Introduction
‡ Bridges have two components,
  Superstructure and sub structure.
‡ The substructure is normally cast in
  place over the foundation and various
  methods are available for this task.
‡ Placing the superstructure (girders)
  on the substructure is an important
  task for the engineers.

                   NICMAR
NICMAR
NICMAR
NICMAR
WORKS TO BE ENSURED BEFORE
             LAUNCHING

‡ Abutments and Piers to be completed
  including bed blocks.
‡ Dirt wall and fly wings of Abutment not to be
  concreted to facilitate movement of steel
  Launching girder.
‡ The fabricated launching girder is assembled
  on Abutment side approach in the launching
  direction.
‡ Track is welded on steel launching
LAUNCHING EQUIPMENTS

‡ Steel launching girder of appropriate length and
  weight.
‡ 5 M.T winch trolley for movement of steel
  launching girder
‡ Counterweight trolley
‡ Trolleys for transporting of girders - 2 nos.
‡ 5 M.T winch trolley(for movement of girder
  trolleys)
‡ Hydraulic jacks
‡ Gantry Portals
                                            NICMAR
FIRST SPAN ERECTION




     SEGMENT S2

     SEGMENT S1




    SLIDING BEAMS

    LIFTING HOIST

     MAIN GIRDER

   MIDDLE SUPPORT

   FRONT SUPPORT
NORMAL SPAN ERECTION




      SEGMENT S2

      SEGMENT S1

     SLIDING BEAMS

     LIFTING HOIST

     MAIN GIRDER

     REAR TROLLEY

     REAR SUPPORT

    MIDDLE SUPPORT

    FRONT SUPPORT
AUTO LAUNCHING OF
LAUNCHING GIRDER
DIRECTION




        NICMAR
SALIENT FEATURES OF SUPER
               STRUCTURE

Location                    Sathdhara, Barman,
                            Narsinghpur, Madhya Pradesh

KM                          0.3
SPAN                        30m
SUPER STRUCTURE             PSC GIRDER
LENGTH OF GIRDER            27.5m
WIDTH OF GIRDER             1.5m
HEIGHT OF GIRDER            1.8m
CONCRETE QUANTITY (EACH)    33 m3
WEIGHT OF GIRDER            87.5 MT
REINFORCEMENT STEEL         3.5 MT
                           NICMAR
SHIFTING OF LAUNCHING GIRDER
            PROJECT DESCRIPTION

‡ The steel girder is pulled with the help of power
  operated winch and is placed on first two spans i.e. on
  abutment and adjacent pier.
‡ Rollers are placed on bank and on the bed blocks for
  shifting.
‡ After proper position of launching girder, remove the
  rollers and ensure firm sitting of launching girder on the
  bed blocks.
‡ Construct dirt wall , fly wings of ABUTMENT .
‡ Now the launching girder is ready for launching of PSC
  girder.


                                                       NICMAR
Shifting of fabricated
         truss




NICMAR
Pulley arrangement




                     NICMAR
Fabricated truss shifted




NICMAR
Arrangement of bed




NICMAR
Casting Yard & Stacking yard




NICMAR
LIFTING OF PRECAST GIRDER
    USING JACKS FOR LOADING ON TROLLEY
The PSC Girder is to be lifted over the casting bed with the help of four
hydraulic jacks of appropriate capacity each.

Each lift is to be in stages of 100mm.

 Wooden blocks supports to be placed underneath PSC girder.

Supports to be provided at the bearing location areas only.

Jacks to be placed below the lifting pads only.

In successive increments PSC girder is to be lifted to a ht. of 2.00 m
over the casting beds.
Now the PSC Girder is ready for placement of track and trolleys below it to
facilitate leading.
Girder placed on
         rail




NICMAR
Railing track




NICMAR
Attachment of winching
         machine to PC GIRDER




NICMAR
GIRDER PLACED ON TROLLEY AND SHIFTING
                    TO THE SPAN

‡ Keep the PSC girder over the hydraulic jacks placed
  below the lifting heads.
‡ Remove the wooden blocks in the bearing area for
  linking purpose.
‡ Link the track below the PSC girder.
‡ Place two trolleys below the PSC girder in the
  bearing area.
‡ Rest the PSC girder over the trolley by lowering
  hydraulic jacks.
‡ Remove the wooden blocks and hydraulic jacks.
‡ Now the trolleys are ready to shift to the first span.
‡ Shift the PSC girder using winch machine.
Launching girder




NICMAR
Place on Position




NICMAR
GIRDER SHIFTING TO POSITION FOR PLACEMENT


‡ Once the girder placed on trolleys reaches at proper
  launching location,(Exactly over the bearing area) lock
  the trolleys.
‡ The PSC girder is slowly lifted from the trolleys and
  supported on the specially designed platforms using 4
  Nos. jacks.
‡ Once the girder is loaded on the platforms and jacks,
  the trolleys are removed and sent back to casting bed
  for shifting of another PSC girder.



