This memorandum provides a standard operating procedure for human resources practices within the Surface Maintenance community of the California Army National Guard. It outlines responsibilities for remote designees and supervisors in regards to personnel actions such as submitting SF-52 forms, tracking personnel actions, conducting vacancy requests and performance appraisals, and administering awards. The SOP also provides guidance on using the DCPDS personnel system to efficiently process personnel actions in compliance with National Guard regulations and policies.
Standard Operating Procedures are the documents that explains in a step-by-step manner about the scope and purpose of an activity, the list of tasks, sequence of tasks, who need to perform, how to perform and expected quality, resources and time. SOPs are a great step towards process improvement. SOPs help the organization to freeze the current best practices of the organization and as and when things are improved the SOPs are revised to incorporate the new best practices. In other words, SOPs establish a baseline of performance that is expected within an organization.
Apart from the above SOPs are helpful in continuous training of the employees to ingrain the best practices and a source document for training the new employees. It is a step towards transitioning an organization from people-centric to process-centric.
Presentation on 5S workplace management Sambeet Panda
5S is a key component in eliminating the eight wastes of Lean when setting up a workstation. While it ranks among the most widely used and fundamental tool of Lean Manufacturing.
Standard Operating Procedures are the documents that explains in a step-by-step manner about the scope and purpose of an activity, the list of tasks, sequence of tasks, who need to perform, how to perform and expected quality, resources and time. SOPs are a great step towards process improvement. SOPs help the organization to freeze the current best practices of the organization and as and when things are improved the SOPs are revised to incorporate the new best practices. In other words, SOPs establish a baseline of performance that is expected within an organization.
SOP- Standard Operating procedures.
It is a step by step instructions, to help employees/workers to carry out the operations/task.
If we made SOP, it will help every individual who is working in the Organization.
It's a standard process of every task that has been assigned to particular individual.
Developing an SOP is about systemizing all of your processes and documenting them.
It helps in various ways:
1. Quality of work
2. Helps in Individual Efficiency
3. Quality Output
4. Helps in performance
5. Reducing Miss-Communication
The level of detail in SOPs should provide adequate information to keep
performance consistent while keeping the procedures from becoming impractical
Standard Operating Procedures are the documents that explains in a step-by-step manner about the scope and purpose of an activity, the list of tasks, sequence of tasks, who need to perform, how to perform and expected quality, resources and time. SOPs are a great step towards process improvement. SOPs help the organization to freeze the current best practices of the organization and as and when things are improved the SOPs are revised to incorporate the new best practices. In other words, SOPs establish a baseline of performance that is expected within an organization.
Apart from the above SOPs are helpful in continuous training of the employees to ingrain the best practices and a source document for training the new employees. It is a step towards transitioning an organization from people-centric to process-centric.
Presentation on 5S workplace management Sambeet Panda
5S is a key component in eliminating the eight wastes of Lean when setting up a workstation. While it ranks among the most widely used and fundamental tool of Lean Manufacturing.
Standard Operating Procedures are the documents that explains in a step-by-step manner about the scope and purpose of an activity, the list of tasks, sequence of tasks, who need to perform, how to perform and expected quality, resources and time. SOPs are a great step towards process improvement. SOPs help the organization to freeze the current best practices of the organization and as and when things are improved the SOPs are revised to incorporate the new best practices. In other words, SOPs establish a baseline of performance that is expected within an organization.
SOP- Standard Operating procedures.
It is a step by step instructions, to help employees/workers to carry out the operations/task.
If we made SOP, it will help every individual who is working in the Organization.
It's a standard process of every task that has been assigned to particular individual.
Developing an SOP is about systemizing all of your processes and documenting them.
It helps in various ways:
1. Quality of work
2. Helps in Individual Efficiency
3. Quality Output
4. Helps in performance
5. Reducing Miss-Communication
The level of detail in SOPs should provide adequate information to keep
performance consistent while keeping the procedures from becoming impractical
Introduction to 6S (5S plus Safety) methodology for continuous improvement. You will find this informative and full of practical advice to get started right away.
