites brought in Automation and BTS Alarms Rectification in Darbhanga, Madhubani and Sitamarhi.
 Bokaro steel plant, Exhauster-5 PLC Automation and SCADA implementation for iron melting ores Plant as a
Commission Technician.
 Consistent Bhagalpur BSC KPI>=99.95% of Vodafone Network, two times SPACE STAR AWARD winner.
 Made myself Auto Domestic Motor starter to make Reservoir full, when water reached at bottom level and Auto
switched off when reached at Top level, using 556 Multi-vibrator IC.
 Optical Fiber Splicing work on Sponsorship for Eastern Railway under M/s Supreme Telecommunications,
Calcutta, from Aug. 1999 to June 2000.
Page 4 of 4
E D U C A T I O N :
 M.Sc.-Electronics 64% , from Anugrah Narayan College, Patna, Magadha University.
 B.Sc.-Electronics 59% , from Anugrah Narayan College, Patna, Magadha University.
 DOEACC O Level Computer Diploma Course with “C” grade. (55-64% ).
 ITI in Electronics repairing like Inverter, UPS, Servo-Stabilizer, Amplifier, TV, Radio etc.
 Hobbies: Net surfing, cooking, Electronics TV, Radio, UPS, SMPS, Mobile, Computer Repairing.

More Related Content

What's hot

2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiataHasitha Neelaka
 
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...Living Online
 
Training report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3GTraining report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3Gengramjadislam78
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?TTI Telecom
 
IRJET-K- Band Differential LNA using Gan HEMT
IRJET-K- Band Differential LNA using Gan HEMTIRJET-K- Band Differential LNA using Gan HEMT
IRJET-K- Band Differential LNA using Gan HEMTIRJET Journal
 
Abstract of bts installation & commisioning
Abstract of bts installation & commisioningAbstract of bts installation & commisioning
Abstract of bts installation & commisioningAIRTEL
 
Renewable Energy Conversion
Renewable Energy ConversionRenewable Energy Conversion
Renewable Energy Conversionrob_1v
 
BHEL TRAINING REPORT IN TELECOMMUNICATION
BHEL TRAINING REPORT IN TELECOMMUNICATIONBHEL TRAINING REPORT IN TELECOMMUNICATION
BHEL TRAINING REPORT IN TELECOMMUNICATIONgy_manish
 
Technical overview of all sources of Electrical Power used in BTSs in Nigeria
Technical overview of all sources of Electrical Power used in BTSs in NigeriaTechnical overview of all sources of Electrical Power used in BTSs in Nigeria
Technical overview of all sources of Electrical Power used in BTSs in NigeriaIRJET Journal
 
Troubleshooting Power Line Carrier Senggiring Singkawang with Electronic Simu...
Troubleshooting Power Line Carrier Senggiring Singkawang with Electronic Simu...Troubleshooting Power Line Carrier Senggiring Singkawang with Electronic Simu...
Troubleshooting Power Line Carrier Senggiring Singkawang with Electronic Simu...Hariadi Aji Jejey
 
Bsnl ppt-by aswin.ppt
Bsnl ppt-by aswin.pptBsnl ppt-by aswin.ppt
Bsnl ppt-by aswin.pptAswinkumar R
 
Project ManagementOf Telecom Project A Case Study
Project ManagementOf Telecom Project A Case StudyProject ManagementOf Telecom Project A Case Study
Project ManagementOf Telecom Project A Case StudyDjadja Sardjana
 

What's hot (20)

2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata
 
Dt report
Dt reportDt report
Dt report
 
CV-VP-KEMYA
CV-VP-KEMYACV-VP-KEMYA
CV-VP-KEMYA
 
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
 
Training report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3GTraining report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3G
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?
 
