Introduction to Construction Industry | FNBE 0414 | Final Project
1
FNBE APRIL INTAKE 2014
INTRODUCTION TO CONSTRUCTION INDUSTRY
FINAL PROJECT REPORT
Harwinder Singh Girn
Liew Jin
Project proposed: Rest Area
Introduction to Construction Industry | FNBE 0414 | Final Project
2
CONTENT
No. Content Page No.
1 Introduction
i) Suggestion and Proposal
3
2 Site plan and location 4
3 Site analysis 5-6
4 Concept 7
5 Introduction to site 8
6 Benefits of proposal site 9
7 Sketch of plan 10
8 Sketches of perspective and images of site 11-13
9 plan 14
10 Building plan approval process and procedures 15-23
11 Conclusion 24
Introduction to Construction Industry | FNBE 0414 | Final Project
3
Introduction
In this final project, in a group of 2, we were given a task to find a specific land
within campus area to initiate and propose a small construction project. The
land shall not be more than 30mx30m.
Our proposal should be one project that serves the purposes of either a
recreational area, study enhancement area, rest area, food and beverage area, or
commercial area.
i) Suggestion and proposal
We would like to propose a rest area and our suggested site would be the empty
space in Taylor’s University Lakeside Campus, Level 4, between Block D and
Block E. The rest area would be an open air green space rest area and is also
open to all university students 24/7. It does not only serves the purpose as a rest
area but it could also be a study enhancement area at the same time.
Introduction to Construction Industry | FNBE 0414 | Final Project
4
Site Plan and Location
The location of the project proposed is the gap at level 4, between Block D and
Block E. The site is a flat concrete slab and has an area around 30m x 30m. The
area is quite dull, boring and is not meant for anyone to walk through it.
Selected Site
Introduction to Construction Industry | FNBE 0414 | Final Project
5
Site Analysis
Sunlight
The site has both sunrise and sunset views. This could make the site a little
livelier during the morning all the way till the evening.
Wind
Besides, the site is between both blocks which is Block D and Block E. This
causes the current of the wind there to be quite strong, making the site very
cooling and relaxing at the same time.
Introduction to Construction Industry | FNBE 0414 | Final Project
6
Views
The views from the site isn’t very attractive but changes could be made to work
it out. There are two potential entrance which are the staircases in both Block D
and Block E, and also the elevators.
Traffic
The human traffic there is quite active especially in the morning and also the
afternoon, especially for Block E, the traffic could also be active all night long
because of the architecture students whom are staying over for projects.
Introduction to Construction Industry | FNBE 0414 | Final Project
7
Concept
The concept of this proposal is to provide a green space rest area for all
students. The nearest rest area is the one at the level 2 corridor and the student
life centre is all the way at front of the university which it would be convenient
for students who are in Block D and Block E to get to a good relaxing spot to
chill. Besides, there isn’t any green space rest area which students could enjoy
the greenery and also the strong wind blowing on both sides through the gap
between both buildings on a higher floor in the university too.
The proposed green space rest area would be great for the university
students to chill, rest, and relax surrounded by trees and plants and also the great
environment on a higher ground. Although there is already a rest area at the
level 2 corridor, this proposed green space rest area could bring the phrase ‘rest
area’ into a whole new level. The rich, sublime atmospheres and layered
textures of the rest area are brought to life with timber assemblies and textured
concrete, native plants and trees, and thick shades. The language is
contemporary, simple, and elegant and most of all, green. The use of familiar
materials such as wood and textured concrete gives an authentic flavour to these
contemporary creations.
The innovation in this proposed project is to transform a boring and
dull concrete slab area into a new inviting and user-friendly environment
oriented towards nature, leisure and art.
Introduction to Construction Industry | FNBE 0414 | Final Project
8
Introduction to Site
At this site which is about the size of 20mx20m that is between block D and
block E on the fourth floor or Taylor's Lakeside University campus will be an
opened air green space rest area. This rest area will be surrounded by lots of
greenary such as trees, plants and also a vertical garden so that the air can be
filtered to produce fresh air and also obtain a cleaner and greener enviroment for
students to experience. Facilities such as benches will be provided all over the
proposed resting area.
Introduction to Construction Industry | FNBE 0414 | Final Project
9
Benefits of Proposal site
1. This site is very convinient to be used as a rest area because it's located in
between block D and block E where there are many classes around.
2.This site will improve the amount of green in these type of area of the
university blocks and also improve the quality of air.
3. The natural wind provided by nature is able to fan everyone at the site so
ample electricty can be saved by rarely using fans.
4. This site is also very quiet and peaceful which is a great thing because
students will be able to have the rest they need after or before atending their
class or completing their assignments.
5. It's also the best place to spend time with your love ones or hangout with
friends and just enjoy the open air of the site hence this green space rest area is
always open to all university students 24/7.
Introduction to Construction Industry | FNBE 0414 | Final Project
10
Sketch of Plan
Introduction to Construction Industry | FNBE 0414 | Final Project
11
Sketches of perspective and images of
site
Introduction to Construction Industry | FNBE 0414 | Final Project
12
Introduction to Construction Industry | FNBE 0414 | Final Project
13
Introduction to Construction Industry | FNBE 0414 | Final Project
14
Introduction to Construction Industry | FNBE 0414 | Final Project
15
Plan
Introduction to Construction Industry | FNBE 0414 | Final Project
16
Building plan approval process and
procedures
Abstract
Successful development project is crucial to all project stakeholders. Meeting
the dateline to complete a project will be an added advantage for both the
developer and the land owner. Project development just like construction
project will encounter some form of project life cycle (PLC). A typical PLC of
developmental project comprise of a initiation and planning phase, construction
phase and post construction phase. Further, the implementation of the one-stop-
centre (OSC) by Ministry of Housing and Local Government (MHLG)
nationwide in April 2007 have succesfully improved the delivery system of the
planning process. As the result of the MHLG bold step, a more systematic
planning process have benefited the developers, consultant and the authorities.
In lieu of this, it is imperative that all the consultants and the developer should
