TABLE OF CONTENTS
PAGE
WEIGHBRIDGE TERMINOLOGY.................................................................2
ABOVE GROUND WEIGHBRIDGE CONSIDERATIONS.............................3
SEMI-PIT WEIGHBRIDGE CONSIDERATIONS...........................................4
CUSTOM SEMI-PIT WEIGHBRIDGE CONSIDERATIONS..........................5
CUSTOM SEMI-PIT VARIATION...................................................................6
FULLY INGROUND WEIGHBRIDGE CONSIDERATIONS...........................7
MULTIPLE-DECK WEIGHBRIDGE CONSIDERATIONS..............................8
PORTABLE WEIGHBRIDGE CONSIDERATIONS.......................................9
ADVANTAGES AND DISADVANTAGES......................................................11
WEIGHBRIDGE ALTERNATIVES................................................................15
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 1	 Revision: 04-2013
ACN 004 659 358
Unit 2/9 Production Drive,
Campbellfield, Vic, 3061
Phone: (03) 9357 7470
Facsimile: (03) 9357 7450
precision@ultrahawke.com.au
www.ultrahawke.com.au
Approach and
End Wall
Approach and
End Wall
Ramp
Deck Surface
Deck Surface
Side Wall
Main Beams
Main Beams
E
- Deck or Platform
- Module
- Bay
- Main Beam
- Cross Beam, Piece, or Section
- Cross Channel, Piece, or Section
F
G
H
I
J
K
ABOVE GROUND
WEIGHBRIDGE EXAMPLE
WEIGHBRIDGE TERMINOLOGY AND
LEGISLATIVE REQUIREMENTS
SEMI-PIT
WEIGHBRIDGE EXAMPLE
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 2	 Revision: 04-2013
There are legal requirements for trade weighbridges that are usually catered for during the installation staged of
the weighbridge. However, you should be aware of these requirements when planning a weighbridge site, as well as
preventing future modifications to an installation that may nullify these requirements.
•	 The approaches must be level and in good condition (not pitted or rutted).
•	 The first 3m (for a weighbridge less than 18m long) or first 1m (for a weighbridge 18m or longer) of each
approach must be constructed of concrete.
•	 The foundation must be free from a build up of water and debris.
•	 The digital weigh indicator must be 6m or less from the weighbridge deck. [Therefore, do not relocate the
indicator further than 6m unless an application for exemption is made to the Trade Measurement Authority
and accepted].
•	 If a fully inground weighbridge, all sumps must be fully functional.
•	 If a portable weighbridge, the ground beneath the deck must be treated to prevent growth of foliage.
•	 If an above ground weighbridge, there must be a 1m clear space along both sides of the weighbridge deck.
The clearance must be of the same level as the foundation floor or lower, but never higher. [Therefore, never
install structures within the 1m clear space unless an application for exemption is made to the Trade Meas-
urement Authority and accepted].
Any enquiries, ofcourse, can be made to the appropriate Trade Measurement Authority, or to UltraHawke Pty
Ltd. Enquiries are welcomed by both organisations.
Site Determined
Typ Slope 1:10
Ground Level
Deck Level
1m1m
Minimum
Minimum
Minimum
1m
Be Careful of
Overhang
ite Determined
Typ Slope 1:10
Ground Level
Deck Level
1m1m
Minimum
Minimum
Minimum
1m
Be Careful of
Overhang
Site Determined
Typ Slope 1:10
Ground Level
Deck Level
Minimum
1m
Be Careful of
Overhang
Site Determined
Typ Slope 1:10
Ground
Deck Level
1m1m
Minimum
Minimum
Minimum
1m
Be Careful of
Overhang
Represents
Ground Level
ISOMETRIC VIEW
Above Ground Weighbridge
CROSS-SECTIONAL VIEW
When planning for an above-ground weighbridge, always include ramps and 1m “clear-spaces” along both sides of
the weighbridge deck, as shown below. This clear-space must be a minimum of 1m wide and must be of the same plane
as the foundation floor or lower. If either clear-space includes bare ground, treat the ground to prevent growth of foliage
within the clear-space. Assuming the approach ramps are a 1:10 incline, and the site is level from end to end, each ramp
will be a minimum of 5m long. Add to this any vehicle’s turning circle requirements before and after each ramp, if any, and
you will soon realise that above ground weighbridges claim the most surface area of a site than would any other type of
weighbridge.
The location of the weighbridge office or hut should also be considered. If it is to be located close to the weighbridge,
it may need to be constructed on stumps. In this case, be careful of the office overhanging the bridge. Keep supports for
the office atleast 0.5m away from any nearby loadcell locations. Also ensure loadcells can be easily accessed by service
personnel, if ever required.
ABOVE GROUND WEIGHBRIDGE
INSTALLATION CONSIDERATIONS
TYPE
A
FRONT VIEW
TOP VIEW
OPTION A
Office Constructed on Stumps
OPTION B
Office Constructed Away from the Deck
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 3	 Revision: 04-2013
200mm200mm
Min.1mMin.1m
Deck and Ground Level
Typical Ground Level
200mm200mm
Min.1mMin.1m
Deck and Ground Level
Typical Ground Level
Semi-pit weighbridges have side walls that act as retaining walls. They may be block-filled walls or poured concrete walls
and are located atleast 1m from the side of the deck. Note that additional reinforcement may be required in the side walls if
you intend to allow vehicular traffic to travel adjacent to the side walls.
Since the deck is at ground level, no ramps are required. This may be important where a site is limited with available
space for a weighbridge. Drainage is also another important consideration. Either a sump or drainage pipe must be installed,
and must be located where most effective and appropriate for the site.
Health and safety requirements also tend to require mesh walkways to be installed along side the deck at either deck
level or at beam height level to maximise safety for vehicle drivers and site personnel. The walkway may extend the full
length of the deck or just part of it. In this instance, keep supports for the walkway atleast 0.5m away from any nearby
loadcell locations. Also ensure loadcells can be easily accessed by service personnel, if ever required. If a walkway extends
the full length of the deck, some walkway mesh panels will need to be made removable to allow service personnel to access
loadcells.
SEMI-PIT WEIGHBRIDGE
INSTALLATION CONSIDERATIONS
TYPE
B
TOP VIEW
FRONT VIEW
CROSS-SECTIONAL VIEW
200mm200mm
Min.1mMin.1m
Deck and Ground Level
Typical Ground Level
ISOMETRIC VIEW
Semi-Pit Weighbridge
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 4	 Revision: 04-2013
200mm200mm
Min.1m50mm
Deck and Gro
Typical Ground
CUSTOM SEMI-PIT WEIGHBRIDGE
INSTALLATION CONSIDERATIONS
TYPE
C1
200mm200mm
Min.1m50mm
Deck and Ground Level
Typical Ground Level
200mm200mm
Min.1m50mm
Deck and Ground Level
Typical Ground Level
200mm200mm
Min.1m50mm
Deck and Ground Level
Typical Ground LevelISOMETRIC VIEW
Custom Semi-Pit Weighbridge
Access Holes Constructed as
Part of Weighbridge Deck
ISOMETRIC VIEW
Custom Semi-Pit Weighbridge
Access Holes Constructed as Part
of Weighbridge Foundation
CROSS-SECTIONAL VIEW
The custom semi-pit weighbridge is an adaption of the typical semi-pit weighbridge design. The design is modified to
accommodate site limitations, for example, width limitations, building arrangements, etc. One or both of the side walls’ width