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
Riaz mahmood
Riaz mahmoodRiaz mahmood
Riaz mahmood
 
IRJET-K- Band Differential LNA using Gan HEMT
IRJET-K- Band Differential LNA using Gan HEMTIRJET-K- Band Differential LNA using Gan HEMT
IRJET-K- Band Differential LNA using Gan HEMT
 
Mtnl ppt
Mtnl pptMtnl ppt
Mtnl ppt
 
Abstract of bts installation & commisioning
Abstract of bts installation & commisioningAbstract of bts installation & commisioning
Abstract of bts installation & commisioning
 
Renewable Energy Conversion
Renewable Energy ConversionRenewable Energy Conversion
Renewable Energy Conversion
 
BHEL TRAINING REPORT IN TELECOMMUNICATION
BHEL TRAINING REPORT IN TELECOMMUNICATIONBHEL TRAINING REPORT IN TELECOMMUNICATION
BHEL TRAINING REPORT IN TELECOMMUNICATION
 
Technical overview of all sources of Electrical Power used in BTSs in Nigeria
Technical overview of all sources of Electrical Power used in BTSs in NigeriaTechnical overview of all sources of Electrical Power used in BTSs in Nigeria
Technical overview of all sources of Electrical Power used in BTSs in Nigeria
 
Praveendas Resume -1
Praveendas Resume -1Praveendas Resume -1
Praveendas Resume -1
 
li-fi Bsnl final report
li-fi Bsnl final reportli-fi Bsnl final report
li-fi Bsnl final report
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Troubleshooting Power Line Carrier Senggiring Singkawang with Electronic Simu...
Troubleshooting Power Line Carrier Senggiring Singkawang with Electronic Simu...Troubleshooting Power Line Carrier Senggiring Singkawang with Electronic Simu...
Troubleshooting Power Line Carrier Senggiring Singkawang with Electronic Simu...
 
Bsnl ppt-by aswin.ppt
Bsnl ppt-by aswin.pptBsnl ppt-by aswin.ppt
Bsnl ppt-by aswin.ppt
 
Project ManagementOf Telecom Project A Case Study
Project ManagementOf Telecom Project A Case StudyProject ManagementOf Telecom Project A Case Study
Project ManagementOf Telecom Project A Case Study
 

Similar to Resume-Chandramouli (20)

Resume Bodhi
Resume BodhiResume Bodhi
Resume Bodhi
 
Nawal Kishore
Nawal KishoreNawal Kishore
Nawal Kishore
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
Eberri Kennedy CV
Eberri Kennedy CVEberri Kennedy CV
Eberri Kennedy CV
 
manoj_resume__1_
manoj_resume__1_manoj_resume__1_
manoj_resume__1_
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
Suresh V Resume
Suresh V ResumeSuresh V Resume
Suresh V Resume
 
Cv
CvCv
Cv
 
CV of PK Mishra_Update
CV of PK Mishra_UpdateCV of PK Mishra_Update
CV of PK Mishra_Update
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
CV_ Sudhir
CV_ Sudhir CV_ Sudhir
CV_ Sudhir
 
CV_Tathagata Bandopdhyay-v1.1
CV_Tathagata Bandopdhyay-v1.1CV_Tathagata Bandopdhyay-v1.1
CV_Tathagata Bandopdhyay-v1.1
 
Resumes
ResumesResumes
Resumes
 
Resume
ResumeResume
Resume
 
Thomas Hooton Resume
Thomas Hooton ResumeThomas Hooton Resume
Thomas Hooton Resume
 
