WORK STUDY METHODOLOGY
&
P.I CALCULATION
By Ankit Patra
Sigma Consultants Private Limited
WORK STUDY
 A system of assessing methods of working so as to achieve the maximum
output and efficiency.
 Classifications of work Study
 Time & Motion Study: For direct workmen
 Activity Sampling : For indirect workmen
 Method Study : Implement of new methods to enhance productivity
 Objectives
 Achieve Standard Man Hour (SMH).
 Achieve Standard Output
 Improve Productivity of machines, man & materials.
 Eliminate wastages to increase production with less fatigue.
TIME & MOTION STUDY
 Time Study is quantitative analysis Leading to establishing the time
standards whereas motion study is qualitative analysis leading to
establishment of time standard.
 Procedure
 Calculate the Net Available Time in a Shift/Day(N.A.T)
 Cover all measurable work element from a particular section.
 Decides the Unit of those working elements.
 Observe unit/Shift & Normal min./unit.
 Calculate Normal min./shift.
 Determine the no. of Squad & Gang involved .
 Calculate Normal man min.
CONT’D..
 Calculate Cycle Time of that work element.
 Cycle time can be conclude in two types
 Normal Cycle time : In General cases i.e. when single operation goes on.
 Controlling Cycle time: When Line Operation goes on.
***Line Operation
***Line Balancing
 Calculate Standard Man Hour(SMH) with Relaxation allowances and
contingency allowances.
 Calculate Standard output
 Calculation of SMH/unit production
 Calculate OMS(Output per Man Shift)
ACTIVITY SAMPLING
 A technique in which a large number of observations are made over a
period of time of one group of machines, processes or workers.
 Procedure
o Observe the no. of workmen engaged in a particular work.
o No. of active observation.
o No. of Idle observation.
o No. of forced Idle observation.
o Calculate Utilization %
o Calculate Idle %
o Calculate the workload.
o Calculate standard workload with standard relaxation allowances and
misc. Allowances.
o Calculate the Accuracy of the study.
METHOD STUDY
 Method study is the process of subjecting work to systematic,
critical scrutiny to make it more effective and/or more efficient.
It is one of the keys to achieving productivity improvement.
 Procedure
 Select the job – on which method study is to be applied.
 Gather information and record.
 Examine the information critically.
 Develop the most practical, economical and effective method by
considering real limitations of the situation.
 Install the new method as standard practice.
PRODUCTIVITY INDICES (P.I)
 The shift-wise standard hours of each individual in a Direct Group is calculated on the
basis of actual shift’s good output divided by the Output Norms. The cumulative monthly
standard hours for the individual divided by the actual monthly hours of the individual
gives the Labour Productivity for the individual and this is expressed as a percentage.
Mathematically, P.I. = (SMH Earned)*100/Total AMH
 SMH: Standard Man Hours
 AMH: Attendant Man Hours
 Procedure
 Collect last one year’s monthly production data from respective department.
 Collect the total AMH(including normal & overtime hrs.)from Time office/Plant HR.
 Calculate the SMH earned per month.
 Calculate the P.I month wise for a particular section by following previous described
mathematical formula.
 Similarly calculate the overall P.I for that particular section.
CONCLUSION
 Do better planning for existing manpower.
 Improvement of existing methods.
 Increased productivity & operational efficiency.
 Optimum utilisation of resources.
 Cut down the inefficient motions.
 Less Fatigue to the worker.
 Set up Incentive schemes for workmen.
THANK YOU

More Related Content

What's hot

Work study and method study
Work study and method studyWork study and method study
Work study and method study
Nitin Gulgulia
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
learnito
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
Joseph Konnully
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
ahmad bassiouny
 
Motion Study
Motion StudyMotion Study
Motion Study
ahmad bassiouny
 
method study- micromotion vs memo motion
method study- micromotion vs memo motionmethod study- micromotion vs memo motion
method study- micromotion vs memo motion
pranav teli
 
Method study
Method studyMethod study
Method study
sparsh maheshwari
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
Muhammad Hassan
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement pptLizzette Danan
 
Worksampling - Methods Engineering
Worksampling - Methods EngineeringWorksampling - Methods Engineering
Worksampling - Methods EngineeringAngelica Angelo Ocon
 
Work study method-and_time_study-final
Work study method-and_time_study-finalWork study method-and_time_study-final
Work study method-and_time_study-final
Hareesh M
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowancePratibha Khemchandani
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
ahmad bassiouny
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
Dhruvit Lakhani
 
Time and motion study
Time and motion studyTime and motion study
Time and motion studyVaithi2140
 
Introduction to time study
Introduction to time studyIntroduction to time study
Introduction to time study
mechanical2015
 
Methods Engineering
Methods EngineeringMethods Engineering
Methods Engineering
miguelaep
 

What's hot (20)

Work study and method study
Work study and method studyWork study and method study
Work study and method study
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 
Motion Study
Motion StudyMotion Study
Motion Study
 
method study- micromotion vs memo motion
method study- micromotion vs memo motionmethod study- micromotion vs memo motion
method study- micromotion vs memo motion
 
Method study
Method studyMethod study
Method study
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
 
Time study
Time studyTime study
Time study
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
 
