CRAWLER MOUNTED CRANE
CONSTRUCTION TECHNOLOGY & EQUIPMENTS
(PRESENTATION)
CRANE
• A crane is a type of machine, generally equipped with a hoist rope, wire
ropes or chains, and sheaves, that can be used both to lift and lower materials and
to move them horizontally.
• It is mainly used for lifting heavy things and transporting them to other places.
• The device uses one or more simple machines to create mechanical advantage and
thus move loads beyond the normal capability of a human.
• Cranes are commonly employed in the transport industry for the loading and
unloading of freight, in the construction industry for the movement of materials,
and in the manufacturing industry for the assembling of heavy equipment.
CRAWLER MOUNTED CRANE-INTRODUCTION
. The crawler crane is basically a tracked vehicle that has a crane mechanism
attached to it.
2. This crane has the capability to work on every type of ground surface, even on
the softest grounds, thanks to its specially designed track properties. The metal
tracks make the crawler crane very stable on the ground and also provide increased
maneuverability on the ground.
3. The lifting capacity of the crawler crane ranges from 30 to 3000 tons depending
on the model.
VARIOUS COMPONENTS OF CRAWLER CRANE
COMPONENTS
 1. CRANE: consists of a rotating structure for lifting and lowering horizontally on crawler treads
 2. HOIST: used to lift and lower load
 3. BOOM: an inclined spar, strut, or other long member supporting the hoisting tackle
 4. JIB: extension attached to the boom point to provide added boom length for lifting specified
loads
 5. COUNTER WEIGHT: weights used for balancing loads and the weight of the crane in providing
stability
DIAGRAM
1. All crawler cranes consist of several parts. The propulsion system and the tracks
are the main parts of the crane.
2. A long boom is attached to the cabin and can be raised high above the control
cabin. Cables move through the boom and a hook is attached at the end of the boom
for catching, lifting and moving various kinds of items and loads from one place to
another.
3. Some crawler crane models come with additional part known as a jib which is
attached at the end of the boom. The jib allows the crawler crane to move items
even further from its position on the ground. The crawler crane moves like a crawler
tractor, but because of its weight it moves very slowly on the ground.
4.One main feature which allows the crawler crane to lift and move heavy loads
without losing control is the counterweight. The counterweight are usually placed at
the back of the crane and can weight up to several tons. The crawler crane is
versatile machine , capable of performing and completing various lifting tasks on all
types of groung surfaces and weather conditions.
ADVANTAGES AND DISADVANTAGES
 The MAIN ADVANTAGE of the crawler crane is the ability to move and lift items
and other heavy loads around the construction site very easily. In addition,
the tracks of the crawler crane provide support and increased stability.
 • The BIGGEST DISADVANTAGE of the crawler crane is the big size and weight.
The crawler crane is not transported fully assembled. They are just too big
for the roads. That's why they are delivered in manageable pieces and
assemble on site. This can be a project on its own and will involve a team of
professional heavy lifting technicians such as riggers and operators. The
configuration of the crane is predetermined in advance by the lift engineer
based on the customer's project requirement.
EXAMPLE
GIVEN DATA:ACE 750 –MODEL
PURCHASE COST:175 LAKHS
USEFUL LIFE:10 YEARS(2000Hr/Yr)
ENGINE:230 Hp
Assumed data :operating factor-0.65
Salvage value-10%purchase cost
Maintainance & repair-85%of depreciation
Investment cost-12% of AAI
Lubricating oil-20% of fuel cost
Labour cost -15000 rupees per month
1)Avg annual investment-
P(n+1)+S(n-1)
2n
Here, S=10% of P
P=purchase value
S=salvage value
n=useful life
=175*10^5(10+1)+175*10^4(10-1)
2*10
=10412500rupees=104.125 lakhs
a)Investment cost per year=12% avg annual investment
=0.12*104.125 lakhs
=12.495lakh rs / yr
ICP hr=12.495lakh rs/2000
=624.75 rs/hr
b)Depreciation cost per year=P-S
n
=175lakh-17.5lakh
10
=15.75lakh/yr
DCP per hour=787.5rs/hr
c)Maintainance & repair cost/year-
85%of depreciation=0.85*15.75lakh/yr=13.3875lakh/year
per hour =669.37rs/hr
d)Fuel cost-Assume the rate of fuel :60rs/lt
Operating fuel consumption/hr(Q)=op. factor *Hp*fuel factor
Fuel fac.=0.04gal/Hp=0.04*3.785L/hp=0.1514L/hp
Opearting fuel consumption=230*0.6*0.1514=20.893L
Fuel cost=20.893*60=125.6rs/hr
e)Lubricating oil cost=20%of fuel cost=0.20*1253.6=250.716rs
f) Labour cost=15000*12
2000
=90rs/hr
Total owning & operating cost=3425.22rs/hr
MAJOR CAUSES OF CRANE ACCIDENTS
the major causes or crane accidents to include :
 1. Crane buckling or collapsing: All cranes have weight limits to ensure that
the crane will not tip over. To counter balance the weight, cranes use
counterweight and out-rigging systems. If the maximum weight is exceeded,
the crane will be in danger of either buckling or the boom may collapse.
 2. Improper crane assembly: One of the biggest reasons that a boom collapses
is improper assembly. Specifically if the crane does not have the proper
blocking (wood or metal supports) to stabilize the load, the unbalanced load
will move and may lead to the crane collapsing.
 3. Improper employee training: Operators who do not have the proper
training in crane operation and safety procedures may lead to crane
accidents.
4.Mechanical failures: Routine crane maintenance should be followed to prevent
accidents due to mechanical failure. Crane components with excessive wear
should be repaired and replaced right away.
5. Contact with overhead power lines: Electrocution from contact with overhead
power lines is leading cause of crane related accidents. Both the crane operator
and workers in the crane basket should be aware of the placement of power lines
surrounding the worksite. Before work commences the current to active power
lines should be shut off to prevent electrocution from accidental contact with
live wires.
6. Flawed or infrequent inspections: Timely, consistent inspections by
experienced and well trained inspectors can wholly prevent tragic accidents.
PLANNING BEFORE START-UP
1.Level the crane and ensure support surface is firm and able to support the load.
2.Know the basic crane capacities , limitations, and job site restrictions ,such as the location of
power lines ,unstable soil or high winds.
3.Contact power line owners and determine precautions . Know the location and voltage of
overhead power lines.
4.At the beginning ,walk-around your crane checking for mechanical , electrical , structural , and
hydraulic issues (MESH).
5.Make other personnel aware of hoisting activities.
6.Barricade areas within swing radius.
7.Ensure proper maintenance and inspections.
8.Determine safe areas to store materials and place machinery.
APPLICATIONS
1.Used in lifting operations on different ground surfaces, including soft ground .
2. Used in demolition.
3. Used in bridge/road construction.
4.Used in Cargo loading.
5.Used in removal of debris.
Site images
MADE BY: ANUBHAV SUHALKA(16BCL005)
ANUSHKA SUROLIA(16BCL007)
AXAY SHARMA(16BCL008)