Human Resource Management Assignment Sample - Assignment PrimeAssignment Prime
Read this Human Resource Management Assignment Sample prepared by the expert writer of Assignment Prime Australia. We offer assignment sample to all students without charging any cost. Our expert writers covers all subjects and provide the best assignment help to the university scholars. Contact us now to score A+ grade in your academics.
This document provides a step-by-step approach to implement 5S across your factory. Contents are explained in simple language to help the readers understand 5S and implement in their factories.
Employee onboarding is the process to introduce new employee to the organization’s environment and culture. It helps the new employee to adopt the company culture and policies and increase work efficiency and productivity of the employee.
For more information visit https://www.hrhelpboard.com/hr-process/onboarding-process.htm
It is real Art and Talent to make an effective Standard Operating procedure and understanding of the difference between guideline and SOP.
SOP should tell itself
Introduction to 6S (5S plus Safety) methodology for continuous improvement. You will find this informative and full of practical advice to get started right away.
Human Resource Management Assignment Sample - Assignment PrimeAssignment Prime
Read this Human Resource Management Assignment Sample prepared by the expert writer of Assignment Prime Australia. We offer assignment sample to all students without charging any cost. Our expert writers covers all subjects and provide the best assignment help to the university scholars. Contact us now to score A+ grade in your academics.
This document provides a step-by-step approach to implement 5S across your factory. Contents are explained in simple language to help the readers understand 5S and implement in their factories.
Employee onboarding is the process to introduce new employee to the organization’s environment and culture. It helps the new employee to adopt the company culture and policies and increase work efficiency and productivity of the employee.
For more information visit https://www.hrhelpboard.com/hr-process/onboarding-process.htm
It is real Art and Talent to make an effective Standard Operating procedure and understanding of the difference between guideline and SOP.
SOP should tell itself
Site Master File or SMF is a document in the pharmaceutical industry which provides information about the production and control of manufacturing operations. The document is created by a manufacturer.
It's a document prepared by the manufacturer containing specific and factual GMP information about the production and/or control of pharmaceutical manufacturing operations carried out at the named site and any closely integrated operations at adjacent and nearby buildings. If only part of a pharmaceutical operation is carried out on the site, the site master file need describe only those operations, e.g., analysis, packaging.
We provide end-to-end bookkeeping, finance and accounting Services and offer outsourcing as a strategic tool to enable you to meet your finance and accounting needs.
Running head SIMPLIFIED PROJECT PLAN .docxrtodd599
Running head: SIMPLIFIED PROJECT PLAN 1
SIMPLIFIED PROJECT PLAN 2
Simplified Project Plan
Name
Institution
The project to be implemented involves the development of Bank Management Software and entails the use of the waterfall model. Selecting a methodology is essential since it gives a framework of the overall process and associated project documents as well as the deliverables that will control the project development cycle from start to close. The waterfall model ensures that the development phases flow seamlessly and is subdivided into separate sequential stages where the result of the preceding phase becomes the input of the succeeding phase.
In the waterfall model, the development team moves through the stages of development. The phases include; Analysis, Requirements Specification, Design, Coding, and Implementation, Testing and integration. The sequence flow from one phase to another in a top to bottom fashion. Theoretically, all the requirements are initially specified as well as the scope of the project. The app is designed according to the requirements where it is implemented and tested devoid of any modifications. The final product is then delivered to the customer.
Development phases for the project include:
· Requirements gathering and elicitation where the system requirement objectives are met. The user requirements for the system will entail Financial / Management Accounting, Treasury and Risk Management as well as Bank Communication Management.
· The system design phase will enable proper determination of the hardware and software requirements that describes the entire system architecture.
· The Implementation phase involves the development of application modules which are tested separately to establish their functionality.
· The Integration and Testing phase will entail the integration of the individual modules into a single system which is then tested as a single system. Also, user acceptance testing is done at this phase
· System implementation phase. This phase follows the successful integration and testing phase where it is deployed.
