Quality Month: Oct 2011                                          Kaizen No.                       Page No.:
                                                            KAIZEN REPORT
Company logo                  Company Name: Emirates Aluminium                                                                     Department: Cast House                                           Section/Process: Sheet Ingot / Cast House
                                                                                                                                                                                                    Maintenance

Improvement Title:            SERMAS SAW STRAPPING POSITION MODIFICATION
Category: [x ] Quality improvement [x ] Health & Safety [ ] Environment [ x ] Productivity [ ] Office processes [ ] Product design improvement                                                                         [ ] Service improvement
             Before Situation                           Root Cause Analysis                      Improvement Measures                                                                                                  After Situation
Automatic strapping of sheet ingots less than                      It cannot meet customer requirement                          A cross-functional team from Cast House was                        - This Kaizen has helped in eliminated in lots of
4200mm was not possible as per customer                            because the runner position falls exactly                    formed which involving Cast House                                  manual work by Operators.
requirement.                                                       same as of support.                                          Maintenance Sections and Sheet Ingot                               - 08 FTEs were made available for other
From Operations, 02 FTEs per shift were                            Manual strapping require lot of extra labour                 Production.                                                        important tasks in Cast House, so savings of
unnecessarily dedicated for this manual task and                   as operator has to pick it from strapping                    The team brainstormed the problem and came                         FTEs per year + savings of Maintenance Man
05 Man days of Maintenance were also wasted                        machine and put it in manual strapping area                  up with the solution that “by reducing the                         Days in one year = 0.5 Million AED (Estimated).
per month.                                                         where operator does manual strapping with                    distance between two supports and modifying                        - Safety risks were eliminated fully after this
Manual handling and rework posses high safety                      no proper facility (again high risk activity)                the control logic we shall be able to                              design change.
risks and creates unsafe work condition because                    and after strapping take it back to stock                    accommodate 4000mm sheet ingot and strap it
                                                                   yard.                                                        as per customer requirement.”                                      - Additional Metal movement due to incorrect
of 50T forklift movement (biggest forklift in                                                                                                                                                      auto strapping of smaller length sheet ingots has
EMAL).                                                             Due to slow manual operation there used to                   To implement solution, Cast House obtained                         been eliminated too.
1 Medical Treatment incident occurred due to                       be pile up of sheet ingots on the shop floor                 design drawing from OEM.
                                                                   causing unsafe work environment.                                                                                                - Fork Lift usage was eliminated hence reduction
this manual strapping and one operator suffered                                                                                 Implementation was done totally in-house by                        of Fuel and availability of Fork lift for other tasks.
a cut in his left arm when he was cutting the                                                                                   Cast House maintenance team with Internal                          Quality issues arising from forklift handling were
metal strap of one sheet.                                                                                                       labour COST!                                                       eliminated also.
Hazards creating potential for injuries:                                                                                        Complete automation and control logic part was                     - Zero Cost on Project as it was done IN-
•       Handling of heavy wooden runners                                                                                        designed and implemented in-house by Cast                          HOUSE, whereas if OEM could have done it
    repeatedly– muscular injury and forced                                                                                      House maintenance team.                                            then it would have costed a huge amount of
    postures                                                                                                                                                                                       money to EMAL. ($$)
•       Positioning of runners underneath ingot in                                                                                                                                                 - Quality of stacking starts meeting customer
    conjunction of 50mt FLT operation – crush                                                                                                                                                      requirements, and no complaint related to
    injury and forced postures.                                                                                                                                                                    Stacking were raised by Customer.
•       Handling and inserting steel banding                                                                                                                                                       - Demurrage Costs related to shipping delays
    under runner and over ingot – hand pinch /                                                                                                                                                     was reduced because of strapping issues were
    laceration injury                                                                                                                                                                              resolved and now the Sheet Ingot are not
•       Handling of heavy manual banding                                                                                                                                                           delayed for shipment.
    machine and air hose– muscular injury,                                                                                                                                                         - This Kaizen has eliminates the following
    tripping hazard and muscular-skeletal                                                                                                                                                          wastes:
    disorders.                                                                                                                                                                                     - Inventory            - Motion
•       Insertion of band wire and positioning of                                                                                                                                                  - Waiting             - People
    banding machine – hand pinch / injury
                                                                                                                                                                                                   - Over processing - Transportation
•       Aerosol Cans in Operational areas –
    molten metal explosion hazard

