SlideShare a Scribd company logo
1 of 31
PUNCH POINTS



MECHANICAL &
CONSTRUCTION
No approach provided for Steam coiled air pre-heater(SCAPH)
              valve Operation & maintenance.




                                                  Location-06 mts.
No approach provided for Main steam stop valve (MSSV)
              Operation & maintenance.




                                           Location-65 mts.
No approach provided for Eco to drum feed line vent valve
               Operation & maintenance




                                                   Location-57 mts.
Hanger rod found bent of attemperation line




                                      Location- 50 mts.
Hand hole door beside soot blower found damaged.




                                          Location RHS-54 mt.
Manhole door in 1st pass fouling with junction box.




                                          Location RHS-60 mt.
Manual handle of Eco feed regulation valve got damaged. Need to be
                             replace.




                                          Location LHS-34 mt.
Construction Rod found welded in hand railings.




                                           Many locations
Obstruction due to permanent supported beam on the walk way.




                                          Location RHS-50 mt.
ESP TOP FLOOR APPROACH AREA




The staircase is very steep
and also the width of
stairs is very less.
TRANSFER TOWER 02

Rail track foundation found in damaged condition for 4A conveyor.
TRACK HOPPER




Huge seepage in
underground walls of
Track Hopper
TRACK HOPPER




Huge seepage in
underground walls of
Track Hopper
TRANSFER TOWER - 01




Underground water
coming with very high
speed
TRANSFER TOWER - 02




Seepage observed at
underground walls
Some Other Punch Points




Sr.N
 o.                                              Main plant
 1     mill MDV cylinders are not accessible
 2     classifier vane adjusting handle is missing
 3     seal air line rubber bellow proper clamping not done
 4     Mill fire fighting water line is not provided.
 5     FD Fan interconnect damper link is not straight
 6     Fan Hoist not yet installed
 7     PA Fan B metallic bellow damage
 8     APH B side flue gas bellow damage
PUNCH POINTS



 ELCTRICAL
Ground floor MCCs - MCCs near to water or steam line to be covered with
 fire proof sheets all around to avoid entering of water/steam in case of
                                  leakage.
GT - Over head DM Tank is close to 220 KV Over Head Line. Near
 Unit #2 GT gantry, And the ladder for tank is provided towards
                       Over head Lines.
Generator NGT Panel -Pipe Line restricts complete opening of NGT
                             panel.
JOP Motor -Motor Terminal Box not sealed properly
Local Panel - LCS Panel No Identification.
TT3 Cable Rack - Cable Racks are uncovered. It is near to 540 coal
            yard. No fire retardant coating on cable.
220 KV SWYD - Gravels not laid in charged Switchyard.
CEP Motor - Approach to work at Motor JB not available
M-BFP - Cooling water line is so close to motor power JB.
                Maintenance is difficult.
PUNCH POINTS



    C&I
C & I Punch Points

Sr.No
     .   C&I Main plant
  1      Fan brg vib probes are inside the casing & not accessible from outside. Difficult to maintain in running condition.
  2      Sipos actuators are given without display there for calibration & troubleshooting of these actuators are not possible
  3      Gun Sov Box is not accessible also the box door is fouling with scanners so can't be opened.
  5      Down comer and other LK type actuators are not in healthy condition (oil leakage/handle/wheel missing/rusting etc)
         Instrument air header drain at lowest point with drain valve/actuator required.
  6            Interlock of opening this drain with boiler mft has to be made.
         Mill instruments (flow/pressure/DP etc) impulse piping is too long. Impulse tube dia is also less for the application.
  7            This requires an automatic purging solution
  8      Sealing for the instruments cables coming out of mill through seal air header is not proper
  9      Mill i/l gates are not accessible also there control cabs.
 10      mill inert steam manual isolation and actuators are not accessible
 11      Tech doc clause 4.10.00 violated in many locations instrument rack. Instrument readings not possible to read out.
 12      APH hopper ash vessel temp measurement required
 13      APH/economizer ash vessel dome valve position feedback required
 14      cold pa actuator access not available
 15      scaph actuator access not available
 16      TD BFP barring gear position indication is not available
 17      actuators at aux stm header installed too congested, can be rotated for easy access and O&M
 18      Foxboro graphics are not good (congested/parameters overlapping each other and lines etc)
 19      Engineering station keyboards are normal key board, required is an engineering keyboard.
 20      Keyboards are not configurable
21   triple module redundancy not ensured in triconex system
22   ETS system does not incorporates all the trip logics such as ms temp low/high/rate of tem drop etc
23   boiler trips on turbine trip if load is >30 %
24   exchange duty room in CCR is not ready
25   Fire detection and alarm system is not ready