is decreased. In this circumstance, access to some loadcells is reduced or altogether prevented. Access holes must then
be installed adjacent to each obscured loadcell location, either in the deck or as part of the side wall, to facilitate servicing
and maintenance to those loadcells (see the corresponding isometric drawing at the end of this Weighbridge Format
Specification).
If access holes are installed as part of the side wall, and vehicular traffic is expected to use this area, then the access
hole covers must be correctly designed and constructed to take the expected loadings of vehicles. The side walls will also
require additional reinforcing.
As with the standard semi-pit weighbridge, drainage must also be considered.
FRONT VIEW
TOP VIEW
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 5	 Revision: 04-2013
CUSTOM SEMI-PIT WEIGHBRIDGE
INSTALLATION CONSIDERATIONS
TYPE
C2
Deck and Ground Level
Access Cover Adjacent
to Loadcell Area
Typical Ground Level
50mm 50mm
200mm200mm
Deck and Ground Level
Access Cover Adjacent
to Loadcell Area
Typical Ground Level
50mm 50mm
200mm200mm
FRONT VIEW
TOP VIEW
This design is similar to Type C1. All considerations for Type C1 apply to this design. Access holes must be provided
both sides of the deck.
CROSS-SECTIONAL VIEW
Deck and Ground Level
Access Cover Adjacent
to Loadcell Area
Typical Ground Level
50mm 50mm
200mm200mm
ISOMETRIC VIEW
Custom Semi-Pit Weighbridge
Access Holes Constructed as
Part of Weighbridge Deck
Access Holes are Both
Sides of the Deck
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 6	 Revision: 04-2013
CUSTOM SEMI-PIT WEIGHBRIDGE
INSTALLATION CONSIDERATIONS
TYPE
C3
Full Width Access Cover
Adjacent to Loadcell Areas
200mm200mm
0.8m
Approx
25mm 25mm
Deck and Ground Level
Typical Ground Level
Kerb May be Required to
Comply with Trade
Measurement Regulations
Full Width Access Cover
Adjacent to Loadcell Areas
200mm200mm
0.8m
Approx
25mm 25mm
Deck and Ground Level
Typical Ground Level
Kerb May be Required to
Comply with Trade
Measurement Regulations
FRONT VIEW
TOP VIEW
This design is similar to Type C2. All considerations for Type C1 and Type C2 apply to this design. Access holes
must be provided both sides of the deck.
This design differs to Type C2 in that the top of the deck is completely flush with the typical ground level. This
design also differs to Type D in that the depth of the pit is not as deep. This design may therefore be suitable for some
sites that require a fully inground weighbridge, but wish to reduce or eliminate the risks involved with a confined space.
As an alternative to a single access cover for each loadcell area, one full-width access cover may be used for
each loadcell area pair (loadcell areas on opposite sides of the deck to each other), as shown in the Top View above.
The benefit of this is that a single access cover can removed to allow access to two loadcells.
CROSS-SECTIONAL VIEW
Full Width Access Cover
Adjacent to Loadcell Areas
200mm200mm
0.8m
Approx
25mm 25mm
Deck and Ground Level
Typical Ground Level
Kerb May be Required to
Comply with Trade
Measurement Regulations
ISOMETRIC VIEW
Custom Semi-Pit Weighbridge
Access Holes Constructed as
Part of Weighbridge Deck
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 7	 Revision: 04-2013
1.2m
Approximately
25mm 25mm
200mm200mm
1.2m
roximately
25mm 25mm
Deck and Ground Level
Typical Ground Level
Typical Ground Level
Kerb May be Required to
Comply with Trade
Measurement Regulations
Kerb May be Required to
Comply with Trade
Measurement Regulations
Pillar
1.2m
Approximately
25mm 25mm
200mm200mm
1.2m
Approximately
25mm 25mm
Deck and Ground Level
Typical Ground Level
Typical Ground Level
Kerb May be Required to
Comply with Trade
Measurement Regulations
Kerb May be Required to
Comply with Trade
Measurement Regulations
Pillar
Pillar
FRONT VIEW
TOP VIEW
Fully inground weighbridges provide a completely level weighing surface with the surrounding ground level. Access to
the loadcells must be made either by including access holes in the deck or to the side of the deck as part of the foundation
design. Since vehicular traffic often travels adjacent to the deck, the access hole covers are designed and constructed to
take the expected vehicle loadings.
Drainage must be considered, either as a sump or as a drainage pipe, and must be located where most effective and
appropriate for the site.
Fully inground weighbridges claim the least surface area of a site than any other weighbridge type. However, they are
the most expensive weighbridge type to construct due to the extensive excavation work required and slightly more concrete
and reinforcing required.
Health and safety often defines the inground weighbridge pit as a confined space. As such, personnel cannot enter
the pit to service the weighbridge without special confined space entry training and equipment (including a gas detector
and harnesses). Service personnel are therefore typically charged out as a higher hourly rate. A minimum of two service
personnel is required with one acting as a safety look-out for those entering the confined space.
CROSS-SECTIONAL VIEW
FULLY INGROUND WEIGHBRIDGE
INSTALLATION CONSIDERATIONS
TYPE
D
1.2m
Approximately
25mm 25mm
200mm200mm
1.2m
Approximately
25mm 25mm
Deck and Ground Level
Typical Ground Level
Typical Ground Level
Kerb May be Required to
Comply with Trade
Measurement Regulations
Kerb May be Required to
Comply with Trade
Measurement Regulations
Pillar
Pillar
1.2m
Approximately
25mm 25mm
200mm200mm
ately
25mm 25mm
Deck and Ground Level
Typical Ground Level
Typical Ground Level
Kerb May be Required to
Comply with Trade
Measurement Regulations
Kerb May be Required to
Comply with Trade
Measurement Regulations
Pillar
ISOMETRIC VIEW
Fully Inground Weighbridge
Access Holes Constructed as
Part of Weighbridge Deck
ISOMETRIC VIEW
Fully Inground Weighbridge
Access Holes to Constructed
as Part of Side Wall
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 8	 Revision: 04-2013
Mid Deck Restraining Bolts
(Both Sides of Deck)
Deck 1
Deck 2
Deck 3
Deck 4
Deck 1 Deck 2 Deck 3 Deck 4
Ground LevelDeck Level
Mid Deck Restraining Bolts
(Both Sides of Deck)
Deck 1
Deck 2
Deck 3
Deck 4
Deck 1 Deck 2 Deck 3 Deck 4
Ground LeveDeck Level
MULTIPLE DECK WEIGHBRIDGE
INSTALLATION CONSIDERATIONS
TYPE
E
FRONT VIEW
TOP VIEW
	 Multiple deck weighbridges are really a variation of a design, rather than another weighbridge type. For example,
multiple deck weighbridges may be an above ground, a semi-pit, or a fully inground design. The number and length of the
decks vary according to your requirements. Decks need not be of the same length.
	 The advantage of multiple deck weighbridges is that individual axles, or axle groups, are weighed individually and
simultaneously. This is ideal for weighbridges that will be used to record axle breakdown weights as its primary function.
	 Considerations for the corresponding weighbridge type (above ground, semi-pit, and fully inground) still apply.
Mid deck restraining assemblies are typically installed between decks to limit deck movement. A digital weigh indicator is
provided for each deck and a summing unit is provided to sum the weight of all decks and display the total weight. These
are typically mounted in a single enclosure.
