Objective
• Determine weighted average speed, Pace, modal speed, speed
limits, design speed
• Check the speed distribution pattern
• Finding Time-mean speed and Space-mean speeds
• Finding delay for each type of vehicle
• Finding the cost of delay
• Find LOS of study road
IMPLICATION
• Capacity studies
• Geometric studies
• Accident analysis
• Economic studies
• Performance studies
• Planning and designing of
1. Traffic signal design
2. Road sign design
3. Parking crossing design
4. Establishing speed limit
5. Speed zoning
6. Placing control device
Methodology
SPOT SPEED:
1.Manual
2.Automatic:
a. RADAR meter
b.Pressure strip
c.Video
d.Graph
Travel speed:
a.License plate method
b.Floating car method
c.Elevated observer method
OUR APPROACH
SPOT SPEED : MANUAL
odometer , stopwatch
Checking with radar gun
Grouped numerators
Travel speed :
License plate method
Mobile phone , recording app,stopwatch
Data collection:
Data Analysis:
Flow Histogram:
0
5
10
15
20
25
30
35
40
45
5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00
%frequency
spot speed,mph
%frequency vs speed histogram
Series1
• maximum vehicle
varies speed
between 15-20
mph.About 40%.
• Velocity less than
10mph is very rare.
• Very few vehicle are
within speed greater
than 35mph
Frequency Curve:
-5
0
5
10
15
20
25
30
35
40
45
50
0 10 20 30 40
%frequency
spot speed,mph
• Modal speed 16 mph for this
road and traffic condition.
• Pace is in between 9mph and
24mph.
• As the curve is nearly
symmetric, so Median speed is
also 16mph
Average speed:
speed mid speed frequency %frequency v total
0 to 5 2.5 0 0 0
5 to 10 7.5 1 0.653595 7.5
10 to 15 12.5 58 37.9085 725
15 to 20 17.5 61 39.86928 1067.5
20 to 25 22.5 22 14.37908 495
25 to 30 27.5 6 3.921569 165
30 to 35 32.5 5 3.267974 162.5
35 to 40 37.5 1 0.653595 37.5
154 100 total 2660
Vehicle are
running at a
speed of
17.27mph
Cumulative frequency distribution:
0
20
40
60
80
100
120
0 5 10 15 20 25 30 35 40
AxisTitle
Axis Title
95%
85%
50%
15%
 Our design speed to be
32.5mph
 Median speed is 16 mph.Look
it has satisfied the previous
%frequency vs speed curve
 Safe speed is 19mph
 Speed limit is 9mph to 19
mph
Travel Speed :
Vehicle
Type
Vehicle No Duration
(Seconds)
Speed
(m/s)
Average Duration
(Seconds), dT1
Car 1 140 7.14286
160.80
2 155 6.45161
3 150 6.66667
4 183 5.46448
5 176 5.68182
Bus 1 251 3.98406
241.75
2 228 4.38596
3 262 3.81679
4 226 4.42478
CNG 1 217 4.60829
215.50
2 245 4.08163
3 197 5.07614
4 203 4.92611
Motorcyc
le
1 318 3.14465
289.20
2 223 4.4843
3 329 3.03951
4 297 3.367
5 279 3.58423
Travel Time
On average
• Time mean speed 4.5
min
• Space mean speed
2.5sec
0
1
2
3
4
5
6
1
time mean speed and space
mean speed
time mean space mean
duratio
n
speed time mean
speed
space mean (ʋi-
ʋt)^2
sd space
mean+sd62/space
mean
179 4.469274 4.829396 2.556784 0.129688 5.787736 3.9987
110 7.272727 52.89256
105 7.619048 58.04989
106 7.54717 56.95977
150 5.333333 28.44444
285 2.807018 7.879347
98 8.163265 66.6389
94 8.510638 72.43096
109 7.33945 53.86752
50 16 256
130 6.153846 37.86982
135 5.925926 35.1166
1019 0.785083 0.616356
137 5.839416 34.09878
144 5.555556 30.8642
144 5.555556 30.8642
158 5.063291 25.63692
153 5.228758 27.33991
247 3.238866 10.49026
215 3.72093 13.84532
The war drop relationship is
established
Delay cost:
no del
ay
total
delay
,min
vo
c
fac
or
occupa
ncy
fact
vot
fact
or
cost
1
passen
ger
cost
2
total
lv 40
01
60.
8
67.5724
4
10
0
2.1 20 6757.
244
8402.1 1680
42
17479
9.2
ar 91
7
40.
5
10.3162
5
25 2.1 5 257.9
063
1925.7 9628
.5
9886.
406
sp 83
3
40.
4
9.34811
1
45 10 6 420.6
65
8330 4998
0
50400
.67
tru
ck
83 95 2.19027
8
17
6
0 0 385.4
889
0 0 385.4
889
bu
s
16
6
91.
75
4.23069
4
11
0
40 5.5
2
465.3
764
6640 3665
2.8
37118
.18
bik
e
83
3
10
9.2
25.2676
7
5 1 12 126.3
383
833 9996 10122
.34
So we can see per hour
cost of in total is about
282712 BDT
Most loss is done for
light vehicle passengers
Distribution pattern:
Value of chi square is 29.9
LEVEL OF SERVICE:
DATA shows it to be F
But
• Visual seems to be los C
• This is due to that we
assumed to be lane wise and
motorized vehicle which is
not the real situation
LEVEL OF SERVICE:
DATA shows it to be F
RECOMMANDATION:
For improvement
• We have found speed to be
decreased due to loss of width
which is the result of
unauthorized parking. So
improvement can be done
here.
• Service road within or
controlled entrance from
nearby estates has to be done
For Study:
• If speed gun and
wireless talking
device(travel speed)
were used more
frequently more
reliable data could be
gained. Some group
used it un evenly. If
equitable use were
done data would be
more correct
• A test survey should be
conducted first
SUMMARY
:
• maximum vehicle varies speed between 15-20 mph.About 40%.
• Again volume study showed about 50% vehicle was light vehicle.So a
summary can be taken as light vehicle are running at a speed near 20
mph in that section
• Modal speed 16 mph for this road and traffic condition.That is most car
want to maintain 16mph while operating
• Pace is in between 9mph and 24mph.That is most driver are seen with 15
mph difference , to be in between these speeds
• As the curve is nearly symettric,so Median speed is also 16mph
• Our design speed to be 32.5mph
• Median speed is 16 mph.Look it has satisfied the previous %ferquency vs
speed curve
• Safe speed is 19mph
• Speed limit is 9mph to 19 mph
• Space mean speed is 2.5mph and time mean is 4mph
• Visual seems to be los C
T
Question?
THANK YOU