Resume
Resume Resume
Resume
 
CV bharat new
CV    bharat newCV    bharat new
CV bharat new
 
Shailesh-Update
Shailesh-UpdateShailesh-Update
Shailesh-Update
 

Resume-Chandramouli

  • 1. Page 1 of 4 CHANDRAMOULI DEV S/o Late Ram Vijay Kumar, Yamuna-2, Vastu-Vihar Colony, Phase-1, Industrial Area CIPET Road, Hajipur-844101, Bihar. Contact: +91- 9199759998; Email: - cmelect@gmail.com; DOB: 11th Sep 1978; CTC- 3.75 Lakhs/Annum. Telecom Industry Professional SUMMARY I am industrious professional with experience of over 11 years across Testing, Installation & Commissioning, Operation & Maintenance, Site coordination, Project Execution, Safety and Team Management. I have been instrumented in troubleshooting, servicing and operation & maintenance to ensure maximum operational availability of telecommunication/electrical/electronic- equipment / systems. I have demonstrated strength in implementing planned, preventive and predictive maintenance practices to optimize efficiency with constant endeavours to realize zero downtime. I have proven competencies in managing team performance by constantly monitoring quality aspects and empowering members to achieve and surpass goals. Gifted with a creative aptitude and attention to detail, I have proven track of making significant contributions by deploying and setting systems,atthe same time bringing about considerable cost reductions, while ensuring efficiency and quality benchmark of Telecommunication Engineering with flexibility to adapt to new situations, I always look forward to adopt and adapt the new wave of technology for its day-to-day application. I am adroit in identifying faults and have ability to handle the entire range of troubleshooting activities. I have demonstrated ability in drawing well -balanced conclusions whilst dealing with complexservice and maintenance issues and interpreting procedures and guidelines in order to resolve them. Driven by the key values of leadership, innovation and responsiveness, I always ensure to implement measures for cost rationalization and increase productivity. My unique approach is to emphasize on restructuring core areas to enhance competency and thereby add a value to the business. I have proven competencies in judiciously managing manpower, machines and materials resources to generate maximum operational efficiency as well as capable of maintaining harmonious industrial relations to ensure hassle free business operations. SKILLS * Project Management, Liaising & Co-ordination * Vendor Management * Bill Vetting * Manpower Management * Site Co-ordination * MIS Coordination * Crisis Management * Project Liaising * Training and Development * Cross Functional Coordination * BSS Network * ESS Network * Preventive, Reactive and Corrective Maintenance * Telecom/Industrial Electrical Maintenance * Payroll Management * Materials Management * Commissioning, Installation and Integration- BTS, PDH/SDH Microwave Media, PLC, Sensors, Switchgears, AMF Panels, HT/LT installations, Transformers, SMPS & Battery Banks, UPS, Diesel Generator, Solar Panels, Domestic Electrical/Electronic Repairing & Maintenance. Experiences 1. Electro Mechnico Projects Pvt. Ltd. Duration: From Sep. 2014 To till Date. Location:- Haldia. Designation: Site In-charge. -:Key Responsibilities:- 1. On Behalf of Indian Oil looking after comprehensive Electrical Maintenance job of a Township, of 1500 Quarters, Club and Guest House with 20 Groups of Electrical licensed workers. 2. Resolve Electrical Distribution problems, Resolve customer complains, Procurement of materials as per requirements, provide HT/LT Inter-Connection during Rectification/Preventive Maintenance, allots jobs to Manpower for 24X7 basis to rectify Electrical complains and No Power event. 3. Preventive & Corrective Maintenance of 11KVA Kiosk Panel, Motorized LT Distribution Panels, Earthling System, 500KVA Transformers, LED/SV Lamp Street Lights, XLPE Armored cables and joints and other electrical home appliances power rectification and installations. Geyser, Fan, Air-condition Preventive Maintenance and Workshop. 4. Analyze Root cause of a fault for permanent solution. Planning of Preventive Maintenance of all Electrical Panels, and MIS record generation for the same. 5. Payroll Management, Billing, and payment realization and utilization of full work as per work order. 6. Provide Technical Support and resolve issues among the team. Focus on customer satisfaction, and Teamsafety. 2. P. K Industry. Duration: From Dec. 2012 To Aug 2014. Location: Patna. Designation: Site In-charge. -:Key Responsibilities:-