· The maintenance phase occurs after the system is implemented to correct or add new modules to meet customer’s changing needs or scope creep.
Simplified project plan for a Bank Management Software
Task Mode
Task Name
Duration
Start
Finish
Predecessors
Auto Scheduled
Bank Management Software Development
23 days
Wed 5/2/18
Fri 6/1/18
Auto Scheduled
Application conception and initiation
2 days
Wed 5/2/18
Thu 5/3/18
Auto Scheduled
Project plan
2 days
Wed 5/2/18
Thu 5/3/18
Auto Scheduled
Requirement analysis and specification
3 days
Fri 5/4/18
Tue 5/8/18
Auto Scheduled
Develop Financial / Management Accounting requirements
1 day
Fri 5/4/18
Fri 5/4/18
3
Auto Scheduled
Supply Chain Manag.
At Bromford Lab we believe in sharing the learning from our experiments. This is an overview of a pilot to encourage customers to complete basic repairs themselves
1. DEPARTMENT OF THE ARMY
HEADQUARTERS, CALIFORNIA ARMY NATIONAL GUARD
SURFACE MAINTENANCE HEADQUARTERS
9800 GOETHE ROAD
SACRAMENTO, CA 95826-3919
NGCA-LOD-SM 15 September 2014
MEMORANDUM FOR Surface Maintenance Remote Designees and Supervisors
SUBJECT: Human Resources Standard Operating Procedure (Interim #1)
1. REFERENCES:
a. CNG FPR 001, FPR Handbook
b. CNG FPR 752, Discipline and Adverse Actions
c. CNG FPR 451, Technician Incentive Awards Program
d. DCPDS Desktop Guide
2. Purpose. To provide a set standard for personnel practices within the Surface Maintenance
community. Updates to this SOP will be provided as needed.
3. Scope. This SOP outlines the responsibilities of the Remote Designees and Supervisors
assigned to Surface Maintenance in regards to personnel related actions. Personnel practice must
be efficient yet provide quality products to ensure all employees within Surface Maintenance are
provided the best customer service. All references, SOP and Annexes can be found on the G4
HR Site. This SOP is a living document and will be updated as needed to ensure upkeep with
changing personnel practices.
4. Personnel Actions. Personnel Actions will be completed by Supervisors and submitted to
their remote designee.
a. SF 52’s will be completed by the supervisor requesting the action; see Annex A for
areas requiring completion. Once supervisor has signed the SF 52 the supervisor will email the
SF 52 to their respective HR remote for QAQC and auctioning. If the HR remote rejects the SF
52 for corrections the HR remote will email the SF 52 back to the supervisor and verbally verify
the supervisor understands the mistakes made and actions to fix it.
b. Personnel action submissions – HR remote will submit personnel actions within
DCPDS, utilizing the appropriate action family. If the personnel action has an already
established interface action, it will be requested by the remote designee to be placed in the
CA_SMO inbox from HRO Staffing.
c. Personnel action tracking – Tracking for personnel actions will be inputted in the
Surface Maintenance portal, within the HR site. Every action that is completed must be inputted
into the tracker, for follow-up purposes. All information must be included at the time of
submission. The exception to this will be personnel actions with no known effective date.
REPLY TO
ATTENTION OF
2. NGCA-LOD-SM
SUBJECT: Human Resources Standard Operating Procedure
d. Vacancy numbers, important information, and other information relative to the action
will be included in the remarks column. Once an action has been completed, it will be updated to
reflect “Completed” by the remote designee assigned to the action. Examples of the personnel
action tracking spreadsheet can be found in Annex B.
