SlideShare a Scribd company logo
Quality Month: November 2011                                Kaizen No.                   Page No.:
                                                         KAIZEN REPORT
                             Dubai Aluminium Company Limited (DUBAL)                                                                   Department: Casthouse Maintenance                           Section/Process: Properzi Ingot Casting

 Improvement Title:          Reduction of frequent faults related to Properzi Casting Wheel Flange
 Category: [√] Quality improvement [ ] Health & Safety [ ] Environment [√] Productivity [ ] Office processes                                                  [ ] Product design improvement                 [ ] Service improvement
             Before Situation                                                  Root Cause Analysis                                                       Improvement Measures                                               After Situation
                                                                                                                                                                                                                                  Before            After
                                                                                                                                                 • Provided additional pins for the flanges
                                                                                                                                                                                                       Average per Month
                                     Worn-out Pin          Fish bone diagram: Probable causes                                                                                                                                      2008     2009     2010
                                                                                                                                                                                                                                                              2011
                                     and Hole                       Negative
                                                                                 Men                               Wrong             Method                                                                                                                   YTD
                                                                    attitude
                                                                                              Unskilled            installation                                                  Original bolts: 20
                                                                                              Maintenance
                                                                                                                   Wrong
                                                                                                                                                                                 Nos. (22mm)           No. of Work Order            2.7      0        0           0
                                                                                     New                           Procedure         Wrong
                                                            Untrained
                                                                                     Operators                                       Operation
                                                            operators
                                   Worn out                                                           Metal                                                                                            Equipment Downtime
                                                                                                                                  Wrong Data
                                   Chamfer (where                               Poor                  Spillage                    Entry                                           Additional                                       1.94      0        0           0
                                                                                Maintenance                                                                                       (modified) 10        (Hrs)
                                   the copper ring
                                   seats)                                                                                                                                         Pins (44mm)
                                                                                              Defective Pins /                     Weak                                                                Maintenance Man-hours       11.72     0        0           0
                                                                                              bolts                                Bolts
                                                                               Wrong Pins

                                                                                                                 Misaligned         Wrong                                         Original bolts
                                                          Wrong selection                                        wheels             casting
                                                                                                                                                                                  (20 Nos.)            Maintenance Cost (AED)      1.4K      0        0           0
                                                                                                                                    Belts
                                     Bolts are not        of metal                     Wrong spares
                                     in the centre
                                                              No standard
                                     of the holes             specification
                                                                                                                  Design                                                          Modified pins
                                                                                 Material                                         Machine

 • Frequent faults related to Properzi Casting
   Wheel flange were due to:                                                                                                                         o 4th replacement on 27/01/2009 - Modified
                                                                                                                                                       Flange with old Copper Ring
     o Broken or loose Casting Wheel Bolts
     o Jerking of Casting Wheel                                                                                                                      o Produced drawing/ design in-house
     o Unaligned Casting Wheel                       Conclusions and Root Cause (s):                                                                                                                                                         Bolts are in the
     o Above faults will lead to Cast stoppage       • Critical discussion on probable causes highlighted                                               th
                                                                                                                                                     o 5 replacement on 20/07/2010 - Modified                                                centre of the hole
 • Even if it is one sheared bolt, the casting           o Design related issues (Less number of Bolts)                                                Flange from Properzi with new Copper
   operations gets hampered                          • Further study on the shop floor validated “Weak Bolts” as the root                              Ring (Note: Still running without a single
 • Sheared bolts also affect the Casting Wheel         cause of frequent faults                                                                        bolt broken)
   Belt Life
                                                           Benefits:                                                                                                                                  Participation
    •   Zero Faults related to Wheel Flange - Less downtime calls due to bolts broken and increased machine availability
                                                                                                                                                      Roy Flores – General Superintendent, Casthouse Maintenance
    •   Eliminates metal spillage due to misaligned flanges – More safety work environment
                                                                                                                                                      P. P. D’ Kutty – Supervisor, Mechanical Maintenance, Ingot & Foundry
    •   Increased reliability of the casting belts                                                                                                    D. Kumar – Mechanical Technician
    •   Projected savings of 472K (one-off) – in place of buying New Flange from OEM                                                                  C. Hugos – Mechanical Technician
 Standardization                                                                                                                                 Horizontal Deployment Opportunities (Replication):
                                                                                                                                                      One off Machine (Properzi Casting) in DUBAL and hence not applicable to other machines

                                                                                                                                                      Same modification was adapted by OEM, as the 5 th replacement of casting wheel flange that they supplied
                                                                                                                                                       was already modified as per DUBAL’s recommendations.




