SlideShare a Scribd company logo
1 of 4
Sadanand Dubey
Address : Bhandubar PO-Kumand
Angul Odisha, Pin: 759122
E-Mail: sadanand.dubey@gmail.com
Mobile: +91-9777443413
Managerial assignments in Power Plant Electrical Commissioning or Maintenance section
Career Outlook
A competent professional with 8 Year experience in Electrical engineering discipline under
commissioning & maintenance section in power plant & water utilities. Deft at handling site
operations and offering quality service & timely completion of the jobs. Proficient in handling
execution of electrical projects including maintenance and commissioning of equipment,
interfacing with approving authorities and coordinating with engineering team /
department. Adept at recommending / implementing equipment calibrations to enhance
operational efficiencies of the systems. Operational analysis, strategic / capacity planning, and
decision-making strengths, an innovative creator of profit-enhancing cost control and efficiency
measures.
Professional Experience
• Working with Jindal Steel & Power Limited Angul (Odisha ), in power plant (6x135)
810MW, Joined as Junior Manager & present as Assistant Manager (Electrical
Commissioning & Maintenance) from 15’th November 2010, till present.
Current Responsibility: Co-ordination, Execution of maintenance, Breakdown &
commissioning activities, related to main plant STG (6x135MW) & BOP (Water Treatment
Plant (RO Plant 3x400 M’3/hr),Cooling Tower, LDO, Raw Water System, Fire Fighting
system, Waste water treatment plant.
As an Assistant Manager and In charge of a sectionalized portion of the plant, I am directly
responsible for the outcome of the following activities.
Providing uninterrupted, reliable power supply, equipment availability for smooth operation of
the entire Balance of Plant System (BOP) through proper short circuit calculation of the system
by distribution network Relay Grading.
• Maintenance of 6.6 KV HT Switchgear, 415 V LT Switchgear, HT/ LT motors.
• Overhauling of HT/ LT motors.
• Proper, safe and target oriented Testing & commissioning of 6.6 KV HT Switchgear, 415 V
LT Switchgear, HT/ LT motors.
• Testing, commissioning & maintenance of High Voltage Oil Cooled and Dry Type
Transformers.
• Commissioning & maintenance of 220 V and 24 V battery charger systems.
• Effective Shift management as the Electrical shift in charge of Main Plant.
• Planning and Execution of necessary steps for achieving optimum safety.
• Planning and execution of Preventive, Predictive and Breakdown Maintenance Schedules.
• Preparation of purchase requisitions, service PR’s, Maintenance orders through SAP for
effective spare management, Maintenance related activity through SAP.
• Testing, commissioning & maintenance of ‘Chinese BTG set of capacity 135MW, 460TPH
CFBC’ which is currently running.
• Technical evaluation of Electrical designs / Electrical Equipment received from various
external vendors.
• Testing & commissioning of AARTECH SOLONICS LTD. makes ABT (BTS 2000) system.
• Accomplishment of resources planning, budgeting, scheduling & execution of
preventive / predictive maintenance / service activities for existing units.
• Spares management, vendor development, Negotiation & finalization of contract.
• Preparation of single line diagram (SLD) of electrical network & standard Maintenance
practices (SMP) for proper Maintenance activities.
• Technical studies for analysis of equipment failure by adopting CAPA(Corrective
action & preventive action plan) & providing/implementing practical solution like
modification, improvement for better plant reliability and integrity of equipment /
system.
• Prepare & review Technical documents as per ISO standard.
