SlideShare a Scribd company logo
1 of 3
BHUSHAN G.WARGHANE
Mobile: 91 9096631495
E-Mail: aims_bhushan@rediffmail.com
Seeking assignments in Project Execution / Erection & Commissioning / Operations & Maintenance with an
organization of high repute
PROFILE SNAPSHOT
 A competent professional with 4.3 years of experience in erection, commissioning, operation & maintenance,
installation, testing and project execution
 Skilled in carrying out inspection of electrical equipment as per standards & agreement within norms
 Possess sound understanding of Health & Safety Standards, Quality Compliances, Energy Conservation Methodologies,
electrical equipment and instrumentation related to WHR boilers, TG & Switchyard
 Adroit in managing erection & commissioning of various equipment, maintenance functions for reducing
breakdown / downtime and enhancing operational effectiveness
 Possess good trouble shooting skills and sound knowledge of boiler and allied equipment operations
 A enthusiast with strong analytical, problem solving and people management skills
CORE COMPETENCIES
 Monitoring project execution, scheduling, site management
 Deploying suitable manpower, equipment / materials and ensuring proper planning for timely execution of the projects
 Managing installation, maintenance, testing, commissioning and inspection of electrical equipment
 Effecting preventive maintenance schedules of various kind of equipment to increase the equipment uptime /
reliability & accomplishing project targets
 Creating and sustaining a dynamic environment that fosters development opportunities and motivates high
performance amongst team members.
 Processes in depth knowledge of various standards used for different type of process industries like relay
configuration & and VFD panel commissioning.
 Engineering for WHR Boilers & auxiliaries (E&I).
ORGANIZATIONAL EXPERIENCE
Since Feb’12 with Transparent Energy System Pvt. Ltd., Pune as Project Engineer
Role & Responsibility:
 Handling a team of contractor.
 Overseeing project activities right from conceptualization to execution; involving finalization of technical
specifications, scheduling, progress monitoring, site management and manpower planning
 Maintaining healthy relationships with customers, electrical consultants and vendors
 Providing interface between customer & TESPL HO; representing TESPL in customer premises
 Coordinate entire Erection & commissioning activity at site.
Project handles:
Organization: UltraTech Cement Ltd., Awarpur Maharashtra
Capacity: 13.22 MW
Period: Nov.2013-Present
Organization: Chettinad Cement Corporation Ltd. Kallur, karnataka
Capacity: 7.3 MW
Period: Dec.2012-Nov-2013
Organization: Shri Digvijay Cement Corporation Ltd. Jamnagar, Gujarat
Capacity: 8.3 MW
Period: Feb.2012-Nov-2012
Dec’10-Feb’12 with Kisanveer S.S.K. Co-Gen Ltd., Bhuinj Dist., Satara (22MW Baggage & Sugar factory )as
Electrical Engineer
Role & Responsibility:
 Handling a team 7 Members.
 Monitoring plans/schedules to start maintenance activities & achieving targets and implementing maintenance
systems During Shut down Time
 Managing the Spare for maintenance activities.
 Scheduling and planning predictive, preventive maintenance for process plants, and root cause analysis including
budgeting and cost control activities.
 Handling Commercial activity.
May’10-Dec’10 with RPL Urja Ltd., Wani, Dist. Yavatmal (MH) as Graduate Engineer Trainee (10MW)
Role:
 Handled various types of injection molding machine at the shop floor
 Supervised overall work of workers and operators
 Commissioned 33 KV Switchyard and CHP Section
 Shouldered the responsibility of Operation & Maintenance
