Responsible to take care of the day to day shift routine jobs, preventive and breakdown maintenance.
Handle service delivery operations and preventive maintenance and Installations and testing of various types Transformers 150MVA Generator transformers(GT), 110MVA Unit Auxiliaries Transformers (UAT), and 16MVA Unit transformers, 2MVA Station transformers(SAT), installation of control transformer, and well known about its protection & protection relay checking like Buchholz relay, MOG, PRV, WTI, OTI etc.
Preventive and breakdown maintenance of 33KV HT switchgear ABB make HPA Sf6 Circuit breaker (up to 36KV, 1200A), 6.6KV Switchgear ABB make VD4 Vacuum Circuit Breaker circuit breaker (up to 12KV, 1250A), different type HT & LT motors maintenance and its protection, LV breakers (ACB), Generators change over panel, Motors starters (DOL, RDOL, Star-Delta), VFD panel and able to interpret AC circuits and wiring diagram.
Preventive and Breakdown Maintenance and Monitoring of 220KV and 400KV Switchyard.
Maintenance of plant UPS & BATTERY Bank, Inverters, Battery Charger (up to 1000A). Inspection of all Emergency equipment (DG-Set, Battery Charger and battery bank) during operation and analyzing their performance, checking and analysis of battery’s healthiness.
Synchronizing to grid & Auto Changeover schemes with Incomers & Bus coupler, DG set.
Playing active role in cable tray laying, Cable laying scheduling, Cable Glanding & Termination scheduling.
Well known about SAP application, updated all maintenance activity on SAP.
Updating daily and monthly generation reports (which includes daily generation reports, breakdown hours, Generator and motor’s parameters, keep vibration and temperature record of electrical equipment, important activities done during month, updating maintenance report) and reporting to Plant V.P.
1. ABHISHEK SHARMA
Looking forward to an opportunity to work in a progressive and challenging environment where i can
enhance my skill and potential to achieve perfection in my job through hard work.
1) BHUSHAN POWER AND STEEL LTD. ; (ORISSA) :-
Bhushan Power having total capacity 506MW thermal power plant in Shambhalpur Distt. (Orissa).
Currently I am working here as an “Engineer (Electrical)” under 3X130MW Thermal Power Plant from
25/05/2013 to Till Date.
RESPONSIBILITIES -:
Responsible to take care of the day to day shift routine jobs, preventive and breakdown maintenance.
Handle service delivery operations and preventive maintenance and Installations and testing of various
types Transformers 150MVA Generator transformers(GT), 110MVA Unit Auxiliaries Transformers
(UAT), and 16MVA Unit transformers, 2MVA Station transformers(SAT), installation of control
transformer, and well known about its protection & protection relay checking like Buchholz relay, MOG,
PRV, WTI, OTI etc.
Preventive and breakdown maintenance of 33KV HT switchgear ABB make HPA Sf6 Circuit breaker
(up to 36KV, 1200A), 6.6KV Switchgear ABB make VD4 Vacuum Circuit Breaker circuit breaker (up to
12KV, 1250A), different type HT & LT motors maintenance and its protection, LV breakers (ACB),
Generators changeover panel, Motors starters (DOL, RDOL, Star-Delta), VFD panel and ableto interpret
AC circuits and wiring diagram.
Preventive and Breakdown Maintenance and Monitoring of 220KV and 400KV Switchyard.
Maintenance of plant UPS & BATTERY Bank, Inverters, Battery Charger (up to 1000A). Inspection of all
Emergency equipment (DG-Set, Battery Charger and battery bank) during operation and analyzingtheir
performance, checking and analysis of battery’s healthiness.
Synchronizing to grid & Auto Changeover schemes with Incomers & Bus coupler, DG set.
Playing active role in cable tray laying, Cable laying scheduling, Cable Glanding & Termination
scheduling.
Well known about SAP application, updated all maintenance activity on SAP.