• Working with Visa Steel Limited jajpur (Odisha) starting as a Graduate Engineer
Trainee to Sr. Engineer (Electrical Project, Operation & maintenance) at Captive
Power Plant (3x25) 75MW from June 2007 to November 2010.
• I also involved in Documentation, Planning, technical evaluation of Electrical designs
/ Electrical Equipment received from various external vendors, Procurement work in
same organization Visa Steel Limited Jajpur Odisha for Future Expansion Project of
Thermal Power Plant (2X250) 500MW
From the beginning as Graduate Engineer Trainee to Senior Engineer at Visa Steel Limited, I
was involved in Project related activities for the first two years in 3X25 MW after that remaining
period I did documentation, Planning work of 2X250MW & Operation and Maintenance for the
3x25MW Captive power plant & BOP. I was directly involved in the outcome of the following
activities during my stay in the organization. Testing, Commissioning of 3 sets of Turbo
Generator, each with a capacity of 25 MW. This package includes the following activities.
 Errection, Testing, Commissioning of BHEL make Automatic Voltage Regulator
 Testing and Commissioning of Easun Reyrrole make GRP,GCP.
 Cable sizing, scheduling and cable tray routing for the entire Power plant.
 Erection, Testing and Commissioning of 6.6 KV HT Switchgear
 Erection, Testing and Commissioning of 415V LT Switchgear
 Erection, testing and commissioning of Oil Cooled Type Transformers.
 Prepare & review Technical documents as per ISO standard.
 Technical studies for analysis of equipment failure by adopting CAPA(Corrective
action & preventive action plan) & providing/implementing practical solution like
modification, improvement for better plant reliability and integrity of equipment /
system.
 Testing and Commissioning of 220 KV/33 KV Switchyard.
 Commencing back synchronizing scheme in Generator Control Panel.
 Erection and commissioning of 220 V and 24 V battery charger system.
 Erection, Testing and Commissioning of 2 * 1500 KVA Diesel Generator Set.
 Planning and execution of Preventive, Predictive and Breakdown Maintenance
Schedules.
 Maintenance of 6.6 KV HT Switchgear, 415 V LT Switchgear, HT/ LT motors,
Transformer, HT/LT motor Overhauling.
 Management of the entire electrical system of the plant as a shift in charge of the system.
 Documentation, Planning, Procurement work for 2X250MW power plant.
Projects Handled
Testing and commissioning of-
* Turbo generators 6X135 MW, 13.8 KV, associated AVR & Generator relay protection.
* Transformers of 180MVA (GT) 220/13.8 KV, 40 MVA 220/6.6 KV, 25 MVA 13.8/6.6 KV, *
HT/LT Motors, switchgears, Auto bus transfer (ABT), fault recorder, UPS, Battery Bank &
Battery Charger, & O/H crane for 6X135 MW CPP.
* Turbo generators 3X25 MW, 11.0 KV, associated AVR & Generator relay Panel, * HT/LT
Motors, HT/LT switchgears, 2 * 1500 KVA Diesel Generator Set,33KV & 220 KV Switch yard.
* Documentation, Planning & Procurement work of 2X250 MW
Qualification
Course/Certificate Name Of
Institute/University
Percentage
of Marks
Division Year of
Passing
Specialization
10'th M.P Ed. Board
Bhopal
75.8 First 2000 Science
12'th M.P Ed. Board
Bhopal
80.6 First 2002 Science &
Math’s
B.E R.G.P.V Bhopal
(J.E.C Jabalpur)
65.1 First 2007 Electrical
Academic Credentials
Pursuing MBA (Operational Management) from Symbiosis Centre of Distance Learning
B.E. (Electrical Engineering) from JEC, Jabalpur, R.G.P.V. with 65.15% in 2007
Personal Dossier
Date of Birth : 24th September 1984
Category : General
Address : C/o.Sidharth Dubey, Behind Yadav Petrol Pump, Satna- 485001, MP
Linguistic Abilities : English, Hindi and Oriya
Current C.T.C: 8.91 Lac's/Annum
Expected C.T.C: Negotiable

More Related Content

What's hot (19)

SOURABH SONI
SOURABH SONISOURABH SONI
SOURABH SONI
 
Stalin_resumedoc1
Stalin_resumedoc1Stalin_resumedoc1
Stalin_resumedoc1
 
Resume
ResumeResume
Resume
 
Bhushan warghane 1_
Bhushan warghane 1_Bhushan warghane 1_
Bhushan warghane 1_
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
MOST_UPDATED_CV
MOST_UPDATED_CVMOST_UPDATED_CV
MOST_UPDATED_CV
 
Avneesh 5_
Avneesh  5_Avneesh  5_
Avneesh 5_
 
Hari prasad cv ppt
Hari prasad cv pptHari prasad cv ppt
Hari prasad cv ppt
 
Tushar_Resume_02.04.2016
Tushar_Resume_02.04.2016Tushar_Resume_02.04.2016
Tushar_Resume_02.04.2016
 
Rao cv supervisor
Rao cv supervisorRao cv supervisor
Rao cv supervisor
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
 
CV_ RKS 2016
CV_ RKS 2016 CV_ RKS 2016
CV_ RKS 2016
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
CV_Ashok Jain
CV_Ashok JainCV_Ashok Jain
CV_Ashok Jain
 
L Narayan's Resume
L Narayan's ResumeL Narayan's Resume
L Narayan's Resume
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
sanjog navandars
sanjog navandarssanjog navandars
sanjog navandars
 
utsav cv
utsav cvutsav cv
utsav cv
 
Resume -Supachai
Resume -SupachaiResume -Supachai
Resume -Supachai
 

Similar to Sadanand dubey

Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood ButtTahir Butt
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
rahul.cv.new
rahul.cv.newrahul.cv.new
rahul.cv.newRahul Dey
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Prashant Maulikar
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLBISWAJYOTI SWAIN
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companiesbala madhu
 

Similar to Sadanand dubey (20)

Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Resume
ResumeResume
Resume
 
Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood Butt
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
Resume- Plant Manager- Harish
Resume- Plant Manager- HarishResume- Plant Manager- Harish
Resume- Plant Manager- Harish
 
rahul.cv.new
rahul.cv.newrahul.cv.new
rahul.cv.new
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
Resume_Dipti Ranjan Rout
Resume_Dipti Ranjan RoutResume_Dipti Ranjan Rout
Resume_Dipti Ranjan Rout
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
ELEC.ENG CV
ELEC.ENG CVELEC.ENG CV
ELEC.ENG CV
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 

Sadanand dubey

  • 1. Sadanand Dubey Address : Bhandubar PO-Kumand Angul Odisha, Pin: 759122 E-Mail: sadanand.dubey@gmail.com Mobile: +91-9777443413 Managerial assignments in Power Plant Electrical Commissioning or Maintenance section Career Outlook A competent professional with 8 Year experience in Electrical engineering discipline under commissioning & maintenance section in power plant & water utilities. Deft at handling site operations and offering quality service & timely completion of the jobs. Proficient in handling execution of electrical projects including maintenance and commissioning of equipment, interfacing with approving authorities and coordinating with engineering team / department. Adept at recommending / implementing equipment calibrations to enhance operational efficiencies of the systems. Operational analysis, strategic / capacity planning, and decision-making strengths, an innovative creator of profit-enhancing cost control and efficiency measures. Professional Experience • Working with Jindal Steel & Power Limited Angul (Odisha ), in power plant (6x135) 810MW, Joined as Junior Manager & present as Assistant Manager (Electrical Commissioning & Maintenance) from 15’th November 2010, till present. Current Responsibility: Co-ordination, Execution of maintenance, Breakdown & commissioning activities, related to main plant STG (6x135MW) & BOP (Water Treatment Plant (RO Plant 3x400 M’3/hr),Cooling Tower, LDO, Raw Water System, Fire Fighting system, Waste water treatment plant. As an Assistant Manager and In charge of a sectionalized portion of the plant, I am directly responsible for the outcome of the following activities. Providing uninterrupted, reliable power supply, equipment availability for smooth operation of the entire Balance of Plant System (BOP) through proper short circuit calculation of the system by distribution network Relay Grading.
  • 2. • Maintenance of 6.6 KV HT Switchgear, 415 V LT Switchgear, HT/ LT motors. • Overhauling of HT/ LT motors. • Proper, safe and target oriented Testing & commissioning of 6.6 KV HT Switchgear, 415 V LT Switchgear, HT/ LT motors. • Testing, commissioning & maintenance of High Voltage Oil Cooled and Dry Type Transformers. • Commissioning & maintenance of 220 V and 24 V battery charger systems. • Effective Shift management as the Electrical shift in charge of Main Plant. • Planning and Execution of necessary steps for achieving optimum safety. • Planning and execution of Preventive, Predictive and Breakdown Maintenance Schedules. • Preparation of purchase requisitions, service PR’s, Maintenance orders through SAP for effective spare management, Maintenance related activity through SAP. • Testing, commissioning & maintenance of ‘Chinese BTG set of capacity 135MW, 460TPH CFBC’ which is currently running. • Technical evaluation of Electrical designs / Electrical Equipment received from various external vendors. • Testing & commissioning of AARTECH SOLONICS LTD. makes ABT (BTS 2000) system. • Accomplishment of resources planning, budgeting, scheduling & execution of preventive / predictive maintenance / service activities for existing units. • Spares management, vendor development, Negotiation & finalization of contract. • Preparation of single line diagram (SLD) of electrical network & standard Maintenance practices (SMP) for proper Maintenance activities. • Technical studies for analysis of equipment failure by adopting CAPA(Corrective action & preventive action plan) & providing/implementing practical solution like modification, improvement for better plant reliability and integrity of equipment / system. • Prepare & review Technical documents as per ISO standard. • Working with Visa Steel Limited jajpur (Odisha) starting as a Graduate Engineer Trainee to Sr. Engineer (Electrical Project, Operation & maintenance) at Captive Power Plant (3x25) 75MW from June 2007 to November 2010. • I also involved in Documentation, Planning, technical evaluation of Electrical designs / Electrical Equipment received from various external vendors, Procurement work in same organization Visa Steel Limited Jajpur Odisha for Future Expansion Project of Thermal Power Plant (2X250) 500MW From the beginning as Graduate Engineer Trainee to Senior Engineer at Visa Steel Limited, I was involved in Project related activities for the first two years in 3X25 MW after that remaining period I did documentation, Planning work of 2X250MW & Operation and Maintenance for the 3x25MW Captive power plant & BOP. I was directly involved in the outcome of the following activities during my stay in the organization. Testing, Commissioning of 3 sets of Turbo Generator, each with a capacity of 25 MW. This package includes the following activities.  Errection, Testing, Commissioning of BHEL make Automatic Voltage Regulator  Testing and Commissioning of Easun Reyrrole make GRP,GCP.
  • 3.  Cable sizing, scheduling and cable tray routing for the entire Power plant.  Erection, Testing and Commissioning of 6.6 KV HT Switchgear  Erection, Testing and Commissioning of 415V LT Switchgear  Erection, testing and commissioning of Oil Cooled Type Transformers.  Prepare & review Technical documents as per ISO standard.  Technical studies for analysis of equipment failure by adopting CAPA(Corrective action & preventive action plan) & providing/implementing practical solution like modification, improvement for better plant reliability and integrity of equipment / system.  Testing and Commissioning of 220 KV/33 KV Switchyard.  Commencing back synchronizing scheme in Generator Control Panel.  Erection and commissioning of 220 V and 24 V battery charger system.  Erection, Testing and Commissioning of 2 * 1500 KVA Diesel Generator Set.  Planning and execution of Preventive, Predictive and Breakdown Maintenance Schedules.  Maintenance of 6.6 KV HT Switchgear, 415 V LT Switchgear, HT/ LT motors, Transformer, HT/LT motor Overhauling.  Management of the entire electrical system of the plant as a shift in charge of the system.  Documentation, Planning, Procurement work for 2X250MW power plant. Projects Handled Testing and commissioning of- * Turbo generators 6X135 MW, 13.8 KV, associated AVR & Generator relay protection. * Transformers of 180MVA (GT) 220/13.8 KV, 40 MVA 220/6.6 KV, 25 MVA 13.8/6.6 KV, * HT/LT Motors, switchgears, Auto bus transfer (ABT), fault recorder, UPS, Battery Bank & Battery Charger, & O/H crane for 6X135 MW CPP. * Turbo generators 3X25 MW, 11.0 KV, associated AVR & Generator relay Panel, * HT/LT Motors, HT/LT switchgears, 2 * 1500 KVA Diesel Generator Set,33KV & 220 KV Switch yard. * Documentation, Planning & Procurement work of 2X250 MW Qualification Course/Certificate Name Of Institute/University Percentage of Marks Division Year of Passing Specialization 10'th M.P Ed. Board Bhopal 75.8 First 2000 Science 12'th M.P Ed. Board Bhopal 80.6 First 2002 Science & Math’s B.E R.G.P.V Bhopal (J.E.C Jabalpur) 65.1 First 2007 Electrical
  • 4. Academic Credentials Pursuing MBA (Operational Management) from Symbiosis Centre of Distance Learning B.E. (Electrical Engineering) from JEC, Jabalpur, R.G.P.V. with 65.15% in 2007 Personal Dossier Date of Birth : 24th September 1984 Category : General Address : C/o.Sidharth Dubey, Behind Yadav Petrol Pump, Satna- 485001, MP Linguistic Abilities : English, Hindi and Oriya Current C.T.C: 8.91 Lac's/Annum Expected C.T.C: Negotiable