5. Manning and SMREQ- Funding changes yearly for authorized positions and it is a combined
effort between the SMM/Deputy SMM, Remote Designees and shops to ensure vacancies are
tracked properly. The SMREQ review is conducted in April of every year and finalized 1 July.
a. Supervisors whose shops are over SMREQ will not be allowed any vacancy requests,
with the exception of critical positions (PC, Shop Supervisors, Supply Technicians).
b. Supervisors who are submitting for shops who are under SMREQ are free to announce,
as long as the overall manning does not exceed the ceiling for Surface Maintenance and the
requested announcements have been approved by the Tech Ops branch manager.
c. Tech Ops has the ability shift positions as needed.
d. The manning document on the HR site will be updated by COB every Friday for review
by the SMM/Deputy SMM. Each remote will be needed to update their portion of the manning
as needed.
6. Vacancy Requests- All Vacancy requests will be prioritized, with final priority number
approval by the Tech Ops Branch Supervisor. This process will be completed prior to submission
in DCPDS.
a. Supervisors will complete CNG 690-1, vacancy request form. Supervisors will ensure
to input the correct information depending on the situation, and state whether it is a new position
or vice and employee. If it is a reannouncement it will be stated in the Remarks box, with
previous VA number(s) listed. Priority numbers must also be included in the Remarks box. If the
form is incomplete it will be returned by the Remote Designee to the supervisor.
b. Supervisors will turn in completed CNG 690-1 to Shop foreman or Superintendent for
approval and signatures. The Shop Foreman and or Superintendant will give the completed CNG
690-1 to the remote designee for processing in DCPDS.
c. Remote designee will utilize HROs’ VA tracker when needed to check the status of the
Vacancy announcement. The Shop Foreman and or Superintendent will receive a weekly status
from the remote designee. The status will be passed down to the supervisors during the biweekly
meetings from the Shop foreman or Superintendent.
d. VA tracking will be completed within the Surface Maintenance HR Site. Each assigned
remote designee will update their shops Vacancies as action flows through, until the Vacancy
closes and is completed, either by selection or no qualified applicants.
3. NGCA-LOD-SM
SUBJECT: Human Resources Standard Operating Procedure
e. Supervisors will check with the Shop Forman or Superintendant prior to vacancy
submittal to ensure there are no restrictions placed on their shop for announcements.
7. Performance Appraisals- PAA’s will be conducted to allow our employees to perform at an
acceptable level in order to meet mission requirements. Some changes will be implemented
along with the guidance already provided by California to better the performance appraisal
program for the Surface Maintenance.
a. Performance Appraisals will be conducted on a staggered timeline. While all PAA’s
will maintain their rating cycle of 1 July to 30 June, a new timeline for rating will take place as
to defer a last minute rush to complete all PAA’s. Supervisors will write out their employees
rating comments on a word document (example enclosed in Annex C) and transferred to the
PAA for the 30 June cycle end. The only employees not affected by this will be those in their
probationary period.
b. Tiers 4 and 5 of the rating scale will be identified during the performance plan.
Supervisors must allow employees the opportunity to see what is expected of them for 4 and 5
ratings on their annual appraisal.
8. Awards- Are an important part of the morale of the technician program. In order to ensure the
awards program is allowing maximum submittal and participation Supervisors must maintain
timeliness and attention to detail when submitting their nominations.
a. Award submissions will be prepared and submitted in accordance to the new timelines
(See Annex D)
b. Supervisors will complete 690-12 and email it to their supervisor for revision, approval
and signature. Supervisor will then send the complete 690-12 to the remote designee to route the
action to the Commander/Director for revision, approval and signature
c. The supervisor will then email the signed 690-12 to the remote designee to process in
DCPDS for Commander/Director revision, approval, and signature.
d. When Commander/Director signs the 690-12 it will be routed back to the remote
designee. The remote designee will then route the completed award to the ERS Supervisor who
will QC the award and sign in behalf of the HRO.
e. If award is kicked back by Commander/Director, or ERS supervisor the remote
designee will email the request back to the Shop Foreman or Superintendent. The Shop Foreman
or Superintendant will email it back to the supervisor for correction.
