INDUSTRIALISED BUILDING
SYSTEMS & MODULAR
COORDINATION
RACHANA AGUTALE (MT15CTM012)
VAIDIK SAKUNIA (MT15CTM017)
INTRODUCTION
 Industrialized Building System can be defined as
building systems in which structural components are
manufactured in a factory, on or off site, transported and
assembled into a structure with minimal additional site
works.
 IBS is one of the improved building systems that are
being introduced to achieve the target of faster
completion with mass production of the building
elements in places out of its final location in a building.
 It has been proven successful in some countries, namely
Finland, Denmark, Netherlands, Singapore, England and
the United States.
CHARACTERSTICS OF IBS
 One of the major characteristics of the IBS is the Industrial
production of components through prefabrication, “OR”
sometimes highly mechanized in-situ processes i.e. permanent
steel formworks, tunnel forms, etc.
 Reduced labor during prefabrication of components and site
works.
 Modern design and manufacturing methods involving
Information Technology like usage of Computer Aided design
(CAD) and Computer Aided Manufacturing (CAM).
 Systematic Quality Control i.e ISO 9000 principles.
 Open Building Concept- permitting hybrid applications, and
adaptable to standardization and MC (Modular Coordination)
CLASSIFICATION OF IBS
 There are various Industrialized Building
Systems (IBS) used throughout the world, and
they can be classified into three major
categories.
 These categories are:-
 1. Frame or Post & Beam System.
 2. Panel System.
 3. Box system.
General
System
System Production Material
1 Frame
System
Light weight frame Wood, light gage
metals
Medium light weight
frame
Metal, reinforced
plastics, laminated
wood
Heavy weight frame Heavy steel, concrete
2 Panel
System
Light & medium weight
panel
Wood frame, metal
frame & composite
materials
Heavy weight
panel(factory produced)
Concrete
Heavy weight panel(tilt
up-produced on site)
Concrete
3 Box
System
Medium weight
box(mobile)
Wood frame, light
gage metal,
composite
Medium weight
box(sectional)
Wood frame, light
gage metal,
composite
Heavy weight
box(factory produced)
Concrete
Heavy box(tunnel
produced on site)
Concrete
In the evaluation of
the systems various
parameters such
as-
1.the industrialized
process used
2. transportation &
erection problems,
3.architectural
features
4.socio-economic
problems must be
considered.
FRAME SYSTEM
 Frame structures may be defined as those structures that
carry the loads through their beams and girders to
column and to the ground.
 Their important feature is the capacity to transfer heavy
loads over large spans.
 Used in the construction of bridges, parking lots,
warehouses, industrial buildings, sport facilities and so
on.
PANEL SYSTEM
 Panel system may be defined as those structures
that carry the load through large floor and wall
panels.
 Concrete panel systems are extensively used in
Europe for high rise building for ease of
construction purpose.
 Used in Hollow core slabs, Interior & Exterior
Wall.
BOX SYSTEM
Box system may be defined as those
systems that use 3D modules (or boxes)
for fabrication of habitat units.
The main features of this system are in the
internal stability as it can withstand load
from various directions.
Require only large prefabricated sections
to be transported or handled at one time.
WHY IBS???
 Scenario in construction industry compared to other
sectors is that the construction industry suffers from low
productivity, safety and quality control.
 Due to the traditional labor-intensive practices, the 3- D
Syndrome (Dirty, Difficult & Dangerous) has always
been associated with the construction industry.
 IBS is a good solution for these kind of problems of the
construction industry- messy sites, high wastages, labor
intensive works, low quality work, delays.
ADVANTAGES
1. Reduction of site labor
2. Minimal wastage
3. Less site material
4. Cleaner environment
5. Controlled quality
6. Neater and safer site
7. Faster Project Completion
8. Lower total construction cost
 Low site workers requirement due to simplified
construction methods.
 Quality-controlled and highly aesthetic end
products through the processes of controlled pre-
fabrication and simplified installations.
 Reduction of construction materials at sites
through usage of pre-fabricated components.
 Reduction or elimination of conventional timber
formworks and props which are replaced by pre-
fabricated components and alternative moulds
with multiple-usage capability.
 Reduction of construction waste with the usage
of the standardized components and less in-site
works.
 Cleaner sites due to lesser construction waste.
 Safer construction sites due to the reduction of
site workers, materials and construction waste.
 Faster completion of construction projects due
to the usage of standardized pre-fabricated
components and simplified installation
processes.
 Cheaper total construction costs.