                                                        Benefits:                                                                                                                       Participation
Increased Safety, Zero Incident due to this improvement, No. of FTEs were made available for other tasks, Quality, No                                           Rene Flores, Shailendra Choudhari, Heinrich Botha, Amit Parikh, …
Demurrage Cost due to this problem, Waste Elimination, Savings of 0,5 Million AED ++
Standardization: Similar exercise has led to bring more improvements related to Rework Reduction in similar production line.    Horizontal Deployment Opportunities (Replication): systems are getting modified to achieve lower manual work esp. where
                                                                                                                                safety of Employees is at risk.
Single Point Lesson: Innovative Systems Design & Modification can help in reducing Safety Risk !                                Remark / Management Comments:
                                                                                                                                Sign
Copy Distribution:                                                                                                              Date of Starting:                   Date of Completion:                            Control No. (by DQG)


Declaration: We are submitting this Kaizen case voluntarily to DQG for participation in Kaizen Blitz competition. We are glad to authorize DQG to share this information with the Business community at large to promote Continual Improvement and good practices.
We confirm that the improvement has been initiated and completed during the Kaizen Blitz week.

Signed by Authorised signatory: _______________________Name:________________________________Designation:_____________________________________ Date: ____/____/________

More Related Content

Viewers also liked

WQD2011 – KAIZEN – BRONZE WINNER - DUBAL - Reduction of frequent faults relat...
WQD2011 – KAIZEN – BRONZE WINNER - DUBAL - Reduction of frequent faults relat...WQD2011 – KAIZEN – BRONZE WINNER - DUBAL - Reduction of frequent faults relat...
WQD2011 – KAIZEN – BRONZE WINNER - DUBAL - Reduction of frequent faults relat...
Dubai Quality Group
 
WQD2011 - KAIZEN - DEWA - eSignature
WQD2011 - KAIZEN - DEWA - eSignatureWQD2011 - KAIZEN - DEWA - eSignature
WQD2011 - KAIZEN - DEWA - eSignature
Dubai Quality Group
 
WQD2011 - KAIZEN - SRF Oversear Ltd - Re-use of condensed water (generated fr...
WQD2011 - KAIZEN - SRF Oversear Ltd - Re-use of condensed water (generated fr...WQD2011 - KAIZEN - SRF Oversear Ltd - Re-use of condensed water (generated fr...
WQD2011 - KAIZEN - SRF Oversear Ltd - Re-use of condensed water (generated fr...
Dubai Quality Group
 
WQD2011 - KAIZEN - DEWA - WiFi (Wireless Fidelity) network facility
WQD2011 - KAIZEN - DEWA - WiFi (Wireless Fidelity) network facilityWQD2011 - KAIZEN - DEWA - WiFi (Wireless Fidelity) network facility
WQD2011 - KAIZEN - DEWA - WiFi (Wireless Fidelity) network facility
Dubai Quality Group
 
WQD2011 – KAIZEN – GOLD WINNER – Emirates Aluminium - Production Capacity Max...
WQD2011 – KAIZEN – GOLD WINNER – Emirates Aluminium - Production Capacity Max...WQD2011 – KAIZEN – GOLD WINNER – Emirates Aluminium - Production Capacity Max...
WQD2011 – KAIZEN – GOLD WINNER – Emirates Aluminium - Production Capacity Max...
Dubai Quality Group
 
WQD2011 - KAIZEN - SRF Oversear Ltd - To Eliminate frequent breakage of guide...
WQD2011 - KAIZEN - SRF Oversear Ltd - To Eliminate frequent breakage of guide...WQD2011 - KAIZEN - SRF Oversear Ltd - To Eliminate frequent breakage of guide...
WQD2011 - KAIZEN - SRF Oversear Ltd - To Eliminate frequent breakage of guide...
Dubai Quality Group
 