Worksampling - Methods Engineering
Worksampling - Methods EngineeringWorksampling - Methods Engineering
Worksampling - Methods Engineering
 
Work study method-and_time_study-final
Work study method-and_time_study-finalWork study method-and_time_study-final
Work study method-and_time_study-final
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Work sample
Work sampleWork sample
Work sample
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
Time and motion study
Time and motion studyTime and motion study
Time and motion study
 
Introduction to time study
Introduction to time studyIntroduction to time study
Introduction to time study
 
Methods Engineering
Methods EngineeringMethods Engineering
Methods Engineering
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 

Similar to Work study and productivity index

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
ahmad bassiouny
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
Khairul Bashar
 
Work measurement
Work measurementWork measurement
Work measurement
Ratnadeepsinh Jadeja
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
IRJET Journal
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
ahmad bassiouny
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
MdRakibHasan27
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
homeworkping3
 
work sampling.pptx
work sampling.pptxwork sampling.pptx
work sampling.pptx
GroceriesKits
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
Khairul Bashar
 
Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineeringRajeev Sharan
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Study
josy2108
 
Jivan work study
Jivan work studyJivan work study
Jivan work study
Jivan Jadhav
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
shiwakantmaurya
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
Ahmad Alzbeidat
 
Work measurement
Work measurementWork measurement
Work measurement
sendrebogdan
 
Management tools
Management toolsManagement tools
Management tools
Paritosh Kasaudhan
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectivenessgrubinm
 

Similar to Work study and productivity index (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Garments
Garments Garments
Garments
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
 
work sampling.pptx
work sampling.pptxwork sampling.pptx
work sampling.pptx
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineering
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Study
 
Jivan work study
Jivan work studyJivan work study
Jivan work study
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
 
Work measurement
Work measurementWork measurement
Work measurement
 
Management tools
Management toolsManagement tools
Management tools
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
 

Recently uploaded

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 

Recently uploaded (20)

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 

Work study and productivity index

  • 1. WORK STUDY METHODOLOGY & P.I CALCULATION By Ankit Patra Sigma Consultants Private Limited
  • 2. WORK STUDY  A system of assessing methods of working so as to achieve the maximum output and efficiency.  Classifications of work Study  Time & Motion Study: For direct workmen  Activity Sampling : For indirect workmen  Method Study : Implement of new methods to enhance productivity  Objectives  Achieve Standard Man Hour (SMH).  Achieve Standard Output  Improve Productivity of machines, man & materials.  Eliminate wastages to increase production with less fatigue.
  • 3. TIME & MOTION STUDY  Time Study is quantitative analysis Leading to establishing the time standards whereas motion study is qualitative analysis leading to establishment of time standard.  Procedure  Calculate the Net Available Time in a Shift/Day(N.A.T)  Cover all measurable work element from a particular section.  Decides the Unit of those working elements.  Observe unit/Shift & Normal min./unit.  Calculate Normal min./shift.  Determine the no. of Squad & Gang involved .  Calculate Normal man min.
  • 4. CONT’D..  Calculate Cycle Time of that work element.  Cycle time can be conclude in two types  Normal Cycle time : In General cases i.e. when single operation goes on.  Controlling Cycle time: When Line Operation goes on. ***Line Operation ***Line Balancing  Calculate Standard Man Hour(SMH) with Relaxation allowances and contingency allowances.  Calculate Standard output  Calculation of SMH/unit production  Calculate OMS(Output per Man Shift)
  • 5. ACTIVITY SAMPLING  A technique in which a large number of observations are made over a period of time of one group of machines, processes or workers.  Procedure o Observe the no. of workmen engaged in a particular work. o No. of active observation. o No. of Idle observation. o No. of forced Idle observation. o Calculate Utilization % o Calculate Idle % o Calculate the workload. o Calculate standard workload with standard relaxation allowances and misc. Allowances. o Calculate the Accuracy of the study.
  • 6. METHOD STUDY  Method study is the process of subjecting work to systematic, critical scrutiny to make it more effective and/or more efficient. It is one of the keys to achieving productivity improvement.  Procedure  Select the job – on which method study is to be applied.  Gather information and record.  Examine the information critically.  Develop the most practical, economical and effective method by considering real limitations of the situation.  Install the new method as standard practice.
  • 7. PRODUCTIVITY INDICES (P.I)  The shift-wise standard hours of each individual in a Direct Group is calculated on the basis of actual shift’s good output divided by the Output Norms. The cumulative monthly standard hours for the individual divided by the actual monthly hours of the individual gives the Labour Productivity for the individual and this is expressed as a percentage. Mathematically, P.I. = (SMH Earned)*100/Total AMH  SMH: Standard Man Hours  AMH: Attendant Man Hours  Procedure  Collect last one year’s monthly production data from respective department.  Collect the total AMH(including normal & overtime hrs.)from Time office/Plant HR.  Calculate the SMH earned per month.  Calculate the P.I month wise for a particular section by following previous described mathematical formula.  Similarly calculate the overall P.I for that particular section.
  • 8. CONCLUSION  Do better planning for existing manpower.  Improvement of existing methods.  Increased productivity & operational efficiency.  Optimum utilisation of resources.  Cut down the inefficient motions.  Less Fatigue to the worker.  Set up Incentive schemes for workmen.