SEQUENCE OF ACTIVITIES OF IBS
CONSTRUCTION METHOD
MODULAR COORDINATION
 A modular building is a pre-engineered structure
that is flexible enough to satisfy virtually any
requirement, it is tougher than standard drywall
construction, expandable, can be relocated and
completely re-usable.
 One obvious advantage that modular
construction has over conventional construction
is cost as not only it can one save up to 35% on
the initial construction costs like labor and
materials, but there are other benefits as well.
 With increasing industrialization to the building
industry, steadily larger parts of buildings are
made up of prefabricated components, delivered
to the building site from the factories.
 Evidently, some sort of dimensional coordination
of these component amongst themselves and
with the design are of paramount importance.
 The full benefit of the industrialization is
impossible without standardization….AND..
 No effective standardization is possible in the
building industry, without dimensional
coordination.
 Modular coordination is a concept of
coordination of dimension and space in which
buildings and components are dimensioned and
positioned in terms of basic unit or module.
 The basic module is known as 1M which is
equivalent to 100mm.
 It is internationally accepted by the International
Standard Organization and many other countries
including Malaysia.
MODULAR CO-ORDINATION CONCEPT
Less wet work site.
Non dependence on
unskilled labor
Less modification on site
Promote Industrialization (component
manufactured in factory)
Through Standardization
Improves Productivity
CHARACTERISTICS OF MODULE
 Industrialization friendly i.e. able to cater for
manufacturing, transportation and assembly
requirements.
 Small enough in term of size in order to provide
the necessary flexibility in design.
 Internationally accepted to ensure that it can be
mass produced to cater for global market.
 Ergonomic i.e. able to improve the efficiency of
people by providing adequate space for human
livings and working conditions.
NECESSITY OF MODULAR COORDINATION
 It provides a practical and coherent: method for
coordinating- the position and dimension of elements,
components and spaces in the planning and design of
buildings.
 To provide guidance to building component sizing
which can reduce(as much as possible)the need to further
trim and shape the materials to fit together in
construction, hence, reducing wastage of labor and
material.
 For mass production of building components in factories
which ensures good and consistent workmanship and
quality.
 To permit standardization, which encourages the use of
standardized building components for the construction of
different types of building.
 DIMENSIONAL COORDINATION is defined as-
A convention for the co-ordination of the dimensions of
building components and incorporating them in their
design, manufacture and assembly by means of a three
dimensional spatial references system of points, lines and
planes to which the position and size of a components may
be related.
 The dimensional coordination is essential because of
the following reasons :-
 To simplify design and documentation procedures and
allow the implementation of computer techniques.
 To achieve optimum efficiency in the manufacture and
use of components and assemblies.
 To avoid cutting or modifying components and
assemblies on site.
 To standardize the profile and detail of joints
between components.
 To Reduce non-standard or dimensionally
incompatible components and assemblies.
REASONS TO CHOOSE MODULAR CONSTRUCTION OVER CONVENTIONAL
CONSTRUCTION
FEATURE ADVANTAGES BENEFITS
a Pre-Engineered No need for an engg/architect. No hidden design costs.
b Ease of Coordination Ability to supply single source
installation through factory-trained
distributor network.
Buying is simple with local support
& assistance.
c Appearance Attractive integrated systems
manufactured to your exact.
Consistent high quality in both
appearance & design.
d Speedy Installation Fewer disruptions to plant operations. Maintains plant productivity during
building installation.
e No Mess No need to seal off areas against
dust.
Eliminates additional labor costs &
minimizes plant disruption.
f Low Maintenance Pre-finished walls require little
maintenance beyond occasional
surface cleaning.
Eliminates costly painting & other
maintenance & repairs.
g Durability Reinforced cavity & tough quality
facings decrease chances of damage.
Long lasting product will perform
for years without deterioration.
h Adaptability Quickly & easily
relocatable,expandable & reusable.
Provides maximum flexibility to
meet your company's needs.
i Sound Resistance Fire & Sound panels provide superior
sound deadening.
Noise level reduction produces a
more productive work environment.
j Accelerated
Depreciation
Depreciation is over 7 years vs. 31-
1/2 years for conventional
construction.
Quicker return on investment.