comply to the guidelines, rules and regulations stipulated in the standard manual
drawn by Department of Town and Country Planning (DTCP) and the MHLG
to ascertain a smoother planning approval process. Thus, in long run, all these
moves implemented by the government should attract more foreign direct
investment (FDI).
Key words: Development project, planning process
Introduction to Construction Industry | FNBE 0414 | Final Project
17
Introduction
The success of a development project as a whole is crucial to all the
stakeholders who primarily are the developer, the land owner and property
buyer. The timely completion of a project that is not only within the budget but
also in accordance to specifications and the stakeholder’s satisfaction (Nguyen
et al., 2004) benefits both the project owner (developer) and the property buyer.
Each and every project development will undergo some form of project life
cycle (PLC) as mentioned by Kerzner (2009); PMI (2004). A typical
developmental process comprise of a initiation and planning (predevelopment)
stage, a intermediate stage (construction) (intermediate) and a closer stage (post
development).
Project Development the Malaysian Context: A crucial brief overview
In the Malaysian context project development similarly has its own PLC which
is divided into three (3) stages, namely, the predevelopment stage, the
construction stage and the post construction stage. The close of a development
project or the post developmental stage is when the completed property is
handed over to the owner as required and stipulated by the Housing
Development Act (HDA, 2010). The flow of activities starting from the
inception right up to the delivery of a completed property plays a pivotal role in
the planning of property development. A crucial brief overview of a typical
planning process in Malaysia, covering the legislature in the planning process,
the development plan and general implementation of development plan, and are
as follows.
Introduction to Construction Industry | FNBE 0414 | Final Project
18
Legislature in the planning process
The laws, procedures and guidelines pertaining to the property development
process in Malaysia are quite extensive. There are over fifty (50) laws and
guidelines that may either be initiated or pose a constrain on decisions when
undertaking a property development project. Those most pertinent and crucial
laws to be complied to include the National Land Code (NLC) 1965 (NLC,
2008), the Town and Country Planning Act, 1976 (Act 172), the Government
Act 1976 (Act 171), Uniform Building By Law 1984 (UBBL), the Street,
Drainage and Building Act 1974 (Act 133) and the Environmental Quality Act
1984.A very important tool used to manage land development is planning
control, referred to in Part IV of the Town and Country Planning Act (TCPA),
1976 and planning guidelines. In Section 19, the TCPA states that “no person,
other than the local authorities, shall, commence, undertake, or carry out any
development unless planning permission in respect of the development has been
granted to him under Section 22 (treatment of application or extended under
Subsection 24 (3) (lapse of planning permission)” (LOM, 2006).
Introduction to Construction Industry | FNBE 0414 | Final Project
19
Development plan
Various development plans (that is, the national physical plan; a structure plan,
a local plan and a special area plan) has been formulated under Part III of the
TCPA (TCPA, 1976) in order to guide the decision makers when processing
planning permissions. These plans shall form the overall policies for future land
development as well as used to establish zoning and planning standards
concerning public facilities requirements, roads, open spaces, building setbacks,
number of car parks etc. Basically, a layout plan that has been submitted must
comply with the national and physical plan, the state structure plan, the local
plan, a special area plan and all plans approved by the local authorities of the
governing state. The submitting party is also required to comply with a pre-
determined zoning requirement, strategic policies and government policies. For
example, in the state of Selangor, any development on a piece of land that has
been classified as class 3 and class 4 terrain, will not be approved for
development by the respective local authority. Similarly, when it involves a
composition of low cost, medium to low cost and medium cost housing and a
specific race (that is Bumiputera or indigenous group) quota, the planner must
prepare a layout plan that takes into consideration government policies,
guidelines and other technical requirements.
General implementation of a development plan
A development plan in Malaysia is implemented within the framework provided
under the National Development Planning that comes under the Town and
Country Planning Act, 1976 (Act 172). The National Development Planning
Framework (NDPF) comprises of three (3) levels of planning (Figure 2.1),
Introduction to Construction Industry | FNBE 0414 | Final Project
20
namely the National Physical Council (NPC) at the Federal level, the State
Planning Committee (SPC) at the state level and the local council at the local
authorities level. The NDPF is implemented 'top-down' starting at the federal
level down to the state level and finally to the local authorities level, directed
towards achieveing a national development vision by the year 2020. Any
development involving land that is more than 100 hectares in size requires
initial approval from both the SPC and the NPC. The NPC is chaired by the
Prime Minister while the SPC is chaired by the Chief Minister of the respective
state of Malaysia. An approval by the state government is required prior to
submission for approval to the NPPC for federal government approval. Both the
NPPC and SPC convene twice a year to discuss pertinent matters involving
planning such as a zoning change, the development of large parcels of land (100
hectares or more), any special development proposal, gazetted and revocation of
development plans etc.
Stages of Development
The three (3) stages in a project development are discussed in this section. The
first stage is the planning stage or the pre-development period. When all
required approvals have been obtained, it then goes into the second stage; the
construction phase. During the post construction stage, that is the third stage, a
certificate of completion of compliance (CCC) will be awarded to the developer
who then would have successfully completed their (housing) project (HDA,
2010, DTCP, 2007). A developer first has to obtain all planning approvals
before any physical work can commence on site and prior to issuance of any
advertising permit by the relevant authorities. Under the new guidelines by the
OSC, the principal submitting person (PSP) has an option to either submit all
four (4) planning applications for simultaneous approval or to submit it by
stages. The planning applications are (a) planning permission application
Introduction to Construction Industry | FNBE 0414 | Final Project
21