  • 2. Page 2 of 4 1. Installation and Commissioning of APFC Panel and Capacitors Bank with Switchgears arrangements & Programming HPL and L&T APFC embedded Meters to achieve P.F >=99.9. 2. Regular monitoring LT Electrical Meter reading of sump house for change in Inductive and Capacitive load and program APFC meter accordingly for the best power utilization. 3. Installation and Maintenance work of 25KVA to 100KVA of Transformers including Earthling at various rural areas in Bihar, Including Survey, taking NOC from EB board regarding BOQ, Installation of AB switch and LA and take Shutdown permission with Bihar Electricity authority. 4. To maintain Power Factor P.F >=0.99 of APFC Panel for 24 No.’s Sump House of Bihar Rajya Jal Parisad. 5. Preventive & Corrective Maintenance of Star-Delta/DOL motor starter Panels of Sump-House. 6. Marketing and promotion activity of our Electrical products like Geysers, Decorative Lights, LED Lights and other Electrical products make: - Hevells/Bajaj/Crompton etc. 3. Vo da f o n e Es s a r S pa ce t e l Lt d. Duration: From August 2008 to Nov. 2012. Location: Patna, Bhagalpur, Daltonganj. Designation: Executive in Network. (BSS) -:Key Responsibilities:- 1. To maintain Uptime of Network Availability of Vodafone RNA >= 99.98% of my B.S.C of almost 200 Sites. 2. On-Site/Off-site BTS and Electrical complain resolution, 24X7 Basis Site monitoring as per information from OMCR/NMS. 3. BTS is commissioning and Microwave alignments, Trx addition/deletion as per Network demand, Site and all working sectors monitoring from my BSC. 4. Necessary preventive & corrective action of Passive & Active Infra to avoid major breakdown. 5. Maintenance of 250 Electrified sites comprises of 25KVA Transformers and 15KVA Diesel Engines. 6. Proper utilization of Vendors as per P.O. contract of SLA involved in daily OAM activities. 7. MIS generation of all Network Parameters & Asset. MIS of Equipment complains and status pending from OEM or Vendor and its escalation to upper level with Liaising OEM for close before the SLA. 8. Data Records of Servicing, Maintenance and Fuel filling of DGs and EB bills, Also verification of Utilities bills and tally it to field Data and Vendor bill vetting. 9. Site Acquisition according as per RF plan, Acceptance Test of On-Aired new sites. BTS Alarm Rectification with the co-ordination to OMCR to improve BSS KPI and Maintained my BSC TCH Block < 2%, SDCCH Block < 1%, TCH Drop < 1.5%, SDCCH Drop <= 1.5%. Supervision of OFC Network and Project work. 10. Resolution of Customer complaint like Coverage Issue and Call Drops. Implementation of Repeaters and IBS at low coverage area. 11. BTS-Alarm rectification and Site-Automation. 4. Re l i a n ce In t e g ra t e d S e rvi ce s Pvt . Li m i t e d. Duration: Mar. 2008 to Aug. 2008. Location: Purina, Forbisganj, Araria, Kishanganj and Katihar. Designation: Zonal In charge -:Key Responsibilities:- Leading a Technical team consisting of Seven Engineers, fifteen riggers & electricians, for the Installation & Commissioning of PDH/SDH- Telecom Media Transmission Equipments and OAM of the CDMA/ GSM Network. 1. NEC and Ceragon Microwave (PDH/SDH) Radio Equipments Installations to achieve Wireless Network Transport of STM-1 Capacity SDH Ring for Site E1 distribution for mobile and data communications as per RF plan. 2. IP Implementation and Router and Switch Installation for NMS, and AT before finally H/O to OAM. 3. E1 DDF Rack and Optical Rack Installations, Labeling Cables and Optical codes etc. Worked on Paso link+, NEC, Ceragon SDH/PDH, Alcatel and Lucent BTS. 5. N o k i a S i e m e n s N e t wo rk ( f o r Ai r t e l - O & M) . Duration: June 2007 to Feb. 2008. Location: Sitamarhi, Darbhanga. Designation: Electrical System Supervisor (ESS) -:Key Responsibilities:- Infra and Electrical System maintenance of 300 cell sites including three BSCs of Darbhanga, Sitamarhi and Jale, with the co-ordination of OAM vendor supports, consisting of Twenty three (23) Technicians/Electricians to Maintain the quality of Network and Electrical Infra by actively monitoring and rectification on 24X7 basis to Acquire minimum downtime of the Electrical Equipment’s. 1. To maintain the Network availability of Zone>=99.98% aiming to keep minimal down time of Network.