More Related Content

What's hot

Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume surveyRashed Alam
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyStone Rayhan
 
Volume study presentation grp 04
Volume study presentation grp 04Volume study presentation grp 04
Volume study presentation grp 04Stone Rayhan
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyZawad khalil
 
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011Pronob Ghosh
 
Spot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarSpot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarMalika khalil
 
Spot Speed Study (Lab)
Spot Speed Study (Lab)Spot Speed Study (Lab)
Spot Speed Study (Lab)Priyansh Singh
 
Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308saibabu48
 
Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation  by ahmed ferdous - 1004137-buetTraffic volume study-opresentation  by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation by ahmed ferdous - 1004137-buetAhmed Ferdous Ankon
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studiesAnkit Patel
 
Traffic volume studies
Traffic volume studiesTraffic volume studies
Traffic volume studiesJanak Parmar
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyStone Rayhan
 
Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Civil Zone
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyKalpataru Das
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySai Santosh Yakkali
 

What's hot (20)

Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume survey
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Volume study presentation grp 04
Volume study presentation grp 04Volume study presentation grp 04
Volume study presentation grp 04
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Spot speed
Spot speedSpot speed
Spot speed
 
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
 
Spot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarSpot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyar
 
Spot Speed Study (Lab)
Spot Speed Study (Lab)Spot Speed Study (Lab)
Spot Speed Study (Lab)
 
Traffic survey
Traffic surveyTraffic survey
Traffic survey
 
Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308
 
Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation  by ahmed ferdous - 1004137-buetTraffic volume study-opresentation  by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Presentation 1
Presentation 1Presentation 1
Presentation 1
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
Traffic volume studies
Traffic volume studiesTraffic volume studies
Traffic volume studies
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
He final ppt
He final pptHe final ppt
He final ppt
 
Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
 

Viewers also liked

4th International Conference on Researches in Science and Technology (ICRST)
4th International Conference on Researches in Science and Technology (ICRST)4th International Conference on Researches in Science and Technology (ICRST)
4th International Conference on Researches in Science and Technology (ICRST)Global R & D Services
 
Zenia f saraswati university of brawijaya
Zenia f saraswati university of brawijayaZenia f saraswati university of brawijaya
Zenia f saraswati university of brawijayaGlobal R & D Services
 
Spot speed study
Spot speed studySpot speed study
Spot speed studyAmit Raj
 
Pavement skid resistance
Pavement skid resistancePavement skid resistance
Pavement skid resistanceHai Vo
 