 Handling commissioning activity for 132KV switchyard & Techno-commercial activity with state electricity board
(MHETCL), prakashganga, Prakashgad (MSEDCL), state load dispatch center (SLDC) at Mumbai & near by
Substation.
Up to Date Key Deliverables:
 Accountable for working in Testing, commissioning, maintenance of 11/132 KV Switch yard, Installation SF6
Breaker, CT, PT equipped with all switchgear and protective devices for power transformer & auxiliary
transformer.(including Complete Switchyard testing, Relay testing, etc.)
 Switchyard Control Panel, relay panel commissioning & Relay coordination.
 Commissioning & Maintenance of 132 KV Double Breaker LILO transmissions Line.
 Generator Synchronization, parallel operation with DG & Island operation.
 Commissioning & Maintenance of HT & LT Switchgear.(Siemens, Areva, Alstom)
 Maintenance of 33KV & 132 KV Line.
 Managing Overhauling and Commissioning & maintenance of ABB,CG,Siemens,BBL,Kirloskar Make LT Motors.
 Commissioning of CG Make HT Motors upto 1200KW.
 Installation & Trouble shooting of ABB, Vaccon Make VFD.(upto 400KW)
 Installation & Trouble shooting of KIRLOSKAR Make DC Drives.(upto 600KW)
 Troubleshooting of ABB,NAREN make AVR
 Synchronization of TG with Grid.
 Handling DCS System (SPPA-T3000)Siemens power Plant Automation, PLC SEMENS (S7-300/S7-400)Energy
Management Software (EMS)
 Erection, Commissioning & Testing of transformers 1x27.5MVA, 11/132KV Power transformer, 1x2.5MVA,
11/33KV, 6x1.6MVA ,11/0.415 KV, 2x 2MVA ,11/0.660KV, Auxiliary Transformer, 1x16MVA, 6.6/6.9 KV GT
 Commissioning of 2x 1010 KVA DG (Make Supernova, Powerrica)
 Synchronization panel & Relay panel scheme checking, Relay coordination & commissioning.
 Maintenance of Areva make SF6 Breaker, Switchyard, over head crane, EOT, DG etc.
 Commissioning & Maintenance of LAPT, NGR, ESP, Boiler, BOP,STG,ACC, Compressor etc.
 Installation & Calibration of Various field instruments.
 Commissioning of Electrical operated Motorized valve, Calibration of Control valves.
 Commissioning of UPS, DC Battery Charger.
 Operation & Maintenance of WHRPP
 Preparing detailed engineering for:
o WHRPP DCS Logic write up (open Loop & Close loop)
o Relay testing and co-ordination
o Cable Tray routing
o Interconnection Schedule
o Control schematics
o Synchronization Scheme,
o Momentary Synchronization
o Power Transformer Protection System
 Handling Commercials activity with state electricity board (MHETCL)Prakashganga,Prakashgad (MHEDCL), state
load dispatch centre (SLDC), at Mumbai and at nearby substation in case of power failure, during load restriction,
power abnormality like voltage fluctuation, low voltage, low frequency etc.
 Handling activity for CEIG approval, Commercial operation date etc.
 Creating and sustaining a dynamic environment that fosters development opportunities and motivates high
performance amongst Team members
ACADEMIC DETAILS
 Pursuing M.E. (Power Electronic & Power System) from Suresh Deshmukh College of Engineering, Wardha
 B.E. (Electrical Engineering) from Government College of Engineering, Chandrapur with 64.39% in 2010
TRAINING PROGRAMMES & WORKSHOP
 Attended 1 month In plant training in CSTPS Chandrapur (Total Capacity 2450MW)
 Attended 15 days In plant training in BGPPL Ballarpur Dist. Chandrapur 40MW
IT SKILLS
 Well versed in Windows, MS-Office, MS Project and other Internet Applications
PERSONAL DETAILS
Date of Birth: 1st April 1988
Address: Gajanan Nagar, Wardha-442001, Maharashtra
Languages Known: English, Hindi and Marathi
Notice Period: 1 Month
Current CTC: 4.8 LPA
Passport No: K7583616