More Related Content

What's hot

Safety in Erection of Steel Structures
Safety in Erection of Steel StructuresSafety in Erection of Steel Structures
Safety in Erection of Steel StructuresAkash Tilokani
 
Tower Crane Installation Work
Tower Crane Installation WorkTower Crane Installation Work
Tower Crane Installation Worknittipurohit
 
62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girderlotuseye
 
Hoisting equipments
Hoisting equipmentsHoisting equipments
Hoisting equipmentsvipul308
 
Pier & bridge guide
Pier & bridge guidePier & bridge guide
Pier & bridge guidePRATAP MISHRA
 
Earthmoving equipments
Earthmoving equipmentsEarthmoving equipments
Earthmoving equipmentsSamay Attara
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Construction Tech. and Mgmt., VNIT Nagpur
 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingDavid H Moloney
 
DRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTDRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTvikas verma
 
Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequenceRanjith Kumar
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...A Makwana
 
BACKHOE CONSTRUCTION EQUIPMENT
BACKHOE CONSTRUCTION EQUIPMENTBACKHOE CONSTRUCTION EQUIPMENT
BACKHOE CONSTRUCTION EQUIPMENTvikas verma
 

What's hot (20)

Excavations ppt
Excavations pptExcavations ppt
Excavations ppt
 
Safety in Erection of Steel Structures
Safety in Erection of Steel StructuresSafety in Erection of Steel Structures
Safety in Erection of Steel Structures
 
