Standardization of Offshore Structures Specifications
Offshore Structures Specification Task Force (Formed in 2017):
• IOGP initiative funded by JIP35 for standardization of offshore structures design
specifications following successful IOGP JIP33 initiative.
• Objective: Selection of an agreed base standard; using the contributing operators’
specifications as input, identify and agree minimum, essential common
requirements, documenting these in jointly approved supplementary specifications,
published by IOGP.
• 11 contributing operators: bp, Chevron, Eni, Equinor, ExxonMobil, Inpex, Petronas,
Shell, Suncor, TotalEnergies and Woodside.
• Leadership: Chairs - Simen Moxnes, Equinor (Ph.1 & 2) and Andre van der Stap,
Shell ( Ph.3).Vice Chair – Philip Smedley, bp ( Ph.1,2 & 3)
• 11 Teams in Phase 1 & 2 publishing 11 supplementary specifications (overlays).
• 3 Teams in Phase 3 currently progressing 3 supplementary specifications (overlays).
3
Topic (IOGP Supplementary Spec) Selected Base Standard
General Requirements (S-631-01) ISO 19900
Metocean (S-631-09) ISO 19901-1 (API 2MET is a modified adoption)
Seismic (S-631-08) ISO 19901-2 (API RP 2EQ is a modified adoption)
Topsides (S-631-04) ISO 19901-3: 2014 (API RP 2TOP is near equivalent)
Foundations (S-631-05) ISO 19901-4 (API 2GEO is a modified adoption)
Weight Management (S-631-06) ISO 19901-5
Stationkeeping (S-631-07) ISO 19901-7 (API RP 2SK is near equivalent)
Marine Soil Invest. (S-631-10) ISO 19901-8
Fixed Jacket (S-631-11) ISO 19902 (API RP 2A (LRFD) is a modified adoption)
Concrete (S-631-03) ISO 19903
Arctic (S-631-02) ISO 19906 (API RP 2N is a modified adoption)
Floating Structures (S-631-13) Phase 3 Scope – under development
Structural Materials ( S-631-12) Phase 3 Scope – under development
Marine Operations ( S-631-13) Phase 3 Scope – under development
Selected Base Standards
4
Topic (IOGP Supplementary Specification)
Total Company
Requirements
Minimum Essential
Requirements
General Reqs (S-631-01) – Published 44 5
Concrete (S-631-03) – Published 216 43
Seismic (S-631-08) – Published 255 5
Arctic (S-631-02) – Published 170 0
Marine Soil Invest. (S-631-10) – Published 883 90
Stationkeeping (S-631-07) – Published 1111 53
Topsides (S-631-04) – Published 1936 60
Fixed Jacket (S-631-11) – Published 1931 86
Consolidation and Reduction of Company Requirements
5
Freely Available on IOGP website – www.iogp.org/jip35
Publications: Supplementary Specifications
6
Topic Status
Weight Management (S-631-06)
Published *
Worked directly through ISO TC 67/SC 7/WG 6
Metocean (S-631-09) Worked directly through ISO TC 67/SC 7/WG 3.
Foundations (S-631-05) Worked directly through ISO TC 67/SC 7/WG 10.
Floating Systems Under development.
Structural materials Under development.
Marine operations Under development.
Other Topics
* Publication of IOGP Specification, referencing the ISO DIS (publicly available from ISO) and no supplementary requirements
7
Published Supplementary Specifications:
Pre-JIP35 vs Minimum Essential Requirements
8
Consolidation & Reduction of Company Requirements:
Pre-JIP35 vs IOGP Published Requirements
9
Current Status
• Two standards in progress through ISO TC67/SC7.
• Three specifications under development as part of Phase 3.
• Adoption and downgrading of operator specific company requirements in progress.
10
Further Opportunities
• Downgrading of company requirements to recommendations or guidelines
• These supplementary requirements are being considered for incorporation into the
ISO base standards at next revision/opportunity
• Further alignment between the ISO and API standards
• Further improved technical writing of these standards and company specifications
11
For more information please contact:
www.iogp.org
Registered Office
City Tower
Level 14
40 Basinghall Street
London EC2V 5DE
United Kingdom
+44 (0)20 3763 9700
reception@iogp.org
Houston Office
19219 Katy Freeway
Suite 175
Houston, TX 77094
United States
+1 (713) 261 0411
reception@iogp.org
Brussels Office
Avenue de Tervuren 188A
B-1150 Brussels
Belgium
+32 (0)2 790 7762
eu-reception@iogp.org
Andre van der Stap, Shell
Andre.vanderstap@shell.com
Philip Smedley, bp
philip.smedley@uk.bp.com
Sajeev Menon, IOGP
sm@iogp.org

More Related Content

Similar to JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (January 2022)

3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf
MaanMrabet1
 
Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14
Balakrishnan G Nair, AMRINA
 
Nuclear Decommissioning Program at ANL Aug 2009
Nuclear Decommissioning Program at ANL Aug 2009Nuclear Decommissioning Program at ANL Aug 2009
Nuclear Decommissioning Program at ANL Aug 2009
lboing
 
D&D Program Anl Template Aug 2009 Linked In
D&D Program   Anl Template   Aug 2009   Linked InD&D Program   Anl Template   Aug 2009   Linked In
D&D Program Anl Template Aug 2009 Linked In
lboing
 
10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin
myatom
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
UKTI2014
 
Cambridge lecture areva robert davies
Cambridge lecture areva robert daviesCambridge lecture areva robert davies
Cambridge lecture areva robert davies
Abdelrhman Uossef
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
ssuser8685dc
 

Similar to JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (January 2022) (20)

Soil nailing
Soil nailingSoil nailing
Soil nailing
 
Used fuel andrew sowder - epri
Used fuel   andrew sowder - epriUsed fuel   andrew sowder - epri
Used fuel andrew sowder - epri
 
3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf
 
Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14Saipem Presentation - ONGC Symposium 11-12 Nov 14
Saipem Presentation - ONGC Symposium 11-12 Nov 14
 
Nuclear Decommissioning Program at ANL Aug 2009
Nuclear Decommissioning Program at ANL Aug 2009Nuclear Decommissioning Program at ANL Aug 2009
Nuclear Decommissioning Program at ANL Aug 2009
 
D&D Program Anl Template Aug 2009 Linked In
D&D Program   Anl Template   Aug 2009   Linked InD&D Program   Anl Template   Aug 2009   Linked In
D&D Program Anl Template Aug 2009 Linked In
 
Mpieux 08 up -deep-foundations-design-of-pile-foundations
Mpieux 08 up -deep-foundations-design-of-pile-foundationsMpieux 08 up -deep-foundations-design-of-pile-foundations
Mpieux 08 up -deep-foundations-design-of-pile-foundations
 
Asia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
Asia days Oslo 2013 - Market opportunities in South & South East Asia - EnergyAsia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
Asia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
 
10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin
 
RCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcreeRCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcree
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
 
Training PPT
Training PPTTraining PPT
Training PPT
 
Cambridge lecture areva robert davies
Cambridge lecture areva robert daviesCambridge lecture areva robert davies
Cambridge lecture areva robert davies
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
 
MARPOL Annex VI and Emissions Control
MARPOL Annex VI and Emissions ControlMARPOL Annex VI and Emissions Control
MARPOL Annex VI and Emissions Control
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 Presentation
 
Oil & Gas opportunities in Southeast Asia
Oil & Gas opportunities in Southeast AsiaOil & Gas opportunities in Southeast Asia
Oil & Gas opportunities in Southeast Asia
 
Rcs1-Chapter2-Standards
Rcs1-Chapter2-StandardsRcs1-Chapter2-Standards
Rcs1-Chapter2-Standards
 
PROJECT PRESENTATION- first review.pptx
PROJECT PRESENTATION- first review.pptxPROJECT PRESENTATION- first review.pptx
PROJECT PRESENTATION- first review.pptx
 
Innovation of Coal Seam Gas Well-Construction Process in Australia:
Innovation of Coal Seam Gas Well-Construction Process in Australia:Innovation of Coal Seam Gas Well-Construction Process in Australia:
Innovation of Coal Seam Gas Well-Construction Process in Australia:
 

Recently uploaded

electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
benjamincojr
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
drjose256
 

Recently uploaded (20)

History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 

JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (January 2022)

  • 2. 2 Standardization of Offshore Structures Specifications Offshore Structures Specification Task Force (Formed in 2017): • IOGP initiative funded by JIP35 for standardization of offshore structures design specifications following successful IOGP JIP33 initiative. • Objective: Selection of an agreed base standard; using the contributing operators’ specifications as input, identify and agree minimum, essential common requirements, documenting these in jointly approved supplementary specifications, published by IOGP. • 11 contributing operators: bp, Chevron, Eni, Equinor, ExxonMobil, Inpex, Petronas, Shell, Suncor, TotalEnergies and Woodside. • Leadership: Chairs - Simen Moxnes, Equinor (Ph.1 & 2) and Andre van der Stap, Shell ( Ph.3).Vice Chair – Philip Smedley, bp ( Ph.1,2 & 3) • 11 Teams in Phase 1 & 2 publishing 11 supplementary specifications (overlays). • 3 Teams in Phase 3 currently progressing 3 supplementary specifications (overlays).
  • 3. 3 Topic (IOGP Supplementary Spec) Selected Base Standard General Requirements (S-631-01) ISO 19900 Metocean (S-631-09) ISO 19901-1 (API 2MET is a modified adoption) Seismic (S-631-08) ISO 19901-2 (API RP 2EQ is a modified adoption) Topsides (S-631-04) ISO 19901-3: 2014 (API RP 2TOP is near equivalent) Foundations (S-631-05) ISO 19901-4 (API 2GEO is a modified adoption) Weight Management (S-631-06) ISO 19901-5 Stationkeeping (S-631-07) ISO 19901-7 (API RP 2SK is near equivalent) Marine Soil Invest. (S-631-10) ISO 19901-8 Fixed Jacket (S-631-11) ISO 19902 (API RP 2A (LRFD) is a modified adoption) Concrete (S-631-03) ISO 19903 Arctic (S-631-02) ISO 19906 (API RP 2N is a modified adoption) Floating Structures (S-631-13) Phase 3 Scope – under development Structural Materials ( S-631-12) Phase 3 Scope – under development Marine Operations ( S-631-13) Phase 3 Scope – under development Selected Base Standards
  • 4. 4 Topic (IOGP Supplementary Specification) Total Company Requirements Minimum Essential Requirements General Reqs (S-631-01) – Published 44 5 Concrete (S-631-03) – Published 216 43 Seismic (S-631-08) – Published 255 5 Arctic (S-631-02) – Published 170 0 Marine Soil Invest. (S-631-10) – Published 883 90 Stationkeeping (S-631-07) – Published 1111 53 Topsides (S-631-04) – Published 1936 60 Fixed Jacket (S-631-11) – Published 1931 86 Consolidation and Reduction of Company Requirements
  • 5. 5 Freely Available on IOGP website – www.iogp.org/jip35 Publications: Supplementary Specifications
  • 6. 6 Topic Status Weight Management (S-631-06) Published * Worked directly through ISO TC 67/SC 7/WG 6 Metocean (S-631-09) Worked directly through ISO TC 67/SC 7/WG 3. Foundations (S-631-05) Worked directly through ISO TC 67/SC 7/WG 10. Floating Systems Under development. Structural materials Under development. Marine operations Under development. Other Topics * Publication of IOGP Specification, referencing the ISO DIS (publicly available from ISO) and no supplementary requirements
  • 7. 7 Published Supplementary Specifications: Pre-JIP35 vs Minimum Essential Requirements
  • 8. 8 Consolidation & Reduction of Company Requirements: Pre-JIP35 vs IOGP Published Requirements
  • 9. 9 Current Status • Two standards in progress through ISO TC67/SC7. • Three specifications under development as part of Phase 3. • Adoption and downgrading of operator specific company requirements in progress.
  • 10. 10 Further Opportunities • Downgrading of company requirements to recommendations or guidelines • These supplementary requirements are being considered for incorporation into the ISO base standards at next revision/opportunity • Further alignment between the ISO and API standards • Further improved technical writing of these standards and company specifications
  • 11. 11 For more information please contact: www.iogp.org Registered Office City Tower Level 14 40 Basinghall Street London EC2V 5DE United Kingdom +44 (0)20 3763 9700 reception@iogp.org Houston Office 19219 Katy Freeway Suite 175 Houston, TX 77094 United States +1 (713) 261 0411 reception@iogp.org Brussels Office Avenue de Tervuren 188A B-1150 Brussels Belgium +32 (0)2 790 7762 eu-reception@iogp.org Andre van der Stap, Shell Andre.vanderstap@shell.com Philip Smedley, bp philip.smedley@uk.bp.com Sajeev Menon, IOGP sm@iogp.org

Editor's Notes

  1. Draft as number of intended company requirements are not finalised as yet
  2. Draft as number of intended company requirements are not finalised as yet