WQD2011 - KAIZEN - DEWA - Personal Computer Auto Shutdown
WQD2011 - KAIZEN - DEWA - Personal Computer Auto ShutdownWQD2011 - KAIZEN - DEWA - Personal Computer Auto Shutdown
WQD2011 - KAIZEN - DEWA - Personal Computer Auto Shutdown
Dubai Quality Group
 
WQD2011 - KAIZEN - EMAL - Suggestion for energy & cost saving as well as redu...
WQD2011 - KAIZEN - EMAL - Suggestion for energy & cost saving as well as redu...WQD2011 - KAIZEN - EMAL - Suggestion for energy & cost saving as well as redu...
WQD2011 - KAIZEN - EMAL - Suggestion for energy & cost saving as well as redu...
Dubai Quality Group
 
WQD2011 - KAIZEN - DEWA - CCTV (Closed Circuit Television) System
WQD2011 - KAIZEN - DEWA - CCTV (Closed Circuit Television) SystemWQD2011 - KAIZEN - DEWA - CCTV (Closed Circuit Television) System
WQD2011 - KAIZEN - DEWA - CCTV (Closed Circuit Television) System
Dubai Quality Group
 
WQD2011 - KAIZEN - EMAL - To eliminate the chances of breaking of PC charging...
WQD2011 - KAIZEN - EMAL - To eliminate the chances of breaking of PC charging...WQD2011 - KAIZEN - EMAL - To eliminate the chances of breaking of PC charging...
WQD2011 - KAIZEN - EMAL - To eliminate the chances of breaking of PC charging...
Dubai Quality Group
 
WQD2011 - KAIZEN - EMAL - Hot Bath Removal Multi-Function Car Carriage Lift P...
WQD2011 - KAIZEN - EMAL - Hot Bath Removal Multi-Function Car Carriage Lift P...WQD2011 - KAIZEN - EMAL - Hot Bath Removal Multi-Function Car Carriage Lift P...
WQD2011 - KAIZEN - EMAL - Hot Bath Removal Multi-Function Car Carriage Lift P...
Dubai Quality Group
 
WQD2011 - KAIZEN - EMAL - New design for Ring Main Cover lifting trolley
WQD2011 - KAIZEN - EMAL - New design for Ring Main Cover lifting trolleyWQD2011 - KAIZEN - EMAL - New design for Ring Main Cover lifting trolley
WQD2011 - KAIZEN - EMAL - New design for Ring Main Cover lifting trolley
Dubai Quality Group
 
WQD2011 - KAIZEN - SRF Oversear Ltd - To reduce production loss due to Maximu...
WQD2011 - KAIZEN - SRF Oversear Ltd - To reduce production loss due to Maximu...WQD2011 - KAIZEN - SRF Oversear Ltd - To reduce production loss due to Maximu...
WQD2011 - KAIZEN - SRF Oversear Ltd - To reduce production loss due to Maximu...
Dubai Quality Group
 
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling DuctWQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
Dubai Quality Group
 
WQD2011 - KAIZEN - ETA Ascon - Eliminating Honeycombing Defect in Concrete
WQD2011 - KAIZEN - ETA Ascon - Eliminating Honeycombing Defect in ConcreteWQD2011 - KAIZEN - ETA Ascon - Eliminating Honeycombing Defect in Concrete
WQD2011 - KAIZEN - ETA Ascon - Eliminating Honeycombing Defect in Concrete
Dubai Quality Group
 
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
Dubai Quality Group
 
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box RelocationWQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
Dubai Quality Group
 
20425 Utica Tugger
20425 Utica Tugger20425 Utica Tugger
20425 Utica Tugger
amscott2
 
WQD2011 - KAIZEN - ETA Ascon - Repairing & Eliminating Honeycomb Defect in Co...
WQD2011 - KAIZEN - ETA Ascon - Repairing & Eliminating Honeycomb Defect in Co...WQD2011 - KAIZEN - ETA Ascon - Repairing & Eliminating Honeycomb Defect in Co...
WQD2011 - KAIZEN - ETA Ascon - Repairing & Eliminating Honeycomb Defect in Co...
Dubai Quality Group
 
