ABHISHEK SHARMA
Looking forward to an opportunity to work in a progressive and challenging environment where i can
enhance my skill and potential to achieve perfection in my job through hard work.
1) BHUSHAN POWER AND STEEL LTD. ; (ORISSA) :-
Bhushan Power having total capacity 506MW thermal power plant in Shambhalpur Distt. (Orissa).
Currently I am working here as an “Engineer (Electrical)” under 3X130MW Thermal Power Plant from
25/05/2013 to Till Date.
 RESPONSIBILITIES -:
 Responsible to take care of the day to day shift routine jobs, preventive and breakdown maintenance.
 Handle service delivery operations and preventive maintenance and Installations and testing of various
types Transformers 150MVA Generator transformers(GT), 110MVA Unit Auxiliaries Transformers
(UAT), and 16MVA Unit transformers, 2MVA Station transformers(SAT), installation of control
transformer, and well known about its protection & protection relay checking like Buchholz relay, MOG,
PRV, WTI, OTI etc.
 Preventive and breakdown maintenance of 33KV HT switchgear ABB make HPA Sf6 Circuit breaker
(up to 36KV, 1200A), 6.6KV Switchgear ABB make VD4 Vacuum Circuit Breaker circuit breaker (up to
12KV, 1250A), different type HT & LT motors maintenance and its protection, LV breakers (ACB),
Generators changeover panel, Motors starters (DOL, RDOL, Star-Delta), VFD panel and ableto interpret
AC circuits and wiring diagram.
 Preventive and Breakdown Maintenance and Monitoring of 220KV and 400KV Switchyard.
 Maintenance of plant UPS & BATTERY Bank, Inverters, Battery Charger (up to 1000A). Inspection of all
Emergency equipment (DG-Set, Battery Charger and battery bank) during operation and analyzingtheir
performance, checking and analysis of battery’s healthiness.
 Synchronizing to grid & Auto Changeover schemes with Incomers & Bus coupler, DG set.
 Playing active role in cable tray laying, Cable laying scheduling, Cable Glanding & Termination
scheduling.
 Well known about SAP application, updated all maintenance activity on SAP.
 Updating daily and monthly generation reports (which includes daily generation reports, breakdown
hours, Generator and motor’s parameters, keep vibration and temperature record of electrical
equipment, important activities done during month, updating maintenance report) and reporting to
Plant V.P.
2) BROTHERS ENGINEERING AND ERECTORS LTD. ; (CHHATTISGARH) :-
I have done job as an “Executive Engineer (Electrical)” in Brothers Engineering & Erectors Ltd. (BEEL)
who is installed Generator Auxiliaries & Turbine Auxiliaries at the project site of 6X600MW KSK
Mahanadi Thermal Power Project (KMPCL) at Chhattisgarh. From 10/04/2012 to 05/05/2013.
 RESPONSIBILITIES -:
 Handle Project, Erection, Commissioning, and Maintenance related work to electrical as well as of
Power Plant.
 Erection & Commissioning of Turbine & Boiler auxiliary i.e. (CEP, CW, CCW, PA-FAN, SA-FAN, ID-
FAN, and all H.T and L.T motors (up to 880kw), and its control circuit.
 Erection & Commissioning of i.e. Chemical dozing motor, ESP Raping and collecting motors, RSB and
LRSB motor, Coal feeder Motor, coal conveyor motors, flap gate motors etc. Variable Frequency Drives
(VFDs) Installation, control and power wiring, parameter setting and testing
 Erection & Commissioning of 33KV, 6.6KV H.T panel, 415V MCC & PCC panel, Bus-bar, LPBS etc.
Add. : 23 Seema Apartment G-2,
Govind Garden Raisen Road
Bhopal-462023 (M.P)
Email : abhishek0908@gmail.com
Mob. : +91 - 9755678684
Phone : 0755 - 4079028
CAREER OBJECTIVE
WORKING EXPERIENCE (Total Exp.-: 5+ Year)
Passport Detail: H9952358
SkypeId:
abhishek_sharma0908
3) PRAKASH INDUSTRY LTD.; (CHHATTISGARH) :-
Prakash Industry Limited, having Captive Power Plant (CPP). I have done job in running Power
plant as “Electrical Maintenance Engineer”, Bilaspur (Chhattisgarh) from 01/07/2009 to
01/02/2011.
 RESPONSIBILITIES -:
 Responsible to write the logbook and log the routine and unexpected events in order to take
corrective and preventive action. Responsible to maintain the different preventive checklists
of the equipment maintenance.
 Responsible to safe guard the handy Measuring instruments used during maintenance work.
 Routine and Preventive maintenance of 415KV LT switch gear, i.e. turbine and boiler
auxiliaries motors, Water treatment plant motors, ESP field transformers and its raping and
collecting motors, Ash silo motors, etc.
Course University / Board Subject Percentage
Passout
Year
P.G.D.C
(Equivalent N.P.T.I
Course)
V.T.U, Karnataka
/ JSW-Energy
Thermal Power Plant
Engg.
67.20 2012
B.E R.G.P.V, Bhopal
Electrical & Electronics
Engg.
67.50 2009
12th
M.P Board P.C.M 56.90 2005
 Two weeks training course on ‘’ 300 MW Power Plant Simulator” from JSW - Energy Center
of Excellence, Toranagallu (Karnataka).
 Twoweeks trainingat” BharatHeavyElectricals Limited(BHEL)”,in A.CMachineDivision,
Bhopal (M.P).
 Two weeks training at” M.P. Power Transmission Company Limited (MPTCL)” in 220KV/
415V Substation, Bhopal (M.P).