More Related Content

What's hot

resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...anas pareed
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning EngineerKumaresanT7
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copyarmando doria
 
sai resume new
sai resume newsai resume new
sai resume newsai charan
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 

What's hot (20)

resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Cover letter
Cover letterCover letter
Cover letter
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...
 
My_resume 2016
My_resume 2016My_resume 2016
My_resume 2016
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
Resume
ResumeResume
Resume
 
Rao cv supervisor
Rao cv supervisorRao cv supervisor
Rao cv supervisor
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 
sai resume new
sai resume newsai resume new
sai resume new
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
Resume
ResumeResume
Resume
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
ELEC.ENG CV
ELEC.ENG CVELEC.ENG CV
ELEC.ENG CV
 
C.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawiC.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawi
 
update 1
update 1update 1
update 1
 
bala.1
bala.1bala.1
bala.1
 

Viewers also liked

Sejarah Penumpasan G 30 SPKI
Sejarah Penumpasan G 30 SPKISejarah Penumpasan G 30 SPKI
Sejarah Penumpasan G 30 SPKISiti Rohimah
 
WordPress auto-install: просто о сложном
WordPress auto-install: просто о сложномWordPress auto-install: просто о сложном
WordPress auto-install: просто о сложномVladimir Samoletov
 
The Case for James H. McMillian
The Case for James H. McMillianThe Case for James H. McMillian
The Case for James H. McMillianRandal Burd
 
The Thin Blue Line (1988) 分析
The Thin Blue Line (1988) 分析The Thin Blue Line (1988) 分析
The Thin Blue Line (1988) 分析Chi-Hsiang Chang
 
Power electrocardiograma
Power electrocardiogramaPower electrocardiograma
Power electrocardiogramaNoe yesi
 
Зоркие глазки
Зоркие глазкиЗоркие глазки
Зоркие глазкиshiko2086
 
Tumbuhan Paku - Biologi kelas 10 semester 1
Tumbuhan Paku - Biologi kelas 10 semester 1Tumbuhan Paku - Biologi kelas 10 semester 1
Tumbuhan Paku - Biologi kelas 10 semester 1Maria Widhi Astuti
 
Recepción del recién nacido
Recepción del recién nacidoRecepción del recién nacido
Recepción del recién nacidoNoe yesi
 
Indahnya hak & kewajiban dalam demokrasi
Indahnya hak & kewajiban dalam demokrasiIndahnya hak & kewajiban dalam demokrasi
Indahnya hak & kewajiban dalam demokrasiMaria Widhi Astuti
 
personality development through nss
personality development through nsspersonality development through nss
personality development through nsssudeep choubey
 
Kwu bab 1- kerajinan dan wirausaha limbah tekstil
Kwu bab 1- kerajinan dan wirausaha limbah tekstilKwu bab 1- kerajinan dan wirausaha limbah tekstil
Kwu bab 1- kerajinan dan wirausaha limbah tekstilMaria Widhi Astuti
 

Viewers also liked (15)

Sejarah Penumpasan G 30 SPKI
Sejarah Penumpasan G 30 SPKISejarah Penumpasan G 30 SPKI
Sejarah Penumpasan G 30 SPKI
 
Traveling
TravelingTraveling
Traveling
 
WordPress auto-install: просто о сложном
WordPress auto-install: просто о сложномWordPress auto-install: просто о сложном
WordPress auto-install: просто о сложном
 
Ch03
Ch03Ch03
Ch03
 
Hemiplejias
HemiplejiasHemiplejias
Hemiplejias
 
The Case for James H. McMillian
The Case for James H. McMillianThe Case for James H. McMillian
The Case for James H. McMillian
 
The Thin Blue Line (1988) 分析
The Thin Blue Line (1988) 分析The Thin Blue Line (1988) 分析
The Thin Blue Line (1988) 分析
 
Power electrocardiograma
Power electrocardiogramaPower electrocardiograma
Power electrocardiograma
 
Зоркие глазки
Зоркие глазкиЗоркие глазки
Зоркие глазки
 
Tumbuhan Paku - Biologi kelas 10 semester 1
Tumbuhan Paku - Biologi kelas 10 semester 1Tumbuhan Paku - Biologi kelas 10 semester 1
Tumbuhan Paku - Biologi kelas 10 semester 1
 
Recepción del recién nacido
Recepción del recién nacidoRecepción del recién nacido
Recepción del recién nacido
 
Indahnya hak & kewajiban dalam demokrasi
Indahnya hak & kewajiban dalam demokrasiIndahnya hak & kewajiban dalam demokrasi
Indahnya hak & kewajiban dalam demokrasi
 
personality development through nss
personality development through nsspersonality development through nss
personality development through nss
 