WQD2011 - KAIZEN - EMAL - To conserve DM water
WQD2011 - KAIZEN - EMAL - To conserve DM waterWQD2011 - KAIZEN - EMAL - To conserve DM water
WQD2011 - KAIZEN - EMAL - To conserve DM water
Dubai Quality Group
 

Viewers also liked (20)

WQD2011 – KAIZEN – BRONZE WINNER - DUBAL - Reduction of frequent faults relat...
WQD2011 – KAIZEN – BRONZE WINNER - DUBAL - Reduction of frequent faults relat...WQD2011 – KAIZEN – BRONZE WINNER - DUBAL - Reduction of frequent faults relat...
WQD2011 – KAIZEN – BRONZE WINNER - DUBAL - Reduction of frequent faults relat...
 
WQD2011 - KAIZEN - DEWA - eSignature
WQD2011 - KAIZEN - DEWA - eSignatureWQD2011 - KAIZEN - DEWA - eSignature
WQD2011 - KAIZEN - DEWA - eSignature
 
WQD2011 - KAIZEN - SRF Oversear Ltd - Re-use of condensed water (generated fr...
WQD2011 - KAIZEN - SRF Oversear Ltd - Re-use of condensed water (generated fr...WQD2011 - KAIZEN - SRF Oversear Ltd - Re-use of condensed water (generated fr...
WQD2011 - KAIZEN - SRF Oversear Ltd - Re-use of condensed water (generated fr...
 
WQD2011 - KAIZEN - DEWA - WiFi (Wireless Fidelity) network facility
WQD2011 - KAIZEN - DEWA - WiFi (Wireless Fidelity) network facilityWQD2011 - KAIZEN - DEWA - WiFi (Wireless Fidelity) network facility
WQD2011 - KAIZEN - DEWA - WiFi (Wireless Fidelity) network facility
 
WQD2011 – KAIZEN – GOLD WINNER – Emirates Aluminium - Production Capacity Max...
WQD2011 – KAIZEN – GOLD WINNER – Emirates Aluminium - Production Capacity Max...WQD2011 – KAIZEN – GOLD WINNER – Emirates Aluminium - Production Capacity Max...
WQD2011 – KAIZEN – GOLD WINNER – Emirates Aluminium - Production Capacity Max...
 
WQD2011 - KAIZEN - SRF Oversear Ltd - To Eliminate frequent breakage of guide...
WQD2011 - KAIZEN - SRF Oversear Ltd - To Eliminate frequent breakage of guide...WQD2011 - KAIZEN - SRF Oversear Ltd - To Eliminate frequent breakage of guide...
WQD2011 - KAIZEN - SRF Oversear Ltd - To Eliminate frequent breakage of guide...
 
WQD2011 - KAIZEN - DEWA - Personal Computer Auto Shutdown
WQD2011 - KAIZEN - DEWA - Personal Computer Auto ShutdownWQD2011 - KAIZEN - DEWA - Personal Computer Auto Shutdown
WQD2011 - KAIZEN - DEWA - Personal Computer Auto Shutdown
 
WQD2011 - KAIZEN - EMAL - Suggestion for energy & cost saving as well as redu...
WQD2011 - KAIZEN - EMAL - Suggestion for energy & cost saving as well as redu...WQD2011 - KAIZEN - EMAL - Suggestion for energy & cost saving as well as redu...
WQD2011 - KAIZEN - EMAL - Suggestion for energy & cost saving as well as redu...
 
WQD2011 - KAIZEN - DEWA - CCTV (Closed Circuit Television) System
WQD2011 - KAIZEN - DEWA - CCTV (Closed Circuit Television) SystemWQD2011 - KAIZEN - DEWA - CCTV (Closed Circuit Television) System
WQD2011 - KAIZEN - DEWA - CCTV (Closed Circuit Television) System
 
WQD2011 - KAIZEN - EMAL - To eliminate the chances of breaking of PC charging...
WQD2011 - KAIZEN - EMAL - To eliminate the chances of breaking of PC charging...WQD2011 - KAIZEN - EMAL - To eliminate the chances of breaking of PC charging...
WQD2011 - KAIZEN - EMAL - To eliminate the chances of breaking of PC charging...
 
