1.0 Overview of Construction
Development
 Construction is the massive, worldwide effort to
build various types of structures and facilities.
 This can be accomplished by assembling materials,
parts, and systems into the major subsections of the
structure.
 The finished structure it then becomes part of the
building stock necessary for the conduct of business
and life.
1.0 Overview of Construction
Development – cont…
 The main purposes of the construction project are to
contain shelter, transport, and manufacture,
communicate, or provide recreation.
 Therefore, construction can be described as a basic
industry that fulfills human needs.
 It includes the building of everything from simple,
light frame sheds to massive dams.
 The building we occupied, roads we drive on and
bridge that we cross all are made possible by the
activities of the construction.
1.0 Overview of Construction
Development – cont…
Figure : The projects skyscrapers under construction
1.0 Overview of Construction
Development – cont…
 Construction is a process that consists of the building
or assembling of infrastructure.
 It could be in a single activity or large scale
construction which is a feat of multitasking.
 Construction of a building is usually executed by a
specialized construction team.
 It is normally separate from the design team,
although some large organizations may combine
both functions.
1.0 Overview of Construction
Development – cont…
 The general contractor may do some of the actual
work on the building in addition to its coordinating
role.
 The remainder of the work is done by a group of
specialty subcontractors who are under contract to
the general contractor.
 Each subcontractor provides and installs one or
more of the building systems e.g., the structural or
electrical system.
 The subcontractors in turn buy the system
components from the manufacturers.
1.0 Overview of Construction
Development – cont…
 During the construction process the design team
continues to act as the owner’s representative, making
sure that the executed building conforms to the contract
documents and that the systems and components meet
the specified standards of quality and performance.
 In Malaysia, the construction industry accounts
approximately 2.7% of the gross domestic product
(GDP) in 2006 and nearly 5% in the 2008. This
industry has multiplier effects to the economy and
became the heart that initiate the growth of other
industries, namely manufacturing, professional services,
financial services, education and others.
1.1 Construction Life Cycle
 All construction projects involve the same steps and
procedure throughout its life cycle.
 A project usually is planned, built and operated.
PLANNING
CONSTRUCTING
SERVICING
DESIGNING
BUILDING STRUCTURE
MANAGING
INSTALLING SYSTEM
FINISHING PROJECT
Initiate project Obtain site Survey site Design and engineer
project
Make working Drawing and
specifications
Contracting Manage Construction Obtain Workers Obtain materials and equipments
Prepare to build Do earthwork Build Foundations Prepare Superstructure Enclose
structure
Install transportation
system
Install climate control
system
Install plumbing
systems
Install electrical
systems
Install communication
system
Insulate Enclose Interior Finish Structure Landscape Site
Transfer project
Changing Using
Alter Install Restore Demolish Operate Maintain Repair
The construction cycle
1.1 Construction Life Cycle – cont…
 Planning begins when a person has an idea and
gets the decision-making started.
 This step is called initiating. Initiators will determine
the need for the project and convince others on the
needs.
 To ensure that the project is a good or a profitable
idea to be built, a feasibility study is done to
determine the marketability of the project.
 Then only a clear recommendation can be made
and forward to the client.
1.1 Construction Life Cycle – cont…
 When the owners accept the project, the site selection
will be made.
 Land and soil surveys are made to measure and
describe the land profile and soil conditions.
 Information gained from all the surveys and testing then
will be used in the design and engineering stage to
produce the working drawings and specifications.
 Basically, the working drawing will describe the
placement, shape and size of the project; while the
specifications will describe the kind of materials and the
quality of work expected by the owner.
1.1 Construction Life Cycle – cont…
 The constructing or building works start when the
contractor begins to prepare the site for the project.
 The site was cleared from unwanted features e.g.
bushes, rocks, trees, existing building etc.
 This process is known as Site Clearing. Temporary
access road and infrastructures were then being
built for the construction usage follows by an
earthwork, substructure and the superstructure
works.
1.1 Construction Life Cycle – cont…
 When the construction stage complete/finished, the
contractor is responsible for problems occur through
the warranty period which is normally one (1) year
or (3) years (can be vary depends on contract
condition).
1.2 Types of Construction
 Construction industry sectors are usually separated
into the following four categories:
1. Residential
2. Commercial building
3. Infrastructure and heavy highway
4. Industrial
1.2 Types of Construction – cont…
1. Residential Construction Sectors
 The residential construction sector is comprised of individual
homes, small condominiums, and apartment complexes.
 These projects tend to be privately funded by individual
owners for their own use or for speculation.
 As a site-built product, this construction uses fairly low
technology and readily available technology. In small or
individual house construction, normally a one-person
company will serve as a general contractor.
 This general contractor will then hire subcontractors to do
special jobs/task. Construction for the other large residential
such as entire housing developments, apartment buildings
and condominium normally executed by large and well
establish construction Company with in-house professionals
and workers to execute the project.
Figure : Residential Construction
1.2 Types of Construction – cont…
2. Commercial Building Construction Sectors
 The commercial building sector includes office buildings,
large apartment complexes, shopping malls, theaters,
schools, universities, and hospitals.
 These sectors included private and public funding.
 Typical designs and the specialization involved in the