(Subsection 21[1], Act 172), (b) building plan application, (c) road and drainage
plan application (Section 9, Act 133) and (d) the various 'works' plan (Section
70A, Act 133). The local authorities shall stipulate conditions subject to
comments from their technical department. The total number of technical
departments that exist is peculiar to that local authority where the plans are
being submitted. Just in the state of Selangor, for example, there are a total of
fourteen (14) technical departments (DTCP, 2007; MHLG, 2008) with whom
the PSP must work with during the submission of plans. Any development that
involves land area larger than 50 hectares in size, is required to be supported by
a study on the potential impact it may have on the local environment (DTCP,
2007). The environental impact principal submitting party (PSP) where the
submitted plans must go through the various technical departments (DTCP,
2007; MHLG, 2008), for example the department of environment, that handles
all matters pertaining to the environment, the Department of Sewerage on
matters concerning sewerage, the Department of Drainage on drainage matters
and the Board of Water Management that manages water matters. Other
standard compliances include the building setback line requirement for different
building types (housing, industrial, or commercial), density, plot ratios, public
facilities, retention ponds, supply of electricity (by the National Board of
Electricity) and road levels. All planning approvals is subject to the planning
permission process referred to under Section IV, Town and Country Planning
Act, 1976 (Act 172). Generally, the local authorities would only offer an initial
conditional approval. The submitting party, that is the planner (appointed by the
developer), shall then make the necessary amendments in compliance with to
the requirements stated in the letter of conditional approval issued by the
various technical departments.
One-Stop-Centre (OSC)
Introduction to Construction Industry | FNBE 0414 | Final Project
22
In April 2007, the Malaysian government under the Ministry of Housing and
Local government (MHLG) initiated a One-Stop-Centre (OSC) approval
process in an effort to improve the delivery system and procedures at all state
municipalities. Its main purpose is to ensure that Malaysia stays globally
competitive in the property and real estate sectors (MHLG, 2008). It is an
independant body that acts as a facilitator for the planning process for
submission of plans at the local authority. Currently the OSC forms part of the
local authority located in every state in Malaysia. Prior to the introduction of the
OSC, submission for approval was done separately and in sequence. Only upon
approval of the layout plan can the building plan be submitted for approval with
the rest of the drawings to follow suit. With the implementation of the OSC, the
consultants have the option to submit all five (5) drawings, namely the layout
plan, building plan, road and drainage plan, earthwork plan and landscape plan
simultaneously (DTCP, 2007; MHLG, 2008).
Principal Submitting Party (PSP)
The planner (registered planner) is principal submitting party (PSP) engaged by
the developer or land owner to prepare the layout plan and will act as PSP for
all planning approvals, primarily at the planning permission stage (refer to
Appendix A). In smaller development projects, the architect acts as PSP to
complete and obtain the building plan approval from the local authorities. The
civil and structural (C and S) engineer is required to produce the platform
design for the earthworks plan application. The C and S engineer also prepares
the structural building design for the architect to submit at the building plan
approval stage. Similarly, the mechanical and electrical (M and E) engineers
prepares the mechanical and electrical drawings and layout to include plumbing,
electrical supply and the sewerage treatment plant (STP) for submission at the
Introduction to Construction Industry | FNBE 0414 | Final Project
23
building plan approval stage.The key consultant who is responsible for
coordinating the works activities at the initial stage of submission of the layout
plan with the authorities shall be the planner. A registered planner must fullfill
two (2) requirements, that is (a) be registered as a corporate member with the
Malaysian Institute of Planners (MIP) and (b) be registered with the Malaysian
Planning Board. The registered planner, being the consultant or the PSP acting
on behalf of the developer, must ensure full compliance with all the
requirements stipulated by the local authorities and technical departments.
Relationship between Principal Submitting Persons (PSP) and Approving
Authorities
A good working relationship between the consultant, the developer and the
various respective departments at the local authorities will directly contribute to
a successful planning approval. The consultant must keep abreast of all
requirements stipulated by the authorities. Where in doubt, the manual for
planning guidelines and procedures for the State of Selangor (DTCP, 2007) is
available. It is imperative for the developer of a housing project to comply with
the planning standard guideline (DTCP, 2007; MHLG, 2008) of that respective
local authority where the project is located. This is easily achievable by
cooperating with the planning consultant (registered planner). A lack of
cooperation in any aspect may result in a protracted conditional approval and a
delay to obtain the endorsement for final approval hence delaying the overall
construction.
Introduction to Construction Industry | FNBE 0414 | Final Project
24
Planning Approving Committee
The planning approval is decided by the planning approval committee at the
local authorities where the OSC is located. The committee is chaired by the
head (Mayor) of the local authority and comprises of sixteen (16)
representatives from the respective technical departments, local authorities’
councillors (representatives of the local municipalities selected by the state)
(Appendix B). The head of the planning department at the local authority is
responsible for submitting the development report on each layout plan
submission. The report and the layout plan are then tabled at the OSC meeting
for approval. Appendix B is a typical example of a full planning approval
committee for the state of Selangor headed by the Town Councillor (Yang di
Pertua) for State Municipality or Mayor (Datuk Bandar) for City Municipality.
Introduction to Construction Industry | FNBE 0414 | Final Project
25
Conclusion
After coming up with this proposal of consrtucting of an opened air green
space rest area, we realised that this site will never be a boring or dull place to
look at and also acessible by anyone either from block D or block E because the
concrete slab is joint to both blocks at this floor. This rest area will be an
interesting place to go to because of green enviroment. Furthermore, even
though this design of ours will cost a lot of money beacause of the type of
material used but it will really benefit the students who really need find rest at
place which is the nearest to them.