9. DCPDS- Guarantees a smooth tracking system for the success of personnel actions. Remote
designees and supervisors must have a proper understanding of how DCPDS actions flow, and
the basic requirements needed to obtain access.
a. Remote designees must complete the “Processing Personnel Actions” Course conducted
by the Graduate School.
4. NGCA-LOD-SM
SUBJECT: Human Resources Standard Operating Procedure
b. Supervisors and remotes requesting access must submit a DD Form 2278 to HRO’s
Training and Development section.
c. The signature delegation will be utilized at all times to ensure continuity and rapid
action processing, reference Annex E.
d. The comment box will be used for quick reference when viewing in the civilian inbox.
1) Actions that do not need SMM/Deputy SMM signature must include in comment
box the following statement “Route Direct to ____ inbox”. The designated inbox will be
determined by the actions workflow, reference Annex G.
2) Recruit/Fill actions must include a comment to let other users know which VA is
included in the action. It will use the format included in the naming conventions, which can be
found in Annex F.
e. The notepad within the personnel action will be used at all times. Each user that touches
the action must include their comments in reference to what was done to the actions. I.E.
“Reviewed by SPC John Doe”, “Corrected action to reflect appropriate duty station – JD”,
“Uploaded Personnel Action for Jane Doe, Promotion off of VA #00-000”.
1) Supervisors “signing” the action within DCPDS must use the notepad.
2) Those listed on the delegation scheme must utilize the notepad to approve an action.
3) Hierarchy/Supervisor Information, VA information, and any other information
integral to the personnel action must be included in the notepad.
f. All personnel actions that are for a position change (i.e. reassignment, CLG, promotion)
must include a hierarchy form for that individual.
g. Personnel actions that require employee statements (i.e. reassignments and resignations)
must have an SF 52 uploaded until further guidance is received from HRO.
h. Temporary Promotions will only be submitted for 120 days on an SF 52. Any action
beyond that will require an announcement, and only allowed for up to 3 years. It is adviseable
that Supervisors rotate out employees for temporary promotions, as to not exceed to time limits
and to provide additional experience.
10. Buybacks – Supervisors are in charge of encouraging their employees to buyback their active
duty time. For example, supervisors can discuss the benefits of buying back their service time
upon return to duty from active duty service, or as part of a new hires initial counseling.
a. The remote designee will give information and the required forms to the employee.
b. It is the employee’s responsibility to fill out the forms, mail the forms, and follow-up
with DFAS or ABC-C to check the status of their buyback.
5. NGCA-LOD-SM
SUBJECT: Human Resources Standard Operating Procedure
c. Paid-In-Full tickets (PIF) are requested through HRO Benefits by the remote designee.
The employee receives the PIF ticket from DFAS to their home of record. The employee is
responsible for sending the remote designee a copy of their PIF. The remote designee will file
one copy in their folder and send a copy to HRO for retirement credit.
11. USERRA and Return to Duty packets- Supervisors are responsible for informing their
employees to complete a USERRA packet three weeks before they leave and a Return to Duty
packet as soon as they come back from deployment. This will allow for processing and avoids
pay issues.
a. The remote designee is responsible of going over the forms with the employee, to
ensure full advantage of their benefits.
b. The remote designee will process the USERRA and RTD packet on DCPDS and track
the status daily for pay purposes.
12. Retirement Packets- Remote Designees are not able to give employees advice on their
retirement packets. It is recommended that the supervisor encourage their employees who will be
retiring if they have any questions or concerns to talk make an appointment with an HRO
benefits team member to go over their retirement benefits.
a. The remote designee will go over the forms to make sure they are complete and all
forms required are attached.
b. The employee can call the HRO employee(s) currently assigned to benefits and make an
appointment for questions and review of their retirement packet.
c. When the retirement packet is complete the remote designee will send to the HRO
Benefits inbox for review. Upon completion of the review and any required corrections, the
employee will send the original retirement packet to HRO benefits by mail.