ISOMETRIC VIEW
Multiple Deck Weighbridge
(Above Example is a Four-Deck,
Above Ground Weighbridge)
EXAMPLE
SUMMING
ENCLOSURE
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 9	 Revision: 04-2013
Concrete Load Pad
Typical Ground Level
End Wall is Part of Removable Frame
Removable Frame -
Assembles to Form a
Rigid Support Base for
the Loadcells and
Weighbridge Deck
Earth Ramp
Concrete Load Pad
Typical Ground Level
End Wall is Part of Removable Frame
Removable Frame -
Assembles to Form a
Rigid Support Base for
the Loadcells and
Weighbridge Deck
Earth Ramp
RELOCATABLE WEIGHBRIDGE
INSTALLATION CONSIDERATIONS
TYPE
F
Portable weighbridges are typically a variation of the above ground weighbridge design. Rather than a complete concrete
foundation being constructed, rectangular concrete slabs are constructed at load bearing locations only (loadcell areas
only). A removable frame is assembled from components, forming a rigid support base for the loadcells and deck. The deck
may be a fully steel design (to make it lighter for relocating) or the typical concrete/steel deck, making it lighter and easier
to transport than a concrete/steel deck.
Earth ramps are constructed to access the deck. Loadcells can be fitted with connectors (prior to supply) to assist
assembly and disassembly. The digital indicator can be mounted in an enclosure that bolts to the side of the deck.
Considerations for an above ground weighbridge apply to a portable weighbridge. Once assembled, the ground beneath
the deck (between load bearing concrete pads) should be treated to prevent growth of foliage. If the weighbridge is required
to be used for trade purposes, concrete end walls will need to be constructed.
ISOMETRIC VIEW
Portable Weighbridge
(Above Example is an Above
Ground Weighbridge)
ISOMETRIC VIEW
Portable Weighbridge Support
Frame Only (Deck Removed for
Clarity of Detail)
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 10	 Revision: 04-2013
ADVANTAGES AND DISADVANTAGES
TYPE ADVANTAGES DISADVANTAGES
TYPE
A
Above-
Ground
Weighbridge
	 Least expensive weighbridge option
	 Least site preparation required before
construction
	 Most common type of weighbridge supplied
	 Requires the largest site footprint of all the
options
TYPE ADVANTAGES DISADVANTAGES
TYPE
B
Standard
Semi-Pit
Weighbridge
	 Second least expensive weighbridge option
	 Common type of weighbridge supplied
	 Smaller site footprint required than the above
ground weighbridge option
	 Some excavation required before construction
	 Requires drainage considerations
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 11	 Revision: 04-2013
TYPE ADVANTAGES DISADVANTAGES
TYPE
C1
Single
Clear-Space
Semi-Pit
Weighbridge
	 Ideal for sites with a weighbridge bypass road
adjacent to one side of the weighbridge
	 Ideal for sites with an office or building adjacent
to one side of the weighbridge
	 Smaller site footprint required than the semi-pit
weighbridge option
	 Some excavation required before construction
	 Requires access holes (typically in the deck) to
access the loadcells for servicing purposes
	 Access holes make this option slightly more
expensive than the semi-pit weighbridge option
	 Trade Measurement Authority exemption in
writing required
	 Requires drainage considerations
TYPE ADVANTAGES DISADVANTAGES
TYPE
C2
No Clear-
Space Semi-
Pit
Weighbridge
	 Ideal for sites with two weighbridge bypass roads
adjacent to both sides of the weighbridge
	 Ideal for sites with offices or buildings adjacent to
both sides of the weighbridge
	 Smaller site footprint required than the semi-pit
weighbridge option
	 Some excavation required before construction
	 Requires access holes (typically in the deck) to
access the loadcells for servicing purposes
	 Access holes make this option more expensive
than the semi-pit weighbridge option
	 Trade Measurement Authority exemption in
writing required
	 Requires drainage considerations
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 12	 Revision: 04-2013
TYPE ADVANTAGES DISADVANTAGES
TYPE
C3
No Clear-
Space Semi-
Pit
Weighbridge
	 Ideal for sites with two weighbridge bypass roads
adjacent to both sides of the weighbridge
	 Ideal for sites with offices or buildings adjacent to
both sides of the weighbridge
	 Smaller site footprint required than the semi-pit
weighbridge option
	 Some excavation required before construction
	 Requires access holes (typically in the deck) to
access the loadcells for servicing purposes
	 Access holes make this option more expensive
than the semi-pit weighbridge option
	 Trade Measurement Authority exemption in
writing required
	 Requires drainage considerations
TYPE ADVANTAGES DISADVANTAGES
TYPE
D
Fully
Inground
Weighbridge
	 Requires the smallest site footprint of all the
options
	 Ideal for sites with extreme space restrictions
	 Ideal for sites with shared weighing and traffic
areas
	 Ideal for sites where vehicles are weighed during
loading by forklifts
	 Most expensive weighbridge option due to
extensive excavation work required
	 Most preparation required before construction
	 Requires drainage considerations
	 Confined space to access the loadcells requiring
special training for service personnel (typically
charged as a higher hourly rate)
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 13	 Revision: 04-2013
TYPE ADVANTAGES DISADVANTAGES
TYPE
E
Multi-Deck
Weighbridge
	 Weigh individual axles or axle groups to
maximise vehicle loading and minimise legal axle
overloading for road transport
	 More expensive than a single deck option
TYPE ADVANTAGES DISADVANTAGES
TYPE
F
Portable
Weighbridge
	 Inexpensive weighbridge option
	 Ideal for non-trade operation
	 Ideal for temporary sites (six months to two
years)
	 Sites operating longer than two years should
consider a permanent installation
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 14	 Revision: 04-2013
9m
DECK
1
DECK
2
8.4m
End Load Pad
Centre Load Pad
Deck or Platform
Sub-Frame
Pneumatically-
Operated Gate
(Optional)
Manually-
Operated Gate
(Standard)
Earth Ramp
Typical Ground Level
All Frames Are
Completely Collapsable
(Including Sub-Frame,
Cage, and Gates) for
Easy Relocation and
Transport
WEIGHBRIDGE ALTERNATIVES
ISOMETRIC VIEW
Heavy Vehicle Weighbridge
Example
ISOMETRIC VIEW
Cattle Weighbridge Example
Rail Weighbridge Example Wheel Weigher Example
In-Motion Weighbridge
Example
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 15	 Revision: 04-2013
UltraHawke Pty Ltd also manufactures and supplies heavy vehicle weighbridges (ideal for mine sites), cattle
weighbridges, rail weighbridges, in-motion weighbridges, axle weighbridges and wheel weighers.
WHEEL WEIGHERS IN-MOTION
WEIGHBRIDGES
AXLE WEIGHERSEND LOADERS
AND FORKLIFTS
A number of onboard vehicle weighing systems is also available. Though not as accurate as full-length weighbridges,
they do produce an accurate approximation of vehicle loads.
WASTE COLLECTION
VEHICLES
CRANES AND HIABSAIR-SUSPENSIONED
VEHICLES
RIGID VEHICLES
AND TIPPERS
SKELETAL TRAILERS
SKIP BIN VEHICLES HOOK TRUCKS VANS AND LIGHT
COMMERCIAL
Copyright© - Intellectual Property of UltraHawke Pty Ltd	 Page 16	 Revision: 04-2013
UltraHawke Pty Ltd can also perform weighbridge calibration visits with its Weighbridge Test Rig Unit, as well as
perform regular preventative maintenance visits.