AICP Prep Course - Transportation Planning
AICP Prep Course - Transportation PlanningAICP Prep Course - Transportation Planning
AICP Prep Course - Transportation Planningguestd509af
 
Speed detection-of-moving-vehicle-using-speed-cameras
Speed detection-of-moving-vehicle-using-speed-camerasSpeed detection-of-moving-vehicle-using-speed-cameras
Speed detection-of-moving-vehicle-using-speed-camerasVIKAS SINGH BHADOURIA
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume StudiesMd Tanvir Alam
 

Viewers also liked (9)

4th International Conference on Researches in Science and Technology (ICRST)
4th International Conference on Researches in Science and Technology (ICRST)4th International Conference on Researches in Science and Technology (ICRST)
4th International Conference on Researches in Science and Technology (ICRST)
 
Zenia f saraswati university of brawijaya
Zenia f saraswati university of brawijayaZenia f saraswati university of brawijaya
Zenia f saraswati university of brawijaya
 
ATHLETIC TESTING
ATHLETIC TESTINGATHLETIC TESTING
ATHLETIC TESTING
 
Traffic speed study
Traffic speed studyTraffic speed study
Traffic speed study
 
Spot speed study
Spot speed studySpot speed study
Spot speed study
 
Pavement skid resistance
Pavement skid resistancePavement skid resistance
Pavement skid resistance
 
AICP Prep Course - Transportation Planning
AICP Prep Course - Transportation PlanningAICP Prep Course - Transportation Planning
AICP Prep Course - Transportation Planning
 
Speed detection-of-moving-vehicle-using-speed-cameras
Speed detection-of-moving-vehicle-using-speed-camerasSpeed detection-of-moving-vehicle-using-speed-cameras
Speed detection-of-moving-vehicle-using-speed-cameras
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
 

Similar to Traffic speed analysis presentation- ahmed ferdous-1004137 buet

Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And DrainagePrashant Ranjan
 
Rmt fleet management
Rmt fleet managementRmt fleet management
Rmt fleet managementvivacityinfo
 
Rmt fleet management latest
Rmt fleet management latestRmt fleet management latest
Rmt fleet management latestvivacityinfo
 
SAFE CITY DAR Project
SAFE CITY DAR ProjectSAFE CITY DAR Project
SAFE CITY DAR ProjectJohn Sargsyan
 
Peak mileage expenses
Peak mileage expensesPeak mileage expenses
Peak mileage expensesAlex Baker
 
Transportation enginering
Transportation engineringTransportation enginering
Transportation engineringSathik Mohamed
 
Speed study pradipta banik 1204012
Speed study pradipta banik 1204012Speed study pradipta banik 1204012
Speed study pradipta banik 1204012Pradipta Banik
 
AITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony JohnstoneAITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony JohnstoneJumpingJaq
 
ECE BATCH 1 201223.pptx
ECE BATCH 1 201223.pptxECE BATCH 1 201223.pptx
ECE BATCH 1 201223.pptxmvsaikumar9
 
Driving workforce enablement through it innovation - RAC Utilising Data Insig...
Driving workforce enablement through it innovation - RAC Utilising Data Insig...Driving workforce enablement through it innovation - RAC Utilising Data Insig...
Driving workforce enablement through it innovation - RAC Utilising Data Insig...Microsoft UK
 
road widening
road wideningroad widening
road wideningSanjay Ps
 
Self driving car
Self driving carSelf driving car
Self driving carzebatasneem
 
INTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEMINTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEMAmar Patel
 
Yandex.Trafik "Real-time traffic information for avoiding traffic jam"
Yandex.Trafik "Real-time traffic information for avoiding traffic jam"Yandex.Trafik "Real-time traffic information for avoiding traffic jam"
Yandex.Trafik "Real-time traffic information for avoiding traffic jam"Yandex.Türkiye
 
DRIVERLESS CAR PPT PRESENTATION
DRIVERLESS CAR PPT PRESENTATION DRIVERLESS CAR PPT PRESENTATION
DRIVERLESS CAR PPT PRESENTATION VeereshTony1
 

Similar to Traffic speed analysis presentation- ahmed ferdous-1004137 buet (20)

Final FYP-ppt
Final FYP-pptFinal FYP-ppt
Final FYP-ppt
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And Drainage
 
CE-354-Group-3-Slides.pptx
CE-354-Group-3-Slides.pptxCE-354-Group-3-Slides.pptx
CE-354-Group-3-Slides.pptx
 