Tower Crane Installation Work
Tower Crane Installation WorkTower Crane Installation Work
Tower Crane Installation Work
 
Tower cranes
Tower cranesTower cranes
Tower cranes
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girder
 
1.2.2.front end loaders
1.2.2.front end loaders1.2.2.front end loaders
1.2.2.front end loaders
 
Hoisting equipments
Hoisting equipmentsHoisting equipments
Hoisting equipments
 
Pier & bridge guide
Pier & bridge guidePier & bridge guide
Pier & bridge guide
 
grader
gradergrader
grader
 
Earthmoving equipments
Earthmoving equipmentsEarthmoving equipments
Earthmoving equipments
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise Building
 
Aerial lift
Aerial liftAerial lift
Aerial lift
 
DRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTDRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENT
 
CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK
 
Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
 
Draglines
DraglinesDraglines
Draglines
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
 
BACKHOE CONSTRUCTION EQUIPMENT
BACKHOE CONSTRUCTION EQUIPMENTBACKHOE CONSTRUCTION EQUIPMENT
BACKHOE CONSTRUCTION EQUIPMENT
 

Similar to Crawler Mounted crane

Construction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptxConstruction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptxKartikSodha
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...swaroop k s
 
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاالروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاOsamaAbdelbaset2
 
Construction Truck Crane 2009
Construction Truck Crane 2009Construction Truck Crane 2009
Construction Truck Crane 2009vtsiri
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rulesytcrane
 
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptapm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptLeandroGonzlezDeCecc
 
www.scanrent.com.au
www.scanrent.com.au www.scanrent.com.au
www.scanrent.com.au Ghazanfar Ali
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniquessunilighare
 
Cran and its types
Cran and its typesCran and its types
Cran and its typesecat031
 
2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sitesPrastowo Priyatmoko
 
Overhead Crane Operator Safety 2021.pptx
Overhead Crane Operator Safety 2021.pptxOverhead Crane Operator Safety 2021.pptx
Overhead Crane Operator Safety 2021.pptxssuser74cff3
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile CranesMihajlo Stupar
 
Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...
Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...
Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...IRJET Journal
 
Jindal steel and power limited ppt
Jindal steel and power limited pptJindal steel and power limited ppt
Jindal steel and power limited pptvijaya kisku
 
Amit crane ppt
Amit crane pptAmit crane ppt
Amit crane pptamits2280
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLift Events
 

Similar to Crawler Mounted crane (20)

Construction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptxConstruction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptx
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...
 
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاالروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
 
Construction Truck Crane 2009
Construction Truck Crane 2009Construction Truck Crane 2009
Construction Truck Crane 2009
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rules
 
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptapm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
 
www.scanrent.com.au
www.scanrent.com.au www.scanrent.com.au
www.scanrent.com.au
 
L&H International
L&H InternationalL&H International
L&H International
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniques
 
Cran and its types
Cran and its typesCran and its types
Cran and its types
 
2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites
 
Overhead Crane Operator Safety 2021.pptx
Overhead Crane Operator Safety 2021.pptxOverhead Crane Operator Safety 2021.pptx
Overhead Crane Operator Safety 2021.pptx
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
 
Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...
Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...
Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...
 
Jindal steel and power limited ppt
Jindal steel and power limited pptJindal steel and power limited ppt
Jindal steel and power limited ppt
 
Amit crane ppt
Amit crane pptAmit crane ppt
Amit crane ppt
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
 
Nce603 mod unit5
Nce603 mod unit5Nce603 mod unit5
Nce603 mod unit5
 
Belt conveyor _2_
Belt conveyor _2_Belt conveyor _2_
Belt conveyor _2_
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
 

More from Axay Sharma

A case study on GIS application
A case study on GIS applicationA case study on GIS application
A case study on GIS applicationAxay Sharma
 
Renewable Energy
Renewable EnergyRenewable Energy
Renewable EnergyAxay Sharma
 
Smart solid waste management-surat city.
Smart solid waste management-surat city.Smart solid waste management-surat city.
Smart solid waste management-surat city.Axay Sharma
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimneyAxay Sharma
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segmentsAxay Sharma
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) modelAxay Sharma
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.Axay Sharma
 