                                                  NICMAR
Shifting of girder




                     NICMAR
Shifting of girder




                     NICMAR
ALTERNATIVE METHODS
 OF LAUNCHING GIRDER

  CAST IN
               PRE-CAST
   SITU

CONVENTIONAL
  METHOD


 SEGMENTAL
  METHOD
                          NICMAR
ALTERNATIVE TECHNIQUES
     OF LAUNCHING

      BY RAIL / JACK/ WINCH
            MACHINE


      BY STAGING/SUPPORT
            METHOD


       BY TOWER CRANE
           METHOD


       BY GANTRY GIRDER
              NICMAR
Site
        condition




       COMPARISON
Time       OF            Risk
        LAUNCHING
       TECHNIQUES




         Cost
                    NICMAR
STAGING METHOD
NICMAR
BY TOWER CRANE




NICMAR
BY GANTRY GIRDER




           NICMAR
ADVANTAGES OF
                   LAUNCHING METHOD
‡ Height of bridge is not the criteria and this method is applied
  at any height.
‡ Ground supports can be totally avoided during launching and
  as such launching scheme is best suited for perennial
  course.
‡ Proper quality control can be ensured in case of pre cast
  method since the girders will be cast on approach formation.
‡ There will be lot of working space available around the girder
  for providing supporting system to shuttering and movement
  of men.
‡ Simultaneous construction of sub structure and super
  structure.
‡ This scheme is more feasible for multiple spans and cost of
  launching is cheaper.
                                                          NICMAR
DISADVANTAGES OF
          LAUNCHING METHOD


‡ Maintenance is difficult as number of
  machinery involved are more.
‡ Number of operations are more so
  individual supervision is required.
‡ High risk involved in accident.




                     NICMAR
ANY QUESTION ?????

More Related Content

What's hot

Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Ankit Singh
 
report of open web girder (railway)
report of open web girder (railway)report of open web girder (railway)
report of open web girder (railway)Alankar jaiswal
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training pptSumit Singh
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEsrinivas cnu
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteRAVI KUMAR
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failuresSunil Kumar Meena
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadLachhmikant. Prasad
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge EngineeringKHUSHBU SHAH
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGJAPJEETSINGH13
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADGLA University
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTShankar Ramasamy
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipmentswetha110
 
Industrial training report of construction of the residential building
Industrial training report of construction of the residential buildingIndustrial training report of construction of the residential building
Industrial training report of construction of the residential buildingsuraj jha
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Akhilesh Shukla
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction pptBeing Deepak
 
Batching plant ppt
Batching plant pptBatching plant ppt
Batching plant pptdip17
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadampradip dangar
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundationSourabh Jain
 

What's hot (20)

Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
 
report of open web girder (railway)
report of open web girder (railway)report of open web girder (railway)
report of open web girder (railway)
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction Site
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failures
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasad
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERING
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipment
 
Industrial training report of construction of the residential building
Industrial training report of construction of the residential buildingIndustrial training report of construction of the residential building
Industrial training report of construction of the residential building
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
 
Batching plant ppt
Batching plant pptBatching plant ppt
Batching plant ppt
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadam
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
 

Viewers also liked

NOH3 Launching Girder Assembly and Erection VSL
NOH3  Launching Girder Assembly and Erection VSLNOH3  Launching Girder Assembly and Erection VSL
NOH3 Launching Girder Assembly and Erection VSLIan Kelly
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge ConstructionRobin Nirwal
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridgesSravan Kumar
 
A PowerPoint Presentation On Superstructure
A PowerPoint Presentation On SuperstructureA PowerPoint Presentation On Superstructure
A PowerPoint Presentation On Superstructurekuntansourav
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-designRahul Ranakoti
 