                                                                     - Released related Drawing / Design
 Single Point Lesson:                                                                                                                            Remark / Management Comments: An excellent in-house development that has increased average
                                                                                                                                                 running hours of the machine and no bolt failure.
                          Improvements on designs can still be carried-out in-house without relying much on OEMs.
                                                                                                                                                 Sign: Nasser Al Khaja, Senior Manager – Area Maintenance
 Copy Distribution:                                                                                                                              Date of Starting:       Date of Completion:    Control No. (by DQG)
                                                                                                                                                 January 2009                      July 2010
Declaration: We are submitting this Kaizen case voluntarily to DQG for participation in “Improvement Case Studies – KAIZEN” competition. We are glad to authorize DQG to share this information with the Business community at
large to promote Continual Improvement and good practices.
Signed by Authorised signatory: __________________________               Name: Nasser Al Khaja                      Designation: Senior Manager, Area Maintenance                           Date: 15/ 10/ 2011

More Related Content

More from Dubai Quality Group

Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- DubalIdea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
Dubai Quality Group
 
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Dubai Quality Group
 
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Dubai Quality Group
 
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Dubai Quality Group
 
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Dubai Quality Group
 
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
Dubai Quality Group
 
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
Dubai Quality Group
 
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
Dubai Quality Group
 
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
Dubai Quality Group
 
'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...
Dubai Quality Group
 
"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed
Dubai Quality Group
 
"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher
Dubai Quality Group
 
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
Dubai Quality Group
 
"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch
Dubai Quality Group
 
"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie
Dubai Quality Group
 
"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann
Dubai Quality Group
 
"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl
Dubai Quality Group
 
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
Dubai Quality Group
 
"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles
Dubai Quality Group
 
"Benchmarking Genesis" by Basma A. Bargal
"Benchmarking Genesis" by Basma A. Bargal"Benchmarking Genesis" by Basma A. Bargal
"Benchmarking Genesis" by Basma A. Bargal
Dubai Quality Group
 

More from Dubai Quality Group (20)

Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- DubalIdea of the Year Competition 2012 - Productivity Category Winner- Dubal
Idea of the Year Competition 2012 - Productivity Category Winner- Dubal
 
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
Idea of the Year Competition 2012 - Innovation Category Winner - Dubai Munici...
 
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
Idea of the Year Competition 2012 - Idea of the Year Winner & Financial Categ...
 
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
Idea of the Year Competition 2012 - Environmental Category Winner - Dubai Mun...
 
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
Idea of the Year Competition 2012 - Customer Service Category Winner - Minist...
 
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
'Recognize, Reward, Retain: Tata Motor case study' by G. V. Srirama Kumar
 
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
'Sustainability in Employee Suggestion Schemes' by Flevy Lasrado
 
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury'Innovation and Communication' by Prof. Ujjwal K Chowdhury
'Innovation and Communication' by Prof. Ujjwal K Chowdhury
 
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya'Role of Technology in Innovation' by Capt. Khalid bin Mediya
'Role of Technology in Innovation' by Capt. Khalid bin Mediya
 
'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...'Suggestion Schemes can Improve quality and service to external and internal ...
'Suggestion Schemes can Improve quality and service to external and internal ...
 
"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed"Benchmarking - the UAE Style" by Zillay Ahmed
"Benchmarking - the UAE Style" by Zillay Ahmed
 
"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher"Customer Service Excellence" by Terry Pilcher
"Customer Service Excellence" by Terry Pilcher
 
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
"Global Benchmarking .. A graphical pesrpective" by Sunil Bahri
 
"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch"Megatrends for the Future" by Oliver Riebartsch
"Megatrends for the Future" by Oliver Riebartsch
 
"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie"AsiaBenchmark" by Khashayar Ataie
"AsiaBenchmark" by Khashayar Ataie
 
"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann"Views on 2030" by Dr. Robin Mann
"Views on 2030" by Dr. Robin Mann
 
"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl"Views on 2030" by Dr. Holger Kohl
"Views on 2030" by Dr. Holger Kohl
 
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
"Overview on the Future of Benchmarking 2030 Project" by Bruce Searles
 
"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles"Findings on the future by GBN research" by Bruce Searles
"Findings on the future by GBN research" by Bruce Searles
 