More Related Content

What's hot

Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & MonitoringJawad Ahmad
 
Arki tabulated-reviewer
Arki tabulated-reviewerArki tabulated-reviewer
Arki tabulated-reviewerFann Portento
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectNekumi Kida
 
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building Aroh Thombre
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006Melvin Lim
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2Azizan Supardi
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 
Carlos Antonio Santos - Viola
Carlos Antonio Santos - ViolaCarlos Antonio Santos - Viola
Carlos Antonio Santos - ViolaShayne Galo
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details Gilbert Bautista
 
pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanFiQahh AmiNn
 
Cold water supply system & Components
Cold water supply system & ComponentsCold water supply system & Components
Cold water supply system & Componentsashikin
 
Project Management Knowledge Areas
Project Management Knowledge AreasProject Management Knowledge Areas
Project Management Knowledge AreasMais Jauhary, PMP
 

What's hot (20)

Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & Monitoring
 
Arki tabulated-reviewer
Arki tabulated-reviewerArki tabulated-reviewer
Arki tabulated-reviewer
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A Project
 
UBBL 2021.pdf
UBBL 2021.pdfUBBL 2021.pdf
UBBL 2021.pdf
 
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2
 
BS Role
BS RoleBS Role
BS Role
 
Bcon
BconBcon
Bcon
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
Carlos Antonio Santos - Viola
Carlos Antonio Santos - ViolaCarlos Antonio Santos - Viola
Carlos Antonio Santos - Viola
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
 
pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaan
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
Cold water supply system & Components
Cold water supply system & ComponentsCold water supply system & Components
Cold water supply system & Components
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
 
Project Management Knowledge Areas
Project Management Knowledge AreasProject Management Knowledge Areas
Project Management Knowledge Areas
 

Viewers also liked

Cl f inal project report
Cl f inal project reportCl f inal project report
Cl f inal project reportjinlieww
 
Ici magazine (latest)
Ici magazine (latest)Ici magazine (latest)
Ici magazine (latest)jinlieww
 
Tadao Ando- Koshino House
Tadao Ando- Koshino HouseTadao Ando- Koshino House
Tadao Ando- Koshino HouseNabeel Joomun
 
Mathematics Assignment 1 Slides
Mathematics Assignment 1 SlidesMathematics Assignment 1 Slides
Mathematics Assignment 1 SlidesTan Jaden
 
EPC Oral Presentation 2 by Tan Wen Hao
EPC Oral Presentation 2 by Tan Wen HaoEPC Oral Presentation 2 by Tan Wen Hao
EPC Oral Presentation 2 by Tan Wen HaoTan Jaden
 
SSSY Report
SSSY ReportSSSY Report
SSSY Reportjinlieww
 
CNC Project 3 Coffee Table Book
CNC Project 3 Coffee Table BookCNC Project 3 Coffee Table Book
CNC Project 3 Coffee Table BookTan Jaden
 
Sarang Paloh Heritage stay & event hall building report
Sarang Paloh Heritage stay & event hall building reportSarang Paloh Heritage stay & event hall building report
Sarang Paloh Heritage stay & event hall building reportTan Jaden
 
Building science 1
Building science 1Building science 1
Building science 1jinlieww
 
Presentation board stuidio final
Presentation board stuidio finalPresentation board stuidio final
Presentation board stuidio finaljinlieww
 
Building construction-ii
Building construction-iiBuilding construction-ii
Building construction-iijinlieww
 
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportProject 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportTan Jaden
 
Building Construction 2
Building Construction 2Building Construction 2
Building Construction 2Nabeel Joomun
 
EPC Oral presentation 1 by Tan Wen Hao
EPC Oral presentation 1 by Tan Wen HaoEPC Oral presentation 1 by Tan Wen Hao
EPC Oral presentation 1 by Tan Wen HaoTan Jaden
 
Culture History 2
Culture History 2Culture History 2
Culture History 2jinlieww
 
koshino house analysis essay
koshino house analysis essaykoshino house analysis essay
koshino house analysis essayNabeel Joomun
 
Tadao Ando- Koshino house
Tadao Ando- Koshino house Tadao Ando- Koshino house
Tadao Ando- Koshino house Nabeel Joomun
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 

Viewers also liked (19)