 Swimming
 Cooking.
 Traveling.
 Watching Movies
 Father’s Name : Shri. Mahesh Kumar Sharma
 Mother’s Name : Smt. Sudha Sharma
 Date of Birth : 09-Augast-1987
I hereby declare that information furnished above is true to the best of my knowledge and belief.
Date : / /
Place : Bhopal [ABHISHEK SHARMA]
HOBBIES
PERSONAL DETAIL
DECLARATION
EDUCATION QUALIFICATION
INDUSTRIAL TRAINING

More Related Content

What's hot (19)

Bhushan warghane 1_
Bhushan warghane 1_Bhushan warghane 1_
Bhushan warghane 1_
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
Cv
CvCv
Cv
 
CV bharat new
CV    bharat newCV    bharat new
CV bharat new
 
Avneesh 5_
Avneesh  5_Avneesh  5_
Avneesh 5_
 
Daman resume
Daman resumeDaman resume
Daman resume
 
Resume -Supachai
Resume -SupachaiResume -Supachai
Resume -Supachai
 
resume 11-2015
resume 11-2015resume 11-2015
resume 11-2015
 
2015-05-07 Ashish Kumar
2015-05-07 Ashish Kumar2015-05-07 Ashish Kumar
2015-05-07 Ashish Kumar
 
Tushar_Resume_02.04.2016
Tushar_Resume_02.04.2016Tushar_Resume_02.04.2016
Tushar_Resume_02.04.2016
 
PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015
 
Radhe_Resume
Radhe_ResumeRadhe_Resume
Radhe_Resume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Sanjog navandars
Sanjog navandarsSanjog navandars
Sanjog navandars
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
Muhammad Jawad(Resume)
Muhammad Jawad(Resume)Muhammad Jawad(Resume)
Muhammad Jawad(Resume)
 
Raju
RajuRaju
Raju
 
CV
CVCV
CV
 

Viewers also liked

CURRICULUM VITAE ingles actualizado
CURRICULUM VITAE ingles actualizadoCURRICULUM VITAE ingles actualizado
CURRICULUM VITAE ingles actualizadoDanilo Rodriguez
 