Updating daily and monthly generation reports (which includes daily generation reports, breakdown
hours, Generator and motor’s parameters, keep vibration and temperature record of electrical
equipment, important activities done during month, updating maintenance report) and reporting to
Plant V.P.
2) BROTHERS ENGINEERING AND ERECTORS LTD. ; (CHHATTISGARH) :-
I have done job as an “Executive Engineer (Electrical)” in Brothers Engineering & Erectors Ltd. (BEEL)
who is installed Generator Auxiliaries & Turbine Auxiliaries at the project site of 6X600MW KSK
Mahanadi Thermal Power Project (KMPCL) at Chhattisgarh. From 10/04/2012 to 05/05/2013.
RESPONSIBILITIES -:
Handle Project, Erection, Commissioning, and Maintenance related work to electrical as well as of
Power Plant.
Erection & Commissioning of Turbine & Boiler auxiliary i.e. (CEP, CW, CCW, PA-FAN, SA-FAN, ID-
FAN, and all H.T and L.T motors (up to 880kw), and its control circuit.
Erection & Commissioning of i.e. Chemical dozing motor, ESP Raping and collecting motors, RSB and
LRSB motor, Coal feeder Motor, coal conveyor motors, flap gate motors etc. Variable Frequency Drives
(VFDs) Installation, control and power wiring, parameter setting and testing
Erection & Commissioning of 33KV, 6.6KV H.T panel, 415V MCC & PCC panel, Bus-bar, LPBS etc.
Add. : 23 Seema Apartment G-2,
Govind Garden Raisen Road
Bhopal-462023 (M.P)
Email : abhishek0908@gmail.com
Mob. : +91 - 9755678684
Phone : 0755 - 4079028
CAREER OBJECTIVE
WORKING EXPERIENCE (Total Exp.-: 5+ Year)
Passport Detail: H9952358
SkypeId:
abhishek_sharma0908
2. 3) PRAKASH INDUSTRY LTD.; (CHHATTISGARH) :-
Prakash Industry Limited, having Captive Power Plant (CPP). I have done job in running Power
plant as “Electrical Maintenance Engineer”, Bilaspur (Chhattisgarh) from 01/07/2009 to
01/02/2011.
RESPONSIBILITIES -:
Responsible to write the logbook and log the routine and unexpected events in order to take
corrective and preventive action. Responsible to maintain the different preventive checklists
of the equipment maintenance.
Responsible to safe guard the handy Measuring instruments used during maintenance work.
Routine and Preventive maintenance of 415KV LT switch gear, i.e. turbine and boiler
auxiliaries motors, Water treatment plant motors, ESP field transformers and its raping and
collecting motors, Ash silo motors, etc.
Course University / Board Subject Percentage
Passout
Year
P.G.D.C
(Equivalent N.P.T.I
Course)
V.T.U, Karnataka
/ JSW-Energy
Thermal Power Plant
Engg.
67.20 2012
B.E R.G.P.V, Bhopal
Electrical & Electronics
Engg.
67.50 2009
12th
M.P Board P.C.M 56.90 2005
Two weeks training course on ‘’ 300 MW Power Plant Simulator” from JSW - Energy Center
of Excellence, Toranagallu (Karnataka).
Twoweeks trainingat” BharatHeavyElectricals Limited(BHEL)”,in A.CMachineDivision,
Bhopal (M.P).
Two weeks training at” M.P. Power Transmission Company Limited (MPTCL)” in 220KV/
415V Substation, Bhopal (M.P).
Swimming
Cooking.
Traveling.
Watching Movies
Father’s Name : Shri. Mahesh Kumar Sharma
Mother’s Name : Smt. Sudha Sharma
Date of Birth : 09-Augast-1987
I hereby declare that information furnished above is true to the best of my knowledge and belief.
Date : / /
Place : Bhopal [ABHISHEK SHARMA]
HOBBIES
PERSONAL DETAIL
DECLARATION
EDUCATION QUALIFICATION
INDUSTRIAL TRAINING