Cl f inal project report
Cl f inal project reportCl f inal project report
Cl f inal project report
 
Ici magazine (latest)
Ici magazine (latest)Ici magazine (latest)
Ici magazine (latest)
 
Tadao Ando- Koshino House
Tadao Ando- Koshino HouseTadao Ando- Koshino House
Tadao Ando- Koshino House
 
Mathematics Assignment 1 Slides
Mathematics Assignment 1 SlidesMathematics Assignment 1 Slides
Mathematics Assignment 1 Slides
 
ESD essay
ESD essayESD essay
ESD essay
 
EPC Oral Presentation 2 by Tan Wen Hao
EPC Oral Presentation 2 by Tan Wen HaoEPC Oral Presentation 2 by Tan Wen Hao
EPC Oral Presentation 2 by Tan Wen Hao
 
SSSY Report
SSSY ReportSSSY Report
SSSY Report
 
CNC Project 3 Coffee Table Book
CNC Project 3 Coffee Table BookCNC Project 3 Coffee Table Book
CNC Project 3 Coffee Table Book
 
Sarang Paloh Heritage stay & event hall building report
Sarang Paloh Heritage stay & event hall building reportSarang Paloh Heritage stay & event hall building report
Sarang Paloh Heritage stay & event hall building report
 
Building science 1
Building science 1Building science 1
Building science 1
 
Presentation board stuidio final
Presentation board stuidio finalPresentation board stuidio final
Presentation board stuidio final
 
Building construction-ii
Building construction-iiBuilding construction-ii
Building construction-ii
 
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportProject 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
 
Building Construction 2
Building Construction 2Building Construction 2
Building Construction 2
 
EPC Oral presentation 1 by Tan Wen Hao
EPC Oral presentation 1 by Tan Wen HaoEPC Oral presentation 1 by Tan Wen Hao
EPC Oral presentation 1 by Tan Wen Hao
 
Culture History 2
Culture History 2Culture History 2
Culture History 2
 
koshino house analysis essay
koshino house analysis essaykoshino house analysis essay
koshino house analysis essay
 
Tadao Ando- Koshino house
Tadao Ando- Koshino house Tadao Ando- Koshino house
Tadao Ando- Koshino house
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 

Similar to Ici final project (proposal 2) (1)

ICI Final Project
ICI Final ProjectICI Final Project
ICI Final ProjectLek Yuen
 
ici copy
ici copyici copy
ici copyjie0117
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT Yip Xiaojung
 
Ici report revised (2)
Ici report revised (2)Ici report revised (2)
Ici report revised (2)Darren Loong
 
Project brief
Project brief Project brief
Project brief Haziq1511
 
Ici final project report
Ici final project reportIci final project report
Ici final project reporthongbinng
 
Ici final project report
Ici final project reportIci final project report
Ici final project reportMuhammad Naim
 
Project brief
Project brief Project brief
Project brief PK146
 
Eglinton Square Landspace Project
Eglinton Square Landspace ProjectEglinton Square Landspace Project
Eglinton Square Landspace ProjectJunjian Luo
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentationemdad bhuiyan
 
Development Proposal
Development ProposalDevelopment Proposal
Development Proposaldtan97
 
Ici final project
Ici final projectIci final project
Ici final projectkongzc
 

Similar to Ici final project (proposal 2) (1) (20)

ICI Final Project
ICI Final ProjectICI Final Project
ICI Final Project
 
ici copy
ici copyici copy
ici copy
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
Ici report revised (2)
Ici report revised (2)Ici report revised (2)
Ici report revised (2)
 
Ici report
Ici reportIci report
Ici report
 
Wing chun
Wing chunWing chun
Wing chun
 
Project brief
Project brief Project brief
Project brief
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
Icip3 project brief
Icip3 project briefIcip3 project brief
Icip3 project brief
 
Final project 1
Final project 1Final project 1
Final project 1
 
Project brief
Project brief Project brief
Project brief
 
Eglinton Square Landspace Project
Eglinton Square Landspace ProjectEglinton Square Landspace Project
Eglinton Square Landspace Project
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Ici final project
Ici final projectIci final project
Ici final project
 
Ici individual
Ici individualIci individual
Ici individual
 
ICI_FP
ICI_FPICI_FP
ICI_FP
 
Development Proposal
Development ProposalDevelopment Proposal
Development Proposal
 
Ici final project
Ici final projectIci final project
Ici final project
 
Pm final
Pm finalPm final
Pm final
 

Recently uploaded

psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 

Recently uploaded (20)

Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

Ici final project (proposal 2) (1)