construction of this sector, for example, hospital building
requires a special knowledge of the activities held in
tending to technically complex in design and require tight
quality control during construction.
Figure : Commercial Building
1.2 Types of Construction – cont…
3. Infrastructure And Heavy Highway Construction Sectors
 Construction of infrastructure and heavy highway sector
enables the distribution of goods and people.
 Projects involve (for examples; roadways, dams, bridge etc.)
are designed principally by civil engineers and build by
heavy construction contractors who have engineering
backgrounds or support (equipments, professionals and
technology).
 Most of these types of projects are highly complex and
publicly funded because they served the public’s needs.
Figure : Infrastructure And Heavy Highway
1.2 Types of Construction – cont…
4. Industrial Construction Sectors
 The industrial sector such as steel mills, petroleum refineries,
chemical processing plants, and automobile production
facilities are defined by the production activities within the
facilities.
 The design and construction were depends on the need of
the process and production equipment. Mostly, these
facilities are privately funded and also can be from public
fund which depends on the respective country/nation.
 This sector was also required in specialized design and
construction due to its complexity and high level of
technology used for the production.
Figure : Industrial
1.3 Construction Team
 Each type of construction project requires a unique
team to plan, design, construct, and maintain the
project.
 The construction team is headed by a coordinating
organization, often called a general contractor,
which takes the primary responsibility for executing
the building and signs a contract to do so with the
building user.
1.3 Construction Team– cont…
 The cost of the contract is usually an agreed lump
sum, although cost-plus-fee contracts are sometimes
used on large projects for which construction begins
before the contract documents are complete and
the building scope is not fully defined.
 Major players in the construction industry were
shown in Figure.
OWNER
PROJECT
DESIGN
(Design professional)
MANAGEMENT
(Construction Manager/
General Contractor)
CONSTRUCTION
(Constructor)
Architect
Engineers
Subcontractors
Suppliers
1.3 Building Construction
 Building construction began with the purely
functional needs to control the indoor environment
and to moderate the effects of climate.
 Constructed shelters where one means by which
human beings were able to adapt themselves to a
wide variety of climates and become a global
species.
1.3 Building Construction – cont…
 Human shelters were at first very simple and
perhaps lasted only a few days or months.
 However, even temporary structures evolved into
such higher refined forms as the igloo.
 Gradually more durable structures began to
appear, particularly after the advent of agriculture,
when people began to stay in one place for long
periods.
1.3 Building Construction – cont…
 The first shelters were dwellings, but later other
functions, such as food storage and ceremony, were
housed in separate buildings.
 Some structures began to have symbolic as well as
functional value, marking the beginning of the
distinction between architecture and building.
 Building construction can range from a home to a
skyscraper.
1.3 Building Construction – cont…
 In the field of architecture, construction, engineering
and real estate development, the word building
may refer to one of the following:
1. Any man-made structure used or intended for
supporting or sheltering any use or continuous
occupancy.
2. An act of construction.
1.3 Building Construction – cont…
 In general, building can be classified according to
their usage namely:
1. Agricultural buildings – barn, chicken house, green
house, silo, and farm house etc.
2. Commercial buildings – bank, hotels, office buildings,
restaurants, supermarket etc.
3. Residential Buildings – apartment blocks,
condominium, dormitory, house (bungalow, detached
house, links house etc.)
4. Educational buildings – collage, school, library,
university, concert hall etc.
1.3 Building Construction – cont…
5. Government buildings – city hall, embassy, fire station,
parliament etc.
6. Industrial buildings – factory, power plant, mill etc.
7. Military buildings – barracks, castle, tower, defensive
wall etc.
8. Parking and storage – aircraft hanger, garage, storage
silo, warehouse etc.
9. Religious buildings – mosque, pyramid, pagoda, temple
etc.
10. Transit Stations – airport terminal, bus station, metro etc.
11. Other – stadium, marina, hospital, low energy building,
triumphal arch, etc.
1.3 Building Construction – cont…
 The history of the building is marked by a number
of trends. One is the increasing durability of the
materials used.
 Early building materials were perishable, such as
leaves, branches, and animal hides. Later, most
durable natural materials such as clay, stone, and
timber and, finally, synthetic materials such as brick,
concrete, metals, and plastics were used.
1.3 Building Construction – cont…
 Another is a quest for buildings of ever greater
height and span; this was made possible by the
development of stronger materials and by
knowledge of how materials behave and how to
exploit them to greater advantage.
 A third major trend involves the degree of control
exercised over the interior environment of buildings:
increasingly precise regulation of air temperature,
light and sound levels, humidity, odors, air speed,
and other factors that affect human comfort has
been possible.
1.3 Building Construction – cont…
 Yet another trend is the change in energy available
to the construction process, starting with human
muscle power and developing toward the powerful
machinery used today.
 The general principles of construction are whatever
approach taken for the design and erection of the
buildings there are a number of fundamental
principles that hold true.
 The building has to resist gravity and hence remain
safe throughout its design life and substantial
advice is provided in regulations and standards.
1.3 Building Construction – cont…
 In fact, whatever it shapes and heights, every
building is composed of some common elements:
1. Foundations
2. Floors
3. Walls
4. Roof
5. Windows and doors
6. Stairs and ramps
7. Surface finishes
8. Services
Chapter 1 introduction of construction engineering
Chapter 1 introduction of construction engineering