Comparative study on normal and skew bridge of psc box girder
Comparative study on normal and skew bridge of psc box girderComparative study on normal and skew bridge of psc box girder
Comparative study on normal and skew bridge of psc box girdereSAT Journals
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)Pinak Biswas
 
Catalogue--Veca(2015.10.23)
Catalogue--Veca(2015.10.23)Catalogue--Veca(2015.10.23)
Catalogue--Veca(2015.10.23)Veca Zhu
 
SSRC Presentation of Telmo Andres Sanchez
SSRC Presentation of Telmo Andres SanchezSSRC Presentation of Telmo Andres Sanchez
SSRC Presentation of Telmo Andres SanchezEva Lantsoght
 
CE 6506 CONSTRUCTION TECHNIQUES EQUIPMENTS & PRACTICE
CE 6506 CONSTRUCTION  TECHNIQUES  EQUIPMENTS  & PRACTICE CE 6506 CONSTRUCTION  TECHNIQUES  EQUIPMENTS  & PRACTICE
CE 6506 CONSTRUCTION TECHNIQUES EQUIPMENTS & PRACTICE Anbarasan Muthaiyah
 
Redesigning Input-Method Launcher and Management System
Redesigning Input-Method Launcher and Management SystemRedesigning Input-Method Launcher and Management System
Redesigning Input-Method Launcher and Management SystemFuminobu Takeyama
 
SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)Strukturas
 

Viewers also liked (20)

NOH3 Launching Girder Assembly and Erection VSL
NOH3  Launching Girder Assembly and Erection VSLNOH3  Launching Girder Assembly and Erection VSL
NOH3 Launching Girder Assembly and Erection VSL
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
PiBox Launcher
PiBox LauncherPiBox Launcher
PiBox Launcher
 
A PowerPoint Presentation On Superstructure
A PowerPoint Presentation On SuperstructureA PowerPoint Presentation On Superstructure
A PowerPoint Presentation On Superstructure
 
Offshore Platforms
Offshore Platforms Offshore Platforms
Offshore Platforms
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Introduction to offshore structure
Introduction to offshore structure Introduction to offshore structure
Introduction to offshore structure
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-design
 
Comparative study on normal and skew bridge of psc box girder
Comparative study on normal and skew bridge of psc box girderComparative study on normal and skew bridge of psc box girder
Comparative study on normal and skew bridge of psc box girder
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)
 
Catalogue--Veca(2015.10.23)
Catalogue--Veca(2015.10.23)Catalogue--Veca(2015.10.23)
Catalogue--Veca(2015.10.23)
 
Segmental bridge
Segmental bridgeSegmental bridge
Segmental bridge
 
Release Note: midas Civil 2014 v2.1
Release Note: midas Civil 2014 v2.1Release Note: midas Civil 2014 v2.1
Release Note: midas Civil 2014 v2.1
 
SSRC Presentation of Telmo Andres Sanchez
SSRC Presentation of Telmo Andres SanchezSSRC Presentation of Telmo Andres Sanchez
SSRC Presentation of Telmo Andres Sanchez
 
Precast segmental concrete bridges a
Precast segmental concrete bridges aPrecast segmental concrete bridges a
Precast segmental concrete bridges a
 
CE 6506 CONSTRUCTION TECHNIQUES EQUIPMENTS & PRACTICE
CE 6506 CONSTRUCTION  TECHNIQUES  EQUIPMENTS  & PRACTICE CE 6506 CONSTRUCTION  TECHNIQUES  EQUIPMENTS  & PRACTICE
CE 6506 CONSTRUCTION TECHNIQUES EQUIPMENTS & PRACTICE
 
Redesigning Input-Method Launcher and Management System
Redesigning Input-Method Launcher and Management SystemRedesigning Input-Method Launcher and Management System
Redesigning Input-Method Launcher and Management System
 
ppt
pptppt
ppt
 
SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)
 

Similar to 62617938 launching-girder

SUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUESSUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUESR821992
 
Comparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transportComparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transportShyamal Bag
 
Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support Rafi Tchopourian
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...swaroop k s
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFShankar Ramasamy
 
Seismic Evaluation of Nuclear Structures
Seismic Evaluation of Nuclear StructuresSeismic Evaluation of Nuclear Structures
Seismic Evaluation of Nuclear StructuresProSIM R & D Pvt. Ltd.
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rulesytcrane
 