Project on brts(ahmedabad)
Project on brts(ahmedabad)Project on brts(ahmedabad)
Project on brts(ahmedabad)Axay Sharma
 
Flyover Bridge construction project
Flyover Bridge construction projectFlyover Bridge construction project
Flyover Bridge construction projectAxay Sharma
 
Classification of Organization
Classification of OrganizationClassification of Organization
Classification of OrganizationAxay Sharma
 
Presentation on Modern construction materials
Presentation on Modern construction materialsPresentation on Modern construction materials
Presentation on Modern construction materialsAxay Sharma
 

More from Axay Sharma (12)

A case study on GIS application
A case study on GIS applicationA case study on GIS application
A case study on GIS application
 
Renewable Energy
Renewable EnergyRenewable Energy
Renewable Energy
 
Smart solid waste management-surat city.
Smart solid waste management-surat city.Smart solid waste management-surat city.
Smart solid waste management-surat city.
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) model
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 
Project on brts(ahmedabad)
Project on brts(ahmedabad)Project on brts(ahmedabad)
Project on brts(ahmedabad)
 
Flyover Bridge construction project
Flyover Bridge construction projectFlyover Bridge construction project
Flyover Bridge construction project
 
Classification of Organization
Classification of OrganizationClassification of Organization
Classification of Organization
 
Presentation on Modern construction materials
Presentation on Modern construction materialsPresentation on Modern construction materials
Presentation on Modern construction materials
 
3D Printing
3D Printing3D Printing
3D Printing
 

Recently uploaded

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 

Recently uploaded (20)