More Related Content

What's hot

Type of caissons
Type of caissonsType of caissons
Type of caissons
AB MAKASANA
 
PILE-CAP & Batching plant
PILE-CAP & Batching plantPILE-CAP & Batching plant
PILE-CAP & Batching plantSagnik Datta
 
Unit vi-Plastic Analysis of beam Static & Kinematic methods
Unit vi-Plastic Analysis of beam Static & Kinematic methodsUnit vi-Plastic Analysis of beam Static & Kinematic methods
Unit vi-Plastic Analysis of beam Static & Kinematic methods
Subhash Patankar
 
Penetration of bituminous materials
Penetration of bituminous materialsPenetration of bituminous materials
Penetration of bituminous materials
NUR
 
Standard Penetration Test for soils
Standard Penetration Test for soilsStandard Penetration Test for soils
Standard Penetration Test for soils
Amardeep Singh
 
Laboratory Vane Shear Test
Laboratory Vane Shear TestLaboratory Vane Shear Test
Laboratory Vane Shear Test
A K
 
Overview of foundation design for the burj dubai
Overview of foundation design for the burj dubaiOverview of foundation design for the burj dubai
Overview of foundation design for the burj dubai
Hamed Zarei
 
Modes of failure of retaining walls
Modes of failure of retaining wallsModes of failure of retaining walls
Modes of failure of retaining wallsRitesh Chinchawade
 
Proktor compaction
Proktor compactionProktor compaction
Proktor compaction
Natalie Ulza
 
Types of samplers used in soil sampling
Types of samplers used in soil samplingTypes of samplers used in soil sampling
Types of samplers used in soil samplingAna Debbarma
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for Bitumen
Shweta Sagar
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
Ghanashyam Prajapati
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Anne Allan
 
Sand replacement
Sand replacementSand replacement
Sand replacement
Natalie Ulza
 
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Make Mannan
 
Dynamic Pile Formulae
Dynamic Pile FormulaeDynamic Pile Formulae
Dynamic Pile Formulae
Kriti Singh
 
Sand Replacement Method
Sand Replacement MethodSand Replacement Method
Sand Replacement Method
MachenLink
 

What's hot (20)

Casting yard
Casting yardCasting yard
Casting yard
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
Type of caissons
Type of caissonsType of caissons
Type of caissons
 
PILE-CAP & Batching plant
PILE-CAP & Batching plantPILE-CAP & Batching plant
PILE-CAP & Batching plant
 
Unit vi-Plastic Analysis of beam Static & Kinematic methods
Unit vi-Plastic Analysis of beam Static & Kinematic methodsUnit vi-Plastic Analysis of beam Static & Kinematic methods
Unit vi-Plastic Analysis of beam Static & Kinematic methods
 
Penetration of bituminous materials
Penetration of bituminous materialsPenetration of bituminous materials
Penetration of bituminous materials
 
Standard Penetration Test for soils
Standard Penetration Test for soilsStandard Penetration Test for soils
Standard Penetration Test for soils
 
Laboratory Vane Shear Test
Laboratory Vane Shear TestLaboratory Vane Shear Test
Laboratory Vane Shear Test
 
Overview of foundation design for the burj dubai
Overview of foundation design for the burj dubaiOverview of foundation design for the burj dubai
Overview of foundation design for the burj dubai
 
Modes of failure of retaining walls
Modes of failure of retaining wallsModes of failure of retaining walls
Modes of failure of retaining walls
 
Proktor compaction
Proktor compactionProktor compaction
Proktor compaction
 
Types of samplers used in soil sampling
Types of samplers used in soil samplingTypes of samplers used in soil sampling
Types of samplers used in soil sampling
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for Bitumen
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2
 