13. Hierarchy Changes- All Supervisors are responsible for communicating to the Shop Foreman
or Superintendant if they don’t have visibility of their employees. All actions requested for new
hires, temporary promotion, and reassignments must include an uploaded hierarchy request form
for the employees’ new position. Missing hierarchy forms will cause actions to be returned back
to the remote designee.
a. The Superintendent or Shop foreman will inform the remote designee that a hierarchy
change form is required.
b. The remote designee will fill out the form and send to HRO Classification.
c. Remote designee will follow up with supervisors to ensure hierarchy changes are
reflected. If hierarchy changes are not reflected within one week, the remote designee will follow
up with Classification to check the status of the request.
6. NGCA-LOD-SM
SUBJECT: Human Resources Standard Operating Procedure
14. Benefits - Includes Health Insurance, Dental Insurance, Life Insurance, and Disability
Insurance. Benefits are now self-service and the responsibility of the employee to complete
enrollments, make inquiries, and change dependants.
a. Supervisors are responsible for teaching their employees how to use EBIS, MyBiz and
the TSP website.
b. The remote designee is responsible for providing Supervisors handouts for benefits
information. Supervisors will post this to their informational bulletin boards for employees use.
Website links are also located on the HR Site.
15. Quality Control Measures
a. 10% Quality checks will be conducted once a quarter. An anonymous remote will be
selected to be checked in the following areas:
1) VA Tracker
2) PA Tracker
3) DCPDS Transactions
b. Results of the quality checks will be put out via email to let the remote designees know
what issues need to be addressed in their personnel practices. The selected remote’s identity will
not be revealed.
16. Remote Designee Basic Responsibilities.
a. Attendance to the Remote Designee meetings will take place biweekly. The meeting will
occur the 2nd
and last Thursday of each month at 1000. Any rescheduling will be put out via a
meeting invite. Remotes will be prepared to discuss the following:
1) Internal Training
2) Issues and Recommendations for program improvement
3) Due outs
c. Duty sharing is the individual responsibility for the remote designees. Each remote
designee will be responsible for updating the remote designee shared calendar and coordinating
with the other remotes for back-up support. Remotes will also provide the contact information
for their back-ups in cases of prolonged absence from work (more than 1 business day).
7. NGCA-LOD-SM
SUBJECT: Human Resources Standard Operating Procedure
d. Remote designees will be responsible for assisting with all CSDP/ OIP inspections and
program development.
LORI R. SCHANHALS
7 Encls LTC, LG, CA ARNG
Annex A – SF 52 Examples Surface Maintenance Manager
Annex B – Personnel Action
Tracking Examples
Annex C – PAA Rating Example
Annex D - PAA/Awards Timelines
Annex E – Delegation Scheme
Annex F – Naming Conventions
Annex G – Actions Workflow
24. Unit SM HQ Date Signed 9/5/2014 Routing Action DCPDS
Name Doe, John N. Date Effective*** 10/6/2014 Interface # 14SEPCAHRO0000123456
Action Promotion Status Classification Remarks John Doe was selected off VA 14-
123 for promotion to SM Mech
Leader; Routed to HRO 9/5; HRO
Returned 9/6 for correction;
returned with correction on 9/ by
SPC Stokes.
Example for COMPLETE column fills:
Annex B
Example Personnel Action Tracking
25. Interim Review
Job Objective 1 TITLE OF OBJECTIVE As the first half of the appraisal cycle progresses, use this block
to note significant achievements, needs for improvement, and
general rating. Once you reach the Interim review or annual
appraisal, all you will have to do is copy and paste!