     Grid grounding is used. Electrical and c&I grounding are common. Grounding rods are made of MS.
26   It’s impossible to maintain grounding grid.
27   DCS operating system must be upgraded from ICC to IACC
     All the operating system (Dell PCs are registered in the name of Foxboro, registration transfer to balco is
28   required)
29   All the operating machines & HMI must be industrial grade. Certification for the same is required.
30   Spray control valve not yet installed.
31   spray flow meter not yet installed
32   pressure and temp transmitter required at each spray line (SH I/SH II/ SH III/RH)
33   Flow transmitter at BFP R/C line is required.
34   horizontally installed actuators need support to handle their weight
35   I&C lab is not ready.
36   Drain line and funnel to collect drain bellow every instrument rack is required.
37   temp probe at vp i/l is required
     TD BFP Lube oil station instrument require improvement (sleeve damage/panel door
38       missing/instruments missing)
     Many places at high temp line rotor actuator used. rotor actuator are failure at high temp line.(for
39      example at hph emg drain)
     Many places normal cable used at high temp area without sleeve, may get damage.(fo e.g steam line
40      drain pot level switch.

41   bfp brg temp local indication not given
     Aux steam header actuator/valve placed very near and the location is very congested. Can be rotated
42       for easy access.

43   All hydrogen system panel need cleaning and internal lighting.

44   All PCs language is in Chinese, need english language.

45   MCS logic not yet completed

46   Barring gear is not having any soft starter

47   barring Speed and current didn't came in deh graphics during trial run

48   Cross ferruling not done.

49   JOP pressure Transmitter required

More Related Content

What's hot

Industrial Training Report on Direct Reduced Iron Plant(DRI)
Industrial Training Report on Direct Reduced Iron Plant(DRI)Industrial Training Report on Direct Reduced Iron Plant(DRI)
Industrial Training Report on Direct Reduced Iron Plant(DRI)Shani Kumar Singh
 
Pr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedurePr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedureRagul Selvam
 
Dry Gas Seal Presentation
Dry Gas Seal PresentationDry Gas Seal Presentation
Dry Gas Seal PresentationIONEL DUTU
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingAbhishek Srivastav
 
Design Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage TanksDesign Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage TanksKushagra Saxena
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valvesAmol Dudhate
 
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...Mohit Dhull
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEManohar Tatwawadi
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Control room operator
Control room operatorControl room operator
Control room operatoralalawi123
 
HTRI PRESENTATION.pdf
HTRI PRESENTATION.pdfHTRI PRESENTATION.pdf
HTRI PRESENTATION.pdfssuserbd5784
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheaterHOANG VAN DUC
 
Maintenance of distillation column asmita
Maintenance of distillation column asmitaMaintenance of distillation column asmita
Maintenance of distillation column asmitaAsmita Mishra
 

What's hot (20)

Standard practices r9
Standard practices r9Standard practices r9
Standard practices r9
 
Industrial Training Report on Direct Reduced Iron Plant(DRI)
Industrial Training Report on Direct Reduced Iron Plant(DRI)Industrial Training Report on Direct Reduced Iron Plant(DRI)
Industrial Training Report on Direct Reduced Iron Plant(DRI)
 
Refinery basics
Refinery basicsRefinery basics
Refinery basics
 
Project ppt
Project pptProject ppt
Project ppt
 
Pr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedurePr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedure
 
Dry Gas Seal Presentation
Dry Gas Seal PresentationDry Gas Seal Presentation
Dry Gas Seal Presentation
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and Working
 
Design Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage TanksDesign Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
 
API STD 521
API STD 521API STD 521
API STD 521
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINE
 
Heat balance diagram
Heat balance diagramHeat balance diagram
Heat balance diagram
 