Sand replacement
Sand replacementSand replacement
Sand replacement
 
Siteinvestigation
SiteinvestigationSiteinvestigation
Siteinvestigation
 
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
 
Dynamic Pile Formulae
Dynamic Pile FormulaeDynamic Pile Formulae
Dynamic Pile Formulae
 
Sand Replacement Method
Sand Replacement MethodSand Replacement Method
Sand Replacement Method
 

Similar to Weighbridge Formats Specification

Climbforce Profile 2018 Rev2
Climbforce Profile 2018 Rev2 Climbforce Profile 2018 Rev2
Climbforce Profile 2018 Rev2
Climbforce FZC
 
Service core
Service coreService core
Service core
aduiti
 
Weigbridge Manufacturers
Weigbridge ManufacturersWeigbridge Manufacturers
Weigbridge Manufacturers
TechnoweighIndia2
 
APOEM PLANT LAUNCH
APOEM PLANT LAUNCHAPOEM PLANT LAUNCH
APOEM PLANT LAUNCH
VijayEngineeringandM1
 
Demag-Jib-Cranes
Demag-Jib-CranesDemag-Jib-Cranes
Demag-Jib-Cranes
YOOSHIN3
 
Tcmall fg25 t3l
Tcmall fg25 t3lTcmall fg25 t3l
Tcmall fg25 t3l
SAMCO VINA
 
Gamma industries
Gamma industries Gamma industries
Gamma industries
GAMMA INDUSTRIES
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
VijayEngineeringandM1
 
OMS Vibro Hammer
OMS Vibro HammerOMS Vibro Hammer
Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures
Fred Teichman
 
Kalsi industries Road construction machinery
Kalsi industries Road construction machineryKalsi industries Road construction machinery
Kalsi industries Road construction machinery
Kalsi Industries
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
Akhilesh Kumar
 
Catlogue
CatlogueCatlogue
Catlogue
Maxpromotion
 
ATECO GENERAL CATALOGUE JP
ATECO GENERAL CATALOGUE JPATECO GENERAL CATALOGUE JP
ATECO GENERAL CATALOGUE JPpjulio2000
 
D wall construction
D wall constructionD wall construction
D wall construction
anuragrikku
 
Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.
VijayEngineeringandM1
 
Authorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment MenufacturerAuthorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment Menufacturer
VijayEngineeringandM1
 
Agilia horizontal datasheet_final_2012_lo_res
Agilia horizontal datasheet_final_2012_lo_resAgilia horizontal datasheet_final_2012_lo_res
Agilia horizontal datasheet_final_2012_lo_resgunalan7
 
The Sinus Slide joint as final solution - Kaushal Parikh
The Sinus Slide joint as final solution - Kaushal ParikhThe Sinus Slide joint as final solution - Kaushal Parikh
The Sinus Slide joint as final solution - Kaushal Parikh
ELSCC
 

Similar to Weighbridge Formats Specification (20)

Climbforce Profile 2018 Rev2
Climbforce Profile 2018 Rev2 Climbforce Profile 2018 Rev2
Climbforce Profile 2018 Rev2
 
Service core
Service coreService core
Service core
 
Weigbridge Manufacturers
Weigbridge ManufacturersWeigbridge Manufacturers
Weigbridge Manufacturers
 
APOEM PLANT LAUNCH
APOEM PLANT LAUNCHAPOEM PLANT LAUNCH
APOEM PLANT LAUNCH
 
Demag-Jib-Cranes
Demag-Jib-CranesDemag-Jib-Cranes
Demag-Jib-Cranes
 
Plastech Titan
Plastech TitanPlastech Titan
Plastech Titan
 
Tcmall fg25 t3l
Tcmall fg25 t3lTcmall fg25 t3l
Tcmall fg25 t3l
 
Gamma industries
Gamma industries Gamma industries
Gamma industries
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
 
OMS Vibro Hammer
OMS Vibro HammerOMS Vibro Hammer
OMS Vibro Hammer
 
Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures Part 1 Monopole Tower Structures
Part 1 Monopole Tower Structures
 
Kalsi industries Road construction machinery
Kalsi industries Road construction machineryKalsi industries Road construction machinery
Kalsi industries Road construction machinery
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
 
Catlogue
CatlogueCatlogue
Catlogue
 
ATECO GENERAL CATALOGUE JP
ATECO GENERAL CATALOGUE JPATECO GENERAL CATALOGUE JP
ATECO GENERAL CATALOGUE JP
 
D wall construction
D wall constructionD wall construction
D wall construction
 
Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.
 
Authorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment MenufacturerAuthorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment Menufacturer
 
Agilia horizontal datasheet_final_2012_lo_res
Agilia horizontal datasheet_final_2012_lo_resAgilia horizontal datasheet_final_2012_lo_res
Agilia horizontal datasheet_final_2012_lo_res
 
The Sinus Slide joint as final solution - Kaushal Parikh
The Sinus Slide joint as final solution - Kaushal ParikhThe Sinus Slide joint as final solution - Kaushal Parikh
The Sinus Slide joint as final solution - Kaushal Parikh
 

Recently uploaded

Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 

Recently uploaded (20)

Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 

Weighbridge Formats Specification

  • 1. TABLE OF CONTENTS PAGE WEIGHBRIDGE TERMINOLOGY.................................................................2 ABOVE GROUND WEIGHBRIDGE CONSIDERATIONS.............................3 SEMI-PIT WEIGHBRIDGE CONSIDERATIONS...........................................4 CUSTOM SEMI-PIT WEIGHBRIDGE CONSIDERATIONS..........................5 CUSTOM SEMI-PIT VARIATION...................................................................6 FULLY INGROUND WEIGHBRIDGE CONSIDERATIONS...........................7 MULTIPLE-DECK WEIGHBRIDGE CONSIDERATIONS..............................8 PORTABLE WEIGHBRIDGE CONSIDERATIONS.......................................9 ADVANTAGES AND DISADVANTAGES......................................................11 WEIGHBRIDGE ALTERNATIVES................................................................15 Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 1 Revision: 04-2013 ACN 004 659 358 Unit 2/9 Production Drive, Campbellfield, Vic, 3061 Phone: (03) 9357 7470 Facsimile: (03) 9357 7450 precision@ultrahawke.com.au www.ultrahawke.com.au
  • 2. Approach and End Wall Approach and End Wall Ramp Deck Surface Deck Surface Side Wall Main Beams Main Beams E - Deck or Platform - Module - Bay - Main Beam - Cross Beam, Piece, or Section - Cross Channel, Piece, or Section F G H I J K ABOVE GROUND WEIGHBRIDGE EXAMPLE WEIGHBRIDGE TERMINOLOGY AND LEGISLATIVE REQUIREMENTS SEMI-PIT WEIGHBRIDGE EXAMPLE Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 2 Revision: 04-2013 There are legal requirements for trade weighbridges that are usually catered for during the installation staged of the weighbridge. However, you should be aware of these requirements when planning a weighbridge site, as well as preventing future modifications to an installation that may nullify these requirements. • The approaches must be level and in good condition (not pitted or rutted). • The first 3m (for a weighbridge less than 18m long) or first 1m (for a weighbridge 18m or longer) of each approach must be constructed of concrete. • The foundation must be free from a build up of water and debris. • The digital weigh indicator must be 6m or less from the weighbridge deck. [Therefore, do not relocate the indicator further than 6m unless an application for exemption is made to the Trade Measurement Authority and accepted]. • If a fully inground weighbridge, all sumps must be fully functional. • If a portable weighbridge, the ground beneath the deck must be treated to prevent growth of foliage. • If an above ground weighbridge, there must be a 1m clear space along both sides of the weighbridge deck. The clearance must be of the same level as the foundation floor or lower, but never higher. [Therefore, never install structures within the 1m clear space unless an application for exemption is made to the Trade Meas- urement Authority and accepted]. Any enquiries, ofcourse, can be made to the appropriate Trade Measurement Authority, or to UltraHawke Pty Ltd. Enquiries are welcomed by both organisations.
  • 3. Site Determined Typ Slope 1:10 Ground Level Deck Level 1m1m Minimum Minimum Minimum 1m Be Careful of Overhang ite Determined Typ Slope 1:10 Ground Level Deck Level 1m1m Minimum Minimum Minimum 1m Be Careful of Overhang Site Determined Typ Slope 1:10 Ground Level Deck Level Minimum 1m Be Careful of Overhang Site Determined Typ Slope 1:10 Ground Deck Level 1m1m Minimum Minimum Minimum 1m Be Careful of Overhang Represents Ground Level ISOMETRIC VIEW Above Ground Weighbridge CROSS-SECTIONAL VIEW When planning for an above-ground weighbridge, always include ramps and 1m “clear-spaces” along both sides of the weighbridge deck, as shown below. This clear-space must be a minimum of 1m wide and must be of the same plane as the foundation floor or lower. If either clear-space includes bare ground, treat the ground to prevent growth of foliage within the clear-space. Assuming the approach ramps are a 1:10 incline, and the site is level from end to end, each ramp will be a minimum of 5m long. Add to this any vehicle’s turning circle requirements before and after each ramp, if any, and you will soon realise that above ground weighbridges claim the most surface area of a site than would any other type of weighbridge. The location of the weighbridge office or hut should also be considered. If it is to be located close to the weighbridge, it may need to be constructed on stumps. In this case, be careful of the office overhanging the bridge. Keep supports for the office atleast 0.5m away from any nearby loadcell locations. Also ensure loadcells can be easily accessed by service personnel, if ever required. ABOVE GROUND WEIGHBRIDGE INSTALLATION CONSIDERATIONS TYPE A FRONT VIEW TOP VIEW OPTION A Office Constructed on Stumps OPTION B Office Constructed Away from the Deck Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 3 Revision: 04-2013
  • 4. 200mm200mm Min.1mMin.1m Deck and Ground Level Typical Ground Level 200mm200mm Min.1mMin.1m Deck and Ground Level Typical Ground Level Semi-pit weighbridges have side walls that act as retaining walls. They may be block-filled walls or poured concrete walls and are located atleast 1m from the side of the deck. Note that additional reinforcement may be required in the side walls if you intend to allow vehicular traffic to travel adjacent to the side walls. Since the deck is at ground level, no ramps are required. This may be important where a site is limited with available space for a weighbridge. Drainage is also another important consideration. Either a sump or drainage pipe must be installed, and must be located where most effective and appropriate for the site. Health and safety requirements also tend to require mesh walkways to be installed along side the deck at either deck level or at beam height level to maximise safety for vehicle drivers and site personnel. The walkway may extend the full length of the deck or just part of it. In this instance, keep supports for the walkway atleast 0.5m away from any nearby loadcell locations. Also ensure loadcells can be easily accessed by service personnel, if ever required. If a walkway extends the full length of the deck, some walkway mesh panels will need to be made removable to allow service personnel to access loadcells. SEMI-PIT WEIGHBRIDGE INSTALLATION CONSIDERATIONS TYPE B TOP VIEW FRONT VIEW CROSS-SECTIONAL VIEW 200mm200mm Min.1mMin.1m Deck and Ground Level Typical Ground Level ISOMETRIC VIEW Semi-Pit Weighbridge Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 4 Revision: 04-2013