Rmt fleet management
Rmt fleet managementRmt fleet management
Rmt fleet management
 
Rmt fleet management latest
Rmt fleet management latestRmt fleet management latest
Rmt fleet management latest
 
SAFE CITY DAR Project
SAFE CITY DAR ProjectSAFE CITY DAR Project
SAFE CITY DAR Project
 
Peak mileage expenses
Peak mileage expensesPeak mileage expenses
Peak mileage expenses
 
Peak overview
Peak overviewPeak overview
Peak overview
 
Transportation enginering
Transportation engineringTransportation enginering
Transportation enginering
 
Proving grounds(Automobile)
Proving grounds(Automobile)Proving grounds(Automobile)
Proving grounds(Automobile)
 
Speed study pradipta banik 1204012
Speed study pradipta banik 1204012Speed study pradipta banik 1204012
Speed study pradipta banik 1204012
 
AITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony JohnstoneAITPM Conference Presentation Anthony Johnstone
AITPM Conference Presentation Anthony Johnstone
 
FREIGHT TRANSPORT RESEARCH IN AFRICA & ASIA
FREIGHT TRANSPORT RESEARCH IN AFRICA & ASIAFREIGHT TRANSPORT RESEARCH IN AFRICA & ASIA
FREIGHT TRANSPORT RESEARCH IN AFRICA & ASIA
 
ECE BATCH 1 201223.pptx
ECE BATCH 1 201223.pptxECE BATCH 1 201223.pptx
ECE BATCH 1 201223.pptx
 
Driving workforce enablement through it innovation - RAC Utilising Data Insig...
Driving workforce enablement through it innovation - RAC Utilising Data Insig...Driving workforce enablement through it innovation - RAC Utilising Data Insig...
Driving workforce enablement through it innovation - RAC Utilising Data Insig...
 
road widening
road wideningroad widening
road widening
 
Self driving car
Self driving carSelf driving car
Self driving car
 
INTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEMINTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEM
 
Yandex.Trafik "Real-time traffic information for avoiding traffic jam"
Yandex.Trafik "Real-time traffic information for avoiding traffic jam"Yandex.Trafik "Real-time traffic information for avoiding traffic jam"
Yandex.Trafik "Real-time traffic information for avoiding traffic jam"
 
DRIVERLESS CAR PPT PRESENTATION
DRIVERLESS CAR PPT PRESENTATION DRIVERLESS CAR PPT PRESENTATION
DRIVERLESS CAR PPT PRESENTATION
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 