More Related Content

What's hot

Civil Engineering Project Presentation
Civil Engineering Project PresentationCivil Engineering Project Presentation
Civil Engineering Project PresentationIbrahim Ali
 
Unit 1 basics of construction
Unit 1 basics of constructionUnit 1 basics of construction
Unit 1 basics of constructionSANJEEV Wazir
 
introduction to construction management
 introduction to construction management introduction to construction management
introduction to construction managementHira Atiq
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.JAPJEETSINGH13
 
civil engineering drawing
civil engineering drawing civil engineering drawing
civil engineering drawing Ahmad Hassan
 
Geotechnical engineering, civil engineering
Geotechnical engineering, civil engineeringGeotechnical engineering, civil engineering
Geotechnical engineering, civil engineeringSaicharan Vasala
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18SANJEEV Wazir
 
types and effect of loads
types and effect of loadstypes and effect of loads
types and effect of loadsManish Raman
 
Introduction to Civil Engineering
Introduction to Civil EngineeringIntroduction to Civil Engineering
Introduction to Civil Engineeringmanjugeorge28
 
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTUVATSAL PATEL
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
Structure analysis and design
Structure analysis and designStructure analysis and design
Structure analysis and designKiran Birdi
 
Construction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfConstruction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfMeleseMengistu
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentationemdad bhuiyan
 
Bridges and its Types & Components by Chetan Bisht
Bridges and its Types & Components by  Chetan BishtBridges and its Types & Components by  Chetan Bisht
Bridges and its Types & Components by Chetan BishtChetanBisht16
 

What's hot (20)

Civil Engineering Project Presentation
Civil Engineering Project PresentationCivil Engineering Project Presentation
Civil Engineering Project Presentation
 
Unit 1 basics of construction
Unit 1 basics of constructionUnit 1 basics of construction
Unit 1 basics of construction
 
introduction to construction management
 introduction to construction management introduction to construction management
introduction to construction management
 
Geotechnical Engineering
Geotechnical EngineeringGeotechnical Engineering
Geotechnical Engineering
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.
 
Scope of Civil Engineering
Scope of Civil EngineeringScope of Civil Engineering
Scope of Civil Engineering
 
civil engineering drawing
civil engineering drawing civil engineering drawing
civil engineering drawing
 
Geotechnical engineering, civil engineering
Geotechnical engineering, civil engineeringGeotechnical engineering, civil engineering
Geotechnical engineering, civil engineering
 
coffer Dam.pptx
coffer Dam.pptxcoffer Dam.pptx
coffer Dam.pptx
 
Prestressed Concrete Design
Prestressed Concrete DesignPrestressed Concrete Design
Prestressed Concrete Design
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18
 