Piping ppt1
Piping ppt1Piping ppt1
Piping ppt1
 
Piping presentation (master)
Piping presentation (master)Piping presentation (master)
Piping presentation (master)
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Control room operator
Control room operatorControl room operator
Control room operator
 
HTRI PRESENTATION.pdf
HTRI PRESENTATION.pdfHTRI PRESENTATION.pdf
HTRI PRESENTATION.pdf
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheater
 
Maintenance of distillation column asmita
Maintenance of distillation column asmitaMaintenance of distillation column asmita
Maintenance of distillation column asmita
 

Viewers also liked

Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)CHIDAMBARAM S
 
Power point c kummelstedt 4-14-12
Power point   c kummelstedt 4-14-12Power point   c kummelstedt 4-14-12
Power point c kummelstedt 4-14-12rbirdsongslideshare
 
Thermodynamic Design of a Fire-Tube Steam Boiler
Thermodynamic Design of a Fire-Tube Steam BoilerThermodynamic Design of a Fire-Tube Steam Boiler
Thermodynamic Design of a Fire-Tube Steam BoilerJohn Walter
 
Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Hammad Akber
 
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTGaurav Rai
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERGopi Chand
 
Furnaces and fired heaters
Furnaces and fired heatersFurnaces and fired heaters
Furnaces and fired heatersHiren Shah
 
Power plant instrumentation
Power plant instrumentationPower plant instrumentation
Power plant instrumentationSakshi Vashist
 
furnace design
 furnace design  furnace design
furnace design Atal Khan
 
Selection and Design of Condensers
Selection and Design of CondensersSelection and Design of Condensers
Selection and Design of CondensersGerard B. Hawkins
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsGerard B. Hawkins
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plantsSHIVAJI CHOUDHURY
 
Thermal plant instrumentation and control
Thermal plant instrumentation and controlThermal plant instrumentation and control
Thermal plant instrumentation and controlShilpa Shukla
 
Shell and tube heat exchanger design
Shell and tube heat exchanger designShell and tube heat exchanger design
Shell and tube heat exchanger designhossie
 

Viewers also liked (20)

Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)Chidambaram_QAQC(Piping)
Chidambaram_QAQC(Piping)
 
Power point c kummelstedt 4-14-12
Power point   c kummelstedt 4-14-12Power point   c kummelstedt 4-14-12
Power point c kummelstedt 4-14-12
 
Si412c lesson9
Si412c lesson9Si412c lesson9
Si412c lesson9
 
Thermodynamic Design of a Fire-Tube Steam Boiler
Thermodynamic Design of a Fire-Tube Steam BoilerThermodynamic Design of a Fire-Tube Steam Boiler
Thermodynamic Design of a Fire-Tube Steam Boiler
 
Air heater
Air heaterAir heater
Air heater
 
Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)
 
Boiler equipments
Boiler equipmentsBoiler equipments
Boiler equipments
 
Condenser design
Condenser designCondenser design
Condenser design
 
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
 
Industrial Furnace Types
Industrial Furnace TypesIndustrial Furnace Types
Industrial Furnace Types
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZER
 
Furnaces and fired heaters
Furnaces and fired heatersFurnaces and fired heaters
Furnaces and fired heaters
 
Power plant instrumentation
Power plant instrumentationPower plant instrumentation
Power plant instrumentation
 
furnace design
 furnace design  furnace design
furnace design
 
Furnaces
FurnacesFurnaces
Furnaces
 
Selection and Design of Condensers
Selection and Design of CondensersSelection and Design of Condensers
Selection and Design of Condensers
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia Plants
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 
Thermal plant instrumentation and control
Thermal plant instrumentation and controlThermal plant instrumentation and control
Thermal plant instrumentation and control
 
Shell and tube heat exchanger design
Shell and tube heat exchanger designShell and tube heat exchanger design
Shell and tube heat exchanger design
 

Similar to Punch point

Steam Blowing by Ankit Goyal
Steam Blowing by Ankit GoyalSteam Blowing by Ankit Goyal
Steam Blowing by Ankit GoyalAnkit Goyal
 
Steam blowing stages before turbine rolling
Steam blowing stages before turbine rollingSteam blowing stages before turbine rolling
Steam blowing stages before turbine rollingabhinav kumar
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Nicholas Naing
 