Road making machines in mines
Road making machines in minesRoad making machines in mines
Road making machines in minesVijayant Singh
 
Cam and follower theory prof. sagar a dhotare
Cam and follower theory   prof. sagar a dhotareCam and follower theory   prof. sagar a dhotare
Cam and follower theory prof. sagar a dhotareSagar Dhotare
 
Crawler Mounted crane
Crawler Mounted craneCrawler Mounted crane
Crawler Mounted craneAxay Sharma
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenanceMohd Bakhsh
 
Case study metalic gates of dams
Case study   metalic gates of damsCase study   metalic gates of dams
Case study metalic gates of damsmechmitaoe
 

Similar to 62617938 launching-girder (20)

Mobile crane
Mobile craneMobile crane
Mobile crane
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Innovative Technology for Steel Melt Shop
Innovative Technology for Steel Melt ShopInnovative Technology for Steel Melt Shop
Innovative Technology for Steel Melt Shop
 
Flyer RMG trolleys
Flyer RMG  trolleysFlyer RMG  trolleys
Flyer RMG trolleys
 
SUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUESSUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUES
 
Comparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transportComparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transport
 
Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...
 
Rocker bogie mechanism
Rocker bogie mechanismRocker bogie mechanism
Rocker bogie mechanism
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
 
Flyer STS trolleys
Flyer STS trolleysFlyer STS trolleys
Flyer STS trolleys
 
Seismic Evaluation of Nuclear Structures
Seismic Evaluation of Nuclear StructuresSeismic Evaluation of Nuclear Structures
Seismic Evaluation of Nuclear Structures
 
Introducing Bumper Cranes
Introducing Bumper CranesIntroducing Bumper Cranes
Introducing Bumper Cranes
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rules
 
Grua titan de 26 ton international sterling 900 a
Grua titan de 26 ton international sterling 900 aGrua titan de 26 ton international sterling 900 a
Grua titan de 26 ton international sterling 900 a
 
Road making machines in mines
Road making machines in minesRoad making machines in mines
Road making machines in mines
 
Cam and follower theory prof. sagar a dhotare
Cam and follower theory   prof. sagar a dhotareCam and follower theory   prof. sagar a dhotare
Cam and follower theory prof. sagar a dhotare
 
Crawler Mounted crane
Crawler Mounted craneCrawler Mounted crane
Crawler Mounted crane
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Case study metalic gates of dams
Case study   metalic gates of damsCase study   metalic gates of dams
Case study metalic gates of dams
 