More Related Content

What's hot

Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSDigital Space Consultancy Ltd
 
Building Technology Project 1
Building Technology Project 1Building Technology Project 1
Building Technology Project 1zerospaces_
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement methodhiewliming
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
Industrialised Building Solution
Industrialised Building SolutionIndustrialised Building Solution
Industrialised Building SolutionLee Wan Xuan
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMFarah Sham
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsCarmen Chan
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systemsFarah Sham
 
Industrialised Building System report,
Industrialised Building System report, Industrialised Building System report,
Industrialised Building System report, Eraz
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsGrace Henry
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Constructionphilwdm
 

What's hot (20)

Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
Building Technology Project 1
Building Technology Project 1Building Technology Project 1
Building Technology Project 1
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
Stairs
StairsStairs
Stairs
 
Ibs part1
Ibs part1Ibs part1
Ibs part1
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Industrialised Building Solution
Industrialised Building SolutionIndustrialised Building Solution
Industrialised Building Solution
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building Systems
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Industrialised Building System report,
Industrialised Building System report, Industrialised Building System report,
Industrialised Building System report,
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 
Ibs score
Ibs scoreIbs score
Ibs score
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Construction
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 

Viewers also liked

Pengertian dan Alat-alat Hauling
Pengertian dan Alat-alat HaulingPengertian dan Alat-alat Hauling
Pengertian dan Alat-alat HaulingArif Wicaksono
 
HC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical PropertyHC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical PropertyTeow Beng Hur
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a buildingTeow Beng Hur
 
Presentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPSPresentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPSTeow Beng Hur
 
Building Construction 1 - Experiencing Construction
Building Construction 1 - Experiencing ConstructionBuilding Construction 1 - Experiencing Construction
Building Construction 1 - Experiencing Constructionjisunfoo
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 

Viewers also liked (8)

Pengertian dan Alat-alat Hauling
Pengertian dan Alat-alat HaulingPengertian dan Alat-alat Hauling
Pengertian dan Alat-alat Hauling
 
HC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical PropertyHC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical Property
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
 
Presentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPSPresentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPS
 
Presentation 2016
Presentation  2016Presentation  2016
Presentation 2016
 
Building Construction 1 - Experiencing Construction
Building Construction 1 - Experiencing ConstructionBuilding Construction 1 - Experiencing Construction
Building Construction 1 - Experiencing Construction
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 

Similar to INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION

Modular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxModular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxAtulBhagwat6
 
5 modular const.pptx
5 modular const.pptx5 modular const.pptx
5 modular const.pptxsonu515144
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)Eveana Crystle
 
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptxra1508
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Gopinan
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...IRJET Journal
 
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...IRJET Journal
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of constructionANNA REBECCA PRASAD
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovationSJVijay
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKSameer Malvankar
 
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET Journal
 
Peb presentation
Peb presentation  Peb presentation
Peb presentation Ranjuunico
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report ForestedTiger
 
MODULAR FURNITURE OF OFFICE
MODULAR FURNITURE OF OFFICE MODULAR FURNITURE OF OFFICE
MODULAR FURNITURE OF OFFICE Abhishek Mewada
 

Similar to INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION (20)

Modular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxModular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptx
 
Modular cordination
Modular cordinationModular cordination
Modular cordination
 
5 modular const.pptx
5 modular const.pptx5 modular const.pptx
5 modular const.pptx
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)
 
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
 
MMC Revision Notes
MMC Revision NotesMMC Revision Notes
MMC Revision Notes
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02
 
PEB 2-5.pptx
PEB 2-5.pptxPEB 2-5.pptx
PEB 2-5.pptx
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
 
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of construction
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovation
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORK
 
Modular construction ppt
Modular construction pptModular construction ppt
Modular construction ppt
 
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
 
ED CC7201 DFMAE_notes
ED CC7201 DFMAE_notesED CC7201 DFMAE_notes
ED CC7201 DFMAE_notes
 
Peb presentation
Peb presentation  Peb presentation
Peb presentation
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report
 
MODULAR FURNITURE OF OFFICE
MODULAR FURNITURE OF OFFICE MODULAR FURNITURE OF OFFICE
MODULAR FURNITURE OF OFFICE
 

More from Construction Tech. and Mgmt., VNIT Nagpur

Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Construction Tech. and Mgmt., VNIT Nagpur
 

More from Construction Tech. and Mgmt., VNIT Nagpur (15)

Fire safety arrangement
Fire safety arrangementFire safety arrangement
Fire safety arrangement
 
hot and cold weather concreting
hot and cold weather concretinghot and cold weather concreting
hot and cold weather concreting
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Marine operations
Marine operationsMarine operations
Marine operations
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
Pile and pile driving equipments
Pile and pile driving equipmentsPile and pile driving equipments
Pile and pile driving equipments
 