MEP JUGAADS.pptx
MEP JUGAADS.pptxMEP JUGAADS.pptx
MEP JUGAADS.pptxSHANDEEP1
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.pptssuser9e9be71
 
TA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulTA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulMuhammad Asad Ullah
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.Sheikh Nazmul Islam
 
Hazard operability study - in Industires and plant
Hazard operability study - in Industires and plantHazard operability study - in Industires and plant
Hazard operability study - in Industires and plantJayaKarthic1
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Ashutosh Sachan
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopalPRAVEENKUMARSINGH87
 

Similar to Punch point (20)

Steam Blowing by Ankit Goyal
Steam Blowing by Ankit GoyalSteam Blowing by Ankit Goyal
Steam Blowing by Ankit Goyal
 
Steam blowing stages before turbine rolling
Steam blowing stages before turbine rollingSteam blowing stages before turbine rolling
Steam blowing stages before turbine rolling
 
BP[1] Copy
BP[1] CopyBP[1] Copy
BP[1] Copy
 
2004 0930 Ca
2004 0930 Ca2004 0930 Ca
2004 0930 Ca
 
Presentation-MB-1
Presentation-MB-1Presentation-MB-1
Presentation-MB-1
 
Presentation-MB-II
Presentation-MB-IIPresentation-MB-II
Presentation-MB-II
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
MEP JUGAADS.pptx
MEP JUGAADS.pptxMEP JUGAADS.pptx
MEP JUGAADS.pptx
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
 
ELECTRICAL SYSTEMS
ELECTRICAL SYSTEMSELECTRICAL SYSTEMS
ELECTRICAL SYSTEMS
 
TA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulTA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation Overhaul
 
steam_blowing.pdf
steam_blowing.pdfsteam_blowing.pdf
steam_blowing.pdf
 
Rain Director Install LQ
Rain Director Install LQRain Director Install LQ
Rain Director Install LQ
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 
HAZOP.ppt
HAZOP.pptHAZOP.ppt
HAZOP.ppt
 
Hazard operability study - in Industires and plant
Hazard operability study - in Industires and plantHazard operability study - in Industires and plant
Hazard operability study - in Industires and plant
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
 
Accident Analysis
Accident AnalysisAccident Analysis
Accident Analysis
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
 