  • 1. Introduction to Construction Industry | FNBE 0414 | Final Project 1 FNBE APRIL INTAKE 2014 INTRODUCTION TO CONSTRUCTION INDUSTRY FINAL PROJECT REPORT Harwinder Singh Girn Liew Jin Project proposed: Rest Area
  • 2. Introduction to Construction Industry | FNBE 0414 | Final Project 2 CONTENT No. Content Page No. 1 Introduction i) Suggestion and Proposal 3 2 Site plan and location 4 3 Site analysis 5-6 4 Concept 7 5 Introduction to site 8 6 Benefits of proposal site 9 7 Sketch of plan 10 8 Sketches of perspective and images of site 11-13 9 plan 14 10 Building plan approval process and procedures 15-23 11 Conclusion 24
  • 3. Introduction to Construction Industry | FNBE 0414 | Final Project 3 Introduction In this final project, in a group of 2, we were given a task to find a specific land within campus area to initiate and propose a small construction project. The land shall not be more than 30mx30m. Our proposal should be one project that serves the purposes of either a recreational area, study enhancement area, rest area, food and beverage area, or commercial area. i) Suggestion and proposal We would like to propose a rest area and our suggested site would be the empty space in Taylor’s University Lakeside Campus, Level 4, between Block D and Block E. The rest area would be an open air green space rest area and is also open to all university students 24/7. It does not only serves the purpose as a rest area but it could also be a study enhancement area at the same time.
  • 4. Introduction to Construction Industry | FNBE 0414 | Final Project 4 Site Plan and Location The location of the project proposed is the gap at level 4, between Block D and Block E. The site is a flat concrete slab and has an area around 30m x 30m. The area is quite dull, boring and is not meant for anyone to walk through it. Selected Site
  • 5. Introduction to Construction Industry | FNBE 0414 | Final Project 5 Site Analysis Sunlight The site has both sunrise and sunset views. This could make the site a little livelier during the morning all the way till the evening. Wind Besides, the site is between both blocks which is Block D and Block E. This causes the current of the wind there to be quite strong, making the site very cooling and relaxing at the same time.
  • 6. Introduction to Construction Industry | FNBE 0414 | Final Project 6 Views The views from the site isn’t very attractive but changes could be made to work it out. There are two potential entrance which are the staircases in both Block D and Block E, and also the elevators. Traffic The human traffic there is quite active especially in the morning and also the afternoon, especially for Block E, the traffic could also be active all night long because of the architecture students whom are staying over for projects.
  • 7. Introduction to Construction Industry | FNBE 0414 | Final Project 7 Concept The concept of this proposal is to provide a green space rest area for all students. The nearest rest area is the one at the level 2 corridor and the student life centre is all the way at front of the university which it would be convenient for students who are in Block D and Block E to get to a good relaxing spot to chill. Besides, there isn’t any green space rest area which students could enjoy the greenery and also the strong wind blowing on both sides through the gap between both buildings on a higher floor in the university too. The proposed green space rest area would be great for the university students to chill, rest, and relax surrounded by trees and plants and also the great environment on a higher ground. Although there is already a rest area at the level 2 corridor, this proposed green space rest area could bring the phrase ‘rest area’ into a whole new level. The rich, sublime atmospheres and layered textures of the rest area are brought to life with timber assemblies and textured concrete, native plants and trees, and thick shades. The language is contemporary, simple, and elegant and most of all, green. The use of familiar materials such as wood and textured concrete gives an authentic flavour to these contemporary creations. The innovation in this proposed project is to transform a boring and dull concrete slab area into a new inviting and user-friendly environment oriented towards nature, leisure and art.
  • 8. Introduction to Construction Industry | FNBE 0414 | Final Project 8 Introduction to Site At this site which is about the size of 20mx20m that is between block D and block E on the fourth floor or Taylor's Lakeside University campus will be an opened air green space rest area. This rest area will be surrounded by lots of greenary such as trees, plants and also a vertical garden so that the air can be filtered to produce fresh air and also obtain a cleaner and greener enviroment for students to experience. Facilities such as benches will be provided all over the proposed resting area.
  • 9. Introduction to Construction Industry | FNBE 0414 | Final Project 9 Benefits of Proposal site 1. This site is very convinient to be used as a rest area because it's located in between block D and block E where there are many classes around. 2.This site will improve the amount of green in these type of area of the university blocks and also improve the quality of air. 3. The natural wind provided by nature is able to fan everyone at the site so ample electricty can be saved by rarely using fans. 4. This site is also very quiet and peaceful which is a great thing because students will be able to have the rest they need after or before atending their class or completing their assignments. 5. It's also the best place to spend time with your love ones or hangout with friends and just enjoy the open air of the site hence this green space rest area is always open to all university students 24/7.
  • 10. Introduction to Construction Industry | FNBE 0414 | Final Project 10 Sketch of Plan
  • 11. Introduction to Construction Industry | FNBE 0414 | Final Project 11 Sketches of perspective and images of site
  • 12. Introduction to Construction Industry | FNBE 0414 | Final Project 12
  • 13. Introduction to Construction Industry | FNBE 0414 | Final Project 13
  • 14. Introduction to Construction Industry | FNBE 0414 | Final Project 14
  • 15. Introduction to Construction Industry | FNBE 0414 | Final Project 15 Plan
  • 16. Introduction to Construction Industry | FNBE 0414 | Final Project 16 Building plan approval process and procedures Abstract Successful development project is crucial to all project stakeholders. Meeting the dateline to complete a project will be an added advantage for both the developer and the land owner. Project development just like construction project will encounter some form of project life cycle (PLC). A typical PLC of developmental project comprise of a initiation and planning phase, construction phase and post construction phase. Further, the implementation of the one-stop- centre (OSC) by Ministry of Housing and Local Government (MHLG) nationwide in April 2007 have succesfully improved the delivery system of the planning process. As the result of the MHLG bold step, a more systematic planning process have benefited the developers, consultant and the authorities. In lieu of this, it is imperative that all the consultants and the developer should comply to the guidelines, rules and regulations stipulated in the standard manual drawn by Department of Town and Country Planning (DTCP) and the MHLG to ascertain a smoother planning approval process. Thus, in long run, all these moves implemented by the government should attract more foreign direct investment (FDI). Key words: Development project, planning process