WQD2011 - KAIZEN - EMAL - Hot Bath Removal Multi-Function Car Carriage Lift P...
WQD2011 - KAIZEN - EMAL - Hot Bath Removal Multi-Function Car Carriage Lift P...WQD2011 - KAIZEN - EMAL - Hot Bath Removal Multi-Function Car Carriage Lift P...
WQD2011 - KAIZEN - EMAL - Hot Bath Removal Multi-Function Car Carriage Lift P...
 
WQD2011 - KAIZEN - EMAL - New design for Ring Main Cover lifting trolley
WQD2011 - KAIZEN - EMAL - New design for Ring Main Cover lifting trolleyWQD2011 - KAIZEN - EMAL - New design for Ring Main Cover lifting trolley
WQD2011 - KAIZEN - EMAL - New design for Ring Main Cover lifting trolley
 
WQD2011 - KAIZEN - SRF Oversear Ltd - To reduce production loss due to Maximu...
WQD2011 - KAIZEN - SRF Oversear Ltd - To reduce production loss due to Maximu...WQD2011 - KAIZEN - SRF Oversear Ltd - To reduce production loss due to Maximu...
WQD2011 - KAIZEN - SRF Oversear Ltd - To reduce production loss due to Maximu...
 
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling DuctWQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
 
WQD2011 - KAIZEN - ETA Ascon - Eliminating Honeycombing Defect in Concrete
WQD2011 - KAIZEN - ETA Ascon - Eliminating Honeycombing Defect in ConcreteWQD2011 - KAIZEN - ETA Ascon - Eliminating Honeycombing Defect in Concrete
WQD2011 - KAIZEN - ETA Ascon - Eliminating Honeycombing Defect in Concrete
 
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
 
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box RelocationWQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
WQD2011 - KAIZEN - EMAL - Vibro compactor Height Gauge Junction box Relocation
 
20425 Utica Tugger
20425 Utica Tugger20425 Utica Tugger
20425 Utica Tugger
 
WQD2011 - KAIZEN - ETA Ascon - Repairing & Eliminating Honeycomb Defect in Co...
WQD2011 - KAIZEN - ETA Ascon - Repairing & Eliminating Honeycomb Defect in Co...WQD2011 - KAIZEN - ETA Ascon - Repairing & Eliminating Honeycomb Defect in Co...
WQD2011 - KAIZEN - ETA Ascon - Repairing & Eliminating Honeycomb Defect in Co...
 
WQD2011 - KAIZEN - EMAL - To conserve DM water
WQD2011 - KAIZEN - EMAL - To conserve DM waterWQD2011 - KAIZEN - EMAL - To conserve DM water
WQD2011 - KAIZEN - EMAL - To conserve DM water
 

Similar to WQD2011 - KAIZEN - EMAL - Sermas Saw Strapping Position Modification

WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety ModificationWQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
Dubai Quality Group
 
Group 8 murtuza steel company
Group 8   murtuza steel companyGroup 8   murtuza steel company
Group 8 murtuza steel company
Sanjeev Daukia
 
TALAT Lecture 2102.02: An Upper Casing for an Automobile Steering Column, Spe...
TALAT Lecture 2102.02: An Upper Casing for an Automobile Steering Column, Spe...TALAT Lecture 2102.02: An Upper Casing for an Automobile Steering Column, Spe...
TALAT Lecture 2102.02: An Upper Casing for an Automobile Steering Column, Spe...
CORE-Materials
 
Drilling
DrillingDrilling
Drilling
wadeaameen
 
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
Dubai Quality Group
 
Human Factors In Engineering
Human Factors  In EngineeringHuman Factors  In Engineering
Human Factors In Engineering
KerrieAnne Christian
 