Traffic speed analysis presentation- ahmed ferdous-1004137 buet

  • 1. Traffic speed study Ahmed Ferdous 1004137 Department of civil engineering Bangladesh University of Engineering and Technology
  • 2. Objective • Determine weighted average speed, Pace, modal speed, speed limits, design speed • Check the speed distribution pattern • Finding Time-mean speed and Space-mean speeds • Finding delay for each type of vehicle • Finding the cost of delay • Find LOS of study road
  • 3. IMPLICATION • Capacity studies • Geometric studies • Accident analysis • Economic studies • Performance studies • Planning and designing of 1. Traffic signal design 2. Road sign design 3. Parking crossing design 4. Establishing speed limit 5. Speed zoning 6. Placing control device
  • 4. Methodology SPOT SPEED: 1.Manual 2.Automatic: a. RADAR meter b.Pressure strip c.Video d.Graph Travel speed: a.License plate method b.Floating car method c.Elevated observer method
  • 5. OUR APPROACH SPOT SPEED : MANUAL odometer , stopwatch Checking with radar gun Grouped numerators Travel speed : License plate method Mobile phone , recording app,stopwatch
  • 7. Data Analysis: Flow Histogram: 0 5 10 15 20 25 30 35 40 45 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 %frequency spot speed,mph %frequency vs speed histogram Series1 • maximum vehicle varies speed between 15-20 mph.About 40%. • Velocity less than 10mph is very rare. • Very few vehicle are within speed greater than 35mph
  • 8. Frequency Curve: -5 0 5 10 15 20 25 30 35 40 45 50 0 10 20 30 40 %frequency spot speed,mph • Modal speed 16 mph for this road and traffic condition. • Pace is in between 9mph and 24mph. • As the curve is nearly symmetric, so Median speed is also 16mph
  • 9. Average speed: speed mid speed frequency %frequency v total 0 to 5 2.5 0 0 0 5 to 10 7.5 1 0.653595 7.5 10 to 15 12.5 58 37.9085 725 15 to 20 17.5 61 39.86928 1067.5 20 to 25 22.5 22 14.37908 495 25 to 30 27.5 6 3.921569 165 30 to 35 32.5 5 3.267974 162.5 35 to 40 37.5 1 0.653595 37.5 154 100 total 2660 Vehicle are running at a speed of 17.27mph
  • 10. Cumulative frequency distribution: 0 20 40 60 80 100 120 0 5 10 15 20 25 30 35 40 AxisTitle Axis Title 95% 85% 50% 15%  Our design speed to be 32.5mph  Median speed is 16 mph.Look it has satisfied the previous %frequency vs speed curve  Safe speed is 19mph  Speed limit is 9mph to 19 mph
  • 11. Travel Speed : Vehicle Type Vehicle No Duration (Seconds) Speed (m/s) Average Duration (Seconds), dT1 Car 1 140 7.14286 160.80 2 155 6.45161 3 150 6.66667 4 183 5.46448 5 176 5.68182 Bus 1 251 3.98406 241.75 2 228 4.38596 3 262 3.81679 4 226 4.42478 CNG 1 217 4.60829 215.50 2 245 4.08163 3 197 5.07614 4 203 4.92611 Motorcyc le 1 318 3.14465 289.20 2 223 4.4843 3 329 3.03951 4 297 3.367 5 279 3.58423 Travel Time On average • Time mean speed 4.5 min • Space mean speed 2.5sec
  • 12. 0 1 2 3 4 5 6 1 time mean speed and space mean speed time mean space mean duratio n speed time mean speed space mean (ʋi- ʋt)^2 sd space mean+sd62/space mean 179 4.469274 4.829396 2.556784 0.129688 5.787736 3.9987 110 7.272727 52.89256 105 7.619048 58.04989 106 7.54717 56.95977 150 5.333333 28.44444 285 2.807018 7.879347 98 8.163265 66.6389 94 8.510638 72.43096 109 7.33945 53.86752 50 16 256 130 6.153846 37.86982 135 5.925926 35.1166 1019 0.785083 0.616356 137 5.839416 34.09878 144 5.555556 30.8642 144 5.555556 30.8642 158 5.063291 25.63692 153 5.228758 27.33991 247 3.238866 10.49026 215 3.72093 13.84532 The war drop relationship is established
  • 13. Delay cost: no del ay total delay ,min vo c fac or occupa ncy fact vot fact or cost 1 passen ger cost 2 total lv 40 01 60. 8 67.5724 4 10 0 2.1 20 6757. 244 8402.1 1680 42 17479 9.2 ar 91 7 40. 5 10.3162 5 25 2.1 5 257.9 063 1925.7 9628 .5 9886. 406 sp 83 3 40. 4 9.34811 1 45 10 6 420.6 65 8330 4998 0 50400 .67 tru ck 83 95 2.19027 8 17 6 0 0 385.4 889 0 0 385.4 889 bu s 16 6 91. 75 4.23069 4 11 0 40 5.5 2 465.3 764 6640 3665 2.8 37118 .18 bik e 83 3 10 9.2 25.2676 7 5 1 12 126.3 383 833 9996 10122 .34 So we can see per hour cost of in total is about 282712 BDT Most loss is done for light vehicle passengers
  • 14. Distribution pattern: Value of chi square is 29.9
  • 15. LEVEL OF SERVICE: DATA shows it to be F But • Visual seems to be los C • This is due to that we assumed to be lane wise and motorized vehicle which is not the real situation LEVEL OF SERVICE: DATA shows it to be F
  • 16. RECOMMANDATION: For improvement • We have found speed to be decreased due to loss of width which is the result of unauthorized parking. So improvement can be done here. • Service road within or controlled entrance from nearby estates has to be done For Study: • If speed gun and wireless talking device(travel speed) were used more frequently more reliable data could be gained. Some group used it un evenly. If equitable use were done data would be more correct • A test survey should be conducted first
  • 17. SUMMARY : • maximum vehicle varies speed between 15-20 mph.About 40%. • Again volume study showed about 50% vehicle was light vehicle.So a summary can be taken as light vehicle are running at a speed near 20 mph in that section • Modal speed 16 mph for this road and traffic condition.That is most car want to maintain 16mph while operating • Pace is in between 9mph and 24mph.That is most driver are seen with 15 mph difference , to be in between these speeds • As the curve is nearly symettric,so Median speed is also 16mph • Our design speed to be 32.5mph • Median speed is 16 mph.Look it has satisfied the previous %ferquency vs speed curve • Safe speed is 19mph • Speed limit is 9mph to 19 mph • Space mean speed is 2.5mph and time mean is 4mph • Visual seems to be los C T