  • 5. 200mm200mm Min.1m50mm Deck and Gro Typical Ground CUSTOM SEMI-PIT WEIGHBRIDGE INSTALLATION CONSIDERATIONS TYPE C1 200mm200mm Min.1m50mm Deck and Ground Level Typical Ground Level 200mm200mm Min.1m50mm Deck and Ground Level Typical Ground Level 200mm200mm Min.1m50mm Deck and Ground Level Typical Ground LevelISOMETRIC VIEW Custom Semi-Pit Weighbridge Access Holes Constructed as Part of Weighbridge Deck ISOMETRIC VIEW Custom Semi-Pit Weighbridge Access Holes Constructed as Part of Weighbridge Foundation CROSS-SECTIONAL VIEW The custom semi-pit weighbridge is an adaption of the typical semi-pit weighbridge design. The design is modified to accommodate site limitations, for example, width limitations, building arrangements, etc. One or both of the side walls’ width is decreased. In this circumstance, access to some loadcells is reduced or altogether prevented. Access holes must then be installed adjacent to each obscured loadcell location, either in the deck or as part of the side wall, to facilitate servicing and maintenance to those loadcells (see the corresponding isometric drawing at the end of this Weighbridge Format Specification). If access holes are installed as part of the side wall, and vehicular traffic is expected to use this area, then the access hole covers must be correctly designed and constructed to take the expected loadings of vehicles. The side walls will also require additional reinforcing. As with the standard semi-pit weighbridge, drainage must also be considered. FRONT VIEW TOP VIEW Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 5 Revision: 04-2013
  • 6. CUSTOM SEMI-PIT WEIGHBRIDGE INSTALLATION CONSIDERATIONS TYPE C2 Deck and Ground Level Access Cover Adjacent to Loadcell Area Typical Ground Level 50mm 50mm 200mm200mm Deck and Ground Level Access Cover Adjacent to Loadcell Area Typical Ground Level 50mm 50mm 200mm200mm FRONT VIEW TOP VIEW This design is similar to Type C1. All considerations for Type C1 apply to this design. Access holes must be provided both sides of the deck. CROSS-SECTIONAL VIEW Deck and Ground Level Access Cover Adjacent to Loadcell Area Typical Ground Level 50mm 50mm 200mm200mm ISOMETRIC VIEW Custom Semi-Pit Weighbridge Access Holes Constructed as Part of Weighbridge Deck Access Holes are Both Sides of the Deck Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 6 Revision: 04-2013
  • 7. CUSTOM SEMI-PIT WEIGHBRIDGE INSTALLATION CONSIDERATIONS TYPE C3 Full Width Access Cover Adjacent to Loadcell Areas 200mm200mm 0.8m Approx 25mm 25mm Deck and Ground Level Typical Ground Level Kerb May be Required to Comply with Trade Measurement Regulations Full Width Access Cover Adjacent to Loadcell Areas 200mm200mm 0.8m Approx 25mm 25mm Deck and Ground Level Typical Ground Level Kerb May be Required to Comply with Trade Measurement Regulations FRONT VIEW TOP VIEW This design is similar to Type C2. All considerations for Type C1 and Type C2 apply to this design. Access holes must be provided both sides of the deck. This design differs to Type C2 in that the top of the deck is completely flush with the typical ground level. This design also differs to Type D in that the depth of the pit is not as deep. This design may therefore be suitable for some sites that require a fully inground weighbridge, but wish to reduce or eliminate the risks involved with a confined space. As an alternative to a single access cover for each loadcell area, one full-width access cover may be used for each loadcell area pair (loadcell areas on opposite sides of the deck to each other), as shown in the Top View above. The benefit of this is that a single access cover can removed to allow access to two loadcells. CROSS-SECTIONAL VIEW Full Width Access Cover Adjacent to Loadcell Areas 200mm200mm 0.8m Approx 25mm 25mm Deck and Ground Level Typical Ground Level Kerb May be Required to Comply with Trade Measurement Regulations ISOMETRIC VIEW Custom Semi-Pit Weighbridge Access Holes Constructed as Part of Weighbridge Deck Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 7 Revision: 04-2013
  • 8. 1.2m Approximately 25mm 25mm 200mm200mm 1.2m roximately 25mm 25mm Deck and Ground Level Typical Ground Level Typical Ground Level Kerb May be Required to Comply with Trade Measurement Regulations Kerb May be Required to Comply with Trade Measurement Regulations Pillar 1.2m Approximately 25mm 25mm 200mm200mm 1.2m Approximately 25mm 25mm Deck and Ground Level Typical Ground Level Typical Ground Level Kerb May be Required to Comply with Trade Measurement Regulations Kerb May be Required to Comply with Trade Measurement Regulations Pillar Pillar FRONT VIEW TOP VIEW Fully inground weighbridges provide a completely level weighing surface with the surrounding ground level. Access to the loadcells must be made either by including access holes in the deck or to the side of the deck as part of the foundation design. Since vehicular traffic often travels adjacent to the deck, the access hole covers are designed and constructed to take the expected vehicle loadings. Drainage must be considered, either as a sump or as a drainage pipe, and must be located where most effective and appropriate for the site. Fully inground weighbridges claim the least surface area of a site than any other weighbridge type. However, they are the most expensive weighbridge type to construct due to the extensive excavation work required and slightly more concrete and reinforcing required. Health and safety often defines the inground weighbridge pit as a confined space. As such, personnel cannot enter the pit to service the weighbridge without special confined space entry training and equipment (including a gas detector and harnesses). Service personnel are therefore typically charged out as a higher hourly rate. A minimum of two service personnel is required with one acting as a safety look-out for those entering the confined space. CROSS-SECTIONAL VIEW FULLY INGROUND WEIGHBRIDGE INSTALLATION CONSIDERATIONS TYPE D 1.2m Approximately 25mm 25mm 200mm200mm 1.2m Approximately 25mm 25mm Deck and Ground Level Typical Ground Level Typical Ground Level Kerb May be Required to Comply with Trade Measurement Regulations Kerb May be Required to Comply with Trade Measurement Regulations Pillar Pillar 1.2m Approximately 25mm 25mm 200mm200mm ately 25mm 25mm Deck and Ground Level Typical Ground Level Typical Ground Level Kerb May be Required to Comply with Trade Measurement Regulations Kerb May be Required to Comply with Trade Measurement Regulations Pillar ISOMETRIC VIEW Fully Inground Weighbridge Access Holes Constructed as Part of Weighbridge Deck ISOMETRIC VIEW Fully Inground Weighbridge Access Holes to Constructed as Part of Side Wall Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 8 Revision: 04-2013
  • 9. Mid Deck Restraining Bolts (Both Sides of Deck) Deck 1 Deck 2 Deck 3 Deck 4 Deck 1 Deck 2 Deck 3 Deck 4 Ground LevelDeck Level Mid Deck Restraining Bolts (Both Sides of Deck) Deck 1 Deck 2 Deck 3 Deck 4 Deck 1 Deck 2 Deck 3 Deck 4 Ground LeveDeck Level MULTIPLE DECK WEIGHBRIDGE INSTALLATION CONSIDERATIONS TYPE E FRONT VIEW TOP VIEW Multiple deck weighbridges are really a variation of a design, rather than another weighbridge type. For example, multiple deck weighbridges may be an above ground, a semi-pit, or a fully inground design. The number and length of the decks vary according to your requirements. Decks need not be of the same length. The advantage of multiple deck weighbridges is that individual axles, or axle groups, are weighed individually and simultaneously. This is ideal for weighbridges that will be used to record axle breakdown weights as its primary function. Considerations for the corresponding weighbridge type (above ground, semi-pit, and fully inground) still apply. Mid deck restraining assemblies are typically installed between decks to limit deck movement. A digital weigh indicator is provided for each deck and a summing unit is provided to sum the weight of all decks and display the total weight. These are typically mounted in a single enclosure. ISOMETRIC VIEW Multiple Deck Weighbridge (Above Example is a Four-Deck, Above Ground Weighbridge) EXAMPLE SUMMING ENCLOSURE Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 9 Revision: 04-2013