Interviews to tourists
Interviews to touristsInterviews to tourists
Interviews to touristsjabp2001
 
Milas haircuts and salon
Milas haircuts and salonMilas haircuts and salon
Milas haircuts and salonNiraj Joshi
 
GENIAC - Daniel Roberts Recommendation Letter
GENIAC - Daniel Roberts Recommendation LetterGENIAC - Daniel Roberts Recommendation Letter
GENIAC - Daniel Roberts Recommendation LetterDaniel Roberts
 
Prepn of eugenol dervs and caryophyllene oxide at room temp without any coolant
Prepn of eugenol dervs and caryophyllene oxide at room temp without any coolantPrepn of eugenol dervs and caryophyllene oxide at room temp without any coolant
Prepn of eugenol dervs and caryophyllene oxide at room temp without any coolantBenjamin Lukas
 
Climate change in pakistan Mr Allad Dad Khan Visiting Professor The Universit...
Climate change in pakistan Mr Allad Dad Khan Visiting Professor The Universit...Climate change in pakistan Mr Allad Dad Khan Visiting Professor The Universit...
Climate change in pakistan Mr Allad Dad Khan Visiting Professor The Universit...Mr.Allah Dad Khan
 
A little history of brand utility
A little history of brand utilityA little history of brand utility
A little history of brand utilityMarwann AL SAADI
 
Leadership vs. Management
Leadership vs. ManagementLeadership vs. Management
Leadership vs. ManagementSnag
 
Fundamentos salud ocupacional
Fundamentos salud ocupacionalFundamentos salud ocupacional
Fundamentos salud ocupacionalHarold Robles
 

Viewers also liked (13)

CURRICULUM VITAE ingles actualizado
CURRICULUM VITAE ingles actualizadoCURRICULUM VITAE ingles actualizado
CURRICULUM VITAE ingles actualizado
 
Interviews to tourists
Interviews to touristsInterviews to tourists
Interviews to tourists
 
Narrative printscreen
Narrative printscreenNarrative printscreen
Narrative printscreen
 
Household sport
Household sportHousehold sport
Household sport
 
Milas haircuts and salon
Milas haircuts and salonMilas haircuts and salon
Milas haircuts and salon
 
GENIAC - Daniel Roberts Recommendation Letter
GENIAC - Daniel Roberts Recommendation LetterGENIAC - Daniel Roberts Recommendation Letter
GENIAC - Daniel Roberts Recommendation Letter
 
Lampu led
Lampu ledLampu led
Lampu led
 
Monitoria 2010
Monitoria 2010Monitoria 2010
Monitoria 2010
 
Prepn of eugenol dervs and caryophyllene oxide at room temp without any coolant
Prepn of eugenol dervs and caryophyllene oxide at room temp without any coolantPrepn of eugenol dervs and caryophyllene oxide at room temp without any coolant
Prepn of eugenol dervs and caryophyllene oxide at room temp without any coolant
 
Climate change in pakistan Mr Allad Dad Khan Visiting Professor The Universit...
Climate change in pakistan Mr Allad Dad Khan Visiting Professor The Universit...Climate change in pakistan Mr Allad Dad Khan Visiting Professor The Universit...
Climate change in pakistan Mr Allad Dad Khan Visiting Professor The Universit...
 