Bnp 250 260_wetblast_cabinets
Bnp 250 260_wetblast_cabinetsBnp 250 260_wetblast_cabinets
Bnp 250 260_wetblast_cabinets
Jane Smith
 
TALAT Lecture 2102.03: The Transmission Housing of an Inboard-Outboard Engine...
TALAT Lecture 2102.03: The Transmission Housing of an Inboard-Outboard Engine...TALAT Lecture 2102.03: The Transmission Housing of an Inboard-Outboard Engine...
TALAT Lecture 2102.03: The Transmission Housing of an Inboard-Outboard Engine...
CORE-Materials
 
Lean green belt project improvement
Lean   green belt project improvementLean   green belt project improvement
Lean green belt project improvement
AnkurSharma820
 
Lean six sigma green belt project improvement
Lean six sigma  green belt project improvementLean six sigma  green belt project improvement
Lean six sigma green belt project improvement
AnkurSharma820
 
Gsm Industrial Food Processing
Gsm Industrial Food ProcessingGsm Industrial Food Processing
Gsm Industrial Food Processing
John Kleinfelter
 
Introduction vps en
Introduction vps  enIntroduction vps  en
Introduction vps en
vpsxm
 
PCB Manufacturer, Domestic Circuit Board Production and Prototype
PCB Manufacturer, Domestic Circuit Board Production and PrototypePCB Manufacturer, Domestic Circuit Board Production and Prototype
PCB Manufacturer, Domestic Circuit Board Production and Prototype
Domestic PCB Fabrication
 
Aerodef tam isotropic finishing
Aerodef   tam isotropic finishingAerodef   tam isotropic finishing
Aerodef tam isotropic finishing
Dave Davidson
 
MSc Individual Project
MSc Individual ProjectMSc Individual Project
MSc Individual Project
Floriano Bonfigli
 
Metals bro.0413
Metals bro.0413Metals bro.0413
Metals bro.0413
guest796b72f
 
Single Use Crucible
Single Use CrucibleSingle Use Crucible
Single Use Crucible
Thermitrex
 
About us
About usAbout us
About us
Rajesh Shriyan
 
Built in 2004 mod
Built in 2004 modBuilt in 2004 mod
Built in 2004 mod
Rajesh Shriyan
 
KBMA AC Drive Sales Sheet
KBMA AC Drive Sales SheetKBMA AC Drive Sales Sheet
KBMA AC Drive Sales Sheet
KB Electronics, Inc
 

Similar to WQD2011 - KAIZEN - EMAL - Sermas Saw Strapping Position Modification (20)

WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety ModificationWQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
WQD2011 - KAIZEN - EMAL - Core Cutting Machine (Tech. Lab.) Safety Modification
 
Group 8 murtuza steel company
Group 8   murtuza steel companyGroup 8   murtuza steel company
Group 8 murtuza steel company
 
TALAT Lecture 2102.02: An Upper Casing for an Automobile Steering Column, Spe...
TALAT Lecture 2102.02: An Upper Casing for an Automobile Steering Column, Spe...TALAT Lecture 2102.02: An Upper Casing for an Automobile Steering Column, Spe...
TALAT Lecture 2102.02: An Upper Casing for an Automobile Steering Column, Spe...
 
Drilling
DrillingDrilling
Drilling
 
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
WQD2011 - KAIZEN - EMAL - To improve the slot cleaning quality of slotted ano...
 
Human Factors In Engineering
Human Factors  In EngineeringHuman Factors  In Engineering
Human Factors In Engineering
 
Bnp 250 260_wetblast_cabinets
Bnp 250 260_wetblast_cabinetsBnp 250 260_wetblast_cabinets
Bnp 250 260_wetblast_cabinets
 
TALAT Lecture 2102.03: The Transmission Housing of an Inboard-Outboard Engine...
TALAT Lecture 2102.03: The Transmission Housing of an Inboard-Outboard Engine...TALAT Lecture 2102.03: The Transmission Housing of an Inboard-Outboard Engine...
TALAT Lecture 2102.03: The Transmission Housing of an Inboard-Outboard Engine...
 