Job Objective 2
Job Objective 3
Annual Appraisal
Job Objective 1
Job Objective 2
Job Objective 3
Appraisal Year Employee Name
Annex C
26. Annex D
Suspense Daily Weekly Monthly Quarterly Annually
PAA 30 Jan –
Interim
30 June –
Final (1)
PAA Plan 15 July (2)
RM Meeting 2nd TH 1000
VA Roster COB
Manning
Roster
COB Fri (3)
Award Panel NLT 15 Apr
Awards 30 Apr (4)
10% QC
Training EEO and RMD
(5a)
EEO and RMD
(5b)
28. Naming Conventions
Personnel Actions
SF 52s
Unit Name_Individual Name_Action Type_Effective Date
i.e. FMS1_DoeJohn_Reassignment_20130101
Supporting Documents
LastName_FirstName_ActionType_RequestedDateofAction_Doc
umentType
i.e. Doe_John_Reassignment_20140101_Memorandum
Hire Packets
Unit Name_Individual Name_Position Title _VA #
i.e. FMS1_DoeJohn_Materials Handler_VA13-001
Vacancy Requests
CNG 690-1
Unit Name_Position Title_Pay-Series-Grade_Vice OR New
Position
i.e. FMS1_SupplyTechnician_GS-2005-07_ViceDoeJohn
Justification/Position History
FMS#_PositionTitle_PayPlan_Grade_Vice (or)
NewPosition_DocumentType
i.e.
FMS1_SupplyTechnician_GS_07_NewPosition_Justification
Miscellaneous Actions
Unit Name_Individual Name (If Req.)_Type Document
i.e. FMS1_DoeJohn_ServiceCreditDeposit
Subject Lines in Emails:
The email subject line must match the above naming
conventions.
If sending multiple actions, the attachments must contain
all the same type of action AND include the last names and
first name initial of each individual + unit
i.e. “Promotion for Doe (FMS 1); Smith (FMS 2)
Annex F
29. ARMY/AIR: UNIT>CLASSIFICATION> STAFFING
ARMY/AIR: UNIT>CUSTOMER SERVICES (CS)
WRI ARMY/AIR: INFORMATION SYSTEMS> CUSTOMER SERVICES (CS)
PAY ADJUSTMENTS ( PRD "0" )
TIME OFF AWARDS
RELOCATION INCENTIVES
DETAILS
REQUEST FOR PERSONNEL ACTION (SF-52) WORKFLOW
ACTION ROUTING
PAY ADJUSTMENTS (PRD OTHER THAN "0")
CHANGE IN SCD
ARMY/AIR: UNIT>STAFFING
ARMY/AIR: UNIT>CLASSIFICATION
ARMY: UNIT> EMPLOYEE RELATIONS (ER)>BUDGET
AIR: UNIT>EMPLOYEE RELATIONS (ER)
ARMY/AIR: INFORMATION SYSTEMS> STAFFING
DISCIPLINARY ACTIONS (Involunatry CLG, Reprimand,
Suspensions, Abandonment of Position…)
RETURN TO DUTY (RTD)
TERMINATION
TEMPORARY PROMOTIONS AND EXTENSIONS OF TEMP PROM
RETIREMENTS
ARMY/AIR: UNIT> LABOR RELATIONS (LR)> Will distribute as needed.
NAME CHANGE
EXTENSION OF TEMP EMPLOYMENT
IPP
SSP & SPECIAL ACT/SERVICE AWARDS
TENURE CHANGES
RETENTION INCENTIVES
CONVERSIONS
CAO, INTER-AGENCY TRANSFER
REASSIGNMENTS
PROMOTIONS
RECRUITMENT INCENTIVES
RESIGNATIONS
SEP-US
CHANGE TO LOWER GRADE (CLG)
ARMY/AIR: UNIT>CLASSIFICATION> CUSTOMER SERVICE (CS)
ARMY/AIR: UNIT>CLASSIFICATION>CUSTOMER SERVICE (CS)
ARMY/AIR: UNIT>CLASSIFICATION> STAFFING> CUSTOMER SERVICE (CS)
ARMY/AIR: UNIT>CLASSIFICATION> STAFFING
VACANCY ANNOUNCEMENTS
ABSENT - US
CHANGE IN DUTY LOCATION
APPOINTMENTS
LWOP (Personal and OWCP)
CHANGE IN WORK SCHEDULE
Annex G