"Benchmarking Genesis" by Basma A. Bargal
"Benchmarking Genesis" by Basma A. Bargal"Benchmarking Genesis" by Basma A. Bargal
"Benchmarking Genesis" by Basma A. Bargal
 

Recently uploaded

Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
sayalidalavi006
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
Celine George
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 

Recently uploaded (20)

Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 

WQD2011 – KAIZEN – BRONZE WINNER - DUBAL - Reduction of frequent faults related to Properzi Casting Wheel Flange

  • 1. Quality Month: November 2011 Kaizen No. Page No.: KAIZEN REPORT Dubai Aluminium Company Limited (DUBAL) Department: Casthouse Maintenance Section/Process: Properzi Ingot Casting Improvement Title: Reduction of frequent faults related to Properzi Casting Wheel Flange Category: [√] Quality improvement [ ] Health & Safety [ ] Environment [√] Productivity [ ] Office processes [ ] Product design improvement [ ] Service improvement Before Situation Root Cause Analysis Improvement Measures After Situation Before After • Provided additional pins for the flanges Average per Month Worn-out Pin Fish bone diagram: Probable causes 2008 2009 2010 2011 and Hole Negative Men Wrong Method YTD attitude Unskilled installation Original bolts: 20 Maintenance Wrong Nos. (22mm) No. of Work Order 2.7 0 0 0 New Procedure Wrong Untrained Operators Operation operators Worn out Metal Equipment Downtime Wrong Data Chamfer (where Poor Spillage Entry Additional 1.94 0 0 0 Maintenance (modified) 10 (Hrs) the copper ring seats) Pins (44mm) Defective Pins / Weak Maintenance Man-hours 11.72 0 0 0 bolts Bolts Wrong Pins Misaligned Wrong Original bolts Wrong selection wheels casting (20 Nos.) Maintenance Cost (AED) 1.4K 0 0 0 Belts Bolts are not of metal Wrong spares in the centre No standard of the holes specification Design Modified pins Material Machine • Frequent faults related to Properzi Casting Wheel flange were due to: o 4th replacement on 27/01/2009 - Modified Flange with old Copper Ring o Broken or loose Casting Wheel Bolts o Jerking of Casting Wheel o Produced drawing/ design in-house o Unaligned Casting Wheel Conclusions and Root Cause (s): Bolts are in the o Above faults will lead to Cast stoppage • Critical discussion on probable causes highlighted th o 5 replacement on 20/07/2010 - Modified centre of the hole • Even if it is one sheared bolt, the casting o Design related issues (Less number of Bolts) Flange from Properzi with new Copper operations gets hampered • Further study on the shop floor validated “Weak Bolts” as the root Ring (Note: Still running without a single • Sheared bolts also affect the Casting Wheel cause of frequent faults bolt broken) Belt Life Benefits: Participation • Zero Faults related to Wheel Flange - Less downtime calls due to bolts broken and increased machine availability  Roy Flores – General Superintendent, Casthouse Maintenance • Eliminates metal spillage due to misaligned flanges – More safety work environment  P. P. D’ Kutty – Supervisor, Mechanical Maintenance, Ingot & Foundry • Increased reliability of the casting belts  D. Kumar – Mechanical Technician • Projected savings of 472K (one-off) – in place of buying New Flange from OEM  C. Hugos – Mechanical Technician Standardization Horizontal Deployment Opportunities (Replication):  One off Machine (Properzi Casting) in DUBAL and hence not applicable to other machines  Same modification was adapted by OEM, as the 5 th replacement of casting wheel flange that they supplied was already modified as per DUBAL’s recommendations. - Released related Drawing / Design Single Point Lesson: Remark / Management Comments: An excellent in-house development that has increased average running hours of the machine and no bolt failure. Improvements on designs can still be carried-out in-house without relying much on OEMs. Sign: Nasser Al Khaja, Senior Manager – Area Maintenance Copy Distribution: Date of Starting: Date of Completion: Control No. (by DQG) January 2009 July 2010 Declaration: We are submitting this Kaizen case voluntarily to DQG for participation in “Improvement Case Studies – KAIZEN” competition. We are glad to authorize DQG to share this information with the Business community at large to promote Continual Improvement and good practices. Signed by Authorised signatory: __________________________ Name: Nasser Al Khaja Designation: Senior Manager, Area Maintenance Date: 15/ 10/ 2011