Lean green belt project improvement
Lean   green belt project improvementLean   green belt project improvement
Lean green belt project improvement
 
Lean six sigma green belt project improvement
Lean six sigma  green belt project improvementLean six sigma  green belt project improvement
Lean six sigma green belt project improvement
 
Gsm Industrial Food Processing
Gsm Industrial Food ProcessingGsm Industrial Food Processing
Gsm Industrial Food Processing
 
Introduction vps en
Introduction vps  enIntroduction vps  en
Introduction vps en
 
PCB Manufacturer, Domestic Circuit Board Production and Prototype
PCB Manufacturer, Domestic Circuit Board Production and PrototypePCB Manufacturer, Domestic Circuit Board Production and Prototype
PCB Manufacturer, Domestic Circuit Board Production and Prototype
 
Aerodef tam isotropic finishing
Aerodef   tam isotropic finishingAerodef   tam isotropic finishing
Aerodef tam isotropic finishing
 
MSc Individual Project
MSc Individual ProjectMSc Individual Project
MSc Individual Project
 
Metals bro.0413
Metals bro.0413Metals bro.0413
Metals bro.0413
 
Single Use Crucible
Single Use CrucibleSingle Use Crucible
Single Use Crucible
 
About us
About usAbout us
About us
 
Built in 2004 mod
Built in 2004 modBuilt in 2004 mod
Built in 2004 mod
 
KBMA AC Drive Sales Sheet
KBMA AC Drive Sales SheetKBMA AC Drive Sales Sheet
KBMA AC Drive Sales Sheet
 

More from Dubai Quality Group

Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- DubalIdea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
Dubai Quality Group
 
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Dubai Quality Group
 
Idea of the Year Competition 2012 - Health & Safety Category Winner - Dubal
Idea of the Year Competition 2012 - Health & Safety Category Winner - DubalIdea of the Year Competition 2012 - Health & Safety Category Winner - Dubal
Idea of the Year Competition 2012 - Health & Safety Category Winner - Dubal
Dubai Quality Group
 
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Dubai Quality Group
 
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Dubai Quality Group
 
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Dubai Quality Group
 
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
Dubai Quality Group
 
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
Dubai Quality Group
 
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
Dubai Quality Group
 
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
Dubai Quality Group
 
'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...
Dubai Quality Group
 
"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed
Dubai Quality Group
 
"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher
Dubai Quality Group
 
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
Dubai Quality Group
 
"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch
Dubai Quality Group
 
"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie
Dubai Quality Group
 
"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann
Dubai Quality Group
 
"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl
Dubai Quality Group
 
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
Dubai Quality Group
 
"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles
Dubai Quality Group
 

More from Dubai Quality Group (20)

Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- DubalIdea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
 
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
 
Idea of the Year Competition 2012 - Health & Safety Category Winner - Dubal
Idea of the Year Competition 2012 - Health & Safety Category Winner - DubalIdea of the Year Competition 2012 - Health & Safety Category Winner - Dubal
Idea of the Year Competition 2012 - Health & Safety Category Winner - Dubal
 
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
 
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
 
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
 
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
 
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
 
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
 
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
 
'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...
 
"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed
 
"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher
 
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
 
"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch
 
"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie
 
"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann
 
"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl
 
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
 
"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles
 

Recently uploaded

The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
Celine George
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
Bisnar Chase Personal Injury Attorneys
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 

Recently uploaded (20)