62617938 launching-girder

  • 1. Presentation On LAUNCHING GIRDER Guided by: Submitted By Prof. A. GOSAVI Rohan Kaple (G04117) Hiren Patel (G04130) Kundan Rathod (G04138) National Institute Of Construction Management & Research Goa Campus
  • 2. Introduction ‡ Bridges have two components, Superstructure and sub structure. ‡ The substructure is normally cast in place over the foundation and various methods are available for this task. ‡ Placing the superstructure (girders) on the substructure is an important task for the engineers. NICMAR
  • 6. WORKS TO BE ENSURED BEFORE LAUNCHING ‡ Abutments and Piers to be completed including bed blocks. ‡ Dirt wall and fly wings of Abutment not to be concreted to facilitate movement of steel Launching girder. ‡ The fabricated launching girder is assembled on Abutment side approach in the launching direction. ‡ Track is welded on steel launching
  • 7. LAUNCHING EQUIPMENTS ‡ Steel launching girder of appropriate length and weight. ‡ 5 M.T winch trolley for movement of steel launching girder ‡ Counterweight trolley ‡ Trolleys for transporting of girders - 2 nos. ‡ 5 M.T winch trolley(for movement of girder trolleys) ‡ Hydraulic jacks ‡ Gantry Portals NICMAR
  • 8. FIRST SPAN ERECTION SEGMENT S2 SEGMENT S1 SLIDING BEAMS LIFTING HOIST MAIN GIRDER MIDDLE SUPPORT FRONT SUPPORT
  • 9. NORMAL SPAN ERECTION SEGMENT S2 SEGMENT S1 SLIDING BEAMS LIFTING HOIST MAIN GIRDER REAR TROLLEY REAR SUPPORT MIDDLE SUPPORT FRONT SUPPORT
  • 11. DIRECTION NICMAR
  • 12. SALIENT FEATURES OF SUPER STRUCTURE Location Sathdhara, Barman, Narsinghpur, Madhya Pradesh KM 0.3 SPAN 30m SUPER STRUCTURE PSC GIRDER LENGTH OF GIRDER 27.5m WIDTH OF GIRDER 1.5m HEIGHT OF GIRDER 1.8m CONCRETE QUANTITY (EACH) 33 m3 WEIGHT OF GIRDER 87.5 MT REINFORCEMENT STEEL 3.5 MT NICMAR
  • 13. SHIFTING OF LAUNCHING GIRDER PROJECT DESCRIPTION ‡ The steel girder is pulled with the help of power operated winch and is placed on first two spans i.e. on abutment and adjacent pier. ‡ Rollers are placed on bank and on the bed blocks for shifting. ‡ After proper position of launching girder, remove the rollers and ensure firm sitting of launching girder on the bed blocks. ‡ Construct dirt wall , fly wings of ABUTMENT . ‡ Now the launching girder is ready for launching of PSC girder. NICMAR
  • 14. Shifting of fabricated truss NICMAR
  • 18. Casting Yard & Stacking yard NICMAR
  • 19. LIFTING OF PRECAST GIRDER USING JACKS FOR LOADING ON TROLLEY The PSC Girder is to be lifted over the casting bed with the help of four hydraulic jacks of appropriate capacity each. Each lift is to be in stages of 100mm. Wooden blocks supports to be placed underneath PSC girder. Supports to be provided at the bearing location areas only. Jacks to be placed below the lifting pads only. In successive increments PSC girder is to be lifted to a ht. of 2.00 m over the casting beds. Now the PSC Girder is ready for placement of track and trolleys below it to facilitate leading.
  • 20. Girder placed on rail NICMAR
  • 22. Attachment of winching machine to PC GIRDER NICMAR
  • 23. GIRDER PLACED ON TROLLEY AND SHIFTING TO THE SPAN ‡ Keep the PSC girder over the hydraulic jacks placed below the lifting heads. ‡ Remove the wooden blocks in the bearing area for linking purpose. ‡ Link the track below the PSC girder. ‡ Place two trolleys below the PSC girder in the bearing area. ‡ Rest the PSC girder over the trolley by lowering hydraulic jacks. ‡ Remove the wooden blocks and hydraulic jacks. ‡ Now the trolleys are ready to shift to the first span. ‡ Shift the PSC girder using winch machine.
  • 26. GIRDER SHIFTING TO POSITION FOR PLACEMENT ‡ Once the girder placed on trolleys reaches at proper launching location,(Exactly over the bearing area) lock the trolleys. ‡ The PSC girder is slowly lifted from the trolleys and supported on the specially designed platforms using 4 Nos. jacks. ‡ Once the girder is loaded on the platforms and jacks, the trolleys are removed and sent back to casting bed for shifting of another PSC girder. NICMAR
  • 29. ALTERNATIVE METHODS OF LAUNCHING GIRDER CAST IN PRE-CAST SITU CONVENTIONAL METHOD SEGMENTAL METHOD NICMAR
  • 30. ALTERNATIVE TECHNIQUES OF LAUNCHING BY RAIL / JACK/ WINCH MACHINE BY STAGING/SUPPORT METHOD BY TOWER CRANE METHOD BY GANTRY GIRDER NICMAR
  • 31. Site condition COMPARISON Time OF Risk LAUNCHING TECHNIQUES Cost NICMAR
  • 35. ADVANTAGES OF LAUNCHING METHOD ‡ Height of bridge is not the criteria and this method is applied at any height. ‡ Ground supports can be totally avoided during launching and as such launching scheme is best suited for perennial course. ‡ Proper quality control can be ensured in case of pre cast method since the girders will be cast on approach formation. ‡ There will be lot of working space available around the girder for providing supporting system to shuttering and movement of men. ‡ Simultaneous construction of sub structure and super structure. ‡ This scheme is more feasible for multiple spans and cost of launching is cheaper. NICMAR
  • 36. DISADVANTAGES OF LAUNCHING METHOD ‡ Maintenance is difficult as number of machinery involved are more. ‡ Number of operations are more so individual supervision is required. ‡ High risk involved in accident. NICMAR