  • 3. Page 3 of 4 2. Predictive, Preventive and Reactive maintenance of all Incorporate Equipments of GSM sites such as DG, PIU, SMPS, Battery Bank, Air-Conditioner, Aviation Lamp, Switchgears, Servo-Stabilizers, AMF Panel, lighting Arrestor, Earth Pits, Shelter Lights, Fire Extinguisher, Surge Protector, 3. Site DG-Automation, BTS Alarms Signals rectification for OMCR Monitoring. 4. Maintenance of 300 Electrified sites comprises of 25KVA Transformer to 63KVA and HT/LT Distributions. 5. Ensure DG servicing on time, optimum utilization of EB supply. Lodging complains of Faulty/Breakdown Equipments with respective OEM vendors and ensure for rectification as per SLA. Programming SMPS, PIU, Air conditioner for optimized site operation. 6. Operation and Maintenance of Infra related MIS generation to understand Network’s drawbacks and to reduce running cost from the power utility aspects, frequently site visit for preventive and corrective maintenance. 7. Monitoring and Controlling BTS sites by Monitoring from BSC logging, checking sites status, and Power Alarms. 6 . EMC O N S En g i n e e ri n g Pvt . Li m i t e d. Duration: Nov. 2006 to May 2007 Location: Ranchi (Jharkhand) Designation: Commissioning Engineer. -:Key Responsibilities:- 1. My responsibility is to Quote Estimate for Automation, Switchgears, AMF Panel, Power factor Rectification Panel,PLC, AC/DC Drives, HMI Monitors, Switchgears, Proximity sensors, Encoders etc. for Industrial Automation. 1. Provide GA and control diagram of such Panels in Auto-CAD 2004/2007. 2. Making of BOQ and Procurement of Switchgears after the calculating Rating Currents. 3. Provide offer Quotation of such panels to our customer and liaising for the same. 4. Installation and commissioning of AMF, Motor Starters, Industrial & Residential and APFC Panels at the site. Bill submission and other liaising. 5. Worked on Allen-Bradley PLC and Drives, Honeywell, Havel’s, L&T, TC, ABB etc. as Switchgears. 7 . S y n e rg y T e l e co m m u n i ca t i o n s Pvt . Li m i t e d . Duration: Jan. 2006 to Oct 2006 Location: Patna (Bihar) D e s i g n a t i o n : J u n i o r Ma n a g e r Get the Installation of Power Interface units a type of programmable embedded system for Telecom Site Automation and Alarming purpose and Cool Shelters for Telecom BTS, Battery Bank and ensure Acceptance Test of such Electrical installations. PIU and Cool Shelter Rooms are used as a solutions aiming to minimize the use of DG Set, maintained the Room Temperature for Better Battery Bank Life, used for Backup Power to the BTS and ensure uninterrupted, low Maintenance, Transient free operations of the communication sites. Power Interface Unit integrates all the essential constituents of a site within a single telecom rack to support total Automation of the site with Voltage Stabilizer. 8 . D AT EX El e ct ro n i cs Pvt . Li m i t e d. Duration: Feb. 2005 to Dec. 2005. Location: New Delhi, Patna (Bihar) D e s i g n a t i o n : Re g i o n a l En g i n e e r . Job Profile: 500VA to 15KVA On-line/Line I/interactive UPS assembling, card Testing and Quality Check (QC) of UPS, and installation at customer site. AMC support and Sales support of OFF-Line, ON-Line and Line-Interactive UPS (Uninterrupted Power Supply). The UPS is based on PLA-IC as a controller and MOSFET & IGBT as a Switching device. A C H I E V E M E N T S & P R O J E C T S  Vodafone 100 sites BTS Alarms rectified and brought 150 Sites in Automation in Bhagalpur.  Vodafone OPEX control in Bhagalpur BSC (150 sites) brought Average Dg consumption from 2.4liters/hour to 2.2liters/hour and Average Dg run from 17hours/day to 15hours/day for 15KVA Genset.  Reliance communication, Installation and commissioning of 106 Microwave SDH/PDH Hopes.  Airtel 200 sites brought in Automation and BTS Alarms Rectification in Darbhanga, Madhubani and Sitamarhi.  Bokaro steel plant, Exhauster-5 PLC Automation and SCADA implementation for iron melting ores Plant as a Commission Technician.  Consistent Bhagalpur BSC KPI>=99.95% of Vodafone Network, two times SPACE STAR AWARD winner.  Made myself Auto Domestic Motor starter to make Reservoir full, when water reached at bottom level and Auto switched off when reached at Top level, using 556 Multi-vibrator IC.  Optical Fiber Splicing work on Sponsorship for Eastern Railway under M/s Supreme Telecommunications, Calcutta, from Aug. 1999 to June 2000.
  • 4. Page 4 of 4 E D U C A T I O N :  M.Sc.-Electronics 64% , from Anugrah Narayan College, Patna, Magadha University.  B.Sc.-Electronics 59% , from Anugrah Narayan College, Patna, Magadha University.  DOEACC O Level Computer Diploma Course with “C” grade. (55-64% ).  ITI in Electronics repairing like Inverter, UPS, Servo-Stabilizer, Amplifier, TV, Radio etc.  Hobbies: Net surfing, cooking, Electronics TV, Radio, UPS, SMPS, Mobile, Computer Repairing.