Kwu bab 1- kerajinan dan wirausaha limbah tekstil
Kwu bab 1- kerajinan dan wirausaha limbah tekstilKwu bab 1- kerajinan dan wirausaha limbah tekstil
Kwu bab 1- kerajinan dan wirausaha limbah tekstil
 
Autoconhecimento
AutoconhecimentoAutoconhecimento
Autoconhecimento
 

Similar to Bhushan warghane 1_

Similar to Bhushan warghane 1_ (20)

Resume_Latif Khan
Resume_Latif KhanResume_Latif Khan
Resume_Latif Khan
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 
Arun resume
Arun resumeArun resume
Arun resume
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
NEW CV
NEW CVNEW CV
NEW CV
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
SOURABH SONI
SOURABH SONISOURABH SONI
SOURABH SONI
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 
DEEPU CV O&G_2
DEEPU CV O&G_2DEEPU CV O&G_2
DEEPU CV O&G_2
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
 
Nagaganesh M_original
Nagaganesh M_originalNagaganesh M_original
Nagaganesh M_original
 
Jose_resume 1
Jose_resume 1Jose_resume 1
Jose_resume 1
 

Bhushan warghane 1_

  • 1. BHUSHAN G.WARGHANE Mobile: 91 9096631495 E-Mail: aims_bhushan@rediffmail.com Seeking assignments in Project Execution / Erection & Commissioning / Operations & Maintenance with an organization of high repute PROFILE SNAPSHOT  A competent professional with 4.3 years of experience in erection, commissioning, operation & maintenance, installation, testing and project execution  Skilled in carrying out inspection of electrical equipment as per standards & agreement within norms  Possess sound understanding of Health & Safety Standards, Quality Compliances, Energy Conservation Methodologies, electrical equipment and instrumentation related to WHR boilers, TG & Switchyard  Adroit in managing erection & commissioning of various equipment, maintenance functions for reducing breakdown / downtime and enhancing operational effectiveness  Possess good trouble shooting skills and sound knowledge of boiler and allied equipment operations  A enthusiast with strong analytical, problem solving and people management skills CORE COMPETENCIES  Monitoring project execution, scheduling, site management  Deploying suitable manpower, equipment / materials and ensuring proper planning for timely execution of the projects  Managing installation, maintenance, testing, commissioning and inspection of electrical equipment  Effecting preventive maintenance schedules of various kind of equipment to increase the equipment uptime / reliability & accomplishing project targets  Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members.  Processes in depth knowledge of various standards used for different type of process industries like relay configuration & and VFD panel commissioning.  Engineering for WHR Boilers & auxiliaries (E&I). ORGANIZATIONAL EXPERIENCE Since Feb’12 with Transparent Energy System Pvt. Ltd., Pune as Project Engineer Role & Responsibility:  Handling a team of contractor.  Overseeing project activities right from conceptualization to execution; involving finalization of technical specifications, scheduling, progress monitoring, site management and manpower planning  Maintaining healthy relationships with customers, electrical consultants and vendors  Providing interface between customer & TESPL HO; representing TESPL in customer premises  Coordinate entire Erection & commissioning activity at site. Project handles: Organization: UltraTech Cement Ltd., Awarpur Maharashtra Capacity: 13.22 MW Period: Nov.2013-Present Organization: Chettinad Cement Corporation Ltd. Kallur, karnataka Capacity: 7.3 MW Period: Dec.2012-Nov-2013 Organization: Shri Digvijay Cement Corporation Ltd. Jamnagar, Gujarat Capacity: 8.3 MW Period: Feb.2012-Nov-2012 Dec’10-Feb’12 with Kisanveer S.S.K. Co-Gen Ltd., Bhuinj Dist., Satara (22MW Baggage & Sugar factory )as Electrical Engineer Role & Responsibility:  Handling a team 7 Members.