The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 

WQD2011 - KAIZEN - EMAL - Sermas Saw Strapping Position Modification

  • 1. Quality Month: Oct 2011 Kaizen No. Page No.: KAIZEN REPORT Company logo Company Name: Emirates Aluminium Department: Cast House Section/Process: Sheet Ingot / Cast House Maintenance Improvement Title: SERMAS SAW STRAPPING POSITION MODIFICATION Category: [x ] Quality improvement [x ] Health & Safety [ ] Environment [ x ] Productivity [ ] Office processes [ ] Product design improvement [ ] Service improvement Before Situation Root Cause Analysis Improvement Measures After Situation Automatic strapping of sheet ingots less than It cannot meet customer requirement A cross-functional team from Cast House was - This Kaizen has helped in eliminated in lots of 4200mm was not possible as per customer because the runner position falls exactly formed which involving Cast House manual work by Operators. requirement. same as of support. Maintenance Sections and Sheet Ingot - 08 FTEs were made available for other From Operations, 02 FTEs per shift were Manual strapping require lot of extra labour Production. important tasks in Cast House, so savings of unnecessarily dedicated for this manual task and as operator has to pick it from strapping The team brainstormed the problem and came FTEs per year + savings of Maintenance Man 05 Man days of Maintenance were also wasted machine and put it in manual strapping area up with the solution that “by reducing the Days in one year = 0.5 Million AED (Estimated). per month. where operator does manual strapping with distance between two supports and modifying - Safety risks were eliminated fully after this Manual handling and rework posses high safety no proper facility (again high risk activity) the control logic we shall be able to design change. risks and creates unsafe work condition because and after strapping take it back to stock accommodate 4000mm sheet ingot and strap it yard. as per customer requirement.” - Additional Metal movement due to incorrect of 50T forklift movement (biggest forklift in auto strapping of smaller length sheet ingots has EMAL). Due to slow manual operation there used to To implement solution, Cast House obtained been eliminated too. 1 Medical Treatment incident occurred due to be pile up of sheet ingots on the shop floor design drawing from OEM. causing unsafe work environment. - Fork Lift usage was eliminated hence reduction this manual strapping and one operator suffered Implementation was done totally in-house by of Fuel and availability of Fork lift for other tasks. a cut in his left arm when he was cutting the Cast House maintenance team with Internal Quality issues arising from forklift handling were metal strap of one sheet. labour COST! eliminated also. Hazards creating potential for injuries: Complete automation and control logic part was - Zero Cost on Project as it was done IN- • Handling of heavy wooden runners designed and implemented in-house by Cast HOUSE, whereas if OEM could have done it repeatedly– muscular injury and forced House maintenance team. then it would have costed a huge amount of postures money to EMAL. ($$) • Positioning of runners underneath ingot in - Quality of stacking starts meeting customer conjunction of 50mt FLT operation – crush requirements, and no complaint related to injury and forced postures. Stacking were raised by Customer. • Handling and inserting steel banding - Demurrage Costs related to shipping delays under runner and over ingot – hand pinch / was reduced because of strapping issues were laceration injury resolved and now the Sheet Ingot are not • Handling of heavy manual banding delayed for shipment. machine and air hose– muscular injury, - This Kaizen has eliminates the following tripping hazard and muscular-skeletal wastes: disorders. - Inventory - Motion • Insertion of band wire and positioning of - Waiting - People banding machine – hand pinch / injury - Over processing - Transportation • Aerosol Cans in Operational areas – molten metal explosion hazard Benefits: Participation Increased Safety, Zero Incident due to this improvement, No. of FTEs were made available for other tasks, Quality, No Rene Flores, Shailendra Choudhari, Heinrich Botha, Amit Parikh, … Demurrage Cost due to this problem, Waste Elimination, Savings of 0,5 Million AED ++ Standardization: Similar exercise has led to bring more improvements related to Rework Reduction in similar production line. Horizontal Deployment Opportunities (Replication): systems are getting modified to achieve lower manual work esp. where safety of Employees is at risk. Single Point Lesson: Innovative Systems Design & Modification can help in reducing Safety Risk ! Remark / Management Comments: Sign Copy Distribution: Date of Starting: Date of Completion: Control No. (by DQG) Declaration: We are submitting this Kaizen case voluntarily to DQG for participation in Kaizen Blitz competition. We are glad to authorize DQG to share this information with the Business community at large to promote Continual Improvement and good practices. We confirm that the improvement has been initiated and completed during the Kaizen Blitz week. Signed by Authorised signatory: _______________________Name:________________________________Designation:_____________________________________ Date: ____/____/________