Civil Engineering
Civil EngineeringCivil Engineering
Civil Engineering
 
types and effect of loads
types and effect of loadstypes and effect of loads
types and effect of loads
 
Introduction to Civil Engineering
Introduction to Civil EngineeringIntroduction to Civil Engineering
Introduction to Civil Engineering
 
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU6. BRIDGE ENGINEERING (RBT) 2160603 GTU
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
Structure analysis and design
Structure analysis and designStructure analysis and design
Structure analysis and design
 
Construction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfConstruction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdf
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Bridges and its Types & Components by Chetan Bisht
Bridges and its Types & Components by  Chetan BishtBridges and its Types & Components by  Chetan Bisht
Bridges and its Types & Components by Chetan Bisht
 

Similar to Chapter 1 introduction of construction engineering

CSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdfCSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdfDejeneTsegaye6
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxDejeneTsegaye6
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxDejeneTsegaye6
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxDejeneTsegaye6
 
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdfARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdfFaruq42
 
Classification & Construction Type.
Classification & Construction Type.Classification & Construction Type.
Classification & Construction Type.faizanNoor8
 
Construction economic
Construction economicConstruction economic
Construction economicfauziani
 
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdfahsansaeed78
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONVijayfan2
 
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksakCOTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak2cd
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementGodfrey James
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONVijayfan2
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONVijayfan2
 
ab+ group SARL (1).pdf
ab+ group SARL (1).pdfab+ group SARL (1).pdf
ab+ group SARL (1).pdfShaikhBilal24
 
ab+ group SARL (1).pdf
ab+ group SARL (1).pdfab+ group SARL (1).pdf
ab+ group SARL (1).pdfShaikhBilal24
 
A comprehensive overview of civil engineering.pdf
A comprehensive overview of civil engineering.pdfA comprehensive overview of civil engineering.pdf
A comprehensive overview of civil engineering.pdfnayanaNMH
 
Development Proposal
Development ProposalDevelopment Proposal
Development Proposaldtan97
 

Similar to Chapter 1 introduction of construction engineering (20)

CSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdfCSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdf
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docx
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docx
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docx
 
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdfARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
 
Ch1 introduction
Ch1 introductionCh1 introduction
Ch1 introduction
 
Classification & Construction Type.
Classification & Construction Type.Classification & Construction Type.
Classification & Construction Type.
 
Construction economic
Construction economicConstruction economic
Construction economic
 
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
 
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksakCOTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
 
ab+ group SARL (1).pdf
ab+ group SARL (1).pdfab+ group SARL (1).pdf
ab+ group SARL (1).pdf
 
ab+ group SARL (1).pdf
ab+ group SARL (1).pdfab+ group SARL (1).pdf
ab+ group SARL (1).pdf
 
A comprehensive overview of civil engineering.pdf
A comprehensive overview of civil engineering.pdfA comprehensive overview of civil engineering.pdf
A comprehensive overview of civil engineering.pdf
 
CHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdfCHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdf
 
Development Proposal
Development ProposalDevelopment Proposal
Development Proposal
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 

Recently uploaded

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Chapter 1 introduction of construction engineering