A little history of brand utility
A little history of brand utilityA little history of brand utility
A little history of brand utility
 
Leadership vs. Management
Leadership vs. ManagementLeadership vs. Management
Leadership vs. Management
 
Fundamentos salud ocupacional
Fundamentos salud ocupacionalFundamentos salud ocupacional
Fundamentos salud ocupacional
 

Similar to Abhishek resume

PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015pravash panda
 
SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical EngineeringSudip Dhar
 
Ayush april 2016(ce np)
Ayush april 2016(ce np) Ayush april 2016(ce np)
Ayush april 2016(ce np) Ayush Gupta
 
RESUME_Dinesh Sarda 2
RESUME_Dinesh Sarda 2RESUME_Dinesh Sarda 2
RESUME_Dinesh Sarda 2Dinesh Sarda
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..Keshari Mishra
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
CV- Praveen Channe (15NOV 2015)
CV- Praveen Channe (15NOV 2015)CV- Praveen Channe (15NOV 2015)
CV- Praveen Channe (15NOV 2015)Praveen Channe
 
rahul.cv.new
rahul.cv.newrahul.cv.new
rahul.cv.newRahul Dey
 
Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood ButtTahir Butt
 

Similar to Abhishek resume (20)

SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
 
Resume
Resume Resume
Resume
 
Ayush april 2016(ce np)
Ayush april 2016(ce np) Ayush april 2016(ce np)
Ayush april 2016(ce np)
 
Afroz cv
Afroz cvAfroz cv
Afroz cv
 
deo@dipankar.doc
deo@dipankar.docdeo@dipankar.doc
deo@dipankar.doc
 
RESUME_Dinesh Sarda 2
RESUME_Dinesh Sarda 2RESUME_Dinesh Sarda 2
RESUME_Dinesh Sarda 2
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..
 
Resume
ResumeResume
Resume
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
DHAVAL
DHAVALDHAVAL
DHAVAL
 
CV- Praveen Channe (15NOV 2015)
CV- Praveen Channe (15NOV 2015)CV- Praveen Channe (15NOV 2015)
CV- Praveen Channe (15NOV 2015)
 
rahul.cv.new
rahul.cv.newrahul.cv.new
rahul.cv.new
 
Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood Butt
 
KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
 

Recently uploaded

Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 

Recently uploaded (20)

Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 

Abhishek resume

  • 1. ABHISHEK SHARMA Looking forward to an opportunity to work in a progressive and challenging environment where i can enhance my skill and potential to achieve perfection in my job through hard work. 1) BHUSHAN POWER AND STEEL LTD. ; (ORISSA) :- Bhushan Power having total capacity 506MW thermal power plant in Shambhalpur Distt. (Orissa). Currently I am working here as an “Engineer (Electrical)” under 3X130MW Thermal Power Plant from 25/05/2013 to Till Date.  RESPONSIBILITIES -:  Responsible to take care of the day to day shift routine jobs, preventive and breakdown maintenance.  Handle service delivery operations and preventive maintenance and Installations and testing of various types Transformers 150MVA Generator transformers(GT), 110MVA Unit Auxiliaries Transformers (UAT), and 16MVA Unit transformers, 2MVA Station transformers(SAT), installation of control transformer, and well known about its protection & protection relay checking like Buchholz relay, MOG, PRV, WTI, OTI etc.  Preventive and breakdown maintenance of 33KV HT switchgear ABB make HPA Sf6 Circuit breaker (up to 36KV, 1200A), 6.6KV Switchgear ABB make VD4 Vacuum Circuit Breaker circuit breaker (up to 12KV, 1250A), different type HT & LT motors maintenance and its protection, LV breakers (ACB), Generators changeover panel, Motors starters (DOL, RDOL, Star-Delta), VFD panel and ableto interpret AC circuits and wiring diagram.  Preventive and Breakdown Maintenance and Monitoring of 220KV and 400KV Switchyard.  Maintenance of plant UPS & BATTERY Bank, Inverters, Battery Charger (up to 1000A). Inspection of all Emergency equipment (DG-Set, Battery Charger and battery bank) during operation and analyzingtheir performance, checking and analysis of battery’s healthiness.  Synchronizing to grid & Auto Changeover schemes with Incomers & Bus coupler, DG set.  Playing active role in cable tray laying, Cable laying scheduling, Cable Glanding & Termination scheduling.  Well known about SAP application, updated all maintenance activity on SAP.  Updating daily and monthly generation reports (which includes daily generation reports, breakdown hours, Generator and motor’s parameters, keep vibration and temperature record of electrical equipment, important activities done during month, updating maintenance report) and reporting to Plant V.P. 2) BROTHERS ENGINEERING AND ERECTORS LTD. ; (CHHATTISGARH) :- I have done job as an “Executive Engineer (Electrical)” in Brothers Engineering & Erectors Ltd. (BEEL) who is installed Generator Auxiliaries & Turbine Auxiliaries at the project site of 6X600MW KSK Mahanadi Thermal Power Project (KMPCL) at Chhattisgarh. From 10/04/2012 to 05/05/2013.  RESPONSIBILITIES -:  Handle Project, Erection, Commissioning, and Maintenance related work to electrical as well as of Power Plant.  Erection & Commissioning of Turbine & Boiler auxiliary i.e. (CEP, CW, CCW, PA-FAN, SA-FAN, ID- FAN, and all H.T and L.T motors (up to 880kw), and its control circuit.  Erection & Commissioning of i.e. Chemical dozing motor, ESP Raping and collecting motors, RSB and LRSB motor, Coal feeder Motor, coal conveyor motors, flap gate motors etc. Variable Frequency Drives (VFDs) Installation, control and power wiring, parameter setting and testing  Erection & Commissioning of 33KV, 6.6KV H.T panel, 415V MCC & PCC panel, Bus-bar, LPBS etc. Add. : 23 Seema Apartment G-2, Govind Garden Raisen Road Bhopal-462023 (M.P) Email : abhishek0908@gmail.com Mob. : +91 - 9755678684 Phone : 0755 - 4079028 CAREER OBJECTIVE WORKING EXPERIENCE (Total Exp.-: 5+ Year) Passport Detail: H9952358 SkypeId: abhishek_sharma0908
  • 2. 3) PRAKASH INDUSTRY LTD.; (CHHATTISGARH) :- Prakash Industry Limited, having Captive Power Plant (CPP). I have done job in running Power plant as “Electrical Maintenance Engineer”, Bilaspur (Chhattisgarh) from 01/07/2009 to 01/02/2011.  RESPONSIBILITIES -:  Responsible to write the logbook and log the routine and unexpected events in order to take corrective and preventive action. Responsible to maintain the different preventive checklists of the equipment maintenance.  Responsible to safe guard the handy Measuring instruments used during maintenance work.  Routine and Preventive maintenance of 415KV LT switch gear, i.e. turbine and boiler auxiliaries motors, Water treatment plant motors, ESP field transformers and its raping and collecting motors, Ash silo motors, etc. Course University / Board Subject Percentage Passout Year P.G.D.C (Equivalent N.P.T.I Course) V.T.U, Karnataka / JSW-Energy Thermal Power Plant Engg. 67.20 2012 B.E R.G.P.V, Bhopal Electrical & Electronics Engg. 67.50 2009 12th M.P Board P.C.M 56.90 2005  Two weeks training course on ‘’ 300 MW Power Plant Simulator” from JSW - Energy Center of Excellence, Toranagallu (Karnataka).  Twoweeks trainingat” BharatHeavyElectricals Limited(BHEL)”,in A.CMachineDivision, Bhopal (M.P).  Two weeks training at” M.P. Power Transmission Company Limited (MPTCL)” in 220KV/ 415V Substation, Bhopal (M.P).   Swimming  Cooking.  Traveling.  Watching Movies  Father’s Name : Shri. Mahesh Kumar Sharma  Mother’s Name : Smt. Sudha Sharma  Date of Birth : 09-Augast-1987 I hereby declare that information furnished above is true to the best of my knowledge and belief. Date : / / Place : Bhopal [ABHISHEK SHARMA] HOBBIES PERSONAL DETAIL DECLARATION EDUCATION QUALIFICATION INDUSTRIAL TRAINING