1. CONSTRUCTION OF PRECAST ELEMEMENTS
MR. GOPINATH B
PROJECT COORDINATOR
ALALI ENGINEERING COMPANY
DOHA, STATE OF QATAR
***
2. Hearty Welcome to the Professors for the
1st RAC meeting Dt. 29.12.22
2
3. PRECAST CONSTRUCTION
3
Precast Construction
Precast Concrete is a construction product produced by casting concrete in a reusable “form” which is then cured
in a controlled environment, transported to the construction site and lifted into place. In contrast, standard
concrete is poured into site-specific forms and cured on site.
It is also known as “prefabricated”
4. CONSTRUCTION OF PRECAST ELEMENTS
4
Precast Concrete Product
Nowadays many constructions are building through precast concrete or prefabricated concrete lets discuss the points
one by one.
*Precast concrete building components and site amenities
*Earth retaining systems (Temporary excavation support)
*Sanitary and Stormwater management products
*Precast concrete transportation products
*Marine Products
*Pre-stressed / Structural Products
5. Review of Literatures
5
Civil Engineers have only used those products which are economic and which has more advantages so let’s discuss the
advantages and disadvantages of Precast Construction or Precast Products
Advantages of Precast Construction
*Concrete is cast off-site
*Identical forms can be used several times
*Batter quality control
*Control on curing
*Unaffected by weather, during casting
*Construction in less time
*Low cost (Economical)
*Waste materials can be used waste material may be ( fly ash, slag, asbestos, and compost)
*Fire resistant
*Can avoid air born pollution on site like dusting.
6. Summary of Review of Literatures
6
From the above literature study, It is evident that many researchers
had shown keen interest to treat the construction & demolition
waste with other combined form bottom coal ash , lime powder,
metakaoline, along with the recycled aggregates and broken tiles
etc.,
9. COURSE WORKS IDENTIFIED
S.No Course Code Name of the course Credits Online/Offline
1. RME7001 Research Methodology 4 Offline
2. RME7002 Research and Publication
Ethics
2 Offline
3. CIV18R6107 Characteristics of
construction materials
3 Offline
4. CIV18R6108 Sustainable Building
Materials
3 Offline
10. WORK PLAN (Tentative Time line to complete the research
S.N Work Plan SEM 1 SEM 2 SEM 3 SEM 4 SEM 5 SEM 6
1 Course work & Literature
review
2 Course work and Objective 1
3 Objective 2(Experiment)
4 Objective 3 & 4(Journal)
5 Synapsis & Thesis preparation
6 Thesis Preparations