  • 17. Introduction to Construction Industry | FNBE 0414 | Final Project 17 Introduction The success of a development project as a whole is crucial to all the stakeholders who primarily are the developer, the land owner and property buyer. The timely completion of a project that is not only within the budget but also in accordance to specifications and the stakeholder’s satisfaction (Nguyen et al., 2004) benefits both the project owner (developer) and the property buyer. Each and every project development will undergo some form of project life cycle (PLC) as mentioned by Kerzner (2009); PMI (2004). A typical developmental process comprise of a initiation and planning (predevelopment) stage, a intermediate stage (construction) (intermediate) and a closer stage (post development). Project Development the Malaysian Context: A crucial brief overview In the Malaysian context project development similarly has its own PLC which is divided into three (3) stages, namely, the predevelopment stage, the construction stage and the post construction stage. The close of a development project or the post developmental stage is when the completed property is handed over to the owner as required and stipulated by the Housing Development Act (HDA, 2010). The flow of activities starting from the inception right up to the delivery of a completed property plays a pivotal role in the planning of property development. A crucial brief overview of a typical planning process in Malaysia, covering the legislature in the planning process, the development plan and general implementation of development plan, and are as follows.
  • 18. Introduction to Construction Industry | FNBE 0414 | Final Project 18 Legislature in the planning process The laws, procedures and guidelines pertaining to the property development process in Malaysia are quite extensive. There are over fifty (50) laws and guidelines that may either be initiated or pose a constrain on decisions when undertaking a property development project. Those most pertinent and crucial laws to be complied to include the National Land Code (NLC) 1965 (NLC, 2008), the Town and Country Planning Act, 1976 (Act 172), the Government Act 1976 (Act 171), Uniform Building By Law 1984 (UBBL), the Street, Drainage and Building Act 1974 (Act 133) and the Environmental Quality Act 1984.A very important tool used to manage land development is planning control, referred to in Part IV of the Town and Country Planning Act (TCPA), 1976 and planning guidelines. In Section 19, the TCPA states that “no person, other than the local authorities, shall, commence, undertake, or carry out any development unless planning permission in respect of the development has been granted to him under Section 22 (treatment of application or extended under Subsection 24 (3) (lapse of planning permission)” (LOM, 2006).
  • 19. Introduction to Construction Industry | FNBE 0414 | Final Project 19 Development plan Various development plans (that is, the national physical plan; a structure plan, a local plan and a special area plan) has been formulated under Part III of the TCPA (TCPA, 1976) in order to guide the decision makers when processing planning permissions. These plans shall form the overall policies for future land development as well as used to establish zoning and planning standards concerning public facilities requirements, roads, open spaces, building setbacks, number of car parks etc. Basically, a layout plan that has been submitted must comply with the national and physical plan, the state structure plan, the local plan, a special area plan and all plans approved by the local authorities of the governing state. The submitting party is also required to comply with a pre- determined zoning requirement, strategic policies and government policies. For example, in the state of Selangor, any development on a piece of land that has been classified as class 3 and class 4 terrain, will not be approved for development by the respective local authority. Similarly, when it involves a composition of low cost, medium to low cost and medium cost housing and a specific race (that is Bumiputera or indigenous group) quota, the planner must prepare a layout plan that takes into consideration government policies, guidelines and other technical requirements. General implementation of a development plan A development plan in Malaysia is implemented within the framework provided under the National Development Planning that comes under the Town and Country Planning Act, 1976 (Act 172). The National Development Planning Framework (NDPF) comprises of three (3) levels of planning (Figure 2.1),
  • 20. Introduction to Construction Industry | FNBE 0414 | Final Project 20 namely the National Physical Council (NPC) at the Federal level, the State Planning Committee (SPC) at the state level and the local council at the local authorities level. The NDPF is implemented 'top-down' starting at the federal level down to the state level and finally to the local authorities level, directed towards achieveing a national development vision by the year 2020. Any development involving land that is more than 100 hectares in size requires initial approval from both the SPC and the NPC. The NPC is chaired by the Prime Minister while the SPC is chaired by the Chief Minister of the respective state of Malaysia. An approval by the state government is required prior to submission for approval to the NPPC for federal government approval. Both the NPPC and SPC convene twice a year to discuss pertinent matters involving planning such as a zoning change, the development of large parcels of land (100 hectares or more), any special development proposal, gazetted and revocation of development plans etc. Stages of Development The three (3) stages in a project development are discussed in this section. The first stage is the planning stage or the pre-development period. When all required approvals have been obtained, it then goes into the second stage; the construction phase. During the post construction stage, that is the third stage, a certificate of completion of compliance (CCC) will be awarded to the developer who then would have successfully completed their (housing) project (HDA, 2010, DTCP, 2007). A developer first has to obtain all planning approvals before any physical work can commence on site and prior to issuance of any advertising permit by the relevant authorities. Under the new guidelines by the OSC, the principal submitting person (PSP) has an option to either submit all four (4) planning applications for simultaneous approval or to submit it by stages. The planning applications are (a) planning permission application