Executive summary
Executive summaryExecutive summary
Executive summary
 

Punch point

  • 2. No approach provided for Steam coiled air pre-heater(SCAPH) valve Operation & maintenance. Location-06 mts.
  • 3. No approach provided for Main steam stop valve (MSSV) Operation & maintenance. Location-65 mts.
  • 4. No approach provided for Eco to drum feed line vent valve Operation & maintenance Location-57 mts.
  • 5. Hanger rod found bent of attemperation line Location- 50 mts.
  • 6. Hand hole door beside soot blower found damaged. Location RHS-54 mt.
  • 7. Manhole door in 1st pass fouling with junction box. Location RHS-60 mt.
  • 8. Manual handle of Eco feed regulation valve got damaged. Need to be replace. Location LHS-34 mt.
  • 9. Construction Rod found welded in hand railings. Many locations
  • 10. Obstruction due to permanent supported beam on the walk way. Location RHS-50 mt.
  • 11. ESP TOP FLOOR APPROACH AREA The staircase is very steep and also the width of stairs is very less.
  • 12. TRANSFER TOWER 02 Rail track foundation found in damaged condition for 4A conveyor.
  • 13. TRACK HOPPER Huge seepage in underground walls of Track Hopper
  • 14. TRACK HOPPER Huge seepage in underground walls of Track Hopper
  • 15. TRANSFER TOWER - 01 Underground water coming with very high speed
  • 16. TRANSFER TOWER - 02 Seepage observed at underground walls
  • 17. Some Other Punch Points Sr.N o. Main plant 1 mill MDV cylinders are not accessible 2 classifier vane adjusting handle is missing 3 seal air line rubber bellow proper clamping not done 4 Mill fire fighting water line is not provided. 5 FD Fan interconnect damper link is not straight 6 Fan Hoist not yet installed 7 PA Fan B metallic bellow damage 8 APH B side flue gas bellow damage
  • 19. Ground floor MCCs - MCCs near to water or steam line to be covered with fire proof sheets all around to avoid entering of water/steam in case of leakage.
  • 20. GT - Over head DM Tank is close to 220 KV Over Head Line. Near Unit #2 GT gantry, And the ladder for tank is provided towards Over head Lines.
  • 21. Generator NGT Panel -Pipe Line restricts complete opening of NGT panel.
  • 22. JOP Motor -Motor Terminal Box not sealed properly
  • 23. Local Panel - LCS Panel No Identification.
  • 24. TT3 Cable Rack - Cable Racks are uncovered. It is near to 540 coal yard. No fire retardant coating on cable.
  • 25. 220 KV SWYD - Gravels not laid in charged Switchyard.
  • 26. CEP Motor - Approach to work at Motor JB not available
  • 27. M-BFP - Cooling water line is so close to motor power JB. Maintenance is difficult.
  • 29. C & I Punch Points Sr.No . C&I Main plant 1 Fan brg vib probes are inside the casing & not accessible from outside. Difficult to maintain in running condition. 2 Sipos actuators are given without display there for calibration & troubleshooting of these actuators are not possible 3 Gun Sov Box is not accessible also the box door is fouling with scanners so can't be opened. 5 Down comer and other LK type actuators are not in healthy condition (oil leakage/handle/wheel missing/rusting etc) Instrument air header drain at lowest point with drain valve/actuator required. 6 Interlock of opening this drain with boiler mft has to be made. Mill instruments (flow/pressure/DP etc) impulse piping is too long. Impulse tube dia is also less for the application. 7 This requires an automatic purging solution 8 Sealing for the instruments cables coming out of mill through seal air header is not proper 9 Mill i/l gates are not accessible also there control cabs. 10 mill inert steam manual isolation and actuators are not accessible 11 Tech doc clause 4.10.00 violated in many locations instrument rack. Instrument readings not possible to read out. 12 APH hopper ash vessel temp measurement required 13 APH/economizer ash vessel dome valve position feedback required 14 cold pa actuator access not available 15 scaph actuator access not available 16 TD BFP barring gear position indication is not available 17 actuators at aux stm header installed too congested, can be rotated for easy access and O&M 18 Foxboro graphics are not good (congested/parameters overlapping each other and lines etc) 19 Engineering station keyboards are normal key board, required is an engineering keyboard. 20 Keyboards are not configurable
  • 30. 21 triple module redundancy not ensured in triconex system 22 ETS system does not incorporates all the trip logics such as ms temp low/high/rate of tem drop etc 23 boiler trips on turbine trip if load is >30 % 24 exchange duty room in CCR is not ready 25 Fire detection and alarm system is not ready Grid grounding is used. Electrical and c&I grounding are common. Grounding rods are made of MS. 26 It’s impossible to maintain grounding grid. 27 DCS operating system must be upgraded from ICC to IACC All the operating system (Dell PCs are registered in the name of Foxboro, registration transfer to balco is 28 required) 29 All the operating machines & HMI must be industrial grade. Certification for the same is required. 30 Spray control valve not yet installed. 31 spray flow meter not yet installed 32 pressure and temp transmitter required at each spray line (SH I/SH II/ SH III/RH) 33 Flow transmitter at BFP R/C line is required. 34 horizontally installed actuators need support to handle their weight 35 I&C lab is not ready. 36 Drain line and funnel to collect drain bellow every instrument rack is required.
  • 31. 37 temp probe at vp i/l is required TD BFP Lube oil station instrument require improvement (sleeve damage/panel door 38 missing/instruments missing) Many places at high temp line rotor actuator used. rotor actuator are failure at high temp line.(for 39 example at hph emg drain) Many places normal cable used at high temp area without sleeve, may get damage.(fo e.g steam line 40 drain pot level switch. 41 bfp brg temp local indication not given Aux steam header actuator/valve placed very near and the location is very congested. Can be rotated 42 for easy access. 43 All hydrogen system panel need cleaning and internal lighting. 44 All PCs language is in Chinese, need english language. 45 MCS logic not yet completed 46 Barring gear is not having any soft starter 47 barring Speed and current didn't came in deh graphics during trial run 48 Cross ferruling not done. 49 JOP pressure Transmitter required