The purpose of steam line blowing is to remove pipe slag, weld bead deposits and other foreign
material from the main and reheat steam systems prior to turbine operation. The cleaning is
accomplished by subjecting the piping systems to heating, blowing steam and cooling cycles in
sufficient number and duration until clean steam is obtained.
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
steam_blowing.pdf
1. OBJECTIVE AND PRINCIPLE OF STEAM BLOWING
STEPS INVOLVED IN STEAM BLOWING ( WITH PATH DIAGRAM)
PROCEDURE OF PRE-STEP STEAM BLOWING
PROCEDURE OF MAIN STEP STEAM BLOWING
COMPLETION CRITERIAN OF STEAM BLOWING
PHOTOS OF SIPAT U # 1 STEAM BLOWING
STEAM BOWING PROCEDURE OF STAGE # 1
2. OBJECTIVE
The purpose of steam line blowing is to remove pipe slag, weld bead deposits and other foreign
material from the main and reheat steam systems prior to turbine operation. The cleaning is
accomplished by subjecting the piping systems to heating, blowing steam and cooling cycles in
sufficient number and duration until clean steam is obtained.
PRINCIPLE OF STEAM BLOWING
To ensure that sufficient cleaning forces are applied to the piping, the steam momentum
during the steam blow must be equal to or greater than the steam momentum at normal
maximum load condition. The Cleaning Force Ratio (CFR) is typically used to evaluate if
satisfactory blow conditions are obtained.
CFR = ( vb / vmcr ) x ( Fb / Fmcr )2 > 1.00
Where vb = specific volume at steam blowing condition
vmcr = specific volume at maximum load condition
Fb = steam mass flow rate at blowing condition
Fmcr = steam mass flow rate at maximum load condition
3. STEPS OF STEAM BLOWING
PRE STEP # 1 : Separator – SH - main steam line- Temporary pipe - martyr valve - tailpipe to
atmosphere.
PRE STEP # 2 : Separator - main steam line- HPBP – CRH Line – CRH Isolator - martyr valve -
tailpipe to atmosphere.
MAIN STEP # 1
: Separator-SH-main steam line-MSV-temporary pipe with martyr-valveNRV-CRH-
RH-HRH-LP Bypass valve-temporary pipe-tailpipe to atmosphere
MAIN STEP # 2
: Separator-SH-main steam line-MSV-temporary pipe with martyr-valve-NRV-CRH-RH-
HRH-IPT Stop Valve-temporary pipe-target-tailpipe to atmosphere
4. PRE STEP
PROCEDURE
Start the Boiler as per normal working principle
Raise the Seaprator Pressure to 40 Ksc
At 40 Ksc Shut all Fuel Burners in service
Stop The BRP Pump
Open The Martyr Valve
Let the pressure fall to 20 Ksc
Close The Martyr Valve
COMPLETION CRITERIA
Clean White Smoke to be observed at the Exhaust of Tail Pipe
NOTE :
CFR < 1.0 AND NO TARGET PLATE IS TO BE USED DURING THIS STEP
First Blow at every Step to be given at much reduced pressure to check the temporary piping
healthiness
5. MAIN STEP
PROCEDURE
Start the Boiler as per normal working principle
Raise the Seaprator Pressure to 80 Ksc ( SH O/L Temp : 370
o
C)
At 80 Ksc Shut all Fuel Burners in service
Stop The BRP Pump
Open The Martyr Valve
Let the pressure fall to 40 Ksc
Close The Martyr Valve
Maintain the Separator Storage Tank Level
Light The Boiler For Next Blowing
NOTE :
CFR > 1.0 AND NO TARGET PLATE IS TO BE USED DURING THIS STEP
First Blow at every Step to be given at much reduced pressure to check the temporary piping
healthiness
6. COMPLETION CRITERIAN
No impacts with an diameter larger than 1 mm
Not more than 4 impacts with an diameter larger than 0.5 mm
Not more than 10 impacts with an diameter of 0.2 to 0.5 mm
A Target Plate is used to access the impacts of particle during steam Blowing. Steam Blowing
will be declared when
7.
8.
9.
10.
11.
12.
13. Final
SH
Final
SH
ESV
ESV
Martyr V/v
Martyr V/v
HP
Bypass
CRH Line
CRH NRV CRH Drain
Pot
RH O/L Hdr
HRH Line
MSV
LP
Bypass
IP SV
Open Close Martyr Valve
Steam Blow Line
Temporary Line
Pre Step # 1 : MS Line Steam Blowing
Final
SH
Final
SH
ESV
ESV
Martyr V/v
Martyr V/v
HP
Bypass
MS Line
CRH NRV CRH Drain
Pot
RH O/L Hdr
HRH Line
MSV
MSV
LP
Bypass
IP SV
Open Close Martyr Valve
Steam Blow Line
Temporary Line
Pre Step # 1 : MS Line Steam Blowing
LPBP V/ v
14. Final
SH
Final
SH
ESV
ESV
Martyr V/v
Martyr V/v
HP
Bypass
MS Line
CRH Line
CRH NRV CRH Drain
Pot
RH O/L Hdr
HRH Line
MSV
MSV
LP
Bypass
IP SV
Open Close Martyr Valve
Steam Blow Line
Temporary Line
Pre Step # 2 : HPBP / CRH Line Steam Blowing
17. BRP
TO DRAIN HDR
FROM FEED WATER
BLR FILL PUMP
CHEM CLEANING SYS
CRH DRAIN LINE
SH COMMN DRAIN LINE
SH D.S.H. No1
ECO MIXING LINK
STORAGE TANK
MIXING PIECE
FLASH TANK
WR
ZR
WATER CIRCULATION SYSTEM
Sample Cooler
Blow Down Tan
Click
Here
TO ECO
To
Separator
From
Separator
From
Separator