  • 21. Introduction to Construction Industry | FNBE 0414 | Final Project 21 (Subsection 21[1], Act 172), (b) building plan application, (c) road and drainage plan application (Section 9, Act 133) and (d) the various 'works' plan (Section 70A, Act 133). The local authorities shall stipulate conditions subject to comments from their technical department. The total number of technical departments that exist is peculiar to that local authority where the plans are being submitted. Just in the state of Selangor, for example, there are a total of fourteen (14) technical departments (DTCP, 2007; MHLG, 2008) with whom the PSP must work with during the submission of plans. Any development that involves land area larger than 50 hectares in size, is required to be supported by a study on the potential impact it may have on the local environment (DTCP, 2007). The environental impact principal submitting party (PSP) where the submitted plans must go through the various technical departments (DTCP, 2007; MHLG, 2008), for example the department of environment, that handles all matters pertaining to the environment, the Department of Sewerage on matters concerning sewerage, the Department of Drainage on drainage matters and the Board of Water Management that manages water matters. Other standard compliances include the building setback line requirement for different building types (housing, industrial, or commercial), density, plot ratios, public facilities, retention ponds, supply of electricity (by the National Board of Electricity) and road levels. All planning approvals is subject to the planning permission process referred to under Section IV, Town and Country Planning Act, 1976 (Act 172). Generally, the local authorities would only offer an initial conditional approval. The submitting party, that is the planner (appointed by the developer), shall then make the necessary amendments in compliance with to the requirements stated in the letter of conditional approval issued by the various technical departments. One-Stop-Centre (OSC)
  • 22. Introduction to Construction Industry | FNBE 0414 | Final Project 22 In April 2007, the Malaysian government under the Ministry of Housing and Local government (MHLG) initiated a One-Stop-Centre (OSC) approval process in an effort to improve the delivery system and procedures at all state municipalities. Its main purpose is to ensure that Malaysia stays globally competitive in the property and real estate sectors (MHLG, 2008). It is an independant body that acts as a facilitator for the planning process for submission of plans at the local authority. Currently the OSC forms part of the local authority located in every state in Malaysia. Prior to the introduction of the OSC, submission for approval was done separately and in sequence. Only upon approval of the layout plan can the building plan be submitted for approval with the rest of the drawings to follow suit. With the implementation of the OSC, the consultants have the option to submit all five (5) drawings, namely the layout plan, building plan, road and drainage plan, earthwork plan and landscape plan simultaneously (DTCP, 2007; MHLG, 2008). Principal Submitting Party (PSP) The planner (registered planner) is principal submitting party (PSP) engaged by the developer or land owner to prepare the layout plan and will act as PSP for all planning approvals, primarily at the planning permission stage (refer to Appendix A). In smaller development projects, the architect acts as PSP to complete and obtain the building plan approval from the local authorities. The civil and structural (C and S) engineer is required to produce the platform design for the earthworks plan application. The C and S engineer also prepares the structural building design for the architect to submit at the building plan approval stage. Similarly, the mechanical and electrical (M and E) engineers prepares the mechanical and electrical drawings and layout to include plumbing, electrical supply and the sewerage treatment plant (STP) for submission at the
  • 23. Introduction to Construction Industry | FNBE 0414 | Final Project 23 building plan approval stage.The key consultant who is responsible for coordinating the works activities at the initial stage of submission of the layout plan with the authorities shall be the planner. A registered planner must fullfill two (2) requirements, that is (a) be registered as a corporate member with the Malaysian Institute of Planners (MIP) and (b) be registered with the Malaysian Planning Board. The registered planner, being the consultant or the PSP acting on behalf of the developer, must ensure full compliance with all the requirements stipulated by the local authorities and technical departments. Relationship between Principal Submitting Persons (PSP) and Approving Authorities A good working relationship between the consultant, the developer and the various respective departments at the local authorities will directly contribute to a successful planning approval. The consultant must keep abreast of all requirements stipulated by the authorities. Where in doubt, the manual for planning guidelines and procedures for the State of Selangor (DTCP, 2007) is available. It is imperative for the developer of a housing project to comply with the planning standard guideline (DTCP, 2007; MHLG, 2008) of that respective local authority where the project is located. This is easily achievable by cooperating with the planning consultant (registered planner). A lack of cooperation in any aspect may result in a protracted conditional approval and a delay to obtain the endorsement for final approval hence delaying the overall construction.
  • 24. Introduction to Construction Industry | FNBE 0414 | Final Project 24 Planning Approving Committee The planning approval is decided by the planning approval committee at the local authorities where the OSC is located. The committee is chaired by the head (Mayor) of the local authority and comprises of sixteen (16) representatives from the respective technical departments, local authorities’ councillors (representatives of the local municipalities selected by the state) (Appendix B). The head of the planning department at the local authority is responsible for submitting the development report on each layout plan submission. The report and the layout plan are then tabled at the OSC meeting for approval. Appendix B is a typical example of a full planning approval committee for the state of Selangor headed by the Town Councillor (Yang di Pertua) for State Municipality or Mayor (Datuk Bandar) for City Municipality.
  • 25. Introduction to Construction Industry | FNBE 0414 | Final Project 25 Conclusion After coming up with this proposal of consrtucting of an opened air green space rest area, we realised that this site will never be a boring or dull place to look at and also acessible by anyone either from block D or block E because the concrete slab is joint to both blocks at this floor. This rest area will be an interesting place to go to because of green enviroment. Furthermore, even though this design of ours will cost a lot of money beacause of the type of material used but it will really benefit the students who really need find rest at place which is the nearest to them.