  • 1.
  • 2. 1.0 Overview of Construction Development  Construction is the massive, worldwide effort to build various types of structures and facilities.  This can be accomplished by assembling materials, parts, and systems into the major subsections of the structure.  The finished structure it then becomes part of the building stock necessary for the conduct of business and life.
  • 3. 1.0 Overview of Construction Development – cont…  The main purposes of the construction project are to contain shelter, transport, and manufacture, communicate, or provide recreation.  Therefore, construction can be described as a basic industry that fulfills human needs.  It includes the building of everything from simple, light frame sheds to massive dams.  The building we occupied, roads we drive on and bridge that we cross all are made possible by the activities of the construction.
  • 4. 1.0 Overview of Construction Development – cont… Figure : The projects skyscrapers under construction
  • 5. 1.0 Overview of Construction Development – cont…  Construction is a process that consists of the building or assembling of infrastructure.  It could be in a single activity or large scale construction which is a feat of multitasking.  Construction of a building is usually executed by a specialized construction team.  It is normally separate from the design team, although some large organizations may combine both functions.
  • 6. 1.0 Overview of Construction Development – cont…  The general contractor may do some of the actual work on the building in addition to its coordinating role.  The remainder of the work is done by a group of specialty subcontractors who are under contract to the general contractor.  Each subcontractor provides and installs one or more of the building systems e.g., the structural or electrical system.  The subcontractors in turn buy the system components from the manufacturers.
  • 7. 1.0 Overview of Construction Development – cont…  During the construction process the design team continues to act as the owner’s representative, making sure that the executed building conforms to the contract documents and that the systems and components meet the specified standards of quality and performance.  In Malaysia, the construction industry accounts approximately 2.7% of the gross domestic product (GDP) in 2006 and nearly 5% in the 2008. This industry has multiplier effects to the economy and became the heart that initiate the growth of other industries, namely manufacturing, professional services, financial services, education and others.
  • 8. 1.1 Construction Life Cycle  All construction projects involve the same steps and procedure throughout its life cycle.  A project usually is planned, built and operated.
  • 9. PLANNING CONSTRUCTING SERVICING DESIGNING BUILDING STRUCTURE MANAGING INSTALLING SYSTEM FINISHING PROJECT Initiate project Obtain site Survey site Design and engineer project Make working Drawing and specifications Contracting Manage Construction Obtain Workers Obtain materials and equipments Prepare to build Do earthwork Build Foundations Prepare Superstructure Enclose structure Install transportation system Install climate control system Install plumbing systems Install electrical systems Install communication system Insulate Enclose Interior Finish Structure Landscape Site Transfer project Changing Using Alter Install Restore Demolish Operate Maintain Repair The construction cycle
  • 10. 1.1 Construction Life Cycle – cont…  Planning begins when a person has an idea and gets the decision-making started.  This step is called initiating. Initiators will determine the need for the project and convince others on the needs.  To ensure that the project is a good or a profitable idea to be built, a feasibility study is done to determine the marketability of the project.  Then only a clear recommendation can be made and forward to the client.
  • 11. 1.1 Construction Life Cycle – cont…  When the owners accept the project, the site selection will be made.  Land and soil surveys are made to measure and describe the land profile and soil conditions.  Information gained from all the surveys and testing then will be used in the design and engineering stage to produce the working drawings and specifications.  Basically, the working drawing will describe the placement, shape and size of the project; while the specifications will describe the kind of materials and the quality of work expected by the owner.
  • 12. 1.1 Construction Life Cycle – cont…  The constructing or building works start when the contractor begins to prepare the site for the project.  The site was cleared from unwanted features e.g. bushes, rocks, trees, existing building etc.  This process is known as Site Clearing. Temporary access road and infrastructures were then being built for the construction usage follows by an earthwork, substructure and the superstructure works.
  • 13. 1.1 Construction Life Cycle – cont…  When the construction stage complete/finished, the contractor is responsible for problems occur through the warranty period which is normally one (1) year or (3) years (can be vary depends on contract condition).
  • 14. 1.2 Types of Construction  Construction industry sectors are usually separated into the following four categories: 1. Residential 2. Commercial building 3. Infrastructure and heavy highway 4. Industrial
  • 15. 1.2 Types of Construction – cont… 1. Residential Construction Sectors  The residential construction sector is comprised of individual homes, small condominiums, and apartment complexes.  These projects tend to be privately funded by individual owners for their own use or for speculation.  As a site-built product, this construction uses fairly low technology and readily available technology. In small or individual house construction, normally a one-person company will serve as a general contractor.  This general contractor will then hire subcontractors to do special jobs/task. Construction for the other large residential such as entire housing developments, apartment buildings and condominium normally executed by large and well establish construction Company with in-house professionals and workers to execute the project.
  • 16. Figure : Residential Construction