  • 10. Concrete Load Pad Typical Ground Level End Wall is Part of Removable Frame Removable Frame - Assembles to Form a Rigid Support Base for the Loadcells and Weighbridge Deck Earth Ramp Concrete Load Pad Typical Ground Level End Wall is Part of Removable Frame Removable Frame - Assembles to Form a Rigid Support Base for the Loadcells and Weighbridge Deck Earth Ramp RELOCATABLE WEIGHBRIDGE INSTALLATION CONSIDERATIONS TYPE F Portable weighbridges are typically a variation of the above ground weighbridge design. Rather than a complete concrete foundation being constructed, rectangular concrete slabs are constructed at load bearing locations only (loadcell areas only). A removable frame is assembled from components, forming a rigid support base for the loadcells and deck. The deck may be a fully steel design (to make it lighter for relocating) or the typical concrete/steel deck, making it lighter and easier to transport than a concrete/steel deck. Earth ramps are constructed to access the deck. Loadcells can be fitted with connectors (prior to supply) to assist assembly and disassembly. The digital indicator can be mounted in an enclosure that bolts to the side of the deck. Considerations for an above ground weighbridge apply to a portable weighbridge. Once assembled, the ground beneath the deck (between load bearing concrete pads) should be treated to prevent growth of foliage. If the weighbridge is required to be used for trade purposes, concrete end walls will need to be constructed. ISOMETRIC VIEW Portable Weighbridge (Above Example is an Above Ground Weighbridge) ISOMETRIC VIEW Portable Weighbridge Support Frame Only (Deck Removed for Clarity of Detail) Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 10 Revision: 04-2013
  • 11. ADVANTAGES AND DISADVANTAGES TYPE ADVANTAGES DISADVANTAGES TYPE A Above- Ground Weighbridge Least expensive weighbridge option Least site preparation required before construction Most common type of weighbridge supplied Requires the largest site footprint of all the options TYPE ADVANTAGES DISADVANTAGES TYPE B Standard Semi-Pit Weighbridge Second least expensive weighbridge option Common type of weighbridge supplied Smaller site footprint required than the above ground weighbridge option Some excavation required before construction Requires drainage considerations Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 11 Revision: 04-2013
  • 12. TYPE ADVANTAGES DISADVANTAGES TYPE C1 Single Clear-Space Semi-Pit Weighbridge Ideal for sites with a weighbridge bypass road adjacent to one side of the weighbridge Ideal for sites with an office or building adjacent to one side of the weighbridge Smaller site footprint required than the semi-pit weighbridge option Some excavation required before construction Requires access holes (typically in the deck) to access the loadcells for servicing purposes Access holes make this option slightly more expensive than the semi-pit weighbridge option Trade Measurement Authority exemption in writing required Requires drainage considerations TYPE ADVANTAGES DISADVANTAGES TYPE C2 No Clear- Space Semi- Pit Weighbridge Ideal for sites with two weighbridge bypass roads adjacent to both sides of the weighbridge Ideal for sites with offices or buildings adjacent to both sides of the weighbridge Smaller site footprint required than the semi-pit weighbridge option Some excavation required before construction Requires access holes (typically in the deck) to access the loadcells for servicing purposes Access holes make this option more expensive than the semi-pit weighbridge option Trade Measurement Authority exemption in writing required Requires drainage considerations Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 12 Revision: 04-2013
  • 13. TYPE ADVANTAGES DISADVANTAGES TYPE C3 No Clear- Space Semi- Pit Weighbridge Ideal for sites with two weighbridge bypass roads adjacent to both sides of the weighbridge Ideal for sites with offices or buildings adjacent to both sides of the weighbridge Smaller site footprint required than the semi-pit weighbridge option Some excavation required before construction Requires access holes (typically in the deck) to access the loadcells for servicing purposes Access holes make this option more expensive than the semi-pit weighbridge option Trade Measurement Authority exemption in writing required Requires drainage considerations TYPE ADVANTAGES DISADVANTAGES TYPE D Fully Inground Weighbridge Requires the smallest site footprint of all the options Ideal for sites with extreme space restrictions Ideal for sites with shared weighing and traffic areas Ideal for sites where vehicles are weighed during loading by forklifts Most expensive weighbridge option due to extensive excavation work required Most preparation required before construction Requires drainage considerations Confined space to access the loadcells requiring special training for service personnel (typically charged as a higher hourly rate) Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 13 Revision: 04-2013
  • 14. TYPE ADVANTAGES DISADVANTAGES TYPE E Multi-Deck Weighbridge Weigh individual axles or axle groups to maximise vehicle loading and minimise legal axle overloading for road transport More expensive than a single deck option TYPE ADVANTAGES DISADVANTAGES TYPE F Portable Weighbridge Inexpensive weighbridge option Ideal for non-trade operation Ideal for temporary sites (six months to two years) Sites operating longer than two years should consider a permanent installation Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 14 Revision: 04-2013
  • 15. 9m DECK 1 DECK 2 8.4m End Load Pad Centre Load Pad Deck or Platform Sub-Frame Pneumatically- Operated Gate (Optional) Manually- Operated Gate (Standard) Earth Ramp Typical Ground Level All Frames Are Completely Collapsable (Including Sub-Frame, Cage, and Gates) for Easy Relocation and Transport WEIGHBRIDGE ALTERNATIVES ISOMETRIC VIEW Heavy Vehicle Weighbridge Example ISOMETRIC VIEW Cattle Weighbridge Example Rail Weighbridge Example Wheel Weigher Example In-Motion Weighbridge Example Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 15 Revision: 04-2013 UltraHawke Pty Ltd also manufactures and supplies heavy vehicle weighbridges (ideal for mine sites), cattle weighbridges, rail weighbridges, in-motion weighbridges, axle weighbridges and wheel weighers.
  • 16. WHEEL WEIGHERS IN-MOTION WEIGHBRIDGES AXLE WEIGHERSEND LOADERS AND FORKLIFTS A number of onboard vehicle weighing systems is also available. Though not as accurate as full-length weighbridges, they do produce an accurate approximation of vehicle loads. WASTE COLLECTION VEHICLES CRANES AND HIABSAIR-SUSPENSIONED VEHICLES RIGID VEHICLES AND TIPPERS SKELETAL TRAILERS SKIP BIN VEHICLES HOOK TRUCKS VANS AND LIGHT COMMERCIAL Copyright© - Intellectual Property of UltraHawke Pty Ltd Page 16 Revision: 04-2013 UltraHawke Pty Ltd can also perform weighbridge calibration visits with its Weighbridge Test Rig Unit, as well as perform regular preventative maintenance visits.