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

Crawler Mounted crane

  • 1. CRAWLER MOUNTED CRANE CONSTRUCTION TECHNOLOGY & EQUIPMENTS (PRESENTATION)
  • 2. CRANE • A crane is a type of machine, generally equipped with a hoist rope, wire ropes or chains, and sheaves, that can be used both to lift and lower materials and to move them horizontally. • It is mainly used for lifting heavy things and transporting them to other places. • The device uses one or more simple machines to create mechanical advantage and thus move loads beyond the normal capability of a human. • Cranes are commonly employed in the transport industry for the loading and unloading of freight, in the construction industry for the movement of materials, and in the manufacturing industry for the assembling of heavy equipment.
  • 3.
  • 4. CRAWLER MOUNTED CRANE-INTRODUCTION . The crawler crane is basically a tracked vehicle that has a crane mechanism attached to it. 2. This crane has the capability to work on every type of ground surface, even on the softest grounds, thanks to its specially designed track properties. The metal tracks make the crawler crane very stable on the ground and also provide increased maneuverability on the ground. 3. The lifting capacity of the crawler crane ranges from 30 to 3000 tons depending on the model.
  • 5. VARIOUS COMPONENTS OF CRAWLER CRANE
  • 6. COMPONENTS  1. CRANE: consists of a rotating structure for lifting and lowering horizontally on crawler treads  2. HOIST: used to lift and lower load  3. BOOM: an inclined spar, strut, or other long member supporting the hoisting tackle  4. JIB: extension attached to the boom point to provide added boom length for lifting specified loads  5. COUNTER WEIGHT: weights used for balancing loads and the weight of the crane in providing stability
  • 8. 1. All crawler cranes consist of several parts. The propulsion system and the tracks are the main parts of the crane. 2. A long boom is attached to the cabin and can be raised high above the control cabin. Cables move through the boom and a hook is attached at the end of the boom for catching, lifting and moving various kinds of items and loads from one place to another. 3. Some crawler crane models come with additional part known as a jib which is attached at the end of the boom. The jib allows the crawler crane to move items even further from its position on the ground. The crawler crane moves like a crawler tractor, but because of its weight it moves very slowly on the ground. 4.One main feature which allows the crawler crane to lift and move heavy loads without losing control is the counterweight. The counterweight are usually placed at the back of the crane and can weight up to several tons. The crawler crane is versatile machine , capable of performing and completing various lifting tasks on all types of groung surfaces and weather conditions.
  • 9. ADVANTAGES AND DISADVANTAGES  The MAIN ADVANTAGE of the crawler crane is the ability to move and lift items and other heavy loads around the construction site very easily. In addition, the tracks of the crawler crane provide support and increased stability.  • The BIGGEST DISADVANTAGE of the crawler crane is the big size and weight. The crawler crane is not transported fully assembled. They are just too big for the roads. That's why they are delivered in manageable pieces and assemble on site. This can be a project on its own and will involve a team of professional heavy lifting technicians such as riggers and operators. The configuration of the crane is predetermined in advance by the lift engineer based on the customer's project requirement.
  • 10. EXAMPLE GIVEN DATA:ACE 750 –MODEL PURCHASE COST:175 LAKHS USEFUL LIFE:10 YEARS(2000Hr/Yr) ENGINE:230 Hp Assumed data :operating factor-0.65 Salvage value-10%purchase cost Maintainance & repair-85%of depreciation Investment cost-12% of AAI Lubricating oil-20% of fuel cost Labour cost -15000 rupees per month 1)Avg annual investment-
  • 11. P(n+1)+S(n-1) 2n Here, S=10% of P P=purchase value S=salvage value n=useful life =175*10^5(10+1)+175*10^4(10-1) 2*10 =10412500rupees=104.125 lakhs a)Investment cost per year=12% avg annual investment =0.12*104.125 lakhs =12.495lakh rs / yr
  • 12. ICP hr=12.495lakh rs/2000 =624.75 rs/hr b)Depreciation cost per year=P-S n =175lakh-17.5lakh 10 =15.75lakh/yr DCP per hour=787.5rs/hr c)Maintainance & repair cost/year- 85%of depreciation=0.85*15.75lakh/yr=13.3875lakh/year per hour =669.37rs/hr d)Fuel cost-Assume the rate of fuel :60rs/lt Operating fuel consumption/hr(Q)=op. factor *Hp*fuel factor Fuel fac.=0.04gal/Hp=0.04*3.785L/hp=0.1514L/hp
  • 13. Opearting fuel consumption=230*0.6*0.1514=20.893L Fuel cost=20.893*60=125.6rs/hr e)Lubricating oil cost=20%of fuel cost=0.20*1253.6=250.716rs f) Labour cost=15000*12 2000 =90rs/hr Total owning & operating cost=3425.22rs/hr
  • 14. MAJOR CAUSES OF CRANE ACCIDENTS the major causes or crane accidents to include :  1. Crane buckling or collapsing: All cranes have weight limits to ensure that the crane will not tip over. To counter balance the weight, cranes use counterweight and out-rigging systems. If the maximum weight is exceeded, the crane will be in danger of either buckling or the boom may collapse.  2. Improper crane assembly: One of the biggest reasons that a boom collapses is improper assembly. Specifically if the crane does not have the proper blocking (wood or metal supports) to stabilize the load, the unbalanced load will move and may lead to the crane collapsing.  3. Improper employee training: Operators who do not have the proper training in crane operation and safety procedures may lead to crane accidents.
  • 15. 4.Mechanical failures: Routine crane maintenance should be followed to prevent accidents due to mechanical failure. Crane components with excessive wear should be repaired and replaced right away. 5. Contact with overhead power lines: Electrocution from contact with overhead power lines is leading cause of crane related accidents. Both the crane operator and workers in the crane basket should be aware of the placement of power lines surrounding the worksite. Before work commences the current to active power lines should be shut off to prevent electrocution from accidental contact with live wires. 6. Flawed or infrequent inspections: Timely, consistent inspections by experienced and well trained inspectors can wholly prevent tragic accidents.
  • 16. PLANNING BEFORE START-UP 1.Level the crane and ensure support surface is firm and able to support the load. 2.Know the basic crane capacities , limitations, and job site restrictions ,such as the location of power lines ,unstable soil or high winds. 3.Contact power line owners and determine precautions . Know the location and voltage of overhead power lines. 4.At the beginning ,walk-around your crane checking for mechanical , electrical , structural , and hydraulic issues (MESH). 5.Make other personnel aware of hoisting activities. 6.Barricade areas within swing radius. 7.Ensure proper maintenance and inspections. 8.Determine safe areas to store materials and place machinery.
  • 17. APPLICATIONS 1.Used in lifting operations on different ground surfaces, including soft ground . 2. Used in demolition. 3. Used in bridge/road construction. 4.Used in Cargo loading. 5.Used in removal of debris.
  • 19. MADE BY: ANUBHAV SUHALKA(16BCL005) ANUSHKA SUROLIA(16BCL007) AXAY SHARMA(16BCL008)