  • 17. 1.2 Types of Construction – cont… 2. Commercial Building Construction Sectors  The commercial building sector includes office buildings, large apartment complexes, shopping malls, theaters, schools, universities, and hospitals.  These sectors included private and public funding.  Typical designs and the specialization involved in the construction of this sector, for example, hospital building requires a special knowledge of the activities held in tending to technically complex in design and require tight quality control during construction.
  • 19. 1.2 Types of Construction – cont… 3. Infrastructure And Heavy Highway Construction Sectors  Construction of infrastructure and heavy highway sector enables the distribution of goods and people.  Projects involve (for examples; roadways, dams, bridge etc.) are designed principally by civil engineers and build by heavy construction contractors who have engineering backgrounds or support (equipments, professionals and technology).  Most of these types of projects are highly complex and publicly funded because they served the public’s needs.
  • 20. Figure : Infrastructure And Heavy Highway
  • 21. 1.2 Types of Construction – cont… 4. Industrial Construction Sectors  The industrial sector such as steel mills, petroleum refineries, chemical processing plants, and automobile production facilities are defined by the production activities within the facilities.  The design and construction were depends on the need of the process and production equipment. Mostly, these facilities are privately funded and also can be from public fund which depends on the respective country/nation.  This sector was also required in specialized design and construction due to its complexity and high level of technology used for the production.
  • 23. 1.3 Construction Team  Each type of construction project requires a unique team to plan, design, construct, and maintain the project.  The construction team is headed by a coordinating organization, often called a general contractor, which takes the primary responsibility for executing the building and signs a contract to do so with the building user.
  • 24. 1.3 Construction Team– cont…  The cost of the contract is usually an agreed lump sum, although cost-plus-fee contracts are sometimes used on large projects for which construction begins before the contract documents are complete and the building scope is not fully defined.  Major players in the construction industry were shown in Figure.
  • 25. OWNER PROJECT DESIGN (Design professional) MANAGEMENT (Construction Manager/ General Contractor) CONSTRUCTION (Constructor) Architect Engineers Subcontractors Suppliers
  • 26. 1.3 Building Construction  Building construction began with the purely functional needs to control the indoor environment and to moderate the effects of climate.  Constructed shelters where one means by which human beings were able to adapt themselves to a wide variety of climates and become a global species.
  • 27. 1.3 Building Construction – cont…  Human shelters were at first very simple and perhaps lasted only a few days or months.  However, even temporary structures evolved into such higher refined forms as the igloo.  Gradually more durable structures began to appear, particularly after the advent of agriculture, when people began to stay in one place for long periods.
  • 28. 1.3 Building Construction – cont…  The first shelters were dwellings, but later other functions, such as food storage and ceremony, were housed in separate buildings.  Some structures began to have symbolic as well as functional value, marking the beginning of the distinction between architecture and building.  Building construction can range from a home to a skyscraper.
  • 29. 1.3 Building Construction – cont…  In the field of architecture, construction, engineering and real estate development, the word building may refer to one of the following: 1. Any man-made structure used or intended for supporting or sheltering any use or continuous occupancy. 2. An act of construction.
  • 30. 1.3 Building Construction – cont…  In general, building can be classified according to their usage namely: 1. Agricultural buildings – barn, chicken house, green house, silo, and farm house etc. 2. Commercial buildings – bank, hotels, office buildings, restaurants, supermarket etc. 3. Residential Buildings – apartment blocks, condominium, dormitory, house (bungalow, detached house, links house etc.) 4. Educational buildings – collage, school, library, university, concert hall etc.
  • 31. 1.3 Building Construction – cont… 5. Government buildings – city hall, embassy, fire station, parliament etc. 6. Industrial buildings – factory, power plant, mill etc. 7. Military buildings – barracks, castle, tower, defensive wall etc. 8. Parking and storage – aircraft hanger, garage, storage silo, warehouse etc. 9. Religious buildings – mosque, pyramid, pagoda, temple etc. 10. Transit Stations – airport terminal, bus station, metro etc. 11. Other – stadium, marina, hospital, low energy building, triumphal arch, etc.
  • 32. 1.3 Building Construction – cont…  The history of the building is marked by a number of trends. One is the increasing durability of the materials used.  Early building materials were perishable, such as leaves, branches, and animal hides. Later, most durable natural materials such as clay, stone, and timber and, finally, synthetic materials such as brick, concrete, metals, and plastics were used.
  • 33. 1.3 Building Construction – cont…  Another is a quest for buildings of ever greater height and span; this was made possible by the development of stronger materials and by knowledge of how materials behave and how to exploit them to greater advantage.  A third major trend involves the degree of control exercised over the interior environment of buildings: increasingly precise regulation of air temperature, light and sound levels, humidity, odors, air speed, and other factors that affect human comfort has been possible.
  • 34. 1.3 Building Construction – cont…  Yet another trend is the change in energy available to the construction process, starting with human muscle power and developing toward the powerful machinery used today.  The general principles of construction are whatever approach taken for the design and erection of the buildings there are a number of fundamental principles that hold true.  The building has to resist gravity and hence remain safe throughout its design life and substantial advice is provided in regulations and standards.
  • 35. 1.3 Building Construction – cont…  In fact, whatever it shapes and heights, every building is composed of some common elements: 1. Foundations 2. Floors 3. Walls 4. Roof 5. Windows and doors 6. Stairs and ramps 7. Surface finishes 8. Services