SlideShare a Scribd company logo
1 of 31
Download to read offline
Renewing of Indonesia Highway
Capacity Manual (IHCM): Urban Street Segment;
With Microsimulation
By: Ocky Soelistyo Pribadi
History of IHCM
IHCM PROJECT
1994
FINAL
DOCUMENT
1997
2015
18 years
TRAFFIC DATA
1990 - 1994
Total vehicle amount: 132 million
Motorbike composition: 39,57%
The lenght of national street: 327.000 kms
NEVER BEEN
RENEWED
Total vehicle amount: over 430 million
Motorbike composition: over 80%
The lenght of national street: over 437.000 kms
IHCM Scope and Objectives
FACILITY TYPES
1. Two-lane two-way roads (2/2)
2. Four-lane two-way roads (4/2)
3. Without median (undivided)
4. With median (divided)
5. One-way roads (1-3/1)
For each of the defined road types, the calculation procedure may be
applied with confidence only in the following conditions:
- Flat or essentially flat terrain.
- Straight or essentially straight horizontal alignment.
- On segments of roads which are not affected by queuing caused by
intersections, nor by severe platooning downstream from signalised
intersections.
A road segment is defined as a length of road:
- between and unaffected by signalised or major
unsignalised intersections, and
- having similar characteristics along its length.
Points where road characteristics change
significantly automatically become the boundary of
a segment even if there is no nearby intersection
IHCM Scope and Objectives
If a network or corridor is being analysed, it should be
broken down into its components, as follows:
- Road segments
- Signalised intersections
- Unsignalised intersections
- Weaving Sections
Calculations are then performed separately for each of
these facility types: they are then combined to give the
capacity and overall measures of performance for the
system as a whole.
IHCM Scope and Objectives
Means of city size:
City size is the number of inhabitants in the city
Smaller cities exhibit less urgent driver behaviour and a
less modern vehicle fleet
It leading to reduced capacities and lower speeds at a given
flow, when compared with larger cities
IHCM Scope and Objectives
Throughout the manual the traffic flow values reflect
traffic composition, by expressing flow in passenger car
units (pcu).
Calculation Types
1. Free flow speed
2. Capacity
3. Degree of saturation
4. Actual speed
5. The maximum flow of traffic a road segment can carry
while maintaining a specified level of performance
Point of research:
Capacity:
is defined as the maximum flow past a point on the road
that can be sustained on an hourly basis under prevailing
conditions
Capacity Calculation
C = Capacity (pcu / h)
Co = Base capacity (pcu / h)
FW = Carriageway width adjustment factor
FSP = Directional split adjustment factor (FSP is not valid for oneway
roads)
FSF = Side friction and kerb/shoulder adjustment factor
FCS = City size adjustment factor
Capacity Calculation
Passenger car unit (pcu) for four-lane two-way roads
divided (4/2D)
Light vehicle (LV): 1
Heavy vehicle (HV): 1.2
Motor cycle (MC): 0.25
The impact of unmotorized vehicle is catagorized as a side friction
adjustment factor
Capacity Calculation
Co = Base capacity for four-lane two-way roads
divided (4/2D): 1,650 pcu/hour/lane
Base road conditions:
1. Carriageway width of 10.5 meters to 16 meters
2. Lane width of 3.5 meters
3. Space between kerb and the near obstacle in a sidewalk
over 2 meters
4. A median
5. Traffic directional split of 50:50
6. Low side friction
7. Citi size of 1 to 3 millions
8. Flat alignment
Traffic Data
Affandi Street, Yogyakarta, of 4 x 24 hours, on
October 31st, 2014 to November 3rd, 2014
Traffic Data
WR. Supratman Street, Bandung,
on December 29th, 2011
Development of Vissim Model
Vissim model’s data
Car Truck Bus Bike Motorbike Becak
1 Jl. WR. Supratman Bandung Thursday/29-12-2011 09.00-10.00 North 3511 1161 58 68 7 2215 3
bound 0.331 0.016 0.019 0.002 0.631 0.001
South 2846 893 50 8 30 1862 2
bound 0.314 0.018 0.003 0.011 0.654 0.001
2 Jl. Afandi Yogyakarta Monday/3-11-2014 07.00-08.00 South 5507 770 5 32 33 4656 11
bound 0.140 0.001 0.006 0.006 0.845 0.002
North 3499 472 5 33 40 2942 7
bound 0.135 0.001 0.009 0.011 0.841 0.002
Total
VOLUME
CompositionCITYSTREETNO DAY/DATE TIME
Direction
Output of Vissim’s behaviour parameter default value
Development of Vissim Model
A warning in the end of simulation
Development of Vissim Model
Development of Vissim Model
Model calibration
Model validation
Development of Vissim Model
The developed model:
1) Valid for variabel of total 2-way traffic volume and
vehicle’s mean speed;
2) Close to valid for variable of traffic per 10 minutes
because only few gap between X2 counting and X2 table;
and
3) Not valid for variable of time headway distribution and
vehicle’s speed distribution.
Development of Vissim Model
Road Capacity Calculation
1. Built Vissim model with some variation of traffic volume
value and different random seed, with an assumption if the
vehicle’s composition and speed distribution are constant;
2. Convert the traffic volume in passenger car unit;
3. Record the mean speed of each model;
4. Count the traffic density; and
5. Built a relationship graphic between density and mean speed
value and count the road capacity by the formula of “(Dj x
Vf) / 4”.
The steps of analysis
Road Capacity Calculation
Road Capacity Calculation
Road Capacity Calculation
Road Capacity Calculation
y = -0.1391x + 39.837
R²= 0.4002
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0
Speed(kms/hour)
Density (pcu/km)
Road Capacity Calculation
WR. Supratman Street
0.0
10.0
20.0
30.0
40.0
50.0
60.0
0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0
Speed(kms/hour)
Density (pcu/km)
NB
SB
IHCM Result
Road Capacity Calculation
y = -0.116x + 39.878
R²= 0.5544
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0
Speed(kms/hour)
Density (pcu/km)
AffandiStreet
0.0
10.0
20.0
30.0
40.0
50.0
60.0
0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0
Speed(kms/hour)
Density (pcu/km)
SB
NB
IHCM Result
The Comparison
The Comparison
The Comparison
The summary of this research are:
1. The default value of Vissim software for driver behaviour need to be calibrate
for simulation process of WR. Supratman Street of Bandung and Affandi Street
of Yogyakarta. For the changing of the value, found that the driver behaviour
parameter is more aggresive than the default value.
2. Vissim model is valid for the variable of total volume assigned and the mean
speed of each vehicle type.
3. The Vissim result is so influenced by the desired speed distribution, the different
trend line of the scattered data of the relationship of density and speed for the
same road but different direction can occured.
4. Since Vissim’s model is statistically valid, it can says that KAJI is no longer
suitable to predict the traffic speed and road capacity of WR. Supratman Street
of Bandung and Affandi Street of Yogyakarta..
Summary

More Related Content

What's hot

L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro report
hemanth kumar
 
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Pronob Ghosh
 
Accident Analysis At The Black Spot: A Case Study
Accident Analysis At The Black Spot: A Case StudyAccident Analysis At The Black Spot: A Case Study
Accident Analysis At The Black Spot: A Case Study
iosrjce
 

What's hot (20)

Traffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RKTraffic Queueing analysis using VISSIM Software by RK
Traffic Queueing analysis using VISSIM Software by RK
 
Traffic Speed Analysis
Traffic Speed   AnalysisTraffic Speed   Analysis
Traffic Speed Analysis
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
 
Chapter 3&4
Chapter 3&4Chapter 3&4
Chapter 3&4
 
Origin and destination survey
Origin and destination surveyOrigin and destination survey
Origin and destination survey
 
L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro report
 
Traffic studies
Traffic studiesTraffic studies
Traffic studies
 
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
Traffi speed study on panthapath to russel square by pronob ghosh buet 1204011
 
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
 
Origin – Destination survey
Origin – Destination surveyOrigin – Destination survey
Origin – Destination survey
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
TRIP GENERATION Survey and ORIGIN / DESTINATION STUDY
TRIP GENERATION Survey and ORIGIN / DESTINATION STUDYTRIP GENERATION Survey and ORIGIN / DESTINATION STUDY
TRIP GENERATION Survey and ORIGIN / DESTINATION STUDY
 
He final ppt
He final pptHe final ppt
He final ppt
 
A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...
 
Accident Analysis At The Black Spot: A Case Study
Accident Analysis At The Black Spot: A Case StudyAccident Analysis At The Black Spot: A Case Study
Accident Analysis At The Black Spot: A Case Study
 
Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308
 
Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation  by ahmed ferdous - 1004137-buetTraffic volume study-opresentation  by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
 
Traffic studies for planning bypasses around towns
Traffic studies for planning bypasses around townsTraffic studies for planning bypasses around towns
Traffic studies for planning bypasses around towns
 
Lecture 01 Introduction (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 01 Introduction (Traffic Engineering هندسة المرور & Dr. Usama Shahdah) Lecture 01 Introduction (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 01 Introduction (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 

Similar to 5. renewing of indonesia highway capacity manual urban road segment with traffic microsimulation

Fixation of Toll charge for Six Lane Highway
 Fixation of Toll charge for Six Lane Highway Fixation of Toll charge for Six Lane Highway
Fixation of Toll charge for Six Lane Highway
ijsrd.com
 
Route optimization using network analyst tools of arcgis(mid term evaluation)...
Route optimization using network analyst tools of arcgis(mid term evaluation)...Route optimization using network analyst tools of arcgis(mid term evaluation)...
Route optimization using network analyst tools of arcgis(mid term evaluation)...
PRABHATKUMAR751
 
Traffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsTraffic analysis and Widening of Roads
Traffic analysis and Widening of Roads
Abhinav Pateriya
 

Similar to 5. renewing of indonesia highway capacity manual urban road segment with traffic microsimulation (20)

PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITYPROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
 
ITS
ITSITS
ITS
 
IRJET- Analysis of Saturation Flow at Signalized Intersections
IRJET-  	  Analysis of Saturation Flow at Signalized IntersectionsIRJET-  	  Analysis of Saturation Flow at Signalized Intersections
IRJET- Analysis of Saturation Flow at Signalized Intersections
 
Traffic volume studies
Traffic volume studiesTraffic volume studies
Traffic volume studies
 
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITYPROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
 
INTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEMINTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEM
 
Financial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyFinancial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case study
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
 
Operational analysis of two lane highway
Operational analysis of two lane highwayOperational analysis of two lane highway
Operational analysis of two lane highway
 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
 
road widening
road wideningroad widening
road widening
 
CAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAY
CAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAYCAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAY
CAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAY
 
Fixation of Toll charge for Six Lane Highway
 Fixation of Toll charge for Six Lane Highway Fixation of Toll charge for Six Lane Highway
Fixation of Toll charge for Six Lane Highway
 
Volume study presentation grp 04
Volume study presentation grp 04Volume study presentation grp 04
Volume study presentation grp 04
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
 
Congestion Effects of Parking and Pedestrians on Urban Road -A Case Study of ...
Congestion Effects of Parking and Pedestrians on Urban Road -A Case Study of ...Congestion Effects of Parking and Pedestrians on Urban Road -A Case Study of ...
Congestion Effects of Parking and Pedestrians on Urban Road -A Case Study of ...
 
James Tate - DMUG 2014
James Tate -  DMUG 2014James Tate -  DMUG 2014
James Tate - DMUG 2014
 
Route optimization using network analyst tools of arcgis(mid term evaluation)...
Route optimization using network analyst tools of arcgis(mid term evaluation)...Route optimization using network analyst tools of arcgis(mid term evaluation)...
Route optimization using network analyst tools of arcgis(mid term evaluation)...
 
Study of urban traffic flow
Study of urban traffic flowStudy of urban traffic flow
Study of urban traffic flow
 
Traffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsTraffic analysis and Widening of Roads
Traffic analysis and Widening of Roads
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 

Recently uploaded (20)

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

5. renewing of indonesia highway capacity manual urban road segment with traffic microsimulation

  • 1. Renewing of Indonesia Highway Capacity Manual (IHCM): Urban Street Segment; With Microsimulation By: Ocky Soelistyo Pribadi
  • 2. History of IHCM IHCM PROJECT 1994 FINAL DOCUMENT 1997 2015 18 years TRAFFIC DATA 1990 - 1994 Total vehicle amount: 132 million Motorbike composition: 39,57% The lenght of national street: 327.000 kms NEVER BEEN RENEWED Total vehicle amount: over 430 million Motorbike composition: over 80% The lenght of national street: over 437.000 kms
  • 3. IHCM Scope and Objectives FACILITY TYPES 1. Two-lane two-way roads (2/2) 2. Four-lane two-way roads (4/2) 3. Without median (undivided) 4. With median (divided) 5. One-way roads (1-3/1) For each of the defined road types, the calculation procedure may be applied with confidence only in the following conditions: - Flat or essentially flat terrain. - Straight or essentially straight horizontal alignment. - On segments of roads which are not affected by queuing caused by intersections, nor by severe platooning downstream from signalised intersections.
  • 4. A road segment is defined as a length of road: - between and unaffected by signalised or major unsignalised intersections, and - having similar characteristics along its length. Points where road characteristics change significantly automatically become the boundary of a segment even if there is no nearby intersection IHCM Scope and Objectives
  • 5. If a network or corridor is being analysed, it should be broken down into its components, as follows: - Road segments - Signalised intersections - Unsignalised intersections - Weaving Sections Calculations are then performed separately for each of these facility types: they are then combined to give the capacity and overall measures of performance for the system as a whole. IHCM Scope and Objectives
  • 6. Means of city size: City size is the number of inhabitants in the city Smaller cities exhibit less urgent driver behaviour and a less modern vehicle fleet It leading to reduced capacities and lower speeds at a given flow, when compared with larger cities IHCM Scope and Objectives Throughout the manual the traffic flow values reflect traffic composition, by expressing flow in passenger car units (pcu).
  • 7. Calculation Types 1. Free flow speed 2. Capacity 3. Degree of saturation 4. Actual speed 5. The maximum flow of traffic a road segment can carry while maintaining a specified level of performance Point of research: Capacity: is defined as the maximum flow past a point on the road that can be sustained on an hourly basis under prevailing conditions
  • 8. Capacity Calculation C = Capacity (pcu / h) Co = Base capacity (pcu / h) FW = Carriageway width adjustment factor FSP = Directional split adjustment factor (FSP is not valid for oneway roads) FSF = Side friction and kerb/shoulder adjustment factor FCS = City size adjustment factor
  • 9. Capacity Calculation Passenger car unit (pcu) for four-lane two-way roads divided (4/2D) Light vehicle (LV): 1 Heavy vehicle (HV): 1.2 Motor cycle (MC): 0.25 The impact of unmotorized vehicle is catagorized as a side friction adjustment factor
  • 10. Capacity Calculation Co = Base capacity for four-lane two-way roads divided (4/2D): 1,650 pcu/hour/lane Base road conditions: 1. Carriageway width of 10.5 meters to 16 meters 2. Lane width of 3.5 meters 3. Space between kerb and the near obstacle in a sidewalk over 2 meters 4. A median 5. Traffic directional split of 50:50 6. Low side friction 7. Citi size of 1 to 3 millions 8. Flat alignment
  • 11. Traffic Data Affandi Street, Yogyakarta, of 4 x 24 hours, on October 31st, 2014 to November 3rd, 2014
  • 12. Traffic Data WR. Supratman Street, Bandung, on December 29th, 2011
  • 13. Development of Vissim Model Vissim model’s data Car Truck Bus Bike Motorbike Becak 1 Jl. WR. Supratman Bandung Thursday/29-12-2011 09.00-10.00 North 3511 1161 58 68 7 2215 3 bound 0.331 0.016 0.019 0.002 0.631 0.001 South 2846 893 50 8 30 1862 2 bound 0.314 0.018 0.003 0.011 0.654 0.001 2 Jl. Afandi Yogyakarta Monday/3-11-2014 07.00-08.00 South 5507 770 5 32 33 4656 11 bound 0.140 0.001 0.006 0.006 0.845 0.002 North 3499 472 5 33 40 2942 7 bound 0.135 0.001 0.009 0.011 0.841 0.002 Total VOLUME CompositionCITYSTREETNO DAY/DATE TIME Direction
  • 14. Output of Vissim’s behaviour parameter default value Development of Vissim Model
  • 15. A warning in the end of simulation Development of Vissim Model
  • 16. Development of Vissim Model Model calibration
  • 18. The developed model: 1) Valid for variabel of total 2-way traffic volume and vehicle’s mean speed; 2) Close to valid for variable of traffic per 10 minutes because only few gap between X2 counting and X2 table; and 3) Not valid for variable of time headway distribution and vehicle’s speed distribution. Development of Vissim Model
  • 19. Road Capacity Calculation 1. Built Vissim model with some variation of traffic volume value and different random seed, with an assumption if the vehicle’s composition and speed distribution are constant; 2. Convert the traffic volume in passenger car unit; 3. Record the mean speed of each model; 4. Count the traffic density; and 5. Built a relationship graphic between density and mean speed value and count the road capacity by the formula of “(Dj x Vf) / 4”. The steps of analysis
  • 24. y = -0.1391x + 39.837 R²= 0.4002 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 Speed(kms/hour) Density (pcu/km) Road Capacity Calculation WR. Supratman Street
  • 25. 0.0 10.0 20.0 30.0 40.0 50.0 60.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 Speed(kms/hour) Density (pcu/km) NB SB IHCM Result
  • 26. Road Capacity Calculation y = -0.116x + 39.878 R²= 0.5544 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 Speed(kms/hour) Density (pcu/km) AffandiStreet
  • 27. 0.0 10.0 20.0 30.0 40.0 50.0 60.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 Speed(kms/hour) Density (pcu/km) SB NB IHCM Result
  • 31. The summary of this research are: 1. The default value of Vissim software for driver behaviour need to be calibrate for simulation process of WR. Supratman Street of Bandung and Affandi Street of Yogyakarta. For the changing of the value, found that the driver behaviour parameter is more aggresive than the default value. 2. Vissim model is valid for the variable of total volume assigned and the mean speed of each vehicle type. 3. The Vissim result is so influenced by the desired speed distribution, the different trend line of the scattered data of the relationship of density and speed for the same road but different direction can occured. 4. Since Vissim’s model is statistically valid, it can says that KAJI is no longer suitable to predict the traffic speed and road capacity of WR. Supratman Street of Bandung and Affandi Street of Yogyakarta.. Summary