  • 2.  Monitoring plans/schedules to start maintenance activities & achieving targets and implementing maintenance systems During Shut down Time  Managing the Spare for maintenance activities.  Scheduling and planning predictive, preventive maintenance for process plants, and root cause analysis including budgeting and cost control activities.  Handling Commercial activity. May’10-Dec’10 with RPL Urja Ltd., Wani, Dist. Yavatmal (MH) as Graduate Engineer Trainee (10MW) Role:  Handled various types of injection molding machine at the shop floor  Supervised overall work of workers and operators  Commissioned 33 KV Switchyard and CHP Section  Shouldered the responsibility of Operation & Maintenance  Handling commissioning activity for 132KV switchyard & Techno-commercial activity with state electricity board (MHETCL), prakashganga, Prakashgad (MSEDCL), state load dispatch center (SLDC) at Mumbai & near by Substation. Up to Date Key Deliverables:  Accountable for working in Testing, commissioning, maintenance of 11/132 KV Switch yard, Installation SF6 Breaker, CT, PT equipped with all switchgear and protective devices for power transformer & auxiliary transformer.(including Complete Switchyard testing, Relay testing, etc.)  Switchyard Control Panel, relay panel commissioning & Relay coordination.  Commissioning & Maintenance of 132 KV Double Breaker LILO transmissions Line.  Generator Synchronization, parallel operation with DG & Island operation.  Commissioning & Maintenance of HT & LT Switchgear.(Siemens, Areva, Alstom)  Maintenance of 33KV & 132 KV Line.  Managing Overhauling and Commissioning & maintenance of ABB,CG,Siemens,BBL,Kirloskar Make LT Motors.  Commissioning of CG Make HT Motors upto 1200KW.  Installation & Trouble shooting of ABB, Vaccon Make VFD.(upto 400KW)  Installation & Trouble shooting of KIRLOSKAR Make DC Drives.(upto 600KW)  Troubleshooting of ABB,NAREN make AVR  Synchronization of TG with Grid.  Handling DCS System (SPPA-T3000)Siemens power Plant Automation, PLC SEMENS (S7-300/S7-400)Energy Management Software (EMS)  Erection, Commissioning & Testing of transformers 1x27.5MVA, 11/132KV Power transformer, 1x2.5MVA, 11/33KV, 6x1.6MVA ,11/0.415 KV, 2x 2MVA ,11/0.660KV, Auxiliary Transformer, 1x16MVA, 6.6/6.9 KV GT  Commissioning of 2x 1010 KVA DG (Make Supernova, Powerrica)  Synchronization panel & Relay panel scheme checking, Relay coordination & commissioning.  Maintenance of Areva make SF6 Breaker, Switchyard, over head crane, EOT, DG etc.  Commissioning & Maintenance of LAPT, NGR, ESP, Boiler, BOP,STG,ACC, Compressor etc.  Installation & Calibration of Various field instruments.  Commissioning of Electrical operated Motorized valve, Calibration of Control valves.  Commissioning of UPS, DC Battery Charger.  Operation & Maintenance of WHRPP  Preparing detailed engineering for: o WHRPP DCS Logic write up (open Loop & Close loop) o Relay testing and co-ordination o Cable Tray routing o Interconnection Schedule o Control schematics o Synchronization Scheme, o Momentary Synchronization o Power Transformer Protection System  Handling Commercials activity with state electricity board (MHETCL)Prakashganga,Prakashgad (MHEDCL), state load dispatch centre (SLDC), at Mumbai and at nearby substation in case of power failure, during load restriction, power abnormality like voltage fluctuation, low voltage, low frequency etc.  Handling activity for CEIG approval, Commercial operation date etc.
  • 3.  Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst Team members ACADEMIC DETAILS  Pursuing M.E. (Power Electronic & Power System) from Suresh Deshmukh College of Engineering, Wardha  B.E. (Electrical Engineering) from Government College of Engineering, Chandrapur with 64.39% in 2010 TRAINING PROGRAMMES & WORKSHOP  Attended 1 month In plant training in CSTPS Chandrapur (Total Capacity 2450MW)  Attended 15 days In plant training in BGPPL Ballarpur Dist. Chandrapur 40MW IT SKILLS  Well versed in Windows, MS-Office, MS Project and other Internet Applications PERSONAL DETAILS Date of Birth: 1st April 1988 Address: Gajanan Nagar, Wardha-442001, Maharashtra Languages Known: English, Hindi and Marathi Notice Period: 1 Month Current CTC: 4.8 LPA Passport No: K7583616