Trucks and Hauling Equipment
Trucks and Hauling EquipmentTrucks and Hauling Equipment
Trucks and Hauling Equipment
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
 
Cranes
CranesCranes
Cranes
 
Earth Compaction Equipment
Earth Compaction EquipmentEarth Compaction Equipment
Earth Compaction Equipment
 
Construction Equipment
 Construction Equipment  Construction Equipment
Construction Equipment
 
Construction equipments and methods
Construction equipments and methodsConstruction equipments and methods
Construction equipments and methods
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
 

Recently uploaded

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION

  • 1. INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION RACHANA AGUTALE (MT15CTM012) VAIDIK SAKUNIA (MT15CTM017)
  • 2. INTRODUCTION  Industrialized Building System can be defined as building systems in which structural components are manufactured in a factory, on or off site, transported and assembled into a structure with minimal additional site works.  IBS is one of the improved building systems that are being introduced to achieve the target of faster completion with mass production of the building elements in places out of its final location in a building.  It has been proven successful in some countries, namely Finland, Denmark, Netherlands, Singapore, England and the United States.
  • 3. CHARACTERSTICS OF IBS  One of the major characteristics of the IBS is the Industrial production of components through prefabrication, “OR” sometimes highly mechanized in-situ processes i.e. permanent steel formworks, tunnel forms, etc.  Reduced labor during prefabrication of components and site works.  Modern design and manufacturing methods involving Information Technology like usage of Computer Aided design (CAD) and Computer Aided Manufacturing (CAM).  Systematic Quality Control i.e ISO 9000 principles.  Open Building Concept- permitting hybrid applications, and adaptable to standardization and MC (Modular Coordination)
  • 4. CLASSIFICATION OF IBS  There are various Industrialized Building Systems (IBS) used throughout the world, and they can be classified into three major categories.  These categories are:-  1. Frame or Post & Beam System.  2. Panel System.  3. Box system.
  • 5. General System System Production Material 1 Frame System Light weight frame Wood, light gage metals Medium light weight frame Metal, reinforced plastics, laminated wood Heavy weight frame Heavy steel, concrete 2 Panel System Light & medium weight panel Wood frame, metal frame & composite materials Heavy weight panel(factory produced) Concrete Heavy weight panel(tilt up-produced on site) Concrete 3 Box System Medium weight box(mobile) Wood frame, light gage metal, composite Medium weight box(sectional) Wood frame, light gage metal, composite Heavy weight box(factory produced) Concrete Heavy box(tunnel produced on site) Concrete In the evaluation of the systems various parameters such as- 1.the industrialized process used 2. transportation & erection problems, 3.architectural features 4.socio-economic problems must be considered.
  • 6. FRAME SYSTEM  Frame structures may be defined as those structures that carry the loads through their beams and girders to column and to the ground.  Their important feature is the capacity to transfer heavy loads over large spans.  Used in the construction of bridges, parking lots, warehouses, industrial buildings, sport facilities and so on.
  • 7.
  • 8. PANEL SYSTEM  Panel system may be defined as those structures that carry the load through large floor and wall panels.  Concrete panel systems are extensively used in Europe for high rise building for ease of construction purpose.  Used in Hollow core slabs, Interior & Exterior Wall.
  • 9.
  • 10. BOX SYSTEM Box system may be defined as those systems that use 3D modules (or boxes) for fabrication of habitat units. The main features of this system are in the internal stability as it can withstand load from various directions. Require only large prefabricated sections to be transported or handled at one time.
  • 11.
  • 12. WHY IBS???  Scenario in construction industry compared to other sectors is that the construction industry suffers from low productivity, safety and quality control.  Due to the traditional labor-intensive practices, the 3- D Syndrome (Dirty, Difficult & Dangerous) has always been associated with the construction industry.  IBS is a good solution for these kind of problems of the construction industry- messy sites, high wastages, labor intensive works, low quality work, delays.
  • 13. ADVANTAGES 1. Reduction of site labor 2. Minimal wastage 3. Less site material 4. Cleaner environment 5. Controlled quality 6. Neater and safer site 7. Faster Project Completion 8. Lower total construction cost
  • 14.  Low site workers requirement due to simplified construction methods.  Quality-controlled and highly aesthetic end products through the processes of controlled pre- fabrication and simplified installations.  Reduction of construction materials at sites through usage of pre-fabricated components.  Reduction or elimination of conventional timber formworks and props which are replaced by pre- fabricated components and alternative moulds with multiple-usage capability.
  • 15.  Reduction of construction waste with the usage of the standardized components and less in-site works.  Cleaner sites due to lesser construction waste.  Safer construction sites due to the reduction of site workers, materials and construction waste.  Faster completion of construction projects due to the usage of standardized pre-fabricated components and simplified installation processes.  Cheaper total construction costs.
  • 16. SEQUENCE OF ACTIVITIES OF IBS CONSTRUCTION METHOD
  • 17. MODULAR COORDINATION  A modular building is a pre-engineered structure that is flexible enough to satisfy virtually any requirement, it is tougher than standard drywall construction, expandable, can be relocated and completely re-usable.  One obvious advantage that modular construction has over conventional construction is cost as not only it can one save up to 35% on the initial construction costs like labor and materials, but there are other benefits as well.
  • 18.  With increasing industrialization to the building industry, steadily larger parts of buildings are made up of prefabricated components, delivered to the building site from the factories.  Evidently, some sort of dimensional coordination of these component amongst themselves and with the design are of paramount importance.  The full benefit of the industrialization is impossible without standardization….AND..  No effective standardization is possible in the building industry, without dimensional coordination.
  • 19.  Modular coordination is a concept of coordination of dimension and space in which buildings and components are dimensioned and positioned in terms of basic unit or module.  The basic module is known as 1M which is equivalent to 100mm.  It is internationally accepted by the International Standard Organization and many other countries including Malaysia.
  • 20. MODULAR CO-ORDINATION CONCEPT Less wet work site. Non dependence on unskilled labor Less modification on site Promote Industrialization (component manufactured in factory) Through Standardization Improves Productivity
  • 21. CHARACTERISTICS OF MODULE  Industrialization friendly i.e. able to cater for manufacturing, transportation and assembly requirements.  Small enough in term of size in order to provide the necessary flexibility in design.  Internationally accepted to ensure that it can be mass produced to cater for global market.  Ergonomic i.e. able to improve the efficiency of people by providing adequate space for human livings and working conditions.
  • 22. NECESSITY OF MODULAR COORDINATION  It provides a practical and coherent: method for coordinating- the position and dimension of elements, components and spaces in the planning and design of buildings.  To provide guidance to building component sizing which can reduce(as much as possible)the need to further trim and shape the materials to fit together in construction, hence, reducing wastage of labor and material.  For mass production of building components in factories which ensures good and consistent workmanship and quality.  To permit standardization, which encourages the use of standardized building components for the construction of different types of building.
  • 23.  DIMENSIONAL COORDINATION is defined as- A convention for the co-ordination of the dimensions of building components and incorporating them in their design, manufacture and assembly by means of a three dimensional spatial references system of points, lines and planes to which the position and size of a components may be related.  The dimensional coordination is essential because of the following reasons :-  To simplify design and documentation procedures and allow the implementation of computer techniques.  To achieve optimum efficiency in the manufacture and use of components and assemblies.
  • 24.  To avoid cutting or modifying components and assemblies on site.  To standardize the profile and detail of joints between components.  To Reduce non-standard or dimensionally incompatible components and assemblies.
  • 25. REASONS TO CHOOSE MODULAR CONSTRUCTION OVER CONVENTIONAL CONSTRUCTION FEATURE ADVANTAGES BENEFITS a Pre-Engineered No need for an engg/architect. No hidden design costs. b Ease of Coordination Ability to supply single source installation through factory-trained distributor network. Buying is simple with local support & assistance. c Appearance Attractive integrated systems manufactured to your exact. Consistent high quality in both appearance & design. d Speedy Installation Fewer disruptions to plant operations. Maintains plant productivity during building installation. e No Mess No need to seal off areas against dust. Eliminates additional labor costs & minimizes plant disruption. f Low Maintenance Pre-finished walls require little maintenance beyond occasional surface cleaning. Eliminates costly painting & other maintenance & repairs. g Durability Reinforced cavity & tough quality facings decrease chances of damage. Long lasting product will perform for years without deterioration. h Adaptability Quickly & easily relocatable,expandable & reusable. Provides maximum flexibility to meet your company's needs. i Sound Resistance Fire & Sound panels provide superior sound deadening. Noise level reduction produces a more productive work environment. j Accelerated Depreciation Depreciation is over 7 years vs. 31- 1/2 years for conventional construction. Quicker return on investment.