Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Avneesh 5_
1. Avneesh Sharma
E-Mail: aavneesh@rediffmal.com ~ Mobile: +
9805313962
Seeking Senior Level assignments with key focus on Project Management, Electromechanical
Erection & Commissioning, Operations & Maintenance with reputed organization.
Synopsis
7 12 years of rich experience in Project Management, Operations & Maintenance, Erection &
Commissioning and Team Management.
Currently associated with Patel engineering Ltd at shongton site (h.p)
Expertise in managing maintenance operations for reducing breakdown / downtime & enhancing operational
effectiveness of equipment.
Adept at carrying out various tests & inspection for various processes and checking the quality.
An effective communicator with excellent relationship management skills and strong analytical, leadership,
decision making, problem solving & organizational abilities.
EDUCATIONAL DETAILS
Education Board School Collage
Matric P.S.E.B Govt. Sr. Sec.
School
Diploma in
Electrical
Engineer
P.S.T.E. G.T.B Khalsa
Poly. Collage
Chhappianwali
FUNCTIONAL SUMMARY
1 Patel engineering ltd July 2007 Onwards
2 Indo shree micro hydel Project 1mw
Feb 2005to
July”2007.
Patel Engineering Limited
Job Profile / Responsibilities
I am working as jr. Engineer(elec) of Head race Tunnel, Power house, Pressure shaft, valve house
and Surge Shaft.
Handling and Maintenance of Electrical Equipment as per Diagram Open / Under Ground work.
Batching Plant. Concrete Pump, Rocket Boomer. , Joint the cable of H.T. line as 11kv. , Erection
of the HT line, Diesel Generator (250 kva , 160kva, 500 kva ,) Cifa, Aliva with boom
water pumps , structure of 11 /.4 KV , Blower .90h.p ,Rocket Boomer. Winch (25 ton, 5ton)
Synchronisation of D.G set ., batching plant , VFD (1.5 H.P to 100HP ) ,Electrical compressor
Crusher plant, switch gear,control system, transformer, Distribution panel
2. electrification of the site, installation & commissioning of main panels, subpanels, earthing,planing for
availability of spares for equipments.
Quality check audition, commissioning &testing of power distribution boards, internal & external
electrification of Project.
Responsibility of Batching Plant
a) Maintenance of batching plant Electrical and Mechanical.
b) Operation of Batching Plant and Transit millers.
Responsibility of Crusher Plant:
a) Installation of crusher plant 120TPH.
b) Maintenance of Electric and Mechanical.
Site Details
1. Kameng hydro electric project 600mw arunachal pardesh at kimi site from 2007 to 2009
2. PEL is working for 412 MW hydroelectric project package2 (Rampur hydro electric project
The project is situated near Rampur in Kullu distt on the right bank of Satluj river awarded
by Sutlej Jal Vidyut Nigam Limited . the project period from 2009 to march 2014
3. Shongtong hydro electric project 450 mw ai shongtong site , (H.p) Iam working in patel
engineering ltd at shongtong site from 2014 to till.
Indo Shree Micro Hydel Project Manikaran (Kulu) 1MW
Designation: - Shift Engineer. (Operation)
Duration:-9 Feb 2005to 1`Jully”2007.
Job Responsissssbility:-
1 Handling the shift independently includes synchronization of machine in auto and manual
with grid.
2 To run plant in smooth and economic way round the clock.
3 Handling the breakdown during preventive maintenance of machine.
4 generator, erection, testing and commissioning of Power Transformers, CTs, PTs, Isolators, VCBs, ACB,
HT/LT panels up to 3311kV rating. Supervising Experience in HT and LT cable laying and dealing with
Govt. dept.
LANGUAGES KNOWN
English, Hindi, Punjabi.
PERSONAL DETAILS
Born on : 28 .09. 1978
Son of : Late Madan Lal Sharma
Marital Status : Married
Passport No. : G7149861, 2IND780M1802142
Permanent Add. : CO Rajneesh Sharma
Q no 41 sl-2 B.B.M.B colony slapper Sundernagar
Distt. Mandi ( h.p)