Standardisation of Offshore Structures Specifications
• An IOGP initiative, funded by JIP35, following the successful IOGP JIP33 initiative on the
standardisation of equipment specifications
• 10 Contributing Operators: BP, Chevron, ENI, Equinor, ExxonMobil, INPEX, Shell, Suncor, Total,
Woodside making up the Offshore Structures Specifications Task Force, under the Offshore
Structures Subcommittee
• Objective: Selection of an agreed base standard; using these operators’ specifications as input,
identify and agree minimum, essential common requirements, documenting these in jointly
approved supplementary specifications, published by IOGP
• 12 Teams covering: Concrete, General Requirements, Metocean, Stationkeeping, Marine Soil
Investigations, Seismic, Foundations, Weight Management, Topsides, Fixed Jackets, Floating
Structures, Arctic
• Task Force Chairman: Simen Moxnes of Equinor; Task Force Vice-Chair: Philip Smedley of BP
3
Topic (IOGP Supplementary Spec) Selected Base Standard
General Requirements (S-631-01) ISO 19900
Metocean (S-631-09) ISO 19901-1 (API 2MET is a modified adoption)
Seismic (S-631-08) ISO 19901-2 (API RP 2EQ is a modified adoption)
Topsides (S-631-04) ISO 19901-3: 2014 (API RP 2TOP is near equivalent)
Foundations (S-631-05) ISO 19901-4 (API 2GEO is a modified adoption)
Weight Management (S-631-06) ISO 19901-5
Stationkeeping (S-631-07) ISO 19901-7 (API RP 2SK is near equivalent)
Marine Soil Invest. (S-631-10) ISO 19901-8
Fixed Jacket (S-631-11) ISO 19902 (API RP 2A (LRFD) is a modified adoption)
Concrete (S-631-03) ISO 19903
Arctic (S-631-02) ISO 19906 (API RP 2N is a modified adoption)
Floating N/A – Position paper issued. Phase 3 Scope
Selected Base Standards
4
Topic (IOGP Supplementary Specification)
Total Company
Requirements
Minimum Essential
Requirements
General Reqs (S-631-01) – Published 44 5
Concrete (S-631-03) – Published 216 43
Seismic (S-631-08) – Published 255 5
Arctic (S-631-02) – Published 170 0
Marine Soil Invest. (S-631-10) – Published 883 90
Stationkeeping (S-631-07) – Published 1111 53
Topsides (S-631-04) – Published 1936 60
Fixed Jacket (S-631-11) – Publish September 2020 1931 ~90
Consolidation and Reduction of Company Requirements
5
Available on IOGP website – www.iogp.org/jip35
Publications: Supplementary Specifications
6
Topic Status
Weight Management (S-631-06)
Published
Worked directly through ISO TC 67/SC 7/WG 6
Metocean (S-631-09)
Publish January 2021*
Worked directly through ISO TC 67/SC 7/WG 3. DIS ballot draft
approximately December 2020
Foundations (S-631-05)
Publish March 2021*
Worked directly through ISO TC 67/SC 7/WG 10. DIS ballot draft
approximately February 2021
Floating Systems
Brief position paper issued by Task Force. Further work is planned
during Phase 3
Other Topics
* Publication of IOGP Specification, referencing the ISO DIS (publicly available from ISO) and no supplementary requirements
7
Published Supplementary Specifications:
Pre-JIP35 vs Minimum Essential Requirements
8
Published Supplementary Specifications:
Pre-JIP35 vs Minimum Essential Requirements
Operator:
9
Further Opportunities
• Offer these supplementary requirements for incorporation into the ISO base
standards at next revision/opportunity
• Downgrading of company requirements to recommendations or guidelines
• Further alignment between the ISO and API standards
• Improved technical writing of these standards and company specifications
• Phase 3 scope to be initiated in October 2020
10
For more information please contact:
www.iogp.org
Registered Office
City Tower
Level 14
40 Basinghall Street
London EC2V 5DE
United Kingdom
+44 (0)20 3763 9700
reception@iogp.org
Houston Office
19219 Katy Freeway
Suite 175
Houston, TX 77094
United States
+1 (713) 261 0411
reception@iogp.org
Brussels Office
Avenue de Tervuren 188A
B-1150 Brussels
Belgium
+32 (0)2 790 7762
eu-reception@iogp.org
Simen Moxnes, Equinor
smox@equinor.com
Philip Smedley, BP
philip.smedley@uk.bp.com
Diane Gonsalves, IOGP
dg@iogp.org

More Related Content

Similar to JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (August2020)

Soil nailing
Soil nailingSoil nailing
Soil nailing
Gabby Hernandez
 
Training PPT
Training PPTTraining PPT
Training PPT
indrajeet kumar
 
ADEN Monthly review meeting May 2024.pptx
ADEN Monthly review meeting May 2024.pptxADEN Monthly review meeting May 2024.pptx
ADEN Monthly review meeting May 2024.pptx
adentrivandrum
 
3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf
MaanMrabet1
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 Presentation
Rebecca Barton
 
Development of Safety Case for the Wolsong LILW disposal facility in Korea
Development of Safety Case for the Wolsong LILW disposal facility in KoreaDevelopment of Safety Case for the Wolsong LILW disposal facility in Korea
Development of Safety Case for the Wolsong LILW disposal facility in Korea
Jin Beak Park
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
Jill Reeves
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
Jill Reeves
 
Aegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense PresentationAegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense Presentation
Ben Strickland
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
UKTI2014
 
Abdelraheim Mohamed-1
Abdelraheim Mohamed-1Abdelraheim Mohamed-1
Abdelraheim Mohamed-1
Abdelraheim Mohamed
 
IGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.pptIGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.ppt
grssieee
 
Presentation on steel
Presentation on steel Presentation on steel
Presentation on steel
Probodh Mallick
 
TfI Marine - Mooring Load Reduction - FOWT 2018
TfI Marine - Mooring Load Reduction - FOWT 2018TfI Marine - Mooring Load Reduction - FOWT 2018
TfI Marine - Mooring Load Reduction - FOWT 2018
Noel Halloran
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
ssuser8685dc
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
Ulimella Siva Sankar
 
Valdicotry final final 10.00 20 dec
Valdicotry final final  10.00 20 decValdicotry final final  10.00 20 dec
Valdicotry final final 10.00 20 dec
offshorearray
 
Retaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering ReportRetaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering Report
Joshua Yu
 
DESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRO
DESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRODESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRO
DESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRO
IRJET Journal
 
2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...
smarter2011
 

Similar to JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (August2020) (20)

Soil nailing
Soil nailingSoil nailing
Soil nailing
 
Training PPT
Training PPTTraining PPT
Training PPT
 
ADEN Monthly review meeting May 2024.pptx
ADEN Monthly review meeting May 2024.pptxADEN Monthly review meeting May 2024.pptx
ADEN Monthly review meeting May 2024.pptx
 
3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf
 
Canadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 PresentationCanadian Coast Guard: Mari-Tech 2017 Presentation
Canadian Coast Guard: Mari-Tech 2017 Presentation
 
Development of Safety Case for the Wolsong LILW disposal facility in Korea
Development of Safety Case for the Wolsong LILW disposal facility in KoreaDevelopment of Safety Case for the Wolsong LILW disposal facility in Korea
Development of Safety Case for the Wolsong LILW disposal facility in Korea
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Aegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense PresentationAegis Ballistic Missle Defense Presentation
Aegis Ballistic Missle Defense Presentation
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
 
Abdelraheim Mohamed-1
Abdelraheim Mohamed-1Abdelraheim Mohamed-1
Abdelraheim Mohamed-1
 
IGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.pptIGARSS 2011 pt slides_7 28 2011.ppt
IGARSS 2011 pt slides_7 28 2011.ppt
 
Presentation on steel
Presentation on steel Presentation on steel
Presentation on steel
 
TfI Marine - Mooring Load Reduction - FOWT 2018
TfI Marine - Mooring Load Reduction - FOWT 2018TfI Marine - Mooring Load Reduction - FOWT 2018
TfI Marine - Mooring Load Reduction - FOWT 2018
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
 
Valdicotry final final 10.00 20 dec
Valdicotry final final  10.00 20 decValdicotry final final  10.00 20 dec
Valdicotry final final 10.00 20 dec
 
Retaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering ReportRetaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering Report
 
DESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRO
DESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRODESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRO
DESIGNING FRAMED STRUCTURE IN ETABS AND STAAD PRO
 
2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...2011 deep research report on global and china silicon thin film solar cell in...
2011 deep research report on global and china silicon thin film solar cell in...
 

Recently uploaded

Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
ramrag33
 

Recently uploaded (20)

Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
 

JIP35 - Offshore Strutures Specifications Task Force - Phase 2 (August2020)

  • 2. 2 Standardisation of Offshore Structures Specifications • An IOGP initiative, funded by JIP35, following the successful IOGP JIP33 initiative on the standardisation of equipment specifications • 10 Contributing Operators: BP, Chevron, ENI, Equinor, ExxonMobil, INPEX, Shell, Suncor, Total, Woodside making up the Offshore Structures Specifications Task Force, under the Offshore Structures Subcommittee • Objective: Selection of an agreed base standard; using these operators’ specifications as input, identify and agree minimum, essential common requirements, documenting these in jointly approved supplementary specifications, published by IOGP • 12 Teams covering: Concrete, General Requirements, Metocean, Stationkeeping, Marine Soil Investigations, Seismic, Foundations, Weight Management, Topsides, Fixed Jackets, Floating Structures, Arctic • Task Force Chairman: Simen Moxnes of Equinor; Task Force Vice-Chair: Philip Smedley of BP
  • 3. 3 Topic (IOGP Supplementary Spec) Selected Base Standard General Requirements (S-631-01) ISO 19900 Metocean (S-631-09) ISO 19901-1 (API 2MET is a modified adoption) Seismic (S-631-08) ISO 19901-2 (API RP 2EQ is a modified adoption) Topsides (S-631-04) ISO 19901-3: 2014 (API RP 2TOP is near equivalent) Foundations (S-631-05) ISO 19901-4 (API 2GEO is a modified adoption) Weight Management (S-631-06) ISO 19901-5 Stationkeeping (S-631-07) ISO 19901-7 (API RP 2SK is near equivalent) Marine Soil Invest. (S-631-10) ISO 19901-8 Fixed Jacket (S-631-11) ISO 19902 (API RP 2A (LRFD) is a modified adoption) Concrete (S-631-03) ISO 19903 Arctic (S-631-02) ISO 19906 (API RP 2N is a modified adoption) Floating N/A – Position paper issued. Phase 3 Scope Selected Base Standards
  • 4. 4 Topic (IOGP Supplementary Specification) Total Company Requirements Minimum Essential Requirements General Reqs (S-631-01) – Published 44 5 Concrete (S-631-03) – Published 216 43 Seismic (S-631-08) – Published 255 5 Arctic (S-631-02) – Published 170 0 Marine Soil Invest. (S-631-10) – Published 883 90 Stationkeeping (S-631-07) – Published 1111 53 Topsides (S-631-04) – Published 1936 60 Fixed Jacket (S-631-11) – Publish September 2020 1931 ~90 Consolidation and Reduction of Company Requirements
  • 5. 5 Available on IOGP website – www.iogp.org/jip35 Publications: Supplementary Specifications
  • 6. 6 Topic Status Weight Management (S-631-06) Published Worked directly through ISO TC 67/SC 7/WG 6 Metocean (S-631-09) Publish January 2021* Worked directly through ISO TC 67/SC 7/WG 3. DIS ballot draft approximately December 2020 Foundations (S-631-05) Publish March 2021* Worked directly through ISO TC 67/SC 7/WG 10. DIS ballot draft approximately February 2021 Floating Systems Brief position paper issued by Task Force. Further work is planned during Phase 3 Other Topics * Publication of IOGP Specification, referencing the ISO DIS (publicly available from ISO) and no supplementary requirements
  • 7. 7 Published Supplementary Specifications: Pre-JIP35 vs Minimum Essential Requirements
  • 8. 8 Published Supplementary Specifications: Pre-JIP35 vs Minimum Essential Requirements Operator:
  • 9. 9 Further Opportunities • Offer these supplementary requirements for incorporation into the ISO base standards at next revision/opportunity • Downgrading of company requirements to recommendations or guidelines • Further alignment between the ISO and API standards • Improved technical writing of these standards and company specifications • Phase 3 scope to be initiated in October 2020
  • 10. 10 For more information please contact: www.iogp.org Registered Office City Tower Level 14 40 Basinghall Street London EC2V 5DE United Kingdom +44 (0)20 3763 9700 reception@iogp.org Houston Office 19219 Katy Freeway Suite 175 Houston, TX 77094 United States +1 (713) 261 0411 reception@iogp.org Brussels Office Avenue de Tervuren 188A B-1150 Brussels Belgium +32 (0)2 790 7762 eu-reception@iogp.org Simen Moxnes, Equinor smox@equinor.com Philip Smedley, BP philip.smedley@uk.bp.com Diane Gonsalves, IOGP dg@iogp.org

Editor's Notes

  1. Draft as number of intended company requirements are not finalised as yet
  2. Draft as number of intended company requirements are not finalised as yet