June 2020
Offshore Structures
Specifications Task
Force – JIP35
Phase 2
2
Standardisation of Offshore Structures Specifications
• An IOGP initiative, funded by JIP35, following the successful IOGP JIP33 initiative on the
standardisation of equipment specifications
• 10 Contributing Operators: BP, Chevron, ENI, Equinor, ExxonMobil, INPEX, Shell, Suncor, Total,
Woodside making up the Offshore Structures Specifications Task Force, under the Offshore
Structures Subcommittee
• Objective: Selection of an agreed base standard; using these operators’ specifications as input,
identify and agree minimum, essential common requirements, documenting these in jointly
approved supplementary specifications, published by IOGP
• 12 Teams covering: Concrete, General Requirements, Metocean, Stationkeeping, Marine Soil
Investigations, Seismic, Foundations, Weight Management, Topsides, Fixed Jackets, Floating
Structures, Arctic
• Task Force Chairman: Simen Moxnes of Equinor; Task Force Vice-Chair: Philip Smedley of BP
3
Topic (IOGP Supplementary Spec) Selected Base Standard
General Requirements (S-631-01) ISO 19900
Metocean (S-631-09) ISO 19901-1 (API 2MET is a modified adoption)
Seismic (S-631-08) ISO 19901-2 (API RP 2EQ is a modified adoption)
Topsides (S-631-04) ISO 19901-3: 2014 (API RP 2TOP is near equivalent)
Foundations (S-631-05) ISO 19901-4 (API 2GEO is a modified adoption)
Weight Management (S-631-06) ISO 19901-5
Stationkeeping (S-631-07) ISO 19901-7 (API RP 2SK is near equivalent)
Marine Soil Invest. (S-631-10) ISO 19901-8
Fixed Jacket (S-631-11) ISO 19902 (API RP 2A (LRFD) is a modified adoption)
Concrete (S-631-03) ISO 19903
Arctic (S-631-02) ISO 19906 (API RP 2N is a modified adoption)
Floating N/A – Position paper issued. Possible Phase 3 Scope
Selected Base Standards
4
Topic (IOGP Supplementary Specification)
Total Company
Requirements
Minimum Essential
Requirements
General Reqs (S-631-01) – Published 44 5
Concrete (S-631-03) – Published 216 43
Seismic (S-631-08) – Published 255 5
Arctic (S-631-02) – Published 170 0
Marine Soil Invest. (S-631-10) – Published 883 90
Stationkeeping (S-631-07) – Published 1111 53
Topsides (S-631-04) – Published 1936 ~60
Fixed Jacket (S-631-11) – Publish June 2020 1931 ~100
Consolidation and Reduction of Company Requirements
5
Available on IOGP website – www.iogp.org/jip35
Publications: Supplementary Specifications
6
Topic Status
Weight Management (S-631-06)
Published
Worked directly through ISO TC 67/SC 7/WG 6
Metocean (S-631-09)
Publish November 2020*
Worked directly through ISO TC 67/SC 7/WG 3. DIS ballot draft
approximately October 2020
Foundations (S-631-05)
Publish January 2021*
Worked directly through ISO TC 67/SC 7/WG 10. DIS ballot draft
approximately December 2020
Floating Systems
Brief position paper issued by Task Force. No further work planned
during this Phase. Possible Phase 3 Scope
Other Topics
* Publication of IOGP Specification, referencing the ISO DIS (publicly available from ISO) and no supplementary requirements
7
Published Supplementary Specifications:
Pre-JIP35 vs Minimum Essential Requirements
8
Published Supplementary Specifications:
Pre-JIP35 vs Minimum Essential Requirements
9
Further Opportunities
• Offer these supplementary requirements for incorporation into the ISO base
standards at next revision/opportunity
• Downgrading of company requirements to recommendations or guidelines
• Further alignment between the ISO and API standards
• Improved technical writing of these standards and company specifications
• Phase 3 under consideration
10
For more information please contact:
www.iogp.org
Registered Office
City Tower
Level 14
40 Basinghall Street
London EC2V 5DE
United Kingdom
+44 (0)20 3763 9700
reception@iogp.org
Houston Office
19219 Katy Freeway
Suite 175
Houston, TX 77094
United States
+1 (713) 261 0411
reception@iogp.org
Brussels Office
Avenue de Tervuren 188A
B-1150 Brussels
Belgium
+32 (0)2 790 7762
eu-reception@iogp.org
Simen Moxnes, Equinor
smox@equinor.com
Philip Smedley, BP
philip.smedley@uk.bp.com
Diane Gonsalves, IOGP
dg@iogp.org

More Related Content

Similar to JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (June 2020)

3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdfMaanMrabet1
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationRebecca Barton
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectJill Reeves
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectJill Reeves
 
FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)Narasimha Sharma
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryUKTI2014
 
IGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.pptIGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.pptgrssieee
 
Aegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense PresentationAegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense PresentationBen Strickland
 
Valdicotry final final 10.00 20 dec
Valdicotry final final  10.00 20 decValdicotry final final  10.00 20 dec
Valdicotry final final 10.00 20 decoffshorearray
 
Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14Balakrishnan G Nair, AMRINA
 
The discovery and evaluation of AK6
The discovery and evaluation of AK6The discovery and evaluation of AK6
The discovery and evaluation of AK6James AH Campbell
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visUlimella Siva Sankar
 
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...Rama Krishna Varanasi
 
2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...smarter2011
 
2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...qyresearch
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardssuser8685dc
 

Similar to JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (June 2020) (20)

Training PPT
Training PPTTraining PPT
Training PPT
 
3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf
 
Nid9
Nid9Nid9
Nid9
 
Soil nailing
Soil nailingSoil nailing
Soil nailing
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 Presentation
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
 
Presentation on steel
Presentation on steel Presentation on steel
Presentation on steel
 
IGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.pptIGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.ppt
 
Aegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense PresentationAegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense Presentation
 
Valdicotry final final 10.00 20 dec
Valdicotry final final  10.00 20 decValdicotry final final  10.00 20 dec
Valdicotry final final 10.00 20 dec
 
Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14
 
The discovery and evaluation of AK6
The discovery and evaluation of AK6The discovery and evaluation of AK6
The discovery and evaluation of AK6
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
 
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
 
2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...
 
2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
 

Recently uploaded

Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Nitin Sonavane
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)NareenAsad
 
Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...IJECEIAES
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesRashidFaridChishti
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.benjamincojr
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfJNTUA
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2T.D. Shashikala
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AISheetal Jain
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxMANASINANDKISHORDEOR
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1T.D. Shashikala
 
Low Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookLow Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookPeterJack13
 

Recently uploaded (20)

Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Low Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookLow Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s Handbook
 

JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (June 2020)

  • 1. 1 June 2020 Offshore Structures Specifications Task Force – JIP35 Phase 2
  • 2. 2 Standardisation of Offshore Structures Specifications • An IOGP initiative, funded by JIP35, following the successful IOGP JIP33 initiative on the standardisation of equipment specifications • 10 Contributing Operators: BP, Chevron, ENI, Equinor, ExxonMobil, INPEX, Shell, Suncor, Total, Woodside making up the Offshore Structures Specifications Task Force, under the Offshore Structures Subcommittee • Objective: Selection of an agreed base standard; using these operators’ specifications as input, identify and agree minimum, essential common requirements, documenting these in jointly approved supplementary specifications, published by IOGP • 12 Teams covering: Concrete, General Requirements, Metocean, Stationkeeping, Marine Soil Investigations, Seismic, Foundations, Weight Management, Topsides, Fixed Jackets, Floating Structures, Arctic • Task Force Chairman: Simen Moxnes of Equinor; Task Force Vice-Chair: Philip Smedley of BP
  • 3. 3 Topic (IOGP Supplementary Spec) Selected Base Standard General Requirements (S-631-01) ISO 19900 Metocean (S-631-09) ISO 19901-1 (API 2MET is a modified adoption) Seismic (S-631-08) ISO 19901-2 (API RP 2EQ is a modified adoption) Topsides (S-631-04) ISO 19901-3: 2014 (API RP 2TOP is near equivalent) Foundations (S-631-05) ISO 19901-4 (API 2GEO is a modified adoption) Weight Management (S-631-06) ISO 19901-5 Stationkeeping (S-631-07) ISO 19901-7 (API RP 2SK is near equivalent) Marine Soil Invest. (S-631-10) ISO 19901-8 Fixed Jacket (S-631-11) ISO 19902 (API RP 2A (LRFD) is a modified adoption) Concrete (S-631-03) ISO 19903 Arctic (S-631-02) ISO 19906 (API RP 2N is a modified adoption) Floating N/A – Position paper issued. Possible Phase 3 Scope Selected Base Standards
  • 4. 4 Topic (IOGP Supplementary Specification) Total Company Requirements Minimum Essential Requirements General Reqs (S-631-01) – Published 44 5 Concrete (S-631-03) – Published 216 43 Seismic (S-631-08) – Published 255 5 Arctic (S-631-02) – Published 170 0 Marine Soil Invest. (S-631-10) – Published 883 90 Stationkeeping (S-631-07) – Published 1111 53 Topsides (S-631-04) – Published 1936 ~60 Fixed Jacket (S-631-11) – Publish June 2020 1931 ~100 Consolidation and Reduction of Company Requirements
  • 5. 5 Available on IOGP website – www.iogp.org/jip35 Publications: Supplementary Specifications
  • 6. 6 Topic Status Weight Management (S-631-06) Published Worked directly through ISO TC 67/SC 7/WG 6 Metocean (S-631-09) Publish November 2020* Worked directly through ISO TC 67/SC 7/WG 3. DIS ballot draft approximately October 2020 Foundations (S-631-05) Publish January 2021* Worked directly through ISO TC 67/SC 7/WG 10. DIS ballot draft approximately December 2020 Floating Systems Brief position paper issued by Task Force. No further work planned during this Phase. Possible Phase 3 Scope Other Topics * Publication of IOGP Specification, referencing the ISO DIS (publicly available from ISO) and no supplementary requirements
  • 7. 7 Published Supplementary Specifications: Pre-JIP35 vs Minimum Essential Requirements
  • 8. 8 Published Supplementary Specifications: Pre-JIP35 vs Minimum Essential Requirements
  • 9. 9 Further Opportunities • Offer these supplementary requirements for incorporation into the ISO base standards at next revision/opportunity • Downgrading of company requirements to recommendations or guidelines • Further alignment between the ISO and API standards • Improved technical writing of these standards and company specifications • Phase 3 under consideration
  • 10. 10 For more information please contact: www.iogp.org Registered Office City Tower Level 14 40 Basinghall Street London EC2V 5DE United Kingdom +44 (0)20 3763 9700 reception@iogp.org Houston Office 19219 Katy Freeway Suite 175 Houston, TX 77094 United States +1 (713) 261 0411 reception@iogp.org Brussels Office Avenue de Tervuren 188A B-1150 Brussels Belgium +32 (0)2 790 7762 eu-reception@iogp.org Simen Moxnes, Equinor smox@equinor.com Philip Smedley, BP philip.smedley@uk.bp.com Diane Gonsalves, IOGP dg@iogp.org

Editor's Notes

  1. Draft as number of intended company requirements are not finalised as yet
  2. Draft as number of intended company requirements are not finalised as yet