case study on settlement of foundation
1. Case Study On Settlement Of
Foundation
Geotechnical Engineering - II
• PREPRADE BY
RADADIYA JAY 14SOECV11041
VASOYA DIVAYESH 14SOECV11054
SOJITRA FENIL 14SOECV11049
VAZA GAUTAM 14SOECV11055
3. IMMEDIATE SETTLEMENT OR
ELASTIC SETTLEMENT
• Occurs immediately after the construction of structure.
• Also known as ‘Distortion Settlement’, it occurs due to distortion in
foundation soil.
• Although its not truly elastic, it is computed using elasticity theory. It is
denoted by Si.
4. PRIMARY CONSOLIDATION:OR
CONSOLIDATION SETTLRMENT
• Occurs due to gradual dissipation of pore pressure induced by external
loading and consequently expulsion of water from the soil mass, hence
volume change.
• Important for Inorganic clays. This component is determined using
Terzaghi’s theory of consolidation.
• It is denoted as Sc.
5.
6. Secondary Consolidation Settlement
• This settlement occurs after completion of the primary consolidation
• Occurs at constant settlement effective stress with volume change due to
rearrangement of particles.
• This component of the settlement is due to secondary consolidation. It is
significant for organic soils.
• Determined from the coefficient of secondary consolidation. Denoted as
Ss.
• For any of the mentioned settlement calculations, we first need vertical
stress increase in soil mass due to net load applied on the foundation.
• The total settlement (S) is given as S = Ss + Sc + Si
7. Settlement Due To Other Causes
• Underground erosion may cause formation of cavities in the subsoil
which when collapse cause settlement.
• Structural collapse of soil may cause to dissolution of material responsible
for the inter-granular bond of grains.
• Temperature change causes shrinkage in expansive soils due to which
settlement occurs.
• Frost heave occurs if the structure is not founded below the depth of
frost penetration. When thaw occurs, settlement occurs.
• Vibrations and Shocks cause large settlement, especially in loose and
cohesion less soils.
• Mining subsidence of ground may occur due to removal of minerals and
other materials from mines below.
8. Foundations Loading :
1. Dead load
2. Live load
3. Wind load
4. Snow load
5. Earth pressure
6. Water pressure
7. Earthquake load
9. •Dead load :
• The dead load include the weight of materials permanently fixed to
the structure, such as beam, column, floors , walls and fixed service
equipment.
• Can be calculated if sizes and types of structural materials are known.
• There is a problem in estimating the self weight of the structure
because self weight is initially assumed and the structure is designed.
• Then weight is calculated from the designed dimension and compared
with the assumed weight.
10. • Live load :
• The live loads are the movable loads that are not permanently
attached to the structure.
• These loads are applied during a part of its useful life.
• Loads due to people, goods, furniture, equipment etc. are considered
in live loads.
• It is difficult to estimate the live load accurately. These are specified by
local building codes.
11. • Wind Load :
• Wind loads acts on all exposed surfaces of the structure.
• This loads depends on the velocity of wind and type of the structure.
• Wind loads are specified by building codes.
• Snow Loads :
• Snow loads are occur due to accumulation of snow on roofs and
exterior flat surfaces in cold climates.
• The unit weight of snow load is usually taken as 1kN/sq m
12. • Earth pressure :
• Earth pressure produce lateral force against the structure below the
ground surface or fill surface.
• The earth pressure is normally treated as dead load.
• Water pressure :
• Like earth pressure water, water pressure also produces a lateral force
against the structure below the water level.
• Earthquake pressure :
• The force due to earthquake may be vertical, lateral or tensional on a
structure in any direction.
13. Computation of Design Loads :
• Dead load and live load are computed by tributary area method.
• In tributary area method, it is assumed that a column carries all the
load in the floor area enclosed by lines equidistant from its adjacent
columns.
• Live loads are temporary and transient. A part of it may act for a
duration that may induced settlement, especially for cohesive soil.
• Live loads are referred from is-875.
14. • It is assumed that wind load and earthquake load do not act
simultaneously.
• According to is 1904-1978 foundation should be proportioned for the
combination
dead load + live load and
Dead load + live load + wind load or seismic load
• If the wind load is less than 25% of the total dead load + live load, then it
may be neglected and it is designed for the combination of dead load and
live load only.
• The foundation pressure should not the exceed the safe bearing capacity
by more than 25% for the combination of dead load, live load and wind
load.
16. CONCLUSION
• FORM THIS CASE STUDY WE CAN CONCLUDE THAT ALL THE FACTOR
RELATED TO SETTLEMENET OF FOUNDATION ARE CONSIDERED.
• ALL LOAD CALCULATE AND AFTER START